Unit4: ProductCostControllingbyOrder AC520
Task 2:
Ifusingjointproduction, itispossibletocalculateWIPandvariancesforeach
co-product separately. However this calculation can be performed only if the
actual costs from the process order header are distributed to the co-products
(order items).
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→PreliminarySettlementforCo-Products,Rework→Individual
Processing (CO8B)
Before continuing, choose Add to favorites.
1. Usetheindividualprocessingtodistributetheactualcoststothe co-products
for your process order for the current period. Remain in the Preliminary
Settlement Results screen.
a) Enter your order number.
Settlement period: Current month
Posting period: Current month
Fiscalyear: Current fiscal year
Deselect Test Run.
Choose Execute.
2. SelecttheDetaillistfortheactualsettlementanddisplaythesenders. The
individual cost elements that debited the process order are listed as the
senders. Next,accessthereceivers. Thesettlementreceiversshouldlistthe
orderitems(co-products)asthereceiversforeachindividualsendingcost
element. Is the value split according to the apportionment defined in the
process order?
a) Select Detail Lists.
Theordernumberandorderitemsaredisplayed.
Select the order number.
Select Sender.
The individual cost elements that debited the process order are
displayed.
SelectthegreenarrowtwicetoreturntotheDetaillist.
Choose Receiver.
Theorderitemsaredisplayedandlistedbyassignment.
Yes,thevalueissplitaccordingtotheapportionmentstructure.
Continued on next page
186
© 2009 SAP AG. All rights reserved. 2009/Q2
第 201 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
3. Displaythecostaccountingdocumentfromthelistofaccountingdocuments.
Expandthedocumentdetailandnotethateachactuallineitempostedtothe
orderwassettledtothetwoindividualprocessorderitems,theco-products
T-FF1## and T-FF3##.
a) Selectthegreenarrowtwicetoreturntothedetaillist.
Select Accounting documents.
Choose Controlling document.
Expand the document line.
4. Returntothecostreport. Reviewthepostedactualcoststhatwerechanged
by the distribution to the co-products.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Settings → Order Items → On/Off
SelectLayoutsandselectlayout1SAP02(costtrend).
Enteryourordernumberandorderitem1.
Choose Execute.
Theindividualorderitemsnowhaveactualcosts.
Continued on next page
187
2009/Q2 © 2009 SAP AG. All rights reserved.
第 202 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 3:
Calculateworkinprocessforyourprocessorder.
1. UsetransactionIndividualProcessingtocalculatetheWIPvalueofyour
processorder. UseResultsAnalysisversion0forthecurrentperiod.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→WorkinProcess→IndividualProcessing→
Calculate (KKAX)
Beforecontinuing, selectAddtoFavorites.
Enter your order number.
WIP to period: current month
Fiscalyear: Current fiscal year
Results Analysis version 0
Deselect Test Run
Choose Execute.
2. Create another session and display the cost report. Enter * for the order
item. Executethereport. Recordtheorderbalance. Comparethecalculated
total WIP amount with the remaining balance for your process. Are they
the same value?
(circle one) Yes or No
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Settings → Order Items → On/Off
Enter your order number.
Enter order item *.
Choose Execute.
Yes,thecalculatedWIPandtheactualorderbalancearethesamevalue.
3. IsitarequirementtovalueWIPusingonlyactualcostswhenjointproduction
is used?
Answer: True
It is a requirement to valuate WIP using only actual costs when joint
production is used.
Continued on next page
188
© 2009 SAP AG. All rights reserved. 2009/Q2
第 203 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
4. Returntoyourfirstsession. RecordtheWIPforT-FF1##andT-FF3##.
T-FF1##:
T-FF3##:
a) TheWIPforeachitemislistedintheWorkinProcessList. List
5. AccesstheWIPreportandrecordtheWIPvalueforeachcostelementfor
T-FF1##.
672111 (WIP direct costs):
672121 (WIP overhead):
672131 (WIP production costs):
a) AnalyzetheWIPamountsintheWIPreportforT-FF1##.
From the WIP object list, choose
Goto → WIP Report
Select Layout SAP04
6. ReviewthesettingsfortheWIPcategories. Whatcostelementsareassigned
tothefollowingWIPcategoriesforControllingarea1000,ResultsAnalysis
version 0:
EK (direct costs):
FK (production costs):
GK (overhead costs):
a) Favorites → Tools → Customizing → IMG → Execute Project
(SPRO)
Choose SAP Reference IMG.
Controlling→ProductCostControlling→CostObjectControlling
→ProductCostbyOrder→Period-EndClosing→WorkinProcess
→ Define Assignment (OKGB)
EK(directcosts): 400000–499999;820000–894999;896000-
899999
FK(ProductionCosts): 600000–654999;656000–699999
GK(OverheadCosts): 655100–655199
7. Display the actual report for T-FF1##. What are the subtotals of actual
costsforthefollowingWIPcategories? WhatistheWIPbalanceforeach
of these categories?
Actual costs EK: ____________
Continued on next page
189
2009/Q2 © 2009 SAP AG. All rights reserved.
第 204 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
(400000–499999;820000–894999;896000–899999)
Actual costs FK: ____________
(600000 – 654999; 656000 – 699999)
Actual costs GK: ____________
(655100 – 655199)
Total Actual costs:
Order balance:
TodisplaytheWIPbalances,changetoWorkinProcesslayout1SAP03.
ThesystemallocatestheremainingorderbalancetotheWIPcategoriesby
dividingthetotalcostsbytheactualcostspercategory. Thisdeterminesthe
percentageoftheremainingcoststhatshouldbeallocatedtoeachcategory.
Example:
Actual costs EK 8000 80% of Total
Actual costs FK 2000 20% of Total
Total costs 10000 100%
Remainingorderbalanceafterpartialdelivery: 4000
Calculated WIP for each order category:
WIP category EK 3200
Continued on next page
190
© 2009 SAP AG. All rights reserved. 2009/Q2
第 205 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
WIP category FK 800
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Settings → Order Items → On/Off
Enter your order number.
Enter order item 1.
Choose Execute.
Actual costs EK: ____________
(400000–499999;820000–894999;896000–899999)
Actual costs FK: ____________
(600000 – 654999; 656000 – 699999)
Actual costs GK: ____________
(655100 – 655199)
Total actual costs: ____________
Order balance: ____________
TodisplaytheWIPbalances,changetoWorkinProcesslayout1SAP03.
SelectSelectLayoutandselectlayout1SAP03(WorkinProcess).
ThesystemallocatestheremainingorderbalancetotheWIPcategories
by dividing the total costs by the actual costs per category. This
determines the percentage of the remaining costs that should be
allocated to each category.
Example:
Actual costs EK 8000 = 80 % of total
Actual costs FK 2000 = 20 % of total
Total costs: 10000 = 100%
Iftheremainingorderbalanceafterpartialdeliveryremains4000,this
isthenassignedtoWIPcategoriesasfollows:
WIP category EK 3200 = 80 % of total
WIP category FK 800 = 20 % of total
Continued on next page
191
2009/Q2 © 2009 SAP AG. All rights reserved.
第 206 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 4:
OncetheWIPhasbeencalculated,theWIPbalancemustbepostedtoFinancial
Accounting for period-end closing. This is accomplished using the settlement
transaction.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Settlement→IndividualProcessing(KO88)
Before continuing, select Add to Favorites
1. UsetheindividualprocessingtransactiontosettlethecalculatedWIPcosts
foryourprocessordertofinancialaccountingforthecurrentperiod.
a) Enter your order number.
Settlement period: Current month
Posting period: Current month
Fiscalyear: Current fiscal year
Deselect Test run.
Choose Execute.
2. IntheActualSettlementDetailList,notethateachorderitemisasender.
a) Choose Detail lists.
Ifnecessary,chooseGoto→DetaillistofRAdataforFI.
3. Display the accounting documents for the posting to FI. Why is there no
Controlling document listed?
Answer:
a) The WIP accrual to FI does not credit the process order. The WIP
balances are stored in RA cost elements, which will not update the
controllingobject. Thiscanbeverifiedbydisplayingthesenderand
receiver for the settlement.
Select one of the process order items.
Select Accounting documents.
Fromthelistofaccountingdocuments,chooseAccountingdocument.
This is the WIP accrual posting in FI.
893000 Work in Process
793000 WIP
192
© 2009 SAP AG. All rights reserved. 2009/Q2
第 207 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Exercise 9: Alternative: Period closing
with Partially Delivered Production Orders
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Carry out period-end closing activities
• Calculate WIP at actual cost
• SettleWIPinFinancialAccountingandProfitCenterAccounting
Business Example
Yourorderhasnotbeencompletedbyperiodend. Todisplayprofitaccordingto
thecorrectperiod,calculateWIPduringperiod-endclosingandactivateit.
Task 1:
Completetheprocessandoverheadcostallocationfortheproductionorder.
1. Using the individual processing transaction for Business Process Cost
Allocation,applytheactualprocesscosttotheproductionorderforversion0
of the current period.
2. UsingtheindividualprocessingtransactionforOverheadCalculation,apply
theoverheadcoststotheproductionorderforthecurrentperiod.
Task 2:
1. Returntothecostreport. Executethereportagain,andreviewtheaffectof
the Template and Overhead transaction.
Task 3:
The calculation of work in process is necessary to determine the current order
balance for the production order for R-F1##.
1. Usingtheindividualprocessingtransaction, calculatetheworkinprocess
(WIP)valueofyourproductionorder,usingResultsAnalysisversion0for
the current period.
2. Createanothersessionanddisplaythecostreportforyourproductionorder.
Enter your order number. Execute the report. Record the order balance.
ComparethecalculatedtotalWIPamountwiththeremainingbalancefor
yourproductionorder. Aretheythesamevalue?
Continued on next page
193
2009/Q2 © 2009 SAP AG. All rights reserved.
第 208 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
3. Returntoyourfirstsession. AccesstheWIPreportandrecordtheWIPvalue
for each cost element for R-F1##.
4. ReviewthesettingsfortheWIPcategories. Whatcostelementsareassigned
tothefollowingWIPcategoriesforControllingarea1000,ResultsAnalysis
version 0:
5. Display the configuration of the WIP update. What cost elements are
assigned to the line item ID’s?
Controlling Results Results LineID Cost
Area Analysis Analysis Element
version: Key
1000 0 FERT EK
1000 0 FERT FK
1000 0 FERT GK
6. DisplaytheactualreportforR-F1##. Whatarethesubtotalsofactualcosts
for the following WIP categories?
Task 4:
OncetheWIPhasbeencalculated,theWIPbalancemustbepostedtoFinancial
Accounting for period-end closing. This is accomplished using the settlement
transaction.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Settlement→IndividualProcessing(KO88)
1. Usingtheindividualprocessingtransaction, settlethecalculatedWIPfor
yourproductionordertofinancialaccountingforthecurrentperiod.
2. Display the accounting documents for the posting to FI. Why is there no
Controlling document listed?
194
© 2009 SAP AG. All rights reserved. 2009/Q2
| Controlling Area | Results Analysis version: | Results Analysis Key | LineID | Cost Element |
|---|---|---|---|---|
| 1000 | 0 | FERT | EK | |
| 1000 | 0 | FERT | FK | |
| 1000 | 0 | FERT | GK |
第 209 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Solution 9: Alternative: Period closing
with Partially Delivered Production Orders
Task 1:
Completetheprocessandoverheadcostallocationfortheproductionorder.
1. Using the individual processing transaction for Business Process Cost
Allocation,applytheactualprocesscosttotheproductionorderforversion0
of the current period.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→TemplateAllocation→IndividualProcessing
(CPTA)
Includethetransactioninyourlistoffavorites.
Enter your order number.
Version: 0
Period: Current month
FiscalYear: Current fiscal year
Deselect Test Run.
Select Detail Lists.
Choose Execute.
2. UsingtheindividualprocessingtransactionforOverheadCalculation,apply
theoverheadcoststotheproductionorderforthecurrentperiod.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→Overhead→IndividualProcessing(KGI2)
Includethetransactioninyourlistoffavorites.
Enter your order number.
Period: Current month
FiscalYear: Current fiscal year
Deselect test run.
Choose Execute.
Continued on next page
195
2009/Q2 © 2009 SAP AG. All rights reserved.
第 210 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 2:
1. Returntothecostreport. Executethereportagain,andreviewtheaffectof
the Template and Overhead transaction.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Enter your order number.
Choose Execute.
ChooseSelectlayoutandselectlayout1SAP02(CostTrend).
Task 3:
The calculation of work in process is necessary to determine the current order
balance for the production order for R-F1##.
1. Usingtheindividualprocessingtransaction, calculatetheworkinprocess
(WIP)valueofyourproductionorder,usingResultsAnalysisversion0for
the current period.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→WorkinProcess→IndividualProcessing→
Calculate (KKAX)
Beforebeginningthetask,chooseAddtofavorites.
Enter your order number.
WIP to period: Current month
FiscalYear: Current fiscal year
Results Analysis version 0
Deselect Test Run.
Choose Execute.
Continued on next page
196
© 2009 SAP AG. All rights reserved. 2009/Q2
第 211 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
2. Createanothersessionanddisplaythecostreportforyourproductionorder.
Enter your order number. Execute the report. Record the order balance.
ComparethecalculatedtotalWIPamountwiththeremainingbalancefor
yourproductionorder. Aretheythesamevalue?
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Enter your order number.
Choose Execute.
Yes,thecalculatedWIPandtheactualorderbalancearethesamevalue.
3. Returntoyourfirstsession. AccesstheWIPreportandrecordtheWIPvalue
for each cost element for R-F1##.
a) From the WIP object list, choose
Goto→ WIP report
Select Layout SAP04
4. ReviewthesettingsfortheWIPcategories. Whatcostelementsareassigned
tothefollowingWIPcategoriesforControllingarea1000,ResultsAnalysis
version 0:
a) Favorites → Tools → Customizing → IMG → Execute Project
(SPRO)
Choose SAP Reference IMG.
Controlling→ProductCostControlling→CostObjectControlling
→ Product Cost by Order → Period-End Closing → Work in
Process→ Define Assignment (OKGB)
EK (direct costs): 400000 – 499999; 820000 – 894999; 896000 -
899999
FK(ProductionCosts): 600000–654999;656000–699999
GK(OverheadCosts): 655100–655199
5. Display the configuration of the WIP update. What cost elements are
assigned to the line item ID’s?
Continued on next page
197
2009/Q2 © 2009 SAP AG. All rights reserved.
第 212 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Controlling Results Results LineID Cost
Area Analysis Analysis Element
version: Key
1000 0 FERT EK 672111
1000 0 FERT FK 672131
1000 0 FERT GK 672121
a) Favorites→Tools→Customizing→IMG→ExecuteProject(SPRO)
Choose SAP Reference IMG.
Controlling→ProductCostControlling→CostObjectControlling
→ProductCostbyOrder→Period-EndClosing→WorkinProcess
→ Define Update (OKGA)
6. DisplaytheactualreportforR-F1##. Whatarethesubtotalsofactualcosts
for the following WIP categories?
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Enter your order number.
Choose Execute.
SelectSelectLayoutandselectlayout1SAP03(WorkinProcess).
Actual costs EK: ____________
(400000–499999;820000–894999;896000–899999)
Actual costs FK: ____________
(600000 – 654999; 656000 – 699999)
Actual costs GK: ____________
(655100 – 655199)
Continued on next page
198
© 2009 SAP AG. All rights reserved. 2009/Q2
| Controlling Area | Results Analysis version: | Results Analysis Key | LineID | Cost Element |
|---|---|---|---|---|
| 1000 | 0 | FERT | EK | 672111 |
| 1000 | 0 | FERT | FK | 672131 |
| 1000 | 0 | FERT | GK | 672121 |
第 213 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Task 4:
OncetheWIPhasbeencalculated,theWIPbalancemustbepostedtoFinancial
Accounting for period-end closing. This is accomplished using the settlement
transaction.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Settlement→IndividualProcessing(KO88)
1. Usingtheindividualprocessingtransaction, settlethecalculatedWIPfor
yourproductionordertofinancialaccountingforthecurrentperiod.
a) Enter your order number.
Settlement period: Current period
Posting period: Current period
FiscalYear: Current fiscal year
Deselect test run.
Choose Execute.
2. Display the accounting documents for the posting to FI. Why is there no
Controlling document listed?
a) The WIP accrual to FI does not credit the process order. The WIP
balances are stored in RA cost elements, which will not update the
controllingobject. Thiscanbeverifiedbydisplayingthesenderand
receiver for the settlement.
Select Detail Lists.
Select Accounting documents.
Fromthelistofaccountingdocuments,chooseAccountingdocument.
This is the WIP accrual posting in FI.
893000 Work in Process
793000 WIP
199
2009/Q2 © 2009 SAP AG. All rights reserved.
第 214 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Lesson Summary
You should now be able to:
• Explainperiod-endclosingwithpartiallydeliveredproductionorders
• Explain WIP at actual cost
200
© 2009 SAP AG. All rights reserved. 2009/Q2
第 215 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
Lesson: Period-End Closing with Delivered Production
Orders
Lesson Overview
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Explainperiod-endclosingwithdeliveredproductionorders
• ExplainthedifferencesbetweenthecontrollingmethodsofProductCostby
Order and Product Cost by Period
Business Example
The production type is make-to-stock. Sales Controlling is performed only in
Profitability Analysis (CO-PA).
Fertilizerisproducedinaprocessmanufacturingenvironment.
Fertilizermanufacturingalsoproducessideproducts,whicharetobemappedas
co-products.
Rawmaterialsandmachinetimeareconsumed. Additionalcostsareincurredby
quality control checks and waste removal.
TheproceduresforProductCostbyOrderarethesameregardlessofwhethera
manufacturerusesprocessordersorproductionorders. Inthisscenario,wewill
useaprocessordertodemonstrateProductCostbyOrder.
Afertilizermanufacturerwantstomeasureandanalyzehisprocesscostswiththe
SAPSystem. Thefertilizerproducedisnotmake-to-order.
• Afterthelastgoodsreceiptintotheinventory,themanufacturercomparesthe
actualcostoftheorderwiththestandardcostestimateandthepreliminary
costestimateforeachorderitem. Thedifferencebetweentheactualcosts
oftheorderitemandthedebitvalueatgoodsreceiptarethevariancesthat
areexaminedexactlyintermsofresourcesinthevarianceanalysisandare
settledintheinventoryandProfitabilityAnalysis. Thevariancesaresettled
to FI as a sum, but separated by variance category to the costing-based
Profitability Analysis.
201
2009/Q2 © 2009 SAP AG. All rights reserved.
第 216 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Variance Calculation and Settlement
Figure 93: Process Order: Process Chain
Figure94: VarianceCalculationforCo-Products
Inthecaseofmanufacturingordersthathaveco-productsandwhoseorderitem
hassettlementtypeFUL,variancescanonlybecalculatedwhenallorderitems
havebeendelivered(thatis,whenthedeliverycompletedindicatorissetforall
202
© 2009 SAP AG. All rights reserved. 2009/Q2
第 217 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
orderitemsandthestatusDLVissetfortheorder). Formanufacturingorders
withoutco-productsforwhoseorderitemthesettlementtypeisFUL,variances
canonlybecalculatedafterthestatusDLVhasbeensetfortheorder.
For manufacturing orders that have co-products for whose order item the
settlement type is PER, the order balance is always interpreted as a variance
(regardlessofthestatus). Noworkinprocessiscalculatedforthesemanufacturing
orders. Formanufacturingorderswithoutco-productsthathavethesettlementtype
PER,variancesandworkinprocessarecalculatedusingthetargetcostcalculation.
Noscrapvariancescanbecalculatedforco-products. Youshouldthereforeusea
variancekeyforwhichtheScrapindicatorisnotselected.
Figure 95: Settlement of Co-Products
Thefollowingtakesplacewhentheorderhasbeendeliveredandsettled:
• Workinprocess(WIP)postedinapreviousperiodiscancelled.
• The order balance is reduced to zero by transferring to FI the difference
betweenthecostoftheorderandthevalueofthedeliverytostock. Ifthe
pricecontrolindicatorissettoS,thesystemdebitsPriceDifferencesand
credits Finished Goods Inventory Change. The assigned profit center is
also updated.
• TheaccrualdataisalsoupdatedintheMaterialLedger(ifactive).
• The total variance is transferred to profitability segments in Profitability
Analysis (CO-PA). You can transfer the variances separately by variance
categoryandcostelementtovaluefieldsinCO-PA.
203
2009/Q2 © 2009 SAP AG. All rights reserved.
第 218 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Controlling View Comparison
ComparisonofProductCostCollectorControllingandProductionOrder
Controlling
• The difference is in the usage of:
– Product cost collectors
and
– Production orders
Figure96: ComparisonBetweenFullSettlementandPeriodicSettlement
Everyproductionordercanuseoneofthetwocostingmethods: ProductCost
by Order or Product Cost by Period. This is specified in Customizing in the
“Cost-Accounting-RelevantDefaultValuesforOrderTypesandPlants”table.
• IfProductCostbyPeriodisusedwithaproductcostcollector,theproduct
costcollectorordertypewillusethedefaultruleSTR.Themanufacturing
ordertypeusesthedefaultrulePP2(periodicsettlement). The“Productcost
collector” indicator is set there as well.
• IfProductCostbyPeriodisusedwithouttheproductcostcollector,theorder
typeofthemanufacturingorderwillusethedefaultrulePP2(periodic). The
“ProductCostCollector”indicatorisnotselected. ThisControllingmethod
ispossible,howeveritisnotrecommendedbySAP.
• IfProductCostbyOrderisused,theordertypeofthemanufacturingorder
willusethedefaultrulePP1(fullsettlement). The“ProductCostCollector”
indicator is not selected.
IfyouautomaticallypostthedeterminedWIPtoFinancialAccountingwiththe
settlement,theWIPsettlementmustbecarriedoutineveryperiod.
204
© 2009 SAP AG. All rights reserved. 2009/Q2
第 219 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
Figure97: FinalCostinginProductCostbyPeriod
Whenusingperiodicsettlement, WIPandvariancesareshownforeachperiod
at the same time.
Figure98: Status-BasedFinalCostinginProductCostbyOrderwithFull
Settlement
If full settlement is used, the work in process and the variances are calculated
based on the status of the order. If the order has the status Released, Partially
released,orPartialdelivery,workinprogressiscalculated. Iftheorderhasthe
205
2009/Q2 © 2009 SAP AG. All rights reserved.
第 220 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
statusDeliveredorTechnicallyComplete, theremainingWIPbalancefromthe
previousperiodwillbecancelled,andVarianceswillbecalculated. AWIPbalance
andvariancescalculationcannotoccuratthesametimeinthesameperiod.
Cost Object Controlling using Product Cost Collectors
Advantages: Disadvantages:
• Leancostmanagement • Itisnotobviouswhetherthecosts
• Controlling concentrates itself are assigned to the production
moreontheproductorproduction orderaccordingtothecause.
as a process, and less on the • Not recommended if the
logicaltypeofproduction. production involves significant
• The reduced number of cost set-up costs, if there is a large
objectsimprovestheperiod-end variability in lot size, or if the
closing process. BOMandroutingarenotstable.
• Variances are recognized in the • Not available if WIP and
periodinwhichtheyoccur. variance analysis is required at
the co-product level or when
usingcollectiveorders.
Productcostcollectorscanbeusedinthefollowingproductionenvironments:
• Inrepetitivemanufacturing: mandatoryuseofproductcostcollectors
• In order-related production: optional
• In process manufacturing: optional
Thedefinitionofthecontrollingprocesstobeusedisdeterminedbytheselection
ofanordertypeandthesettingsstoredforitinCustomizing. Evenifyouusea
productcostcollection,youdonotneedtochangethelogisticalprocesses.
Product Cost by Order Using PP Production Orders
Advantages: Disadvantages:
• Largedegreeofresponsibilityon • Many cost objects must be
theleveloftheproductionorder. process for the period-end
• Full settlement provides closing.
production order level variance • When using Full settlement,
analysis,bestsuitedforcomplex variances cannot be analyzed
production environments and until the production order is
orderswithhighset-upcostsand completed.
varying lot sizes.
206
© 2009 SAP AG. All rights reserved. 2009/Q2
第 221 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
Production orders can be used as cost objects in the following production
environments:
• In order-related manufacturing: optional
• In process manufacturing: optional
• Co-product manufacturing using either production or process orders,
wheneverWIPandVariancecalculationattheco-productlevelisnecessary:
mandatory.
ProductionenvironmentscanusebothControllingmethodsinparallel,evenfor
the same material. Whenever applicable, the Product Cost by Period method
would be recommended, thereby reducing the number of cost objects to be
managed,andimprovingprocessingtimeforperiod-endclosing. Ifhowever,a
particularproductdoesnotfittheProductCostbyPeriodsituation,thenchoose
tocontrolthatproductattheproductionorderlevel.
Key Message
Tomeasuretheefficiencyofyourproductionenvironment,collectcostsatthe
required level.
Ifyouonlyevaluateyourproductsafterperiod-endclosingbysummarizingall
oftheproductionorderstoproductlevel,selectProductCostbyPeriod.
Do not collect data that you do not need.
ProductsthatarealwaysproducedwiththeirownBOMsandroutingsarebest
suited for product cost collectors.
Products that either require high numbers of engineering change or have high
setupcostsforvaryingproductionquantitiesaswellasco-productsarebestsuited
forProductCostbyOrderontheproductionorderlevel.
207
2009/Q2 © 2009 SAP AG. All rights reserved.
| Tomeasuretheefficiencyofyourproductionenvironment,collectcostsatthe required level. |
|---|
| Ifyouonlyevaluateyourproductsafterperiod-endclosingbysummarizingall oftheproductionorderstoproductlevel,selectProductCostbyPeriod. |
| Do not collect data that you do not need. |
第 222 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
208
© 2009 SAP AG. All rights reserved. 2009/Q2
第 223 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
Exercise 10: Period-End Closing with
Delivered Process Orders
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• CanceltheWIPatthecompletionoftheorder
• Executevarianceanalysisfortheprocessorderandanalyzetheresult
• SettleWIP(amount=zero)andvarianceamountstoFinancialAccounting
and Profitability Analysis
• Analyzetheaccountingdocumentscreatedduringsettlement
• CheckthesettingsforthevariancesettlementtoProfitabilityAnalysis
Business Example
Theprocessorderhadnotbeensettledbythecloseofthepreviousperiod. Sothat
WIP balances were generated for the order items and transferred to Financial
Accounting. Theprocessorderhasnowbeencompleted,sotheremainingWIP
balances need to be cancelled using WIP calculation, and settled to Financial
Accounting. In addition, since the order uses the full settlement rule (FUL),
variancescannowbecalculatedandtransferredtoProfitabilityAnalysis.
Final confirmation of the process order and posting final delivery of the
co-productsareprerequisitefortheperiod-endclosingactivities.
Task 1:
Postthefinalconfirmationandthegoodsreceiptforyourprocessorder. Thiswill
causeadditionalpostingsofactualcoststotheorder.
1. Createthefinalconfirmationfortheprocessorder. Theremaining600liters
havebeenmanufactured. Thelastphaserequiredanadditionalprocessing
time of 1 hour. Change the duration to reflect the additional hour. When
enteringtheconfirmation,selecttheFinalconfirmationindicator. Savethe
confirmation.
2. Post a goods receipt for the remaining delivery of 600 liters of fertilizer
(T-FF1##) and the remaining sulphuric acid (T-FF3##) with movement
type 101. Continue past the warning messages regarding batch numbers.
SelectNextScreentocontinuepasttheclassificationscreenforthebatch
specificationsforbothmaterials,T-FF1##andT-FF3##.
3. Displaythecostreportfortheorder. Whyaretheactualcostsforcostelement
620000(costcenter4250,activitytype1420)higherthantheplannedcosts?
Answer:
Continued on next page
209
2009/Q2 © 2009 SAP AG. All rights reserved.
第 224 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 2:
Againitisnecessarytoexecutethedistributionofactualcostsforco-products
priortocalculatingeithertheWIPorvariancesforperiod-end.
Favorites→PreliminarySettlementforCo-Products, Rework→Individual
Processing(CO8B)
1. Preliminarysettlementofanorderisnormallyexecutedonlyonceperperiod.
Reversethepreviouspreliminarysettlementfortheprocessorder.
2. Executetheindividualprocessingofallactualcoststotheco-productsof
your process order.
3. ReturntothePlan/ActualComparisonreportandreviewtheconsequences
ofthedistribution. Howwastheadditionalcostoftheadditional1hourof
production time distributed?
Task 3:
Sincetheorderhasthestatusfinaldelivery,WIPmustbecalculatedagaininorder
to cancel the remaining WIP balance.
1. UsetransactionIndividualProcessingtocalculatetheWIPvalueofyour
processorder. UseResultsAnalysisversion0forthecurrentperiod.
2. ComparethecalculatedtotalWIPamountwiththeremainingbalancefor
yourprocessorder. TheWIPbalanceshouldbezero. Theremainingbalance
on the process order will be considered production variance. Choose the
layout 1SAP03 to display the WIP balance.
Task 4:
TheproductionordershouldnowhavethestatusDeliverycompletedandFinally
confirmed. SincethesettlementtypefortheorderisFUL,variancecalculation
can be executed.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Variances→IndividualProcessing(KKS2)
1. Usingtheindividualprocessingtransaction, executevarianceanalysisfor
yourprocessorder. Calculatethevariancesforalltargetcostversionsfor
thecurrentperiod. Remaininthevarianceanalysisdetailedlistdisplayto
answer the following question.
2. Selectcostelementsforitem1anddisplaythevariancereport. Whatcaused
thevarianceforcostelement620000? Displaythecostelementreportfor
item2. Dobothproductsindicateavariancefortheprocessingduration?
Continued on next page
210
© 2009 SAP AG. All rights reserved. 2009/Q2
第 225 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
Task 5:
Aftervarianceshavebeencalculated,thevariancecategoriescanbesettledtoPA
andtheprocessordervariancecanbesettledtoFI.Inaddition,theWIPbalance
will be cancelled in FI.
Favorites→SingleFunctions→Settlement→IndividualProcessing(KO88)
1. Executesettlementfortheprocessorder. Usethecurrentperiodandyear.
2. Display the detail list for the settlement. The senders for production
variancesandthecancellationofWIParelistedonseparatescreens.
Accessthesettlementofthevariancesbyselectingthereceiverlineforthe
materialT-FF1##. ThesystemdisplaysalistofthevarianceamountsforPA
byvariancecategoriesandforFIbymaterial.
Select the accounting documents, and select the entry for Accounting
document. Forwhichcostelementswerepostingsmade?
3. Return to the list of accounting documents, and access the Profitability
Analysis document. Check settlement to the value fields according to
variancecategory. Towhichvaluefieldwasthevariancesettled?
4. InCustomizing, displaytheassignmentofthevaluefieldfortheresource
usagevariancecategoryusingPAtransferstructureE1.
211
2009/Q2 © 2009 SAP AG. All rights reserved.
第 226 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Solution 10: Period-End Closing with
Delivered Process Orders
Task 1:
Postthefinalconfirmationandthegoodsreceiptforyourprocessorder. Thiswill
causeadditionalpostingsofactualcoststotheorder.
1. Createthefinalconfirmationfortheprocessorder. Theremaining600liters
havebeenmanufactured. Thelastphaserequiredanadditionalprocessing
time of 1 hour. Change the duration to reflect the additional hour. When
enteringtheconfirmation,selecttheFinalconfirmationindicator. Savethe
confirmation.
a) Favorites→ProcessOrder→Confirmation→EnterforPhase→
Time Ticket (COR6N)
Entertheprocessordernumberandphase330.
Select Enter.
EntertheconfirmationtypeFinalconfirmation.
Confirm a yield of 600 liters.
Confirm a duration of 1 additional hour.
Save the confirmation.
Continued on next page
212
© 2009 SAP AG. All rights reserved. 2009/Q2
第 227 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
2. Post a goods receipt for the remaining delivery of 600 liters of fertilizer
(T-FF1##) and the remaining sulphuric acid (T-FF3##) with movement
type 101. Continue past the warning messages regarding batch numbers.
SelectNextScreentocontinuepasttheclassificationscreenforthebatch
specificationsforbothmaterials,T-FF1##andT-FF3##.
a) Favorites→Processorder→Environment→MaterialMovement
→ Post Material to Stock. (MB31)
Entermovementtype101,plant1100,andstoragelocation0001.
Choose To Order.
Enter the process order number.
Select Enter.
ConfirmtheremainingquantitiesforT-FF1##andT-FF3##.
Save the goods receipt.
SelectEnter(twice)tocontinuepasteachwarningmessageregarding
the batch number.
Select Next Screen to continue past the classification screen for the
batchspecificationsforbothmaterials(T-FF1##andT-FF3##).
3. Displaythecostreportfortheorder. Whyaretheactualcostsforcostelement
620000(costcenter4250,activitytype1420)higherthantheplannedcosts?
Answer:
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Settings → Order Items → On/Off
SelecttheLayoutsiconandselectlayout1SAP02(costtrend).
Enter your order number.
Choose Execute.
Theactualcostsarehigherthantheplannedcostsduetotheadditional
1hourofproductionthatwasconfirmedforoperation330.
Continued on next page
213
2009/Q2 © 2009 SAP AG. All rights reserved.
第 228 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 2:
Againitisnecessarytoexecutethedistributionofactualcostsforco-products
priortocalculatingeithertheWIPorvariancesforperiod-end.
Favorites→PreliminarySettlementforCo-Products, Rework→Individual
Processing(CO8B)
1. Preliminarysettlementofanorderisnormallyexecutedonlyonceperperiod.
Reversethepreviouspreliminarysettlementfortheprocessorder.
a) Enter your order number.
Settlement period: Current month
Posting period: Current month
FiscalYear: Current fiscal year
Deselect Test Run.
Preliminary Settlement → Reverse
2. Executetheindividualprocessingofallactualcoststotheco-productsof
your process order.
a) Enter your order number.
Settlement period: Current month
Posting period: Current month
FiscalYear: Current fiscal year
Deselect Test Run.
Choose Execute.
Continued on next page
214
© 2009 SAP AG. All rights reserved. 2009/Q2
第 229 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
3. ReturntothePlan/ActualComparisonreportandreviewtheconsequences
ofthedistribution. Howwastheadditionalcostoftheadditional1hourof
production time distributed?
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order→ Detailed Reports → For
Orders (KKBC_ORD)
Enter your order number.
Enter order item * .
Choose Execute.
Toseethecostelements,chooseChangeLayout.
FromtherighthandsideofthedialogueboxchoosetheCostElement
field. ChooseShowSelectedFieldsicon.
MovethefieldCostElementsothatitisthesecondfieldinthedisplay
list.
Noticethecreditentrieslistedbyorderitemforeachcostelement.
Thecostsoftheadditionalproductionhourweresplitaccordingtothe
apportionmentstructureforequivalencenumbers5:3.
Task 3:
Sincetheorderhasthestatusfinaldelivery,WIPmustbecalculatedagaininorder
to cancel the remaining WIP balance.
1. UsetransactionIndividualProcessingtocalculatetheWIPvalueofyour
processorder. UseResultsAnalysisversion0forthecurrentperiod.
a) Favorites→WorkinProcess→IndividualProcessing→Calculate
(KKAX)
Enter your order number.
WIP to period: Current month
FiscalYear: Current fiscal year
Results Analysis version 0
Deselect Test Run.
Choose Execute.
Continued on next page
215
2009/Q2 © 2009 SAP AG. All rights reserved.
第 230 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
2. ComparethecalculatedtotalWIPamountwiththeremainingbalancefor
yourprocessorder. TheWIPbalanceshouldbezero. Theremainingbalance
on the process order will be considered production variance. Choose the
layout 1SAP03 to display the WIP balance.
a) Accounting→Controlling→ProductCostControlling→CostObject
Controlling → Product Cost by Order → Information System →
ReportsforProductCostbyOrder→DetailedReports→ForOrders
(KKBC_ORD)
Settings → Order Items → On/Off
Enter your order number.
Enter order item * .
Choose Execute.
ToconfirmtheWIPbalance,selecttheLayoutsiconandselectlayout
1SAP03 (Work in Process).
ThegeneratedWIPbalanceshouldbezero. However,thereisstillan
orderbalanceresultingfromthevariancegeneratedbytheconfirmation
of operation 330.
Task 4:
TheproductionordershouldnowhavethestatusDeliverycompletedandFinally
confirmed. SincethesettlementtypefortheorderisFUL,variancecalculation
can be executed.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Variances→IndividualProcessing(KKS2)
1. Usingtheindividualprocessingtransaction, executevarianceanalysisfor
yourprocessorder. Calculatethevariancesforalltargetcostversionsfor
thecurrentperiod. Remaininthevarianceanalysisdetailedlistdisplayto
answer the following question.
a) Enter your order number.
Period: Current month
FiscalYear: Current fiscal year
Choose All target cost versions.
Deselect Test Run.
Select Detail list.
Choose Execute.
Continued on next page
216
© 2009 SAP AG. All rights reserved. 2009/Q2
第 231 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithDeliveredProductionOrders
2. Selectcostelementsforitem1anddisplaythevariancereport. Whatcaused
thevarianceforcostelement620000? Displaythecostelementreportfor
item2. Dobothproductsindicateavariancefortheprocessingduration?
a) Select the order item.
Choose Cost Elements.
Thecostelementvariancereportisdisplayed.
The variance for cost element 620000 was caused by the additional
productionhourthatwasconfirmedforoperation330.
DisplaythecostelementreportforT-FF3##.
Select the second order item.
Choose Cost Elements.
Thecostelementvariancereportisdisplayed.
Yes,bothproductsindicateavariancefortheprocessingduration.
Task 5:
Aftervarianceshavebeencalculated,thevariancecategoriescanbesettledtoPA
andtheprocessordervariancecanbesettledtoFI.Inaddition,theWIPbalance
will be cancelled in FI.
Favorites→SingleFunctions→Settlement→IndividualProcessing(KO88)
1. Executesettlementfortheprocessorder. Usethecurrentperiodandyear.
a) Enter your order number.
Settlement period: Current month
Posting period: Current month
FiscalYear: Current fiscal year
Deselect Test Run.
Choose Execute.
2. Display the detail list for the settlement. The senders for production
variancesandthecancellationofWIParelistedonseparatescreens.
Accessthesettlementofthevariancesbyselectingthereceiverlineforthe
materialT-FF1##. ThesystemdisplaysalistofthevarianceamountsforPA
byvariancecategoriesandforFIbymaterial.
Continued on next page
217
2009/Q2 © 2009 SAP AG. All rights reserved.
第 232 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Select the accounting documents, and select the entry for Accounting
document. Forwhichcostelementswerepostingsmade?
a) Choose Detail lists.
Ifnecessary,chooseGoto→Detaillistofsettledvalues
Select the first order item.
Choose Receiver.
ThevarianceamountsforPAarelistedbyvariancecategories,andthe
varianceamountforFIislistedbymaterial.
Usethegreenarrowbackandreturntothedetaillist.
Select Accounting documents.
SelecttheentryforAccountingdocument.
895000 Factory output of production
231500ExpensesfromPriceDifferences
281500 Income
893000 Work in Process
793000 WIP
3. Return to the list of accounting documents, and access the Profitability
Analysis document. Check settlement to the value fields according to
variancecategory. Towhichvaluefieldwasthevariancesettled?
a) Select Profitability Analysis.
Select the Value fields tab.
UsetheNextpageiconinthePAdocumentuntilthevaluefieldforthe
variance is visible.
Continued on next page