Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Figure163: Example: Cost-BasedPOCMethod(3)
You have actual costs of 1,800 and actual revenue of 3,000. During Results
Analysis, thesystemcalculatesthefollowingdata:
Costsaffectingnetincomeofthesale(costofsale):
Revenue affecting net income:
Revenue surplus:
Settlement settles revenue and cost of sales to CO-PA, which consequently
generatesaprofitof900. YouthensettlethecapitalizedcoststoFIandEC-PCA.
On the basis of posting rules (which must be maintained in Customizing),
settlement generates the following posting: inventory change account against
inventoryaccount300. Astheinventorychangeaccountissettledtotheprofit
andlossaccount,actualrevenueof3,000inprofit,andactualcostsof1,800plus
300inventorychangeinlossesaregeneratedontheprofitandlossaccount. Asin
CO-PA, FI and PCA generate a profit of 900.
308
© 2009 SAP AG. All rights reserved. 2009/Q2
第 325 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Method without Planned Costs and Partial Billing
Figure164: MethodwithoutPlannedCostsandPartialBilling
“Inventorydeterminationwithoutplannedcostsandpartialbilling”providesa
furtherexample. Ifyouusethismethod,thecalculatedcostofsalesiszeroaslong
asyouractualrevenueiszero. Theworkinprocessisequaltotheactualcosts
during this time.
Iftheactualrevenueisnotzero,thecalculatedcostofsalesisequaltotheactual
costs. Theworkinprocessiscanceledassoonasactualrevenuesarereceived.
Whenyoubill,itisnolongerpossibletoactivateworkinprocess.
ThecostportioninstockiscanceledwhenitachievesstatusTECO.
Hint:
• You cannot create reserves.
• This method is not suitable for milestone billing because such
billingsresultinfinalcancellationofworkinprocess.
• Theconnectionbetweenthecostofsalesandrevenueisasfollows:
– As soon as revenue has been received, the actual costs are
fully considered cost of sales. This means that the cost of
salesisneitherproportionaltotheactualrevenues,aswiththe
revenue-basedmethod,norproportionaltothequantitysold,
aswiththequantity-basedmethod. Thismethodprovidesyou
withthefollowingadvantage: Youdonotrequireplanvalues.
309
2009/Q2 © 2009 SAP AG. All rights reserved.
第 326 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Customizing for Results Analysis
Figure 165: Method-Based Customizing
Which Results Analysis method you choose depends on your business
requirements. Acompanywillnormallyrundifferenttypesofprocessing–and
thereforeusedifferentmethodsofResultsAnalysis–simultaneously. TheResults
AnalysismethodcontainstheruleforcalculatingResultsAnalysisdata. Youcan
determinehowaccuratelythesystemgeneratesaccrualvaluesinCustomizing.
Simplychooseoneofthe17pre-definedmethodsin“Non-expertmode”. Further
options are available in expert mode.
In make-to-order production, the sales order item goes through several stages,
whicharerepresentedbydifferentstatusesandleadtodifferentresultsinResults
Analysis. Inthestandardsystemtherearethreerelevantsystemstatuses:
• REL (released)
• FNBL (final billing)
• TECO (technically completed)
InCustomizingforSalesOrderControllingunderPeriod-EndClosing→Results
Analysis enter:
• AtwhichstatusResultsAnalysiscanbeperformed
• Atwhichstatustheworkinprocessiscanceled(optional)
• Atwhichstatustheworkinprocessandreservesarecanceled(optional)
310
© 2009 SAP AG. All rights reserved. 2009/Q2
第 327 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Figure166: WIPandProvisions: AllocationtoCostElements
ResultsAnalysissavestheResultsAnalysisdataforthesalesorderitemunder
secondarycostelements, whichyouassigninCustomizing. Tobeabletopass
the WIP and reserves to Financial Accounting, you must define posting rules
in Customizing so that G/L accounts can be assigned to these secondary cost
elements.
Figure 167: Results Analysis at Line ID level
Whenyouselectthelineidentificationlevel,ResultsAnalysiscalculatesseparate
valuesforeachlineID.Undercertainconditions,thismethodcanresultinone
lineIDshowingworkinprocesswhileanotherlineIDshowsreserves.
311
2009/Q2 © 2009 SAP AG. All rights reserved.
第 328 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Figure 168: Results Analysis at Totals Level
Ifyouselectvaluationatthetotalslevel,thesystemcalculatesworkinprocess,
reserves for unrealized costs, reserves for complaints and commissions, and
reservesforimminentlossforeachorder. Thesevaluesarethendistributedtoline
IDsaccordingtoamethodofapportionmentspecifiedinthevaluationmethod.
The standard setting for apportionment is:
• CapitalizedCosts/WorkinProcess: CumulativeActualCosts
• Reserves for unrealized costs: difference between planned costs and
cumulative actual costs
• Reserves for costs of complaints and commissions: Difference between
planned costs and cumulative actual costs
• Provisionsforimminentloss: Displayofcreditforinventorywhichcannot
becapitalizedandinventorywiththeoptiontocapitalize.
Ifamethodofapportionmentcannotbeused,thesystemlooksforanalternative
methodofapportionment. Thesystemsearchesinthefollowingorder:
• Apportionmentnumbers(accordingtothenumberdefinedunder“Update
for Results Analysis”)
• Cumulative Actual Costs
• Planned costs
• ApportionmentnumberswithapportionmentnumbersperlineID=1
312
© 2009 SAP AG. All rights reserved. 2009/Q2
第 329 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Figure169: ApportionmentofWIPBasedonActualCosts
Settlement
Figure 170: Settlement
313
2009/Q2 © 2009 SAP AG. All rights reserved.
第 330 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Figure 171: Integration of Settlement
TheresultsofResultsAnalysisarethensettledtoFI,CO-PAandPCA.
You can settle the following to Financial Accounting (FI) and Profit Center
Accounting (CO-PCA):
• Inventory Values
• Provisions for Unrealized Costs
• Provisions for Imminent Loss
• ProvisionsforComplaintsandCommissions
• Thecostsofsaleifyouareusinganunevaluatedsalesorderstockandusing
thecost-of-salesaccountingmethodinFinancialAccounting.
YoucansettlethefollowingwithProfitabilityAnalysis(CO-PA):
• Cost of Sale or Calculated Revenue
• Reserves for imminent loss and complaints
DuringsettlementtoProfitabilityAnalysis,thegeneratedlineitemoftheCO-PA
canbevaluatedwiththecostcomponentsplitofthesalesordercostestimateor
withthecostcomponentsplitofastandardcostestimate.
314
© 2009 SAP AG. All rights reserved. 2009/Q2
第 331 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Figure 172: Maintain Settlement Rule
If CO-PA is active, the settlement rule is automatically generated for the
profitabilitysegmentwhenthesalesorderitemisgenerated.
Figure 173: Settlement Profile
IfCO-PAisinactive,youcanspecifyinthesettlementprofilethatthesalesorder
mustnotbesettled. Ifyoudosettle,apostingtoFIinaccordancewiththeposting
rules will be made.
315
2009/Q2 © 2009 SAP AG. All rights reserved.
第 332 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Figure174: CustomizingtheAllocationStructure
To use the allocation structure, you must first create cost element groups that
aggregatetheprimaryandsecondarycostelementsusedfordebitpostingstoyour
orders. InCustomizing,youlinkthecostelementgrouptotheallocationstructure
withasettlementassignment. Foreachsettlementassignment,youstipulateby
receivertypewhetherthesettlementwillusetheoriginalpostedcostelementsor
a designated settlement cost element.
You might use settlement cost elements:
• To identify costs allocated from orders to receiver and to describe their
purpose, such as repairs or maintenance
• Toreducedatavolumebyconsolidatingseveraldebitcostelementsunder
one settlement cost element
316
© 2009 SAP AG. All rights reserved. 2009/Q2
第 333 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Figure 175: PA Transfer Structure
If you want to settle costs and revenue of a sales order item to a profitability
segment,youmustdefineaPAtransferstructure,whichassignscostsandrevenue
to the value fields in Profitability Analysis. The PA transfer structure consists
ofoneormoreitemscalledPAsettlementassignments. WhendefiningthePA
transfer structure, ensure that every debit cost element is represented in the
settlementstructureandcanonlybeassignedtoonesettlementcostelement.
IfyoudonotcarryoutResultsAnalysis,thepostedactualcostsandactualrevenue
ofthesalesorderitemwillbesettledtotheprofitabilitysegment. ThePAtransfer
structuremustcontainallcostelementsunderwhichcostsandrevenuecanbe
posted on the sales order item.
OnceyouhavecarriedoutResultsAnalysis,theResultsAnalysisdata(valuated
actual revenue, cost of sales, and reserves for imminent loss) is settled to the
profitabilitysegment. Inthiscase,thePAtransferstructuremustcontainallResults
AnalysiscostelementsunderwhichdatausedinProfitabilityAnalysisisposted.
Figure176: ValuationusingMaterialCostEstimate
317
2009/Q2 © 2009 SAP AG. All rights reserved.
第 334 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
InProfitabilityAnalysis(CO-PA),youcanvaluatedocumentsbyreadingthecost
ofgoodsmanufacturedinthematerialcostestimatesfromProductCostPlanning.
You do this by defining costing keys.
Which costing key is used for a particular document can depend on when the
documentisvaluatedinCO-PA,therecordtype, theproductsold, thematerial
typeofthatproduct,oranyothercharacteristicinyouroperatingconcern.
The following steps in Customizing are necessary to set up valuation using
material cost estimates in your system:
• Whenyoumaintaincostingkeys, youdeterminewhichcostestimatesthe
systemshouldreadinProductCostAccountinginordertovaluatethedata
in CO-PA.
• Onceyouhavedonethis,youcanassignthesecostingkeystoaproductor
materialtype. Alternatively, youcanusetheflexibleassignmentfunction
toassigncostingkeystoanycharacteristicsinyouroperatingconcernfor
valuation.
• Youthenneedtousevaluefieldassignmenttodetermineforeachoperating
concernandateachpointofvaluationhowthecostcomponentsinthecost
componentsplitaretobeassignedtothevaluefieldsinCO-PA.Thismust
bedoneforeachrelevantcostcomponentsplit.
Figure177: DefineKeysforAccessingMaterialCostEstimate
ProductCostPlanningisusedtodeterminetheplannedcostofgoodsmanufactured
foraproduct. InProfitabilityAnalysis(CO-PA),youcanusethesematerialcost
estimates to valuate the data in CO-PA. These include cost estimates with and
without quantity structures.
318
© 2009 SAP AG. All rights reserved. 2009/Q2
第 335 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
With this function, you determine which cost estimates from Product Cost
PlanningshouldbeusedtovalueactualorplanningdatainCO-PA.Youdothisby
definingcostingkeys. Acostingkeyisasetofaccessparameterswhichareused
invaluationtodeterminewhichdatainProductCostPlanningshouldberead.
Normallyyouneedatleast2costingkeys. Youuseonecostingkeytovaluate
a make-to-stock process with a standard cost estimate and another to value a
make-to-orderprocesswithasalesordercostestimate.
Figure 178: Assign Value Fields
Thesteps“Assigncostingkeystoproducts”or“Assigncostingkeystomaterial
types”letyouassigncostingkeystoindividualproductsormaterialtypes. The
product-dependent or material-dependent access of material cost estimates in
ProductCostAccountingisnotflexibleenoughforparalleluseofmake-to-stock
and make-to-order scenarios. To meet this or other requirements, you can
determinethecostingkeysusingyourown“strategy”fortheflexibleassignment
of costing keys.
Use this strategy to determine the costing keys, generally using user-defined
assignmenttables. AsincharacteristicderivationinCO-PA,youcanalsowork
with table lookups or your own customer enhancements when setting up the
strategy.
319
2009/Q2 © 2009 SAP AG. All rights reserved.
第 336 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Youcanusethefollowingmethodstodefineastrategy:
• Table Lookup
A table lookup allows you to access individual data records in any SAP
table. Youcantransferthecontentsofindividualtablefieldstotargetfields
ofthetypeUSERTEMP.TheUSERTEMPfieldsthathavebeenfilledbya
tablelookupcanthenbeusedinasubsequentstrategystepassourcefields
foranassignmentrule. Inourscenariowewilllookuptherequirementtype
ofthesalesorderitemtodeterminetheprocess.
• User-Defined Assignment Tables
Aswiththepre-definedassignmenttablesforproductsandmaterialtypes,
theseuser-definedassignmenttablesletyouassigncostingkeysseparately
for each point of valuation, record type and plan version. We specify an
user-definedassignmenttabletoassigntherequirementtypetoacostingkey.
Figure 179: Assign Value Fields
HereyoucanassignthecomponentsofacostcomponentstructurefromProduct
Cost Controlling to the value fields of your operating concern. Note that you
needtomaintainseparatevaluefieldassignmentsforeachpointofvaluationin
Profitability Analysis (CO-PA).
You can separate cost elements into fixed and variable components before
transferringthemtoCO-PA.Youcanassignasmanycostcomponentasyouwish
(n:1-relationship)tothesamevaluefieldforeachcostestimate. Thevaluesfrom
thesecostcomponentsarethenaddedtogetherinthevaluefield.
Ifyouvaluateusingmultiplematerialcostestimatessimultaneously,thevalues
ofdifferentcostcomponentswithinthesamecostestimateareaggregatedand
then entered in one CO-PA value field.
320
© 2009 SAP AG. All rights reserved. 2009/Q2
第 337 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
However,valuefieldsthatalreadycontaindatafromapreviouscostestimateare
notoverwrittenbyalatercostestimate. Consequently,youshouldassignvalue
fieldsinCustomizingsothatthevaluesofdifferentcostestimatesareenteredin
different sets of value fields.
Youcanassignuptosixdifferentvaluefieldsfromyouroperatingconcerntoeach
costcomponentinthecostcomponentstructure. Theseassignmentsareindicated
bythevaluefieldsenteredinthecolumnsFieldname1throughFieldname6.
321
2009/Q2 © 2009 SAP AG. All rights reserved.
第 338 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
322
© 2009 SAP AG. All rights reserved. 2009/Q2
第 339 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Exercise 14: Period-End Closing of the
Sales Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Explain the typical activities for period-end closing of a sales order with
sales order controlling
• Understand the difference between the revenue-based and cost-based
valuation methods in Results Analysis
• UnderstandwhenstockorreservesareformedandcancelledduringResults
Analysis
• Explainwherethevaluesofthesalesorderaresettled
Business Example
Thepumpwasproducedspecificallyforthecustomeranddelivered. Delivery
is billed.
Dependingonwhenperiod-endclosingisexecuted,differentvaluesarecalculated
forthesalesorderduringtheperiod-basedaccrualofincome(ResultsAnalysis).
These results are then settled: period-based costs and revenues of the sale to
ProfitabilityAnalysis, stockandprovisionstoFinancialAccountingandProfit
Center Accounting.
To simulate different phases of the process, you proceed with production and
deliveryoftheorderfromtheprevioussectionandposttheperiod-endclosing
activities(especiallytheResultsAnalysistransaction)morethanonce.
Task:
1. Calculatetheoverheadforthesalesorderitem.
Howwasthecostingsheettransferredintothesalesorderitem?
_______________________________________________________________
_______________________________________________________________
2. Atthispoint,adeliveryfor5pieceshasbeencompleted. However,nobilling
documenthasyetbeencreatedforthedelivery. CarryoutResultsAnalysis
usingtherevenue-basedvaluationmethod(ResultsAnalysisversion0)and
usingthecost-basedvaluationmethod(ResultsAnalysisversion1). Analyze
Continued on next page
323
2009/Q2 © 2009 SAP AG. All rights reserved.
第 340 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
the different results and compare them to the actual/planned comparison
forthesalesorder. Whydidtheresultsofthesetwomethodsdiffer? Save
the results of the Results Analysis.
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
Repeatthesameprocedurewiththecost-basedmethod, butthistimeuse
Results Analysis version 1.
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
Display the logs to obtain additional information on Results Analysis
calculationandtheconfigurationoftheResultsAnalysiskeySDOR1.
Display the logs to obtain additional information on Results Analysis
calculationandtheconfigurationoftheResultsAnalysiskeySDOR1.
3. Createthebillingdocumentforthepartialdeliveryoffiveitemsfromthe
previous section.
From the document flow, display the billing document and check the
FinancialAccountingdocumentandtheCostAccountingdocument.
4. Now that billing has been completed for the 5 pieces, carry out Results
AnalysisagainusingResultsAnalysisversion0. IsanyWIPremaining?
Have reserves been calculated?
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
5. ReturntotheShopFloorControlmenuandcreatethefinalconfirmationfor
yourproductionorderR-F1##. Reporttheremainingfivepieces.
6. Completethedeliveryfortheremaining5pumpsinyoursalesorderitem.
Createthedeliverydocumentandpostthegoodsissue.
Make a note of the delivery number.
___________________________________________________________
7. Create a billing document for the delivery.
From the document flow, display the billing document and check the
FinancialAccountingdocumentandtheCostAccountingdocument.
Continued on next page
324
© 2009 SAP AG. All rights reserved. 2009/Q2
第 341 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
8. Calculatetheoverheadforthesalesorderitem.
9. Nowthatbillingiscomplete,executeResultsAnalysisusingversion0. Is
anyWIPremaining? Havereservesbeencalculated?
___________________________________________________________
___________________________________________________________
___________________________________________________________
10. No further costs are expected for the sales order item. In the sales order,
setthestatusofthesalesorderitemtoTechnicallycompleted. Whateffect
should this have on Results Analysis?
___________________________________________________________
___________________________________________________________
11. CarryoutResultsAnalysiswithResultsAnalysisversion0. Checkifthere
arestillreservesforunrealizedcosts. SavetheResultsAnalysisdata.
___________________________________________________________
___________________________________________________________
12. Carryoutsalesordersettlement. Selectdetailedliststodisplaythesettled
amounts. From the display you can select receiver, sender or accounting
documentstoreviewthecorrespondingdata.
13. Gotothemake-to-orderreportsandshowtheorderprofitforthesalesorder.
How large is the sales order balance now?
___________________________________________________________
325
2009/Q2 © 2009 SAP AG. All rights reserved.
第 342 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Solution 14: Period-End Closing of the
Sales Order
Task:
1. Calculatetheoverheadforthesalesorderitem.
Howwasthecostingsheettransferredintothesalesorderitem?
_______________________________________________________________
_______________________________________________________________
a) Menu Path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Period-End
Closing→SingleFunctions→Overhead(VA44)
Enter the following data:
Sales document: Your sales order
number(previoussection)
Item: 10
Period: Current period
Fiscal year: Current fiscal year
Backgroundprocessing: Deselect
Test run: Deselect
Detail lists Deselect
Dialog display: Select
Choose: Execute
The costing sheet is assigned to the sales order item through the
requirements class.
2. Atthispoint,adeliveryfor5pieceshasbeencompleted. However,nobilling
documenthasyetbeencreatedforthedelivery. CarryoutResultsAnalysis
usingtherevenue-basedvaluationmethod(ResultsAnalysisversion0)and
usingthecost-basedvaluationmethod(ResultsAnalysisversion1). Analyze
the different results and compare them to the actual/planned comparison
forthesalesorder. Whydidtheresultsofthesetwomethodsdiffer? Save
the results of the Results Analysis.
_______________________________________________________________
Continued on next page
326
© 2009 SAP AG. All rights reserved. 2009/Q2
第 343 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
_______________________________________________________________
_______________________________________________________________
Repeatthesameprocedurewiththecost-basedmethod, butthistimeuse
Results Analysis version 1.
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
Display the logs to obtain additional information on Results Analysis
calculationandtheconfigurationoftheResultsAnalysiskeySDOR1.
Display the logs to obtain additional information on Results Analysis
calculationandtheconfigurationoftheResultsAnalysiskeySDOR1.
a) Menu path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Period-End
Closing → Single Functions → Results Analysis → Execute →
Individual Processing (KKA3)
Enter the following data:
Sales order: Your sales order
number
Item: 10
Period: Current period
Fiscal year: Current fiscal year
RA version: 0
Full log: Select
Choose: Execute
Save the results.
InadifferentR/3mode,repeatthesameprocedureforthecost-based
method, usingResultsAnalysisversion1.
The results are different because Results Analysis version 0 is a
revenue-basedmethod,andResultsAnalysisversion1isacost-based
method. Atthispoint,noactualrevenuehasbeenrealizedusingRA
version0,therefore,thepercentageofcompletion(POC)is0%. Allof
theactualcostsfortheproductareconsideredWIP,orstockfromwhich
revenuecanbegenerated. Theoverheadallocationisconsideredcost
ofsales(COS).TheResultsAnalysisversion1isacost-basedmethod.
Continued on next page
327
2009/Q2 © 2009 SAP AG. All rights reserved.
第 344 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Using this basis for determining the POC, the calculated revenue is
determined by multiplying the POC with the planned revenue. All
of the actual costs, which include both product and overhead costs,
are considered COS.
DisplaythelogstoobtainadditionalinformationonResultsAnalysis
calculationandtheconfigurationoftheResultsAnalysiskeySDOR1.
3. Createthebillingdocumentforthepartialdeliveryoffiveitemsfromthe
previous section.
From the document flow, display the billing document and check the
FinancialAccountingdocumentandtheCostAccountingdocument.
a) Menu path:
Logistics→SalesandDistribution→Sales→Order→Subsequent
functions → Billing Document (VF01)
Enter the following data:
Documents Your delivery number
(previous section)
Choose: Save
Fromthedocumentflow,displaythebillingdocumentandcheckthe
FinancialAccountingdocumentandtheCostAccountingdocument.
4. Now that billing has been completed for the 5 pieces, carry out Results
AnalysisagainusingResultsAnalysisversion0. IsanyWIPremaining?
Have reserves been calculated?
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
a) Enter the following data:
Sales order: Your sales order
number
Item: 10
Period: Current period
Fiscal year: Current fiscal year
RA version: 0
Full log: Select
Continued on next page
328
© 2009 SAP AG. All rights reserved. 2009/Q2
第 345 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Choose: Execute
Billinghasbeencompletedfor5pieces,whichmeansthatthePOC=
R(a)/R(p). C(c) are then determined. At this point, C(c) = C(a), so
there is no WIP. All actual costs for both the product and overhead
are considered COS.
Reservesforunrealizedcostsarecreatedifthecalculatedcostsexceed
the actual costs. (C(c) - C(a) = C(r)).
5. ReturntotheShopFloorControlmenuandcreatethefinalconfirmationfor
yourproductionorderR-F1##. Reporttheremainingfivepieces.
a) Menu path:
Logistics→Production→ShopFloorControl→Confirmation→
Enter → For Order (CO15)
Enter the following data:
Order: Your production order
number for material
R-F1##
Choose: Enter
SelectFinalConf. andsavetheproductionorderconfirmation.
6. Completethedeliveryfortheremaining5pumpsinyoursalesorderitem.
Createthedeliverydocumentandpostthegoodsissue.
Make a note of the delivery number.
___________________________________________________________
a) Menu path:
Logistics→SalesandDistribution→Sales→Order→Subsequent
functions→OutboundDelivery(VL01N)
Enter the following data:
Shipping point: 1000
Selection date: Today's date + 3 weeks
Order: Your sales order
number
Choose: Enter
Continued on next page
329
2009/Q2 © 2009 SAP AG. All rights reserved.
第 346 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
Enter 5 for the pick quantity
Post goods issue with Post goods issue.
Make a note of the delivery number.
___________________________________________________________
7. Create a billing document for the delivery.
From the document flow, display the billing document and check the
FinancialAccountingdocumentandtheCostAccountingdocument.
a) Menu path:
Logistics→SalesandDistribution→Sales→Order→Subsequent
functions → Billing Document (VF01)
Enter the following data:
Documents Your delivery number
Choose: Save
Display the billing document and check the Financial Accounting
documentandtheControllingdocument.
From the Create Billing Document screen, select Billing Document
→Display.
Then select Accounting overview.
Continued on next page
330
© 2009 SAP AG. All rights reserved. 2009/Q2
第 347 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
8. Calculatetheoverheadforthesalesorderitem.
a) Menu path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Period-End
Closing→SingleFunctions→Overhead(VA44)
Enter the following data:
Sales document: Your sales order
number(previoussection)
Item: 10
Period: Current period
Fiscal year: Current fiscal year
Backgroundprocessing: Deselect
Test run: Deselect
Detail lists Deselect
Dialog display: Select
Choose: Execute
9. Nowthatbillingiscomplete,executeResultsAnalysisusingversion0. Is
anyWIPremaining? Havereservesbeencalculated?
___________________________________________________________
___________________________________________________________
Continued on next page
331
2009/Q2 © 2009 SAP AG. All rights reserved.
第 348 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
___________________________________________________________
a) Menu path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Period-End
Closing → Single Functions → Results Analysis → Execute →
Individual Processing (KKA3)
Enter the following data:
Sales order: Your sales order
number
Item: 10
Period: Current period
Fiscal year: Current fiscal year
RA version: 0
Full log: Select
Choose: Execute
ThereisnoWIPremainingasWIPiscancelledafterfinalbilling. No
furtherdeliveriesareexpected. However,reservesmayremainifactual
costs are less than calculated costs.
10. No further costs are expected for the sales order item. In the sales order,
setthestatusofthesalesorderitemtoTechnicallycompleted. Whateffect
should this have on Results Analysis?
___________________________________________________________
___________________________________________________________
a) Menu path:
Logistics → Sales and Distribution → Sales → Order → Change
(VA02)
Select Enter.
Select the sales item, then
Goto → Item → Status
Select the status icon Change.
Choose the Technically Completed pushbutton and save your sales
order.
11. CarryoutResultsAnalysiswithResultsAnalysisversion0. Checkifthere
arestillreservesforunrealizedcosts. SavetheResultsAnalysisdata.
Continued on next page
332
© 2009 SAP AG. All rights reserved. 2009/Q2
第 349 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
___________________________________________________________
___________________________________________________________
a) Menu path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Period-End
Closing → Single Functions → Results Analysis → Execute →
Individual Processing (KKA3)
Enter the following data:
Sales order: Your sales order
number
Item: 10
Period: Current period
Fiscal year: Current fiscal year
RA version: 0
Full log: Select
Choose: Execute
Save the results of the Results Analysis.
Continued on next page
333
2009/Q2 © 2009 SAP AG. All rights reserved.
第 350 页 / 共 443 页
Unit5: Make-to-OrderProductionwithControllingbySalesOrder AC520
12. Carryoutsalesordersettlement. Selectdetailedliststodisplaythesettled
amounts. From the display you can select receiver, sender or accounting
documentstoreviewthecorrespondingdata.
a) Menu path:
Accounting→Controlling→CostObjectControlling→Product
CostbySalesOrder→Period-EndClosing→SingleFunctions→
Settlement (VA88)
Enter the following data:
Sales order: Your sales order
number
Item: 10
Period: Current period
Fiscal year: Current fiscal year
Backgroundprocessing: Deselect
Test run: Deselect
Detail lists Select
Choose: Execute
13. Gotothemake-to-orderreportsandshowtheorderprofitforthesalesorder.
How large is the sales order balance now?
___________________________________________________________
a) Menu path:
Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbySalesOrder→Information
System → Reports for Product Cost by Sales Order→ Detailed
Reports→ForSalesOrder(KKBC_KUN)
Changethelayoutbyaddingtheitem“Profit”asanewcolumn.
334
© 2009 SAP AG. All rights reserved. 2009/Q2
第 351 页 / 共 443 页
AC520 Lesson: Period-End Closing of the Sales Order
Lesson Summary
You should now be able to:
• Explain the typical activities for period-end closing of a sales order with
sales order controlling
• Understand the difference between the revenue-based and cost-based
valuation methods in Results Analysis
• UnderstandwhenstockorreservesareformedandcancelledduringResults
Analysis
• Explainwherethevaluesofthesalesorderaresettled
335
2009/Q2 © 2009 SAP AG. All rights reserved.
第 352 页 / 共 443 页
UnitSummary AC520
Unit Summary
You should now be able to:
• Use a sales order as a cost object
• Conductpreliminarycostingforasalesorder
• Analyzethecontroldataofthesalesorderitem
• Understandthequantityandvalueflowinmake-to-orderproductionwith
salesordercontrollingusingdiscretemanufacturing
• Createapurchaseorderandpostthegoodsreceipt
• Explaingoodsmovementsonthevaluatedsalesorderstock
• Analyzetherelevantaccountingandcontrollingdocuments
• Giveanoverviewofthesalesorderperiod-endclosing
• Explainrequirementstypesandhowrequirementsclassesaredetermined
• Explainentriesintherequirementsclassandtheaccountassignmentcategory
• Createstatisticalcostelementsforbalancesheetaccounts
• Executeperiod-endclosingforpartiallydeliveredproductionorders
• Executeperiod-endclosingforfullydeliveredproductionorders
• Explaintheintegrationaspectsofproductionordersettlement
• Explain the typical activities for period-end closing of a sales order with
sales order controlling
• Understand the difference between the revenue-based and cost-based
valuation methods in Results Analysis
• UnderstandwhenstockorreservesareformedandcancelledduringResults
Analysis
• Explainwherethevaluesofthesalesorderaresettled
336
© 2009 SAP AG. All rights reserved. 2009/Q2
第 353 页 / 共 443 页
第 354 页 / 共 443 页
第 355 页 / 共 443 页
Unit 6
Controlling by Sales Order Without
Production (Service) (optional unit)
Unit Overview
Thisunitshowscontrollingbysalesorderinaservicescenariothatworkswithout
logisticalquantitystructuresandisnotintegratedwithproductionlogistics.
Unit Objectives
After completing this unit, you will be able to:
• Explain the quantity and value flows in Controlling by sales order for a
service
• Explain unit costing for sales orders
• Understandwhentouseresource-relatedbilling
• ExplainthenecessarysettingsinCustomizing
• Debitthesalesorderwithdirectactivityallocationsandwithactualcosts
using the time sheet
• Use resource-related billing
• Understand network confirmations
• Understand Execution Services
• ExplaintheResultsAnalysisforthesalesorder
• Describe the settlement of the sales order
• ExplainCustomizingfortherequirementsclass
• Describe Results Analysis methods
• ExplainCustomizingforresource-relatedbilling(DIPprofile)
Unit Contents
Lesson: Master Data and Preliminary Costing..............................339
Exercise 15: Master Data and Preliminary Costing - Service Order.355
Lesson: Simultaneous Costing................................................360
Exercise 16: Simultaneous Costing - Service Order...................369
Lesson: Period-End Closing...................................................378
Exercise 17: Period-End Closing - Service Order......................381
337
2009/Q2 © 2009 SAP AG. All rights reserved.
第 356 页 / 共 443 页
Unit6: ControllingbySalesOrderWithoutProduction(Service)(optionalunit) AC520
Lesson: Customizing...........................................................391
338
© 2009 SAP AG. All rights reserved. 2009/Q2
第 357 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Lesson: Master Data and Preliminary Costing
Lesson Overview
• Controllingservicesorassemblywithasalesorder
• Resource-related billing
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Explain the quantity and value flows in Controlling by sales order for a
service
• Explain unit costing for sales orders
• Understandwhentouseresource-relatedbilling
• ExplainthenecessarysettingsinCustomizing
Business Example
Acustomerwouldliketoutilizeyourconsultingservicesforafewdays. Asthisis
asimplystructuredservice,youdecidedtouseasalesorderasthecostobject.
Alternative: Acustomerplacesanorderwithyouforaprofessionalinstallationof
newlyacquiredturbines. Asthisisasimpleon-siteassembly,asalesordercould
bethesuitablecostobject. Ifthecustomeralsowantstheturbinesthemselves,
theconception,consulting,andtraining,thetotalpackagewillbemorecomplex.
Asthetasksareprovidedbydifferentdepartmentsofyourcompanybutshould
besubjecttoacommonandconsistentControlling, youwoulduseaprojectin
addition to the sales order.
339
2009/Q2 © 2009 SAP AG. All rights reserved.
第 358 页 / 共 443 页
Unit6: ControllingbySalesOrderWithoutProduction(Service)(optionalunit) AC520
Master Data
Figure 180: Sales Order
Instandardcases,make-to-orderproductionassumesthatthecustomerplacesan
orderbeforewebecomeactive(firstthesalesprocess,thentheservicecreation
process). WiththeaccountassignmentcategoryinCustomizing,youcandefine
whichcostobjectsyouwanttousefortheaccountassignmentofcostsandany
revenue.
Figure181: Scenarios: MasterDataandCombinations
340
© 2009 SAP AG. All rights reserved. 2009/Q2
第 359 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Inadditiontothesalesorder,othercostobjectsandcombinationsofmultiplecost
objectsareavailableforsales-order-relatedandengineer-to-orderproduction. As
perthegraphicabove,thefollowingoptionsareavailable:
• 1and2representsprocessesofmake-to-orderproduction
– For1,thesalesorderitemservesasthesoleaccountassignmentobject
forcostsandrevenue,whichisusefulwhentheprovidedfunctionsof
thesalesorderitemsufficeforrepresentingtheCostObjectControlling
scenario. Ifthisisnotthecase,suchaswhenBOMsandroutingsare
tobeprocessedoradetailedplanningistotakeplace,additionalcost
objectscanbeaddedtothescenario. Thetypicalaccountassignment
category is “E”.
– For 2, a network was added. The network contributes a logistical
quantity structure (such as internal activities, external activities,
material)thatcanalsobeusedforautomaticplanning(costestimate).
Schedulingandcapacitymonitoringarealsopossible. Thecostscan
beassignedtothesalesorderitemaswellasnetworkoperations. The
networkisgenerallysettledtothesalesorderitem. Revenueisalso
assigned to the sales order item using billing. The typical account
assignment category is “E”.
• 3and4representsprocessesofcustomerprojectproduction.
– For3,aprojectiscreatedinadditiontothesalesorder. Thisisusefulif
typicalabilitiesofheprojectarerequiredintheCostObjectControlling
scenario: suchasbudgeting,availabilitycontrol,PSCashManagement,
EasyCostPlanning, employeeassignment, divisionoftheendeavor
intovarioussubprojectsthatcanrepresentvarioustasks,responsibility
areasandassignments(profitcenter,companycode). Inthisscenario,
theprojectistheleadingobject. Thatmeans, thesalesorderitemis
notcontrolledasacostobjectbutassignedtoabillingelementofthe
project. Costsandrevenueareassignedtoaccountsontheproject. The
typicalaccountassignmentcategoriesare“G”,“D”and“Q”.
– For4,anetworkisautomaticallyimmediatelycreatedusingthesales
order. Aprojectisautomaticallycreatedforthisnetwork(derivedfrom
a standard network and a standard project). This is called assembly
processing. Thisoptionisusefulifyoualreadyknowthatanetwork
andacertainprojectwithacertainstructurewillberequiredwhenthe
salesorderitemiscreated,withouthavingtoconsiderotheralternatives
forprocurementandrepresentation. Thetypicalaccountassignment
categoriesare“D”and“Q”(withKZVBR=P).
TheaccountassignmentcategoryDrequiresyoutouseunvaluatedsalesorder
stock.
341
2009/Q2 © 2009 SAP AG. All rights reserved.
第 360 页 / 共 443 页
Unit6: ControllingbySalesOrderWithoutProduction(Service)(optionalunit) AC520
Figure182: ProjectControlling: ProjectMaintenancewithProjectBuilder
You can use Project Builder to create or change objects of the project (project
definition, WBS elements, activities, activity elements, PS texts, documents,
milestones,materialcomponents). Youcanworkwithdetailedscreens,lists,or
withgraphics(hierarchygraphics,networkstructuregraphics)(1-4).
Youcanuseoperativeprojectstructures(workbreakdownstructures,networks)or
standardstructures(standardworkbreakdownstructures,standardnetworks)asa
template,inadditiontomanuallycreatingprojectstructures(7).
Youcanincludeworkbreakdownstructures,standardworkbreakdownstructures,
andstandardnetworksinanexistingprojectstructure(5).
Whenyoucreateprojects,youcancopyanoperativeprojectorstandardproject,
includingallsubordinateobjects(WBSelements,activities,PStexts,documents,
milestones, components) (6).
342
© 2009 SAP AG. All rights reserved. 2009/Q2
第 361 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Figure183: WorkBreakdownStructures: Functions
Workbreakdownstructuresarethebasisforfurtherplanningstepsintheproject.
The focus is on the planning, analysis, description, control, and monitoring of
costs, basis dates, and the budget.
Dates, costs, and outgoing payments are often planned with activities that are
assigned to WBS elements.
343
2009/Q2 © 2009 SAP AG. All rights reserved.
第 362 页 / 共 443 页
Unit6: ControllingbySalesOrderWithoutProduction(Service)(optionalunit) AC520
Figure184: CostProjectI/00##: ProjectStructure
UseoperativeindicatorstosetthepropertiesofaWBSelementandtospecify
whichtaskstheWBSelementtakesonintheprojectexecution.
• ClassifyWBSelementsasplanningelementsonwhichyouwanttomanually
plan costs.
• ClassifyWBSelementsasaccountassignmentelementsonwhichyouwant
to post actual costs.
• Classify WBS elements as billing elements on which you want to post
revenue.
The“Statistical”indicatordetermineswhetheraWBSelementisonlyusedfor
statisticalpurposesorwhetheritcanbedebitedwithrealcosts.
In the example of the graphic above, you can plan up to level 2 of the project
hierarchy. SubordinateWBSelementsstartingwithlevel3arepurelyaccount
assignmentelements. TheWBSelementI/00##-1isalsoabillingelement.
The Sales Order as a Cost Object
Asinglesalesorderisenoughforthepreviousexample.
344
© 2009 SAP AG. All rights reserved. 2009/Q2
第 363 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Figure185: SalesOrderControllingforServices
Thisexampleshowsthecreationofaservicesuchasaconsultationorassembly
carriedoutwiththecustomer. Asthesalesorderitemiscontrolledasacostobject,
thecostsoftheservicearecollecteddirectlyonthesalesorderitem.
Thesalesordercanbebilledandcustomeroractivity-specificorconditionrecords
canbetakenintoaccount. Youcanchoosevariousformsofbilling:
• Starting from a standard price, a sales price is derived using the price
determination schema of the SD.
• Startingfromthecostingresultofthesalesorderorproject,asalespriceis
derivedusingthepricedeterminationschemaoftheSD.
• The sales price is found based on the actual expense in resource-related
billing.
Thefollowingprocessisrepresentedinourexample:
• Costs are charged to the order through goods issues, posting internal
activities, travel expense reporting, etc.
• Resource-relatedbillingisrun. TherevenuesarecalculatedinSDpricing
on the basis of the billed line items.
• ThesalesorderissettledtoProfitabilityAnalysis(CO-PA).
Option: Resource-Related Billing
345
2009/Q2 © 2009 SAP AG. All rights reserved.
第 364 页 / 共 443 页
Unit6: ControllingbySalesOrderWithoutProduction(Service)(optionalunit) AC520
Figure 186: Resource-Related Billing
Thebillingcanbecarriedoutbasedonplannedrevenue(withorwithoutabilling
plan)orbasedontheactualcostswitharesource-relatedbillingwhichgenerates
so-called “dynamic items” from the cost information (for example, costs for
materialandpersonnel). Beforeabillingrequestiscreated, youwillbeshown
an overview screen containing relevant information that you can modify that
enablesyoutodeterminewhatthebillingrequestshouldlooklike. Yougenerate
thebillingrequestfromthisoverviewscreen. Youcanusethisscreenforexample,
tosimulatepricesorsavetheinformationitself. Thisisalsowhereyoudetermine
whichdatathesystemcopiestothebillingrequestafteryouhavefinishedworking
with the overview screen.
There are two aggregation levels:
Level 1: The system aggregates the data records for the overview screen
into dynamic items.
Level 2: The system generates a billing request using the data from the
dynamicitems. Ifnecessary,thedataisreaggregatedbasedontheassigned
materials. Aggregationdependsonthesettingsintheprofileofthe“dynamic
item processor”.
If you do not want to bill a customer for a dynamic item, you can enter your
reason(forexample, warranty)intheoverviewscreenfordynamicitemsasan
apportionmentreason. Thereasonwillonlybeusedforinternalpurposessuch
as calculating profits.
Youfollowthesameprocedureasabovewhencreatingaquotationfromaservice
order.