Unit 6
Sales and Distribution: Stock
Shortage
Unit Overview
ThislessonwillprovideanoverviewonhowtheSalesandDistribution
processisaffectedbyastockshortage. Youwillbecomefamiliarwiththe
effectsoftheshortageandbeabletoidentifyoptionsforprocessingasales
order,deliveryandbillingdocumentinashortagesituation.
Unit Objectives
Aftercompletingthisunit, youwillbe able to:
• Processsalesorderswheninsufficientstockisavailabletomeetthe
order requirements
• Determinetherequirementsfortheavailabilitycheck
• Selectoptionsprovidedintheavailabilitycontrolscreen
• Setcustomerdeliveryagreementsinthesalesorder
• Identifythescopeofcheckusedinanavailabilitycheck
• Determinetherequirementspassedtomaterialsmanagement
• Determinethematerialavailabilitydateinthegivencasestudies
• Determineifasalesorderitemisabackorderitem
• Processdeliverieswithpartialdeliveryquantities
• Createaninvoiceforadeliverythatisshorttherequiredquantities
specified by the order item
Unit Contents
Sales Order Processing – Stock Shortage ..................................279
Exercise 19: Sales Order Processing – Stock Shortage ..................287
Inventory Sourcing: Stock Shortage..........................................295
Exercise 20: Inventory Sourcing: Stock Shortage..........................305
Shipping: Stock Shortage......................................................311
Exercise 21: Shipping: Stock Shortage......................................315
277
December2001 © 2002 SAP AG. All rights reserved.
第 286 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Billing Process: Stock Shortage ..............................................321
Exercise 22: Billing: Stock Shortage.........................................323
278
©2002SAPAG.Allrightsreserved. December2001
第 287 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Lesson: Sales Order Processing – Stock Shortage
Lesson Overview
This lesson will identify the requirements forexecuting the availability
check and provide instruction on how sales ordersare processed when
insufficient stock is available.
Lesson Objectives
Aftercompleting this lesson, youwillbeable to:
• Processsalesorderswheninsufficientstockisavailabletomeetthe
order requirements
• Determinetherequirementsfortheavailabilitycheck
• Selectoptionsprovidedintheavailabilitycontrolscreen
• Setcustomerdeliveryagreementsinthesalesorder
Business Example
Yourcustomerhasrequestedmaterialsforwhichthereisinsufficientstock.
To bestmeet yourcustomer’sneeds, youwilluse theAvailabilitycontrol
screeninthesalesordertoreviewstockavailabilityandconfirmmaterials
foryourcustomer’sorderfromasecondaryplant.
Availability Checking in the Sales Order
Figure 87: Availability Check in the Sales Order
279
December2001 © 2002 SAP AG. All rights reserved.
第 288 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Theavailabilitycheckiscarriedoutduringsalesorderprocessingif:
• Thematerialinthesalesorderhasbeenmaintainedinthematerial
master on the Sales: General/Plant Data view to indicate that an
availability check should be carried out.
• Thecontroltablesinconfigurationhavebeenmaintainedtosupport
the availability check in the sales order.
Material Availability Date
Figure 88: Material Availability Date
Theavailabilitycheckwillbecarriedoutlookingforavailablematerialson
thematerialavailabilitydate. Thedeliveryscheduleisusedtodetermine
thematerialavailabilitydate (intheschedulelinedetails). Thematerial
availability date is the date at which materials must be available to be
processed anddeliveredto thecustomerontime.
R/3 uses backward or forward scheduling to determine the material
availability date of the sales orderline item.
During backwardandforward scheduling R/3willconsiderlead times
neededforpicking,packing,loadingandtransportingthematerials.
280
©2002SAPAG.Allrightsreserved. December2001
第 289 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Availability Check in the Delivering Plant
Figure 89: Availability Check in the Delivering Plant
Theavailabilitycheckiscarriedoutinthedeliveringplantidentifiedfor
the sales order line item.
In order to identify the delivering plant from which to execute the
availabilitycheck,R/3willcarryoutplantdeterminationforeachlineitem
inthesalesorder. Plantdeterminationiscarriedoutasfollows:
1. Customer-materialinformation record
2. Ship-to party customer master record
3. Material master
Youcanmanuallychangethedefaultdeliveringplant.
281
December2001 © 2002 SAP AG. All rights reserved.
第 290 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Availability Control
282
©2002SAPAG.Allrightsreserved. December2001
第 291 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Figure 90: Availability Control Screen in the Create Sales Order
Transaction
If the materialordered by the customeris not available on the material
availabilitydatedeterminedbythedeliveryschedule,R/3automatically
branchestotheAvailabilitycontrolscreen. Thecontrolscreenoffersdelivery
proposals for selection. The system determines these proposals on the
basis of the stock availability situation.
Duringthecheckformaterials,R/3takesintoconsiderationanycustomer
deliveryagreementsthatmayexistinthecustomermasterorinthesales
order. You will receive a warning message if you attempt to accept a
deliveryproposalandthecustomeronlyacceptscompletedeliveries.
TheAvailabilitycontrolscreenalsoprovidesyouwithinformationonthe
scopeofcheck,thecurrentATPquantity,andtheavailabilitysituationin
other plants (see the application toolbar level of the Availability control
screen for these options).
In the Availability control screen you can choose from the following
proposals:
• One Time Delivery—The system checks whether the sales order
item’soriginalrequesteddeliverydatecanbemet. Ifstockisavailable
tomakeadeliveryontheoriginalrequesteddeliverydate,thestock
quantity is confirmed to the date posted here. If there is no stock
available, confirmedquantityzeroisdisplayed(inastockshortage
situation, this will be the case).
• CompleteDelivery—Ifthecustomerrequiresacompletedeliveryfor
theorderitemandthereissufficientstockavailableatalaterdateto
covertheentirerequiredquantityinthesalesorderitem,thesystem
proposes the confirmed date here.
• DeliveryProposal–Ifthecustomerallowspartialdeliveriestocover
theamount requestedontheoriginaldeliverydate, R/3checkson
whichdatespartialdeliveriescanbemadeinordertodeliveratleast
apartialquantitytothecustomer. Partialdeliveriesmaybeproposed
for different dates.
• OtherPlants—Ifthematerialismaintainedinanalternateplant,you
canbranchtostockoverviewforthatplant. Ifaquantityisavailable,
youcancopytherequirementtothealternateplant.
283
December2001 © 2002 SAP AG. All rights reserved.
第 292 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Customer Delivery Agreements
Figure 91: Customer Delivery Agreements in the Sales Order
The indicator for controlling complete/partial customer delivery
agreementsisproposedfromthecustomermasterrecord. Thecomplete
deliveryindicatoriscopiedintotheheaderofthesalesorderandtheline
items. Thisagreementindicatesthattheorder’scompleteditemsshould
bedeliveredtogether,withnopartialdeliveriesallowed.
The partialdelivery agreement is copied into the line items of the sales
order. Complete/partialdelivery proposals atthe itemlevelcouldalso
come from a customer-material information record if one exists. These
complete/partial delivery indicators can be manually changed during
sales order entry.
Subsequentdeliveryprocessingwillbeaffectedbythecustomerdelivery
agreements in the sales order.
ThefollowingcustomerdeliveryagreementscanbesetinR/3:
• Partialdeliverypermitted: Youcanenterasmanypartialdeliveries
asyouwishforanorderitemuntilthemaximumnumberpermitted
isreached. Ifthelastdeliverydoesnotresultintheentireoutstanding
orderquantitybeingreached,youreceiveawarningmessage. Inthis
situation, you can create a partial delivery. The order item is then
regardedaspartiallydelivered. Oncethematerialbecomesavailable
again,youwouldcreateanotherpartialdelivery. Thisprocesswould
continueuntiltheitemisfullydeliveredorthemaximumnumberof
deliveries has been reached (max 1–9).
• A—Enter adelivery with quantity not equal to 0: If the delivery
quantityonthisdateisnotthesameastheoutstandingorderquantity,
youwillreceiveawarningmessage. Ifthedeliveryquantityisgreater
thanzero,thesystemmarkstheorderascomplete. Thisindicatoris
used,forexample,whenthecustomerwantsyoutoshipasmuchas
284
©2002SAPAG.Allrightsreserved. December2001
第 293 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
possible on a particulardate. If the delivery quantity falls short of
the order quantity, the customer wants the order to be marked as
complete(thecustomerwantsno backorders).
• B—Onlycreatea delivery (also with quantity= 0): Thisdelivery
shouldfullysatisfytheorderquantity. Ifthedeliveryquantitydoes
not correspond to the outstanding orderquantity, youwillreceive
a warning message. Any delivery quantity, even zero, completes
processingoftheorder. Thisindicatorcanbeused,forexample,for
customers who want no backorders to be generated, even when a
delivery quantity is zero.
• C—Onlycompletedeliverycanbecarriedout: Completedelivery
is required for an order item (the customer will only accept a full
and complete delivery amount).
• D— No limit to subsequent deliveries: If this indicatorisset, the
order will never show a complete delivery for this line until you
enterareasonforrejectionintheline. Youcanenteranynumberof
subsequentdeliveriesforanorderitemuntilthemaximumnumber
ofpartialdeliveries permittedisreached. Youcanover-deliverthe
original order quantity in the process. An order item can only be
assignedthecompletedstatusmanually. Afteryouassignthisstatus,
nofurtherdeliveriescanbecreated. Youcancreateapartialdelivery
andthengoontocreateanynumberofsubsequentdeliveries. aslong
asyoudonotmanuallymarktheitemascompleted.
285
December2001 © 2002 SAP AG. All rights reserved.
第 294 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
286
©2002SAPAG.Allrightsreserved. December2001
第 295 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Exercise 19: Sales Order Processing –
Stock Shortage
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Process sales orders for which the required stock quantity is not
available
Business Example
Yourcustomerhasrequestedmaterialsforwhichthereisinsufficientstock.
To bestmeet yourcustomer’sneeds, youwilluse theAvailabilitycontrol
screeninthesalesordertoreviewstockavailabilityandconfirmmaterials
foryourcustomer’sorderfromanotherplant.
Task 1 Check a material master for an availability
check routine
Determine whetherornotanavailabilitycheckwillbecarried outfora
particular material.
1. WillanavailabilitychecktakeplaceforthematerialnumberT-AS5##
during order entry in plant 1000? Check the material master to
determine.
________________
Task 2 Determine the delivering plant in the material
master
Checkthematerialmastertodeterminethedeliveringplantforwhichthe
availability check will be carried out.
1. Determinewhichdeliveringplantisproposedinthematerialmaster
record ofmaterialT-AS5##insalesorganization1000, distribution
channel 12.
____________________
2. Determine the deliveringplant thatwillbeproposedduring order
entrywithcustomerT-S50B##insalesorganization1000,distribution
channel 12, division 00.
___________________
Hint: Youwillfindthisanswerinthecustomermasterrecord.
Continued on next page
287
December2001 © 2002 SAP AG. All rights reserved.
第 296 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Task 3 Create a sales order for a material with a stock
shortage
Youreceivedapurchaseorderfrom yourcustomer. Youentertheorder
anddiscoverastockshortage. UsetheAvailabilitycontrolscreentomeet
your customer’s requirements.
1. Createastandardorderbasedonthecustomer’spurchaseorder.
Customer P.O.
Customer: T-S50B##
Purchase order number: 7-311–##
Required delivery date: in 5 days
Material: T-AS5##
Quantity: 25
Hint: IfyouleavetheAvailabilityControlscreen,youcancall
itupagainbyselectingCheckitemavailabilityIcon.
2. Forwhichplantisavailabilityofthismaterialchecked1000or1400?
__________________
3. How many units can be confirmed for the required delivery
date?_________________
4. Onwhatdatewillthecompletequantitybeconfirmed?
___________________________
5. Accept the delivery proposal in the availability controlscreen (use
thegreenchecktodo so)and returntotheSalesOverviewscreenin
the sales order.
Displaytheschedulelinesforitem10. Whyaretheretwoschedule
lines for this item?
______________________________________________________________________________
6. Savetheorderand record the ordernumber.
________________
Continued on next page
288
©2002SAPAG.Allrightsreserved. December2001
第 297 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Task 4 Change the delivering plant
Yourcustomerhasonceagainrequestedamaterialthathasainventory
shortageinplant1000. Duringorderprocessing,youwillcheckavailability
inasecondaryplant(1400)andcopythesalesorderrequirementstothat
plant.
1. Createastandardorderbasedonthefollowingpurchaseorder:
Purchase Order
Customer: T-S50B##
Purchase order number: 7-411–##
Required delivery date: in 10 days
Material: T-AS5##
Quantity: 25
Hint: Ifyouleavetheavailabilitycontrolscreen,youcancall
itupagainbyselectingtheCheckitemavailabilityiconfromthe
bottom of the Order screen.
2. Sinceplant1400hasavailablequantitiesofyourmaterial. Changethe
deliveringplantforthematerialfromwithinthecontrolscreen.
______________
Hint: Tocheckavailabilityforanotherplant, choose: Other
plantspush-buttonontheapplicationtoolbar.
3. Howmanyunitsareconfirmedinyourorderfromplant1400forthe
required delivery date?
_________________
4. Save the order and record the number.
_____________________
289
December2001 © 2002 SAP AG. All rights reserved.
第 298 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Solution 19: Sales Order Processing –
Stock Shortage
Task 1 Check a material master for an availability
check routine
Determinewhetherornotanavailabilitycheck willbecarried out fora
particular material.
1. WillanavailabilitychecktakeplaceforthematerialnumberT-AS5##
during order entry in plant 1000? Check the material master to
determine.
________________
→ → → →
a) Logistics Sales and distribution Master data Products
→ →
Material Trading goods Display.
b) Choose the Sales: General/Plant view.
c) Plant: 1000
d) Yes,anavailabilitychecktakesplaceforthismaterial(checking
group 01 daily requirement).
Task 2 Determine the delivering plant in the material
master
Checkthematerialmastertodeterminethedeliveringplantforwhichthe
availability check will be carried out.
1. Determinewhichdeliveringplantisproposedinthematerialmaster
recordofmaterialT-AS5##insalesorganization 1000, distribution
channel 12.
____________________
→ → → →
a) Logistics Sales and distribution Master data Products
→ →
Material Trading goods Display. Enter sales org 1000 for
channel 12.
b) ChooseSales: Sales Org. Data 1view.
c) Delivering plant field: 1400
2. Determine thedeliveringplant thatwillbeproposedduring order
entrywithcustomerT-S50B##insalesorganization1000,distribution
channel 12, division 00.
Continued on next page
290
©2002SAPAG.Allrightsreserved. December2001
第 299 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
___________________
Hint: Youwillfindthisanswerinthecustomermasterrecord.
→ → →
a) Logistics Sales and distribution Master data Business
→ → → →
partners Customer Display SalesandDistribution Enter.
b) DisplaytheSalesAreaData: Shippingview.
c) Deliveringplant1000isproposedforthiscustomer.
Task 3 Create a sales order for a material with a stock
shortage
Youreceivedapurchase orderfromyourcustomer. Youentertheorder
anddiscoverastockshortage. UsetheAvailabilitycontrolscreentomeet
your customer’s requirements.
1. Createastandardorderbasedonthecustomer’spurchaseorder.
Customer P.O.
Customer: T-S50B##
Purchase order number: 7-311–##
Required delivery date: in 5 days
Material: T-AS5##
Quantity: 25
Hint: IfyouleavetheAvailabilityControlscreen,youcancall
itupagainbyselectingCheckitemavailabilityIcon.
→ → → →
a) Logistics Salesanddistribution Sales Order Create
b) As there is not enough material available for the required
deliverydate,thesystemdisplaystheAvailabilitycontrolscreen
during order entry.
2. Forwhichplantisavailabilityofthismaterialchecked1000or1400?
__________________
a) Plant 1000
In the availability controlscreen you can see the plant that is
being checked.
Continued on next page
291
December2001 © 2002 SAP AG. All rights reserved.
第 300 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
3. How many units can be confirmed for the required delivery
date?_________________
a) Nothingcanbeconfirmedfortherequireddeliverydate.
4. Onwhatdatewillthecompletequantitybeconfirmed?
___________________________
a) Review the Complete delivery and Delivery Proposal fields in
the availability control screen. Select the push-button for the
confirmed quantity.
5. Accept the delivery proposal in the availability controlscreen (use
thegreenchecktodo so)and returntotheSalesOverviewscreenin
the sales order.
Displaytheschedulelinesforitem10. Whyaretheretwoschedule
lines for this item?
______________________________________________________________________________
a) ChooseScheduleslinesforitemiconfromthebottomofthescreen.
b) Thefirstshowsthecustomer’srequesteddeliverydatewithan
unconfirmedquantity. Thesecondschedulelineshowsthenew
proposeddeliverydateandtheconfirmedquantity.
6. Savetheorderand record the ordernumber.
________________
a) Select Save.
b) Thedocumentnumberisassignedbythesystem.
Task 4 Change the delivering plant
Yourcustomerhasonceagainrequestedamaterialthathasainventory
shortageinplant1000. Duringorderprocessing,youwillcheckavailability
inasecondaryplant(1400)andcopythesalesorderrequirementstothat
plant.
1. Createastandardorderbasedonthefollowingpurchaseorder:
Continued on next page
292
©2002SAPAG.Allrightsreserved. December2001
第 301 页 / 共 531 页
LO150 Lesson: Sales Order Processing – Stock Shortage
Purchase Order
Customer: T-S50B##
Purchase order number: 7-411–##
Required delivery date: in 10 days
Material: T-AS5##
Quantity: 25
Hint: Ifyouleavetheavailabilitycontrolscreen,youcancall
itupagainbyselectingtheCheckitemavailabilityiconfromthe
bottom of the Order screen.
→ → → →
a) Logistics Salesanddistribution Sales Order Create.
Note: Asthereisnotasufficientamountavailableforthe
requireddeliverydate,thesystemgoestotheAvailability
control screen during orderentry.
2. Sinceplant1400hasavailablequantitiesofyourmaterial. Changethe
deliveringplantforthematerialfromwithinthecontrolscreen.
______________
Hint: Tocheckavailabilityforanotherplant, choose: Other
plantspush-buttonontheapplicationtoolbar.
→
a) In the Availability control screen, choose Other plants select:
Plant1400. ChooseCheckplantspush-button. Copyplanticon.
b) Thecompletequantitycan be confirmed ontherequired date
from plant 1400.
3. Howmanyunitsareconfirmedinyourorderfromplant1400forthe
required delivery date?
_________________
a) All 25 units.
Checktheschedulelineforconfirmationoftherequesteddate.
4. Save the order and record the number.
_____________________
a) Choose Save.
Thedocumentnumberisassignedbythesystem.
293
December2001 © 2002 SAP AG. All rights reserved.
第 302 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Lesson Summary
You should now be able to:
• Processsalesorderswheninsufficientstockisavailabletomeetthe
order requirements
• Determinetherequirementsfortheavailabilitycheck
• Selectoptionsprovidedintheavailabilitycontrolscreen
• Setcustomerdeliveryagreementsinthesalesorder
294
©2002SAPAG.Allrightsreserved. December2001
第 303 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Lesson: Inventory Sourcing: Stock Shortage
Lesson Overview
Thislessonwillprovideanexplanationofhowthescopeofcheckperforms
asacomponentoftheavailabilitycheck. Thelessonwillalsoexplainthe
transferofrequirementstoMaterialsManagementplanning.
Lesson Objectives
Aftercompleting this lesson, youwillbeable to:
• Identifythescopeofcheckusedinanavailabilitycheck
• Determinetherequirementspassedtomaterialsmanagement
• Determinethematerialavailabilitydateinthegivencasestudies
• Determineifasalesorderitemisabackorderitem
Business Example
Whilecarryingouttheavailabilitycheckforitemsinyoursalesorder,R/3
will look for stock availability in designated locations in an attempt to
fulfilltherequirementsofthesalesorderschedulelinequantities.
Scope of Check
Figure 92: Scope of Check
The scope of check defines which types of stock were included in the
availability check’ssearchforavailable materials. The scope ofcheckis
definedinpartbymasterdatasettingsandbyCustomizingsettings.
The scope of check can include on-hand stock, as well as inward and
outward stock movements.
Stock:
• Safety stock
295
December2001 © 2002 SAP AG. All rights reserved.
第 304 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
• Stock in transfer
• Quality inspection
• Blocked stock
Inward/outward movement of goods:
• Purchase requisitions
• Purchase orders
• Planned orders
• Production orders
• Reservations
• Dependent reservations
• Dependent requirements
• Sales requirements
• Delivery requirements
Transfer of Requirements
Figure 93: Transfer of Requirements
Duringsalesorderprocessing,theitemquantityisviewedasasimulated
requirement by R/3.
When the sales order is saved, the order’s schedule line quantities will
become a requirement and are then communicated from Sales and
DistributiontoMaterialsManagementviaatransferofrequirements.
296
©2002SAPAG.Allrightsreserved. December2001
第 305 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Basedonthetransferofrequirements,materialrequirementsplanningis
informed of quantities that Sales and Distribution require for the sales
order. Ifsufficientquantitiesarenotavailabletocovertherequirements,
purchaseorderscanbecreatedinPurchasingonthebasisofthetransferof
requirements within automatic planning.
Therequirementtypecaninfluencehowtherequirementsarepassedto
Materials Management.
Uponcompletionofthetransferofrequirements,futureavailabilitychecks
of the same material will recognize your sales order’s schedule line
quantity as an existing requirement.
Afteryoudeliveryoursalesorderandthedeliverydocumentispostgoods
issued,therequirementforyoursalesorder’smaterialwillberelievedin
thematerialsmanagementstockrequirementslist.
Case Study 1
Figure 94: Case Study 1: Confirmation of Required Delivery Date
Youenterasalesorderfor10unitsofmaterial. Thesystemusesdelivery
scheduling(backwardscheduling)todeterminethematerialavailability
date. R/3 executes the availability check looking for material to be
available for this date.
The availability check includes:
• Current stock
• Planned inward movements (such as purchase orders, purchase
requisitions and planned orders)
297
December2001 © 2002 SAP AG. All rights reserved.
第 306 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
• Planned outward movements (such as existing sales orders or
deliveries).
Incasestudy1,thesituationregardinginwardmovementsisasfollows:
• Stock: 100 pieces
• Existinginboundpurchaseorderswithquantitiesof50and60units
Thefollowingfutureoutwardmovementsalsoalreadyexist:
• Existing sales orderswith requirement quantitiesof 100, 40and 50
units.
Results for Case Study 1
Figure 95: Results for Case Study 1: Confirmation of Required
Delivery Date
Incasestudy1,theavailabilitycheckshowsthatthesystemcanconfirm
the 10 unitsfor the requested delivery date.
298
©2002SAPAG.Allrightsreserved. December2001
第 307 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Case Study 2
Figure 96: Case Study 2: Confirmation for a Later Date
Thestartingstocksituationisthesameasincasestudy1.
Theexistingstock andinwardmovements are:
• Stock: 100 units
• Existingpurchaseorderswithquantitiesof50and60units
Thefollowingfutureoutwardmovementsalsoalreadyexist:
• Existingsalesorderswithquantitiesof100,40and50units.
Inthiscasestudy,however,thecustomerrequiresacompletedelivery.
The order quantity is for 20 units. The system carries out delivery
scheduling (backward scheduling) based on the customer’s requested
delivery date and determines the material availability date. R/3 then
executes the availability check.
299
December2001 © 2002 SAP AG. All rights reserved.
第 308 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Results for Case Study 2
Figure 97: Results for Case Study 2: Confirmation for a Later Date
Becauseofthecustomer’scompletedeliveryrequirement,R/3executed
theavailabilitychecklookingfortheavailabilityofall20unitsononedate.
Oncetheavailablestockwaslocated,deliveryscheduling wasexecuted
usingforwardschedulingandtheschedulelinewasconfirmed.
Case Study 3
Figure 98: Case Study 3: Partial Deliveries
300
©2002SAPAG.Allrightsreserved. December2001
第 309 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Thestockavailablesituationincasestudy3isthesameasforcases1and
2. The existing situation is:
• Stock: 100 units
• Existingpurchaseorderswithquantitiesof50and60units
Thefollowingfutureoutwardmovementsalsoalreadyexist:
• Existingsalesorderswithquantitiesof100,40and50units.
In case study 3, the customer needs the goods as soon as possible and
allows you to split the delivery quantities into partial deliveries, if
necessary.
Inthisscenarioyouenteryoursalesorderfor20units. Thesystemcarries
outdeliveryscheduling(backwardscheduling)basedonthecustomer’s
requesteddeliverydateanddeterminesthematerialavailabilitydate. It
then runs an availability check forthis date.
Results for Case Study 3
Figure 99: Results for Case Study 3: Partial Deliveries
R/3carriedouttheavailabilitycheckanddeterminedthattherewasnot
enough stock available for the material availability date. Because the
customerhadapartialdeliveryagreement,R/3executedtheavailability
check looking for any amount of stock available to become the earliest
possible material availability date. The availability check found partial
amountsof stockavailableontwoseparatedates.
Thepartialdeliveriespermitted agreement meansthat thequantitycan
be split up.
301
December2001 © 2002 SAP AG. All rights reserved.
第 310 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
The 20 units are confirmed with 10 units on one date and 10 units on
a later date.
InthiscaseR/3usedforwarddeliveryschedulingtodeterminethenew
delivery dates in this sales order.
Case Study 4
Figure 100: Case Study 4: Check with Replenishment Lead Time
(Results Shown)
Withareplenishmentleadstrategyasapartofyouravailabilitycheck,R/3
assumesavailabilitycanbemet, regardlessofthedemand, inXnumber
of days.
A replenishment lead time is set for the material to determine the
number of days it will take to replenish that material into your stock.
Replenishmentcouldcomefromavendororproductions,forexample.
You can take into account all inward and outward movements during
theavailabilitycheckwithreplenishmentleadtime. Itisrecommended,
however, that you only implement an availability check that considers
inwardandoutwardmovementsuntiltheendofthereplenishmentlead
time.
A different replenishment lead time can be specified for each material.
For example:
• Tradinggoods: planneddelivery time+ processingtime forgoods
receipt
• Finished goods: in-houseproduction time
302
©2002SAPAG.Allrightsreserved. December2001
第 311 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Ifyoucheckavailabilityincasestudy4withoutincludingreplenishment
leadtime,theresultisthesameasforcasestudy2. Thecustomerrequiresa
completedelivery. Youcannotmake20unitsavailableuntilthesamedate
onwhichthelastpurchaseorderfor60unitsarrives(inwardmovement).
However, if the system checks availability using replenishment lead
time,youcanmake20unitsavailableforthedateonwhichthepurchase
order with 50 units arrives (inward movement). Only the inward and
outwardmovementsthattakeplacewithinthereplenishmentleadtime
are included in this check.
Backorder Processing
Figure 101: Backorder Processing
Anitem inasalesorderappearson abackorderlist if theitem quantity
doesnothave acompletelyconfirmedschedule line. Anitem ina sales
orderwillalsobeonabackorderlistiftheconfirmeddeliverydateislater
thanthecustomer’srequesteddeliverydate. Inbothcases,R/3wouldlook
foranimprovedmaterialavailabilitydateduringbackorderprocessingso
thatthecustomer’srequesteddeliverydateisme,orisclosertobeingmet.
Backorderprocessingisperformedeithermanuallyorautomatically.
Manualbackorderprocessing: Youcanusemanualbackorderprocessing
to list sales documents with materials and redistribute previously
confirmed order quantities. This could be used to allow you to fulfill
shortfalls to critical customers.
Rescheduling (Automatic Back Order Processing): In this backorder
process, the system is looking at all sales orders that have not meet the
materialavailabilityrequirementssothatthesalesorderitems’customer
requesteddeliverydateismet. Youcanusethedeliverypriority(proposed
303
December2001 © 2002 SAP AG. All rights reserved.
第 312 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
fromthecustomermasterrecordforthesalesorder)asasortingcriteria
in automatic rescheduling. Rescheduling is typically executed as a
background job after MRP has been run.
304
©2002SAPAG.Allrightsreserved. December2001
第 313 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Exercise 20: Inventory Sourcing: Stock
Shortage
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Processsalesordersforwhichthereisashortageofstock
• Check available stock
Business Example
Whilecarryingouttheavailabilitycheckforitemsinyoursalesorder,R/3
will look for stock availability in designated locations in an attempt to
fulfilltherequirementsofthesalesorderschedulelinequantities.
Task 1 Display the scope of check
Determine what stock was considered when R/3 carried out the
availability check for your material.
1. Review the scope of check for the material in PO 7–411–##and
determinewhetherinboundpurchaseorderswereconsideredbythe
availability check._________________
Hint: Youcan display the scope of check foranitem in the
sales order from either the Availability control screen or the
Availability overview screen.
2. Was the replenishment lead time taken into account during the
availability check?
________________
Task 2 Check stock availability for a material
Beforeyouplaceanorder,youwanttogainanoverviewoftheavailable
stockand existingrequirementsforthe material.
1. Displaythecurrentstock/requirementslistformaterialT-AS4##inplant
1000. Recordhowmanyunitsareinstock. Howmuchinventoryis
available? ________________________
Hint: Inventory management is performed in Materials
Management.
Continued on next page
305
December2001 © 2002 SAP AG. All rights reserved.
第 314 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Task 3 Transfer of sales order requirements
When the sales order is saved, the order’s schedule line quantities
will become a requirement and is then communicated from Sales and
DistributiontoMaterialsManagementviaatransferofrequirements.
1. Createastandardorderforthecustomer’spurchaseorder
Customer: T-S50A##
Purchase order number: 7-621–##
Required delivery date: in 10 days
Material: T-AS4##
Quantity: 25
Savetheorderand record the ordernumber.
____________________
Task 4 View the stock requirements
Basedonthetransferofrequirements,materialrequirementsplanningis
informed of quantities that Sales andDistribution requires for the sales
order. Ifsufficientquantitiesarenotavailabletocovertherequirements,
purchaseorderscanbecreatedinPurchasingonthebasisofthetransferof
requirementswithinautomaticplanning(MRP).
1. ViewthestockandrequirementssituationforthematerialT-AS4##
inplant1000. Displaythecurrentstockandrequirementslistforthe
materialanddeterminethecurrentquantity requirementsforsales
orders.
__________________________
2. Onwhat date wastherequirement transferred? Which date in the
sales order corresponds to this date?
______________________________________________________________________________
306
©2002SAPAG.Allrightsreserved. December2001
第 315 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
Solution 20: Inventory Sourcing: Stock
Shortage
Task 1 Display the scope of check
Determine what stock was considered when R/3 carried out the
availability check for your material.
1. Review the scope of check for the material in PO 7–411–##and
determinewhetherinboundpurchaseorderswereconsideredbythe
availability check._________________
Hint: Youcan display the scope of check foranitem in the
sales order from either the Availability control screen or the
Availability overview screen.
→ → → →
a) Logistics Salesanddistribution Sales Order Display.
b) ChooseDisplayavailabilityorAvailabilityControlfromthebottom
of the Sales overview screen.
c) ChoosetheScopeofcheckpush-buttonfromtheapplicationtool
bar.
d) Inavailabilitycheck,purchaseorderswerecheckedalongwith
otherinward and outward movements.
2. Was the replenishment lead time taken into account during the
availability check?
________________
a) WhenyoudisplaytheScopeofcheck,theCheckwithoutRLTfield
is not selected. This means that the replenishment lead time
has been taken into account.
Task 2 Check stock availability for a material
Beforeyouplaceanorder,youwanttogainanoverviewoftheavailable
stockand existingrequirementsforthe material.
Continued on next page
307
December2001 © 2002 SAP AG. All rights reserved.
第 316 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
1. Displaythecurrentstock/requirementslistformaterialT-AS4##inplant
1000. Recordhowmanyunitsareinstock. Howmuchinventoryis
available? ________________________
Hint: Inventory management is performed in Materials
Management.
→ → →
a) Logistics Materials management Inventory management
→ →
Environment Stock Stock/requirementslist.
b) You can see the plant stock in the row with theMRP element
Stock. You will see the on-hand quantity in the Available qty
column.
Task 3 Transfer of sales order requirements
When the sales order is saved, the order’s schedule line quantities
will become a requirement and is then communicated from Sales and
DistributiontoMaterialsManagementviaatransferofrequirements.
1. Createastandardorderforthecustomer’spurchaseorder
Customer: T-S50A##
Purchase order number: 7-621–##
Required delivery date: in 10 days
Material: T-AS4##
Quantity: 25
Savetheorderand record the ordernumber.
____________________
→ → → →
a) Logistics Salesanddistribution Sales Order Create.
b) Select Save.
Thedocumentnumberisassignedbythesystem.
Task 4 View the stock requirements
Basedonthetransferofrequirements,materialrequirementsplanningis
informed of quantities that Sales andDistribution requires for the sales
order. Ifsufficientquantitiesarenotavailabletocovertherequirements,
purchaseorderscanbecreatedinPurchasingonthebasisofthetransferof
requirementswithinautomaticplanning(MRP).
Continued on next page
308
©2002SAPAG.Allrightsreserved. December2001
第 317 页 / 共 531 页
LO150 Lesson: Inventory Sourcing: Stock Shortage
1. ViewthestockandrequirementssituationforthematerialT-AS4##
inplant1000. Displaythecurrentstockandrequirementslistforthe
materialanddeterminethecurrentquantityrequirementsforsales
orders.
__________________________
→ → →
a) Logistics Materials management Inventory management
→ →
Environment Stock Stock/requirementslist.
b) In the row with the MRP element Order, check the rec./reqd.
quantity column.
25 units.
2. Onwhatdatewastherequirement transferred? Which date in the
sales order corresponds to this date?
___________________________________________________________________________
a) The requirements date (see the Date field in the first column)
correspondstothematerialavailabilitydatefromthesalesorder
schedule lines details.
309
December2001 © 2002 SAP AG. All rights reserved.
第 318 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Lesson Summary
You should now be able to:
• Identifythescopeofcheckusedinanavailabilitycheck
• Determinetherequirementspassedtomaterialsmanagement
• Determinethematerialavailabilitydateinthegivencasestudies
• Determineifasalesorderitemisabackorderitem
310
©2002SAPAG.Allrightsreserved. December2001
第 319 页 / 共 531 页
LO150 Lesson: Shipping: Stock Shortage
Lesson: Shipping: Stock Shortage
Lesson Overview
Thislessoncoverscreatingandprocessingadeliverywhenthequantity
requiredinthesalesordercannotbemet. Youwilllearnhowtoprocess
deliverieswhenthecustomerallowspartialdeliveries,andhowdeliveries
are processed when the order quantity cannot be fulfilled (even with
partial deliveries).
Lesson Objectives
Aftercompleting this lesson, youwillbeable to:
• Processdeliverieswithpartialdeliveryquantities
Business Example
While creating a delivery and the transfer order, you discover that the
on-handstockquantityoftherequiredmaterialisnolongeravailablein
thequantitiesneededforyourdelivery. Youwilleithercreatethedelivery
forthequantityon handand delivertheordershort, or, ifthecustomer
allows, you will fill the order requirements by creating several partial
deliveries when the stock becomes available.
Creating Deliveries with Stock Shortages
During sales order processing, the delivery requirement indicators
(deliveryagreements)aresetforthesalesorderanditsdeliverableitems.
The delivery will be processed according to the delivery agreement in
the sales order.
311
December2001 © 2002 SAP AG. All rights reserved.
第 320 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
Figure 102: Delivering Orders with Delivery Agreements
Basedonthedeliveryagreementsforpartialorcompletedeliveriesinthe
salesorder,youwilldeliveranorderasonecompletedeliveryorseveral
partial deliveries.
In acompletedelivery, allitems and orderquantitiesare required to be
delivered in a single delivery.
If asalesorderwithacompletedelivery indicatorisdeliveredwith less
thanthe complete quantity, youwillreceivea systemwarningmessage
at post goods issue time, stating the existence of the complete delivery
agreement with the customer.
Note: Youcandeliberatelycontinuepastthiswarningmessageif
you want.
Ifasalesorderallowsforpartialdeliveries,youcancreatepartialdeliveries
to complete the required quantity.
312
©2002SAPAG.Allrightsreserved. December2001
第 321 页 / 共 531 页
LO150 Lesson: Shipping: Stock Shortage
Figure 103: Updating the Delivery with a Partially Picked Quantity
If,duringtransferorderprocessing,itisdiscoveredthatthereisinsufficient
stock available to fulfill the quantity of a delivery, the partially picked
quantity will be updated on the delivery.
Anyundeliveredquantitieswillremainasopenitemsonthesalesorder
withopenrequirementsinMaterialManagement.
Therearethreeoptionsforprocessingundelivereditems.
• Reduce the quantities in the sales order to match the quantity
availableforthedelivery,thusrelievingtheopenorderrequirement
andcompletingthesalesorder. Therewillbenobackordergenerated
forthe undelivered quantity in this case.
• Reducethequantityinthedeliveryitemtoequalthepickedquantity,
thus completing the delivery. A subsequent delivery(s) is then
requiredtocompletethesalesorderitems’requirements. Thesales
orderitemwillshowasabackorderitemfortheundeliveredportion
of the line item.
• Reject theopenamounton the line iteminthe sales order. Placing
a rejection reason in the line item in the sales order will cause the
status of the order and its item to be Completed. There will be no
subsequent delivery.
313
December2001 © 2002 SAP AG. All rights reserved.
第 322 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
314
©2002SAPAG.Allrightsreserved. December2001
第 323 页 / 共 531 页
LO150 Lesson: Shipping: Stock Shortage
Exercise 21: Shipping: Stock Shortage
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Edit partial deliveries
• Describe transportation processing
• Carry out account determination for a billing document in the
accounting document
Business Example
Whileprocessingdeliveryforyourcustomer’sorder,youdiscoverthatthe
on-handstockquantityoftherequiredmaterialisnolongeravailablein
thequantitiesneededtocompletethedelivery. Youwilleithercreatethe
delivery forthe quantity on hand and deliverthe order short, or, if the
customerallows,youwillfilltheorderrequirementsbycreatingseveral
partialdeliverieswhenthestockbecomesavailable.
Task 1 Identify the customer delivery agreement in the
sales order
1. DisplaythesalesorderforcustomerP.O.7–411–##anddetermineif
thecustomerwillallowyoutopartiallydeliverythisorder.
Whattypeofdeliveryagreementcanbeviewedintheheaderofthe
sales order?
Hint: Lookintheheadershippingdetails.
→ → → →
Logistics Salesanddistribution Sales Order Display
2. From what master data record was the complete delivery indicator
proposed?
3. Isitpossibletodistributepartialquantitiesacrossseveraldeliveries,
ifthefieldCompletedeliveryisnotmarkedintheorderheader?
4. What agreements referring to partial deliveries exist foritem 10of
the order?
Hint: Checktheshippingdetailsattheitemlevel.
5. FromwhatmasterdatarecordisthePart.deliv./itemfieldproposed?
6. SwitchthetransactionfromOrderDisplaytoOrderChange.
Continued on next page
315
December2001 © 2002 SAP AG. All rights reserved.
第 324 页 / 共 531 页
Unit6: SalesandDistribution: StockShortage LO150
7. Setthedeliveryindicatorin the line itemto allowonly a complete
delivery (indicator-C).
8. Save the order.
Task 2 Create a delivery with a stock shortage
Testthesystem’sabilitytorecognizedeliveryagreementsinthesalesorder
during shipping processing.
1. Create the outbound delivery for customer P.O. 7-411–##. Set the
selectiondate20daysintothefuture. Useshippingpoint1400.
2. In thedeliverydocument, change the deliveryquantityto10units
fromthe25unitsthatarescheduledtodeliver.
3. Does R/3notice the change of quantity?
4. Save the delivery with the short delivery quantity. Record the
delivery number.
Hint: Thisisasoftwarning,continuetohitEntertosave.
Task 3 Create a transfer order for a delivery with stock
shortages
Pick the delivery that now has shortages.
1. Createatransferorderforthedelivery. Selectwarehousenumber014.
2. Whatisthepickquantityinthetransferorder?
3. Savethetransferorderandrecordthedocumentnumber.
Task 4 Post goods issue a delivery with stock
shortages
Postthegoodsissueforthedeliverythatwaspickedshort.
1. Postgoodsissue forthe outbound delivery.
2. Check thedocumentflowforthe salesorder.
3. What is statusof the orderand delivery?
4. DisplaytheStatusOverviewofthesalesdocument
.
5. Whatisthestatusofdeliverystatusofthelineitem?