第 325 页 / 共 531 页
LO150 Lesson: Shipping: Stock Shortage
Solution 21: Shipping: Stock Shortage
Task 1 Identify the customer delivery agreement in the
sales order
1. DisplaythesalesorderforcustomerP.O.7–411–##anddetermineif
thecustomerwillallowyoutopartiallydeliverythisorder.
Whattypeofdeliveryagreementcanbeviewedintheheaderofthe
sales order?
Hint: Lookintheheadershippingdetails.
→ → → →
Logistics Salesanddistribution Sales Order Display
a) Search for P.O. with F4
b) ChooseDisplaydoc. headerdetails,thentheShippingtab.
c) TheCompletedlv. fieldisnotselected. Thismeansthatlineitem
quantitiescouldbedeliveredinpartialamounts.
2. From what master data record was the complete delivery indicator
proposed?
a) TheindicatorforCompletedeliveryintheorderheaderisproposed
fromthecustomermaster: SalesAreaData,Shippingview.
3. Isitpossibletodistributepartialquantitiesacrossseveraldeliveries,
ifthefieldCompletedeliveryisnotmarkedintheorderheader?
a) Yes. Itemscouldbesplitupintoseparatedeliveries. However,
anindicatorcouldbesetattheitemlevelwhichwoulddisallow
partial deliveries.
4. What agreements referring to partial deliveries exist foritem 10of
the order?
Hint: Checktheshippingdetailsattheitemlevel.
a) SelecttheItem,thenchoosetheItemDetailsIcon,shippingtab.
b) None exist. Partial deliveries allowed is entered in the
Part.deliv./Itemfieldforitem10ontheShippingpage. Thismeans
that partial deliveries are allowed.
Continued on next page
317
December2001 © 2002 SAP AG. All rights reserved.
第 326 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
5. FromwhatmasterdatarecordisthePart.deliv./itemfieldproposed?
a) TheproposalforthePart.deliv./itemfieldintheorderitemcomes
fromthe customermaster. Ifacustomer-materialinformation
record existed for the customer and the material, and the
proposal here is different than the customer master, then
customerinformationrecorddeliveryagreementhaspriority.
6. SwitchthetransactionfromOrderDisplaytoOrderChange.
a) Fromwithintheorder, gotothemainmenuandchooseOrder
→
change.
7. Setthedeliveryindicatorin the line itemto allowonly a complete
delivery (indicator-C).
a) Selectthelineitem. ChooseItemdetailsfrom thelowerpartof
yourscreen. SelecttheShippingtab. Setthecompleteindicator
for the Item.
8. Save the order.
Task 2 Create a delivery with a stock shortage
Testthesystem’sabilitytorecognizedeliveryagreementsinthesalesorder
during shipping processing.
1. Create the outbound delivery for customer P.O. 7-411–##. Set the
selectiondate20daysintothefuture. Useshippingpoint1400.
→ → →
a) Logistics Salesanddistribution Shippingandtransportation
→ → →
OutboundDelivery Create SingleDocument WithReference
to Sales Order.
2. In thedeliverydocument, change the deliveryquantityto10units
fromthe25unitsthatarescheduledtodeliver.
a) ChangethequantityintheDeliveryquantityfieldatthelineitem
level.
3. Does R/3notice the change of quantity?
a) Youwillreceiveawarninginthestatusbarnotingthecustomer
delivery agreement.
4. Save the delivery with the short delivery quantity. Record the
delivery number.
Hint: Thisisasoftwarning,continuetohitEntertosave.
Continued on next page
318
©2002SAPAG.Allrightsreserved. December2001
第 327 页 / 共 531 页
LO150 Lesson: Shipping: Stock Shortage
Task 3 Create a transfer order for a delivery with stock
shortages
Pick the delivery that now has shortages.
1. Createatransferorderforthedelivery. Selectwarehousenumber014.
→ → →
a) Logistics SalesandDistribution ShippingandTransportation
→ →
Picking CreateTransferOrder SingleDocument.
2. Whatisthepickquantityinthetransferorder?
a) Thepickingquantityofthedelivery is10.
3. Savethetransferorderandrecordthedocumentnumber.
a) Thedocumentnumberisassignedbythesystem.
Task 4 Post goods issue a delivery with stock
shortages
Postthegoodsissueforthedeliverythatwaspickedshort.
1. Post goodsissue fortheoutbound delivery.
→ → →
a) Logistics Salesanddistribution ShippingandTransportation
→ →
Outbounddelivery Change Singledocument.
b) Choose Post Goods Issue.
2. Checkthe documentflowforthe salesorder.
→ → →
a) Logistics Salesanddistribution SalesOrder Change.
→
b) Choose Environment Document Flow.
3. What is statusof the orderand delivery?
a) Being Processed
4. DisplaytheStatusOverviewofthesalesdocument
.
a) Select Status Overview.
5. Whatisthestatusofdeliverystatusofthelineitem?
a) Partially Delivered
319
December2001 © 2002 SAP AG. All rights reserved.
第 328 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Lesson Summary
You should now be able to:
• Processdeliverieswithpartialdeliveryquantities
320
©2002SAPAG.Allrightsreserved. December2001
第 329 页 / 共 531 页
LO150 Lesson: Billing Process: Stock Shortage
Lesson: Billing Process: Stock Shortage
Lesson Overview
Thislessonwillcoverhowthebillingdocumentisprocessedintheevent
thatadeliveryisshippedwithinsufficientstocktocoverthesalesorder
requirement.
Lesson Objectives
Aftercompleting this lesson, youwillbeable to:
• Createaninvoiceforadeliverythatisshorttherequiredquantities
specified by the order item
Business Example
Whileprocessingyourdelivery,aninsufficientamountofstockwasfound
tocovertherequirementofyourcustomer’ssalesorder. Thecustomerwas
made aware of the situation, and instructed you to shipas much of the
materialaspossibleandtobillthemfortheamountthatwasdelivered.
Billing Partial Deliveries
Figure 104: Billing Items That Are Short Stock in the Delivery
WhenabillingdocumentiscreatedinSales and Distribution, reference
ismadetoasourcedocument. Dependingonthematerialandthesales
documentlineitemcategory,eitherthesalesorderorthedeliverywillbe
the referenced document for the item.
In the case of items that are delivered, the delivery is normally the
referencedocument. Inthecaseofaserviceitem,theorderisusuallythe
referencing document.
321
December2001 © 2002 SAP AG. All rights reserved.
第 330 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Whenthereferenceismade,R/3willcontrolwhatinformationiscopied
from the source (referenced) document to the target (being created)
document,includingthebillingquantities. Inthecaseofadelivery-related
item,thequantitydeliveredwillbecopiedfromthedeliverytothebilling
document.
Ifashortageexistedinadeliveryandthedeliverywaspostgoodsissued
with the shortage, then only the quantity that was actually post goods
issued(delivered),willbecopiedontothebillingdocument.
Note: Itispossibletohaveamaterialthatisdelivered,havebilling
basedontheorderquantity,notthedeliveredquantity. Theseare
options controlled in Customizing.
322
©2002SAPAG.Allrightsreserved. December2001
第 331 页 / 共 531 页
LO150 Lesson: Billing Process: Stock Shortage
Exercise 22: Billing: Stock Shortage
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Createabillingdocumentinastockshortagescenario
• Explainhowthebillingquantityisdetermined
Business Example
Whileprocessingyourdelivery,aninsufficientamountofstockwasfound
tocovertherequirementofyourcustomer’sdelivery. Thecustomerwas
made aware of the situation, and instructed you to shipas much of the
materialaspossibleandtobillthemfortheamountthatwasdelivered.
Task Invoice the Partial Delivery
Createabillingdocumentwithapartialdelivery.
1. Create a billing document for the delivery that was partially
delivered. (Reference P.O. 7–411–##)
2. What is the billing quantity?
Caution: __________
3. Wasthebillingitemdelivery-orbilling-related?
__________
4. Savethebillingdocumentandrecordthenumber.
_________________________
5. Display your billing document and check the status of your
documents in the Document Flow. What is the overall processing
statusofthesalesorder,thedeliveryandthebillingdocument?
6. Whyis the salesorderstillbeingprocessed?
_________________________
7. Recordthesalesordernumberinthedocumentflow.
_________________________
8. Returntothesalesorderandcompletetheopenitemsbyenteringa
rejection reason for the line Item.
Continued on next page
323
December2001 © 2002 SAP AG. All rights reserved.
第 332 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
9. SavetheorderandcheckitsOverallprocessingstatusinthedocument
flow.
_______________________________
→
Hint: AftersavingtheordergotoSalesDocument Display.
324
©2002SAPAG.Allrightsreserved. December2001
第 333 页 / 共 531 页
LO150 Lesson: Billing Process: Stock Shortage
Solution 22: Billing: Stock Shortage
Task Invoice the Partial Delivery
Createabillingdocumentwithapartialdelivery.
1. Create a billing document for the delivery that was partially
delivered. (Reference P.O. 7–411–##)
→ → →
a) Logistics Sales and distribution Billing Billing document
→
Create.
b) Choose Execute.
2. What is the billing quantity?
Caution: __________
a) 10
3. Wasthebillingitemdelivery-orbilling-related?
__________
a) Delivery-related
4. Savethebillingdocumentandrecordthenumber.
_________________________
a) Choose: save
5. Display your billing document and check the status of your
documents in the Document Flow. What is the overall processing
statusofthesalesorder,thedeliveryandthebillingdocument?
→ → →
a) Logistics Sales and distribution Billing Billing document
→ →
Display. ChooseEnvironment DocumentFlow.
Field Value
Sales Order Being Processed
Delivery Completed
Billing Document Completed
(invoice)
6. Whyis the salesorderstill beingprocessed?
Continued on next page
325
December2001 © 2002 SAP AG. All rights reserved.
| Field | Value |
|---|---|
| Sales Order | Being Processed |
| Delivery | Completed |
| Billing Document (invoice) | Completed |
第 334 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
_________________________
a) ThesalesorderOverallprocessingstatusisreflectingthepartial
order quantity that has yet to be delivered. According to the
customerdeliveryagreement,thecustomerwishedtohavethe
remainingopenquantitysentwhenitbecomesavailable.
7. Recordthesalesordernumberinthedocumentflow.
_________________________
→
a) Environment Document Flow.
8. Returntothesalesorderandcompletetheopenitemsbyenteringa
rejection reason for the line Item.
→ → → →
a) Logistics SalesandDistribution Sales Order Change
→ →
b) SelecttheopenitemsandchooseEdit FastChange Reason
For Rejection.
c) Enterthe reason: Delivery too late
9. SavetheorderandcheckitsOverallprocessingstatusinthedocument
flow.
_______________________________
→
Hint: AftersavingtheordergotoSalesDocument Display.
→
a) Environment Display Document Flow
b) Order status: Completed
326
©2002SAPAG.Allrightsreserved. December2001
第 335 页 / 共 531 页
LO150 Lesson: Billing Process: Stock Shortage
Lesson Summary
You should now be able to:
• Createaninvoiceforadeliverythatisshorttherequiredquantities
specified by the order item
327
December2001 © 2002 SAP AG. All rights reserved.
第 336 页 / 共 531 页
Unit Summary LO150
Unit Summary
You should now be able to:
• Processsalesorderswheninsufficientstockisavailabletomeetthe
order requirements
• Determinetherequirementsfortheavailabilitycheck
• Selectoptionsprovidedintheavailabilitycontrolscreen
• Setcustomerdeliveryagreementsinthesalesorder
• Identifythescopeofcheckusedinanavailabilitycheck
• Determinetherequirementspassedtomaterialsmanagement
• Determinethematerialavailabilitydateinthegivencasestudies
• Determineifasalesorderitemisabackorderitem
• Processdeliverieswithpartialdeliveryquantities
• Createaninvoiceforadeliverythatisshorttherequiredquantities
specified by the order item
328
©2002SAPAG.Allrightsreserved. December2001
第 337 页 / 共 531 页
LO150 Test Your Knowledge
Test Your Knowledge
1. Can the availability check be carried out in a plant other than the
default delivering plant proposal?
2. Howisthedeliveringplantdeterminedduringorderprocessing?
3. Whyisthecompletionofdeliveryschedulingaprerequisiteforthe
availability check in the sales order?
4. Whenisdeliveryschedulingcarriedoutaftertheavailabilitycheck?
5. Whyisthecompletionofdeliveryschedulingintheschedulelinea
prerequisitefortheavailabilitycheckinthesalesorder?
329
December2001 © 2002 SAP AG. All rights reserved.
第 338 页 / 共 531 页
TestYourKnowledge LO150
6. Ifasalesorderitemhasaschedulelinethatisconfirmedforadate
otherthanthecustomer’srequesteddeliverydate,isthatconfirmed
lineitemgoingtoshowasabackorderinR/3?
7. Whatarethetwooptionsforprocessingbackorders?
8. Whichfieldinthecustomermastercanbeusedasasortingcriteria
forrescheduling backorder processing?
9. Ifacustomerwasshippedapartialdeliveryandthenaskedforthe
remainingamounttobecancelled,howwouldyouupdatethesales
orderstatustoshowthatitisnowcomplete?
10. Deliveryagreementsinthesalesorderthatderivefrommasterdata
sourcescanbeoverriddenduringsalesorderprocessing.
Determinewhetherthisstatementistrueorfalse.
True
False
11. Whilepostinggoodsissueforadeliverywithshortages,youwillbe
warned if anycustomeragreements exist.
Determinewhetherthisstatementistrueorfalse.
True
False
330
©2002SAPAG.Allrightsreserved. December2001
第 339 页 / 共 531 页
LO150 Test Your Knowledge
12. Howdoesthebillingdocumentknowiftheorderorifthedelivery
quantity should be billed for an item?
13. Explain the difference between order-related and delivery-related
items and how billing is affected.
331
December2001 © 2002 SAP AG. All rights reserved.
第 340 页 / 共 531 页
TestYourKnowledge LO150
Answers
1. Can the availability check be carried out in a plant other than the
default delivering plant proposal?
Answer: Yes. You have the option of overwriting the proposal
manually in the customer sales order. As part of the availability
check, you also have the option of checking and copying another
delivering plant into the order.
2. Howisthedeliveringplantdeterminedduringorderprocessing?
Answer: Duringorderentry,theplantisproposedbycheckingthe
master data in the following sequence:
1. Customer-material info
2. Customer master
3. Material master
3. Whyisthecompletionofdeliveryschedulingaprerequisiteforthe
availability check in the sales order?
Answer: Theavailabilitycheckisbasedonthematerialavailability
datewhichisdeterminedbythedeliveryschedule.
4. Whenisdeliveryschedulingcarriedoutaftertheavailabilitycheck?
Answer: Iftheitemcouldnotbeconfirmedfortherequireddelivery
date, then the system carries out forward scheduling after the
availabilitycheckdeterminesthematerialsavailabilitydate.
5. Whyisthecompletionofdeliveryschedulingintheschedulelinea
prerequisitefortheavailabilitycheckinthesalesorder?
Answer: The material availability date is determined by delivery
scheduling,andthisisthedateofthematerialrequirement.
332
©2002SAPAG.Allrightsreserved. December2001
第 341 页 / 共 531 页
LO150 Test Your Knowledge
6. Ifasalesorderitemhasaschedulelinethatisconfirmedforadate
otherthanthecustomer’srequesteddeliverydate,isthatconfirmed
lineitemgoingtoshowasabackorderinR/3?
Answer: Aniteminasalesorderappearsonabackorderlistifthe
itemquantitydoesnothavecompletelyconfirmedscheduleline. An
iteminasalesorderwillalsobeonabackorderlistiftheconfirmed
deliverydateislaterthanthecustomer’srequesteddeliverydate. In
both cases, R/3 would look for an improved material availability
dateduringbackorderprocessing so thatthecustomer’srequested
deliverydateismet,orisclosertobeingmet.
7. Whatarethetwooptionsforprocessingbackorders?
Answer:
• Rescheduling(automaticbackorderprocessing)
• Manual backorder processing
8. Whichfieldinthecustomermastercanbeusedasasortingcriteria
forrescheduling backorderprocessing?
Answer: TheDeliveryPriorityIndicatorfield,foundintheSalesArea
Data, shipping view.
9. Ifacustomerwasshippedapartialdeliveryandthenaskedforthe
remainingamounttobecancelled,howwouldyouupdatethesales
orderstatustoshowthatitisnow complete?
Answer: Updatethesalesorderstatusby changingthequantityin
thesalesordertomatchthepartialdeliveredquantity.
You could also reject the remaining amount of open quantity on
thesalesorderlineitem, whichwould alsoshowacompleteorder
processing status.
10. Deliveryagreementsinthesalesorderthatderivefrommasterdata
sourcescanbeoverriddenduringsalesorderprocessing.
Answer: True
Youcanmanuallychangeacustomerdeliveryagreement,aswellas
add an agreement for an order.
333
December2001 © 2002 SAP AG. All rights reserved.
第 342 页 / 共 531 页
TestYourKnowledge LO150
11. Whilepostinggoodsissueforadeliverywithshortages,youwillbe
warned if anycustomeragreements exist.
Answer: True
R/3 will post a status warning alerting you to any delivery
agreements if you are violating one.
12. Howdoesthebillingdocumentknowiftheorderorifthedelivery
quantity should be billed for an item?
Answer: Controlsinthesalesdocumentitemcategorylevelidentify
this for each item.
13. Explain the difference between order-related and delivery-related
items and how billing is affected.
Answer: During order processing, the items entered into the sales
orderarecontrolled forthis through configuration of the line item
category.
Itemsthatareorder-relatedwillshowuponabillingdocumentasa
direct reference from the sales order.
Items that are delivery-related will be referenced onto a billing
documentwithinformation,suchasthequantitytobebilled,taken
from the delivery.
334
©2002SAPAG.Allrightsreserved. December2001
第 343 页 / 共 531 页
Unit 7
Sales and Distribution: Make-to-Order
Unit Overview
ThisunitwillprovideanexplanationoftheItemCategoryTypeandhow
itisassignedinthesalesorder. Thelaterhalfoftheunitwilldiscussthe
processes of Assemble and Make-to-Order, to include the integration
pointsbetweenSalesandDistribution(SD),MaterialsManagement(MM),
ProductionPlanning(PP)andFinancialAccounting(FI).
Unit Objectives
Aftercompletingthisunit, youwillbe able to:
• Processaninquiry,quotationandasalesorder
• Createasalesorderwithreferencetoaquotation
• Determinetheuseandcontrolsassociatedwiththeitemcategorytype
• Identifytheitemcategorytypesofthesalesorderlineitems
• Determinehowtheitemcategoryofalineitemcanbeinfluencedby
the item category ofahigher-levelline item
• Explain the integrationbetween SD, MM and PPduringthe order
entry of an assemble to order material
• Pack items into the outbound delivery
Unit Contents
Pre-Sales — Make-to-Order...................................................336
Exercise 23: Pre-Sales–Make-to-Order......................................339
Sales Order Processing: Make to Order.....................................347
Exercise 24: Sales Order Processing– Make-to-Order....................351
Inventory Sourcing–Make-to-Order...........................................356
Exercise 25: Inventory Sourcing–Make-to-Order...........................361
Shipping Process – Make-to-Order...........................................369
Exercise 26: Shipping Process–Make-to-Order............................371
335
December2001 © 2002 SAP AG. All rights reserved.
第 344 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Lesson: Pre-Sales — Make-to-Order
Lesson Overview
Potentialcustomerscontactcompanieseverydaytorequestinformation
about the product(s) the company has to offer. In this lesson, you will
learnhowtocreatedocumentstosatisfy thecustomers’requests. These
documentsare: inquiry(IN),quotation(QT),andstandardorder(OR).
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Processaninquiry, quotationand asalesorder
Business Example
IDES, the case company you work for, receives a fax from a customer
inquiringaboutamotorcycle. Youneedtocreateaninquirybasedonthe
customer’srequest,createaquotewithreferencetotheinquiry,andcreate
asalesorderwithreferencetothequote. Toassistinthetrackingofthese
documentsyouwillusetheinformationsystemtocreateaninquirylist.
Figure 105: Sales Documents Used in Pre-sales Processing
You receiveinquiriesfrom customers asking, for example, aboutprices
or delivery times for certain goods.
Youofferyourcustomeraquotationforacertainmaterialwithinformation
about prices, delivery times, etc.
336
©2002SAPAG.Allrightsreserved. December2001
第 345 页 / 共 531 页
LO150 Lesson: Pre-Sales — Make-to-Order
Figure 106: Creating Documents with Reference-Line Item Status
Whenyoucreateanewdocumentwithreferenceto anexistingone, the
status of the original document (header and item status) is updated.
How the status is updated depends on the customizing settings in the
Implementation Guide (IMG).
InthestandardSAPsystem,theinquiryitemstatusbecomescompletely
referenced assoon asthecustomerreceivesa quotationreferring to the
inquiryitem,regardlessofifthefullitemquantitywasreferencedornot.
Aquotationcanbeusedasareferencedocumentuntilyoureferencethe
fullamountof the quotationorthevalidity date has beenreached. You
can also create quotations and salesorders without having to reference
another document.
The item category in the IMG is what controls the completion rule for
the documents.
337
December2001 © 2002 SAP AG. All rights reserved.
第 346 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
338
©2002SAPAG.Allrightsreserved. December2001
第 347 页 / 共 531 页
LO150 Lesson: Pre-Sales — Make-to-Order
Exercise 23: Pre-Sales–Make-to-Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Describe pre-sales activities.
• Processaninquiry, quotationandasalesorder.
Business Example
IDES,the modelcompany youwork for, receivesafaxfrom acustomer
inquiryingaboutamotorcycle. Youareresponsibleforcreatinganinquiry
based on the customer’s request, creating a quote with reference to the
inquiry,andcreatingasalesorderwithreferencetothequote. Toassistin
thetrackingofthesedocuments, youwillusetheinformationsystemto
create an inquiry list.
Task
Create an inquiry for customer T-S50A##.
Note: CustomerFAX:WepurchasedaT-AS3##motorcyclefrom
you severalyears ago. We are now interested in buying 3 more
motorcycles. Couldyoupleasegiveuspricinginformation? Thank
you.
1. Create an inquiry.
Field Value
Document type IN Inquiry
Customer(Sold-to) T-S50A##
Valid From Today
Valid To 30days from today
Sales Area 1000/12/00
Material T-AS3##
Quantity 3 pcs
Hint: During inquiry creation, the Valid to field is entered
asaprocessingdeadline, andisalsousedlaterinquotation
processing.
Continued on next page
339
December2001 © 2002 SAP AG. All rights reserved.
| Field | Value |
|---|---|
| Document type | IN Inquiry |
| Customer(Sold-to) | T-S50A## |
| Valid From | Today |
| Valid To | 30days from today |
| Sales Area | 1000/12/00 |
| Material | T-AS3## |
| Quantity | 3 pcs |
第 348 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Savetheinquiryandrecordthedocumentnumber.
___________________________
2. Thenextday,youprocesstheinquiriesreceived. Beginbycreatinga
listofallinquiriesforcustomerT-S50A##thatneedtobeprocessed
by the end of the month.
Create a list of open inquires.
3. Record the inquiry number.
___________________________
4. Attherequestofthecustomer,createaquotationwithreferenceto
the inquiry.
__________________
As there iscurrently alotofdemand forthis motorcycle, youonly
wanttoofferthecustomer2motorcycles. Thequotationshouldbe
validfromtodayuntiltwomonthsfromtoday. Savethequotation
and record the document number.
5. Customer T-S50A##decides to order one of the motorcycles as a
result of the quotation.
Createanorderwithreferencetothequotation.
Field Value
Document type OR standard order
Customer(Sold-to) T-S50A##
Customer PO no. 8–131##
Requesteddeliverydate 10 days from today
Material T-AS3##
Quantity 1
Createthestandardorderandrecordthenumber. _______________
6. Determine the referencestatusfor the items in the inquiry and the
quotation from the previous exercises.
_____________________________
DisplaythereferencestatusfortheitemintheinquiryinDocument
Flow.
7. Displaythereferencestatusfortheiteminthequotation.
What is the status of the line item?
Continued on next page
340
©2002SAPAG.Allrightsreserved. December2001
| Field | Value |
|---|---|
| Document type | OR standard order |
| Customer(Sold-to) | T-S50A## |
| Customer PO no. | 8–131## |
| Requesteddeliverydate | 10 days from today |
| Material | T-AS3## |
| Quantity | 1 |
第 349 页 / 共 531 页
LO150 Lesson: Pre-Sales — Make-to-Order
_________________________________________________
8. Questions on the pre-sales documents.
Namesomeofthedifferencesbetweenaninquiryandaquotation.
_____________________________________
_____________________________________
_____________________________________
_____________________________________
9. True or False: An inquiry must be saved in the system before a
quotationcanbecreated. _______________
10. Does automatic pricin?g take place during entry of quotations or
inquiries? ____________________
11. Do you have the option of carrying out the availability check
in an inquiry or a quotation as you do in the sales order?
____________________
341
December2001 © 2002 SAP AG. All rights reserved.
第 350 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Solution 23: Pre-Sales–Make-to-Order
Task
Create an inquiry for customer T-S50A##.
Note: CustomerFAX:WepurchasedaT-AS3##motorcyclefrom
youseveral years ago. We are now interested in buying 3 more
motorcycles. Couldyoupleasegiveuspricinginformation? Thank
you.
1. Create an inquiry.
Field Value
Document type IN Inquiry
Customer(Sold-to) T-S50A##
Valid From Today
Valid To 30days from today
Sales Area 1000/12/00
Material T-AS3##
Quantity 3 pcs
Hint: During inquiry creation, the Valid to field is entered
asaprocessingdeadline,andisalsousedlaterinquotation
processing.
Savetheinquiryandrecordthedocumentnumber.
___________________________
→ → → →
a) Logistics Salesanddistribution Sales Inquiry Create.
b) Choose Save.
Thedocumentnumberisassignedbythesystem.
2. Thenextday,youprocesstheinquiriesreceived. Beginbycreatinga
listofallinquiriesforcustomerT-S50A##thatneedtobeprocessed
by the end of the month.
Create a list of open inquires.
→ → → →
a) Logistics SalesandDistribution Sales Informationsystem
→
Inquiries Inquiries list.
b) Sold-to party: T-S50A##
Continued on next page
342
©2002SAPAG.Allrightsreserved. December2001
| Field | Value |
|---|---|
| Document type | IN Inquiry |
| Customer(Sold-to) | T-S50A## |
| Valid From | Today |
| Valid To | 30days from today |
| Sales Area | 1000/12/00 |
| Material | T-AS3## |
| Quantity | 3 pcs |
第 351 页 / 共 531 页
LO150 Lesson: Pre-Sales — Make-to-Order
3. Record the inquiry number.
___________________________
a)
4. Attherequestofthecustomer, create aquotationwithreferenceto
the inquiry.
__________________
As there iscurrentlya lot ofdemandfor this motorcycle, you only
wanttoofferthecustomer2motorcycles. Thequotationshouldbe
validfromtodayuntiltwomonthsfromtoday. Savethequotation
and record the document number.
→ → → →
a) Logistics Salesanddistribution Sales Quotation Create.
Use QT type.
b) Choose Createwithreference pushbutton.
c) Enter the inquiry number.
d) Choose Selection list.
e) Change the open quantity to 2 pcs.
f) Choose Copy.
g) Add validity dates.
h) Choose Save.
Thedocumentnumberisassignedbythesystem.
5. Customer T-S50A##decides to order one of the motorcycles as a
result of the quotation.
Createanorderwithreferencetothequotation.
Field Value
Document type OR standard order
Customer(Sold-to) T-S50A##
Customer PO no. 8–131##
Requesteddeliverydate 10 days from today
Material T-AS3##
Quantity 1
Continued on next page
343
December2001 © 2002 SAP AG. All rights reserved.
| Field | Value |
|---|---|
| Document type | OR standard order |
| Customer(Sold-to) | T-S50A## |
| Customer PO no. | 8–131## |
| Requesteddeliverydate | 10 days from today |
| Material | T-AS3## |
| Quantity | 1 |
第 352 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Createthestandardorderandrecordthenumber. _______________
→ → → →
a) Logistics Salesanddistribution Sales Order Create.
b) Choose Create with reference.
c) Enter the quotation number.
d) Choose Selection list.
Change the open quantity to 1 pc.
e) Choose Copy.
f) Choose Save.
Thedocumentnumberisassignedinternallybythesystem.
6. Determine the referencestatusfor the items in the inquiry and the
quotation from the previous exercises.
_____________________________
DisplaythereferencestatusfortheitemintheinquiryinDocument
Flow.
→ → → →
a) Logistics Salesanddistribution Sales Inquiry Display.
Choose Display document flow.
setthecursorontheInquiry,ChooseStatusoverview
Expand item 10.
b) Reference status: referenced
Thereferencestatusforthe inquirystatesthatitisreferenced,
although only two of the three units have been copied into
the quotation. An inquiry is indicated as being completely
referenced in the standard system as soon as a quotation has
been created from the inquiry.
7. Displaythereferencestatusfortheiteminthequotation.
What is the status of the line item?
Continued on next page
344
©2002SAPAG.Allrightsreserved. December2001
第 353 页 / 共 531 页
LO150 Lesson: Pre-Sales — Make-to-Order
_________________________________________________
→ → → →
a) Logistics Salesanddistribution Sales Quotation Display
→
Display.
b) Choose Display document flow.
c) SetthecursorontheQuotation,ChooseStatusoverview(icon)
d) Expand item 10.
Reference status: partially referenced
The reference status for the quotation is partially referenced.
Onlyapart(oneitem)ofthequotationquantity(two items)is
transferredintotheorder. Aquotationisindicatedaspartially
referencedinthestandardsystemuntilthefullamounthasbeen
transferred into the order.
8. Questions on the pre-sales documents.
Namesomeofthedifferencesbetweenaninquiryandaquotation.
_____________________________________
_____________________________________
_____________________________________
_____________________________________
a) Inquiries are customer requests for information. Quotations
aremadetocustomers. Forinquiries, thevaliditydateisused
in the system as a processing deadline for an answer to the
inquiry. Quotations are legally binding during the customer
validity period.
9. True or False: An inquiry must be saved in the system before a
quotationcanbecreated. _______________
a) False. Quotationswithoutreferencecanalso becreatedforan
inquiry.
10. Does automatic pricin?g take place during entry of quotations or
inquiries? ____________________
a) Yes. Automaticpricingtakesplace(dependentonCustomizing)
duringinquiry andquotation creation.
11. Do you have the option of carrying out the availability check
in an inquiry or a quotation as you do in the sales order?
____________________
a) Yes. An availability check is carried out during inquiry and
quotation entry in the same way as during sales order entry
(dependent on Customizing).
345
December2001 © 2002 SAP AG. All rights reserved.
第 354 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Lesson Summary
You should now be able to:
• Processaninquiry, quotationand asalesorder
Related Information
• http://help.sap.com
346
©2002SAPAG.Allrightsreserved. December2001
第 355 页 / 共 531 页
LO150 Lesson: Sales Order Processing: Make to Order
Lesson: Sales Order Processing: Make to Order
Lesson Overview
Byusinganitemcategory,thesystemcanprocessamaterialdifferentlyin
eachsalesdocumenttype,orevenwithinthesamesalesdocumenttype.
In this lesson, you will learn how item category is determined and the
additionalcontrolsitprovidesforthesalesdocument.
Lesson Objectives
Aftercompleting this lesson, youwillbeable to:
• Createasalesorderwithreferencetoaquotation
• Determinetheuseandcontrolsassociatedwiththeitemcategorytype
• Identifytheitemcategorytypesofthesalesorderlineitems
Business Example
Acustomercallsrequestinginformationaboutyourproduct. Youcreate
aninquirydocumenttype,butthisitem(product)isnottobedeliverable,
asthisdocumentisusedtosupplyinformationonly.
Another customer calls and places an order for the same product. You
createasalesorder;thistimetheitemisrelevantfordeliverybecausethe
customer asks to purchase the product.
Youwillcreateseveraldifferentdocumenttypesusingthesamematerial
tobetterunderstandthecontrolsthatanitemcategoryhastooffer.
Figure 107: Functions Controlled by the Item Category
347
December2001 © 2002 SAP AG. All rights reserved.
第 356 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Item categories provide additional control functions for the sales
documents.
TheItemcategorywillcontrolhowaniteminthesalesorderwillbehave
accordingtothecontrolsyoudefineintheImplementationGuide(IMG).
Byusinganitemcategory,thesystemcanprocessamaterialdifferentlyin
each sales document type.
The item category in the sales document is determined using the sales
documenttype,itemcategorygroup(frommaterialmaster),usage(ABAP
programs), theitemcategory ofahigherlevelitem, oracombinationof
these.
An itemcategory can influence, for example:
• Whetherthe systemruns automaticpricing
• Whetherthe item appears on an invoice
• Which fieldsare recorded intheincompletion logif they were not
entered in the order
• Which partnerfunctionsbelongto the item
• Which text types belong to the item
• Whetherthe item appears on a delivery
• Whetheryoucancreateschedulelinesfortheitem
Figure 108: Item Category Determination for a Standard Item
The item category for a normal item is determined using the sales
documenttypeandtheitemcategorygroupfromthematerialmaster.
348
©2002SAPAG.Allrightsreserved. December2001
第 357 页 / 共 531 页
LO150 Lesson: Sales Order Processing: Make to Order
TheitemcategorygroupismaintainedinthematerialmasterontheSales:
Sales Org. Data 2 page.
Basedontheexampleinthegraphic,bothdocumentsareusingthesame
material,sotheonlyitemchangingisthedocumenttype.
Figure 109: Item Category Determination in the Standard Order
Theitemcategoryinthesalesdocumentisfoundusingthesalesdocument
typeandtheitemcategorygroupfromthematerialmaster.
TheitemcategorygroupismaintainedinthematerialmasterontheSales:
Sales Org. Data 2 page.
Basedontheexampleinthegraphic,onedocumenttypeisbeingusedfor
two differentmaterials. Onthefirstmaterial,anitemcategorygroupof
NORMisfound;forthesecondmaterial,anitemcategorygroupof0001
is found.
349
December2001 © 2002 SAP AG. All rights reserved.
第 358 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
350
©2002SAPAG.Allrightsreserved. December2001
第 359 页 / 共 531 页
LO150 Lesson: Sales Order Processing: Make to Order
Exercise 24: Sales Order Processing–
Make-to-Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Createasalesorderwithreferencetoaquotation
Business Example
Acustomercallsabout informationregardingyourproduct. Youcreate
aninquirydocumenttype,butthisitem(product)willnotbedeliverable
asthisdocumentisusedtosupplyinformationonly. Youcreateaquote
andreferencethequotewhenthecustomercallsandplacesanorderfor
the same product. You will create a sales order; this time, the item is
relevantfordeliverybecausethecustomerask to purchasetheproduct.
Itemcategoryfacilitateshavingtheproductbehavedifferentlyaccording
tothecontrolsyoudefineintheImplementationGuide(IMG).
Task
Createaninquirytoseewhatitemcategoryisbeingdetermined.
1. Create an inquiry.
Field Value
Document type IN Inquiry
Customer(Sold-to) T-S50A##
Valid From Today
Valid To 10days from today
Material T-AS1##
Quantity 2 pcs
Hint: During inquiry creation, the Valid to field is entered
as aprocessing deadlineandisalso used laterinquotation
processing.
Save the inquiry and record the document number.
__________________
2. Displaytheinquiry processedand recordwhich itemcategory has
been determined. ___________
Continued on next page
351
December2001 © 2002 SAP AG. All rights reserved.
| Field | Value |
|---|---|
| Document type | IN Inquiry |
| Customer(Sold-to) | T-S50A## |
| Valid From | Today |
| Valid To | 10days from today |
| Material | T-AS1## |
| Quantity | 2 pcs |
第 360 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
3. Createaquotationwithreferencetotheinquiry.
Asthereiscurrentlyalotofdemandforthisproduct,youonlywant
toofferthecustomerone. Thequotationshouldbevalidfromtoday
until two months from today. Save the quotation and record the
document number. _______________
4. Displaythequoteprocessedandrecordwhichitemcategoryhasbeen
determined. _________________
5. Howwastheitemcategorydeterminedinthesedocuments?
_____________________________________
_____________________________________
_____________________________________
_____________________________________
6. Can each item created in an order have a different item category?
________________
7. Canyousetaniteminanordersothatitisnotrelevantforbilling,
and an item in a sales order that is relevant for billing, depending
on the item category? ________
352
©2002SAPAG.Allrightsreserved. December2001
第 361 页 / 共 531 页
LO150 Lesson: Sales Order Processing: Make to Order
Solution 24: Sales Order Processing–
Make-to-Order
Task
Createaninquirytoseewhatitemcategoryisbeingdetermined.
1. Create an inquiry.
Field Value
Document type IN Inquiry
Customer(Sold-to) T-S50A##
Valid From Today
Valid To 10days from today
Material T-AS1##
Quantity 2 pcs
Hint: During inquiry creation, the Valid to field is entered
as aprocessing deadlineandisalso used laterinquotation
processing.
Save the inquiry and record the document number.
__________________
→ → → →
a) Logistics Salesanddistribution Sales Inquiry Create.
b) Choose Save.
Thedocumentnumberisassignedbythesystem.
2. Displaytheinquiry processedand recordwhich itemcategory has
been determined. ___________
→ → → →
a) Logistics Salesanddistribution Sales Inquiry Display.
b) TheitemcategoryAFNfortheInquiryitemisontheOverview
Sales tab.
3. Createaquotationwithreferencetotheinquiry.
Continued on next page
353
December2001 © 2002 SAP AG. All rights reserved.
| Field | Value |
|---|---|
| Document type | IN Inquiry |
| Customer(Sold-to) | T-S50A## |
| Valid From | Today |
| Valid To | 10days from today |
| Material | T-AS1## |
| Quantity | 2 pcs |
第 362 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Asthereiscurrentlyalotofdemandforthisproduct,youonlywant
toofferthecustomerone. Thequotationshouldbevalidfromtoday
until two months from today. Save the quotation and record the
document number. _______________
→ → → →
a) Logistics Salesanddistribution Sales Quotation Create.
b) Choose Create with reference.
c) Enter the inquiry number
d) Choose Selection list.
e) Change the open quantity to 1 pcs.
f) Choose Copy.
g) Choose Save.
Thedocumentnumberisassignedbythesystem.
4. Displaythequoteprocessedandrecordwhichitemcategoryhasbeen
determined. _________________
→ → → →
a) Logistics Salesanddistribution Sales Quote Display.
b) TheitemcategoryAGNfortheQuoteitemisontheOverview
Sales tab.
5. Howwastheitemcategorydeterminedinthesedocuments?
_____________________________________
_____________________________________
_____________________________________
_____________________________________
a) Thesalesdocumenttype(inquiry,quotation,standardorder,ect.)
and the item category group (from material master), usage
(ABAP programs), item category of higher level item, or a
combination of these.
6. Can each item created in an order have a different item category?
________________
a) Yes. Different items can be created in an order with different
item categories.
7. Canyousetaniteminanordersothatitisnotrelevantforbilling,
and an item in a sales order that is relevant for billing, depending
on the item category? ________
a) Yes. Billing relevance, pricing, delivery relevance and the
incompletion log, for example, can be set in Customizing,
dependent on item categories.
354
©2002SAPAG.Allrightsreserved. December2001
第 363 页 / 共 531 页
LO150 Lesson: Sales Order Processing: Make to Order
Lesson Summary
You should now be able to:
• Createasalesorderwithreferencetoaquotation
• Determinetheuseandcontrolsassociatedwiththeitemcategorytype
• Identifytheitemcategorytypesofthesalesorderlineitems
Related Information
• http://help.sap.com
355
December2001 © 2002 SAP AG. All rights reserved.
第 364 页 / 共 531 页
Unit7: SalesandDistribution: Make-to-Order LO150
Lesson: Inventory Sourcing–Make-to-Order
Lesson Overview
In this lesson, you will create an assembly order for a specific material
requested on the sales document.
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Determinehowtheitemcategoryofalineitemcanbeinfluencedby
theitem categoryof ahigher-levelline item
• Explainthe integrationbetween SD, MMand PPduring the order
entry of an assemble to order material
Business Example
A customer places anorder withIDESfor amotorcycle gas tank that is
to be custom assembled. You will create a sales document to meet the
customer’srequirement. Aswithallcustomassemblyordersforgastanks
youwillsupplyracingstripesandassemblyinstructionsatnoadditional
charge.
Figure 110: Sales and Distribution Processing for an
Assemble/Make-to-Order Sales Order Item
356
©2002SAPAG.Allrightsreserved. December2001