AC520 Lesson: Master Data and Preliminary Costing
Task 4:
1. Theuseofaproductcostcollectorisdependentontheordertypeselected
fortheproductionorder. Displaytheordertypedefaultsforplant1000and
ordertypePP08,andreviewtheCustomizingsettings.
a) Favorites→Tools→Customizing→IMG→ExecuteProject(SPRO)
Choose SAP Reference IMG.
Controlling→ProductCostControlling→CostObjectControlling
→ Product Cost by Order → Manufacturing Orders → Define
Cost-AccountingRelevantDefaultValuesforOrderTypesandPlants
(OKZ3)
Select plant 1000, order type PP08.
Choose Details.
2. Istheproductcostcollectorindicatorselected?
Answer: Yes,theproductcostcollectorindicatorisselected.
3. WhatisthedefaultrulefortheCOsettlement?
Answer: ThedefaultruleforCOsettlementisPP2,periodicsettlement.
4. If a product cost collector is found for a material, will the RA Key and
CostingvariantforordertypePP08defaulttotheproductionorder?
Answer: No, theRAkeyandcostingvariantforordertypePP08willnot
defaulttotheproductionorder. Thesettingsfortheproductcostcollector
will be used.
71
2009/Q2 © 2009 SAP AG. All rights reserved.
第 84 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Lesson Summary
You should now be able to:
• Createthemasterdataforaproductionorderandaproductcostcollector
• ExplaintheCustomizingfora“decouplingscenario”
• Carryoutpreliminarycostingforaproductcostcollector
72
© 2009 SAP AG. All rights reserved. 2009/Q2
第 85 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Lesson: Simultaneous Costing
Lesson Overview
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Carryoutgoodsmovementsandconfirmationsfortheproductionorder
• MakedirectpostingsfromFinancialAccountingtotheproductcostcollector
Business Example
Amanufacturerproducesvarioustypesofpumpsmake-to-stock. Salescontrolling
isonlycarriedoutinProfitabilityAnalysis(CO-PA).
Thepopulartypesareproducedinacontinuousproductionprocessandmappedin
thesystemwithrepetitivemanufacturing. Alesspopulartypeshouldinsteadbe
onlyproducedbasedonlotsizewithproductionordersandonlywhenthestockin
thewarehousedropsbelowthereorderpoint. Tobeabletobettercomparethe
costobjects,allproductionprocessesshouldbeaccompaniedbycontrollingby
period. Each pump has a production version for repetitive manufacturing and
anotherproductionversionfororder-relatedproduction.
Inthisexample,wewilltakeacloselookattheproductionforproductionorders.
When carrying out the production, goods issues and confirmations for the
productionorderarecarriedoutwhiledirectpostingsfromFinancialAccounting
directly address the product cost collector.
73
2009/Q2 © 2009 SAP AG. All rights reserved.
第 86 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure47: ProductionOrderandProductCostCollector: ProcessChain
Figure48: DebitofProductCostCollectorwithActualCosts
Thefollowingbusinesstransactionscanresultinactualcostsoncostobjects: G/L
accountpostingsinFI;goodsmovementsinMM;repostingsofprimarycosts;
repostingsoflineitems;internalactivityallocations;repostingsofinternalactivity
allocations;directassignmentofpersonnelcoststocostobjectsusingtimesheets;
74
© 2009 SAP AG. All rights reserved. 2009/Q2
第 87 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
processcostallocation;manualprocessallocation;templateallocation;calculation
ofoverhead;revaluationofactivitiesatactualprices;confirmationsinLogistics
thatresultinactivityallocations; subcontracting.
Logisticalfunctionssuchasgoodsissuesandconfirmationsarestillperformed
withreferencetothemanufacturingorder(or,inrepetitivemanufacturing,with
reference to the production version). The resulting costs are updated to the
product cost collector.
Youcanentergoodsissues,confirmations,andgoodsreceiptsindependentlyof
eachother. Youcanalsohaveactivityallocationsandgoodsissuesand/orgoods
receiptsgeneratedautomaticallywhenyouconfirm. Youmakethesettingsthat
enable this in Logistics.
Youcanconfirmtheorderheaderorindividualoperations. InProductCostby
Period,itisrecommendedthatyouconfirmoperations(affectsthecalculationof
work in process).
Figure49: CreditofProductCostCollectorbyGoodsReceipt
75
2009/Q2 © 2009 SAP AG. All rights reserved.
第 88 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Thepricecontrolofthematerialisspecifiedinthematerialmasterrecord:
• PriceControlIndicatorV:Thematerialisvaluatedatthemovingaverage
price (unit price). The moving average price changes with each goods
movement or when orders from Cost Object Controlling are settled. The
valueofthegoodsreceiptisdeterminedbythevaluationvariantfordelivery.
• PriceControlIndicatorS:Thematerialisvaluatedatthestandardprice. In
make-to-stockproduction,thispriceisusuallycalculatedinastandardcost
estimateforthematerial. Insales-order-relatedproductionwithavaluated
salesorderstock,thevaluationpriceisselectedusingapredefinedvaluation
strategy and acts like a standard price.
• FormaterialswhosepricecontrolisS,receiptsintostockarevaluatedatthe
standardprice. Thecreditappliedtotheproductcostcollectoristhequantity
receivedintoinventorymultipliedbythestandardprice. Formaterialswhose
pricecontrolindicatorisV,thereceiptintoinventoryandthecredittothe
productcostcollectoriscontrolledbythevaluationvariantfordelivery. The
valuationvariantfordeliverydetermineswhichpricefieldfromthematerial
masterisselectedtovaluethegoodsreceipt. Whentheproductcostcollector
is settled (for example, during the period-end closing), the postings for
materialswithpricecontrolindicatorScandifferfromthoseformaterials
with price control indicator V.
Whenthegoodsreceiptisentered, thesystemautomaticallydebitsthebalance
sheetaccountandcreditstheinventorychangeaccount. Theproductcostcollector
iscreditedusingtheprimarycostelementthatcorrespondstotheplantactivity
account (inventory change account).
Forinternallymanufacturedmaterials,SAPrecommendsvaluationatthestandard
price.
76
© 2009 SAP AG. All rights reserved. 2009/Q2
第 89 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Exercise 2: Simultaneous Costing -
Product Cost Collectors
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Analyzetheactualcostsofmaterialwithdrawalandtherelated(component
scrap)
• Analyze the actual production costs for the confirmation of production
activities
• Analyzetheactualcostforthereceiptofthefinishedproduct
• DisplaytheCustomizingsettingsforsimultaneouscosting
Business Example
Theactualcostsforaproductionorderarepostedwithgoodsreceiptsandissues
as well as with confirmations for operations.
Forthemanufacturingofthepumpassembly,thecomponentsareissuedmanually,
viainventorymanagement. Ifanycomponentsarescrappedduringproduction,
additional quantities are issued to the production order. The production floor
records the progress (products made, execution times) of a production order
byutilizingorderconfirmations. Duringtheconfirmation, youcanchangethe
suggestedexecutiontimes. Goodsreceiptscanbeprocessedeithermanuallyusing
InventoryManagementorautomaticallyduringproductionconfirmation. This
depends on the control key of the operation. In our case, the goods receipt is
automaticallyupdatedwiththeconfirmation. Duringtheconfirmation,youcan
enter scrap quantities.
Anychangestothesuggestedquantities(targetquantities)causequantityvariances
forthevariancecalculationthatiscarriedoutlaterduringtheperiod-endclosing.
Task 1:
Since the production order has been released to the shop floor, inventory
transactionsandproductionconfirmationscanbepostedagainsttheorder. The
simultaneouscostingisrecordedontheassignedproductcostcollector.
1. Enterthegoodsissuefortheproductionorder. Duetomaterialscrapthat
hasoccurredduringassembly,changethewithdrawalquantityofmaterial
R-B1##from10to11. Willthisquantitychangebereportedasavariance?
2. Enterafinalconfirmationforoperation10oftheproductionorder. Enter
a yield of 10 pieces, and increase the labor time by a factor of 10 % to
reflect the additional processing time necessary because of the scrapped
components. Save the confirmation.
Continued on next page
77
2009/Q2 © 2009 SAP AG. All rights reserved.
第 90 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
3. Enter a partial confirmation for operation 70 of the production order.
Enterayieldof5piecesandascrapquantityof1piece. Savethepartial
confirmation. Continuepastthewarningregardingtheactivityrecalculation
due to the partial confirmation.
Hint: Because the operation uses control key PP99, this is a
milestoneconfirmationwithanautomaticgoodsreceipt.
Task 2:
UsetheTarget/Actual-Comparisonreporttoreviewtheactualcostinformation
fortheproductcostcollectorofmaterialR-F1##.
1. DisplaythequantityofmaterialR-B1##thatwasdebitedtotheproductcost
collector. Displaytheactivitiesthatweredebitedtotheproductcostcollector.
2. Locate the credit to the product cost collector for the goods receipt of
R-F1##. Wasthecostcollectorcreditedfortheconfirmationoftheassembly
that was reported as scrap?
3. Whatvaluewasusedtocredittheproductcostcollectorforthegoodsreceipt
of the pump assembly? Why?
Task 3:
TheactualcostsfortheactivitieswerecalculatedusingthecostingvariantPPP3.
Reviewthecustomizingsettingsforthesimultaneouscostingofthecostsforthe
product cost collector.
1. DisplaytheassignmentofthiscostingvarianttotheordertypeRM01default
values for plant 1000.
2. Whichvaluationvariantisassignedtocalculatetheactualordercostsfor
costing variant PPP3?
Valuation variant:
Continued on next page
78
© 2009 SAP AG. All rights reserved. 2009/Q2
第 91 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
3. Whatpriceisselectedforcalculatingtheproductioncosts? Isthisthesame
pricethatwasusedtodetermineplannedcosts(preliminarycostestimate)
for the product cost collector?
Activity price selected for actual costs:
Activity price selected for planned costs:
79
2009/Q2 © 2009 SAP AG. All rights reserved.
第 92 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Solution 2: Simultaneous Costing -
Product Cost Collectors
Task 1:
Since the production order has been released to the shop floor, inventory
transactionsandproductionconfirmationscanbepostedagainsttheorder. The
simultaneouscostingisrecordedontheassignedproductcostcollector.
1. Enterthegoodsissuefortheproductionorder. Duetomaterialscrapthat
hasoccurredduringassembly,changethewithdrawalquantityofmaterial
R-B1##from10to11. Willthisquantitychangebereportedasavariance?
a) Logistics→Production→ShopFloorControl→GoodsMovements
→ Goods Issue (MB1A)
Beforebeginningthetask,chooseAddtofavorites.
Entermovementtype261,plant1000,andstoragelocation0001.
Choose To order.
Enter the production order number.
Select Enter.
ChangethewithdrawalquantityforR-B1##from10to11.
Save the material withdrawal.
SelectEntertocontinuepastanywarningmessageregardingreserved
quantity.
Yes,aquantityvariancewillbedeterminedforthismaterialcomponent
during variance calculation.
Continued on next page
80
© 2009 SAP AG. All rights reserved. 2009/Q2
第 93 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
2. Enterafinalconfirmationforoperation10oftheproductionorder. Enter
a yield of 10 pieces, and increase the labor time by a factor of 10 % to
reflect the additional processing time necessary because of the scrapped
components. Save the confirmation.
a) Logistics→Production→ShopFloorControl→Confirmation→
Enter→ForOperation→TimeTicket(CO11N)
Beforebeginningthetask,chooseAddtofavorites.
Entertheordernumberandoperation0010.
Select Enter.
EntertheconfirmationtypeFinalconfirmation.
Confirm a yield of 10 pieces.
Enter a labor execution time approximately 10% greater than the
default time.
Save the confirmation.
3. Enter a partial confirmation for operation 70 of the production order.
Enterayieldof5piecesandascrapquantityof1piece. Savethepartial
confirmation. Continuepastthewarningregardingtheactivityrecalculation
due to the partial confirmation.
Hint: Because the operation uses control key PP99, this is a
milestoneconfirmationwithanautomaticgoodsreceipt.
a) Favorites→Confirmation→Enter→ToOperation→TimeTicket
(CO11N)
Entertheordernumberandoperation0070.
Select Enter.
EntertheconfirmationtypePartialconfirmation.
Confirm a yield of 5 pieces.
Enter a scrap quantity of 1 piece.
Save the confirmation.
Continuepastthewarningmessagesregardingactivitytimecalculation.
Continued on next page
81
2009/Q2 © 2009 SAP AG. All rights reserved.
第 94 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Task 2:
UsetheTarget/Actual-Comparisonreporttoreviewtheactualcostinformation
fortheproductcostcollectorofmaterialR-F1##.
1. DisplaythequantityofmaterialR-B1##thatwasdebitedtotheproductcost
collector. Displaytheactivitiesthatweredebitedtotheproductcostcollector.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyPeriod→Informationsystem
→ReportsforProductCostbyPeriod→DetailedReports→For
Product Cost Collectors (KKBC_PKO)
Enter your material R-F1##.
Enter plant 1000.
Choose Execute.
TheactivitytypesandmaterialsaredisplayedintheOrigincolumn.
Todisplaytheactualquantitiesforthelineitems:
Choose Change layout.
FromtheColumnSet,selectTotalActualQuantity.
Select Show selected fields.
Select Transfer (Enter).
2. Locate the credit to the product cost collector for the goods receipt of
R-F1##. Wasthecostcollectorcreditedfortheconfirmationoftheassembly
that was reported as scrap?
Answer: The product cost collector was credited for the goods receipt
postingof5pieces. The1piecethatwasreportedasscrapisnotcreditedto
theproductcostcollector. Itwillbecalculatedasscrapvaluewhenvariances
arecalculatedfortheproductcostcollector.
3. Whatvaluewasusedtocredittheproductcostcollectorforthegoodsreceipt
of the pump assembly? Why?
Answer: Thestandardcostestimatewasusedtovaluatethegoodsreceipt.
All materials that use standard price control also credit the product cost
collectorwiththestandardprice. Onlymaterialswithmovingaverageprice
useavaluationvarianttodeterminethecostobjectcreditattimeofgoods
receipt. ThiscanbeconfirmedbydisplayingtheaccountingviewofR-F1##
andlocatingthepricecontrol(Standard)andthecurrentstandardprice.
Continued on next page
82
© 2009 SAP AG. All rights reserved. 2009/Q2
第 95 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Task 3:
TheactualcostsfortheactivitieswerecalculatedusingthecostingvariantPPP3.
Reviewthecustomizingsettingsforthesimultaneouscostingofthecostsforthe
product cost collector.
1. DisplaytheassignmentofthiscostingvarianttotheordertypeRM01default
values for plant 1000.
a) Favorites → Tools → Customizing → IMG → Execute Project
(SPRO)
Choose SAP Reference IMG.
Controlling→ProductCostControlling→CostObjectControlling
→ Product Cost by Period → Product Cost Collectors → Define
Cost-Accounting-RelevantDefaultValuesforOrderTypesandPlants
(OKZ3)
Select plant 1000, order type RM01.
Choose Details.
ThecostingvariantforthesimultaneouscostingisPPP3.
2. Whichvaluationvariantisassignedtocalculatetheactualordercostsfor
costing variant PPP3?
Valuation variant:
a) ReturntotheIMGnodeProductCostCollectors,thenchoose
Check Costing Variants for Product Cost Collectors → Costing
VariantsforValuationofInternalActivities(OPL1)
Select Costing Variant PPP3.
Choose Details.
ValuationVariantProductionOrder-actual(007).
3. Whatpriceisselectedforcalculatingtheproductioncosts? Isthisthesame
pricethatwasusedtodetermineplannedcosts(preliminarycostestimate)
for the product cost collector?
Activity price selected for actual costs:
Continued on next page
83
2009/Q2 © 2009 SAP AG. All rights reserved.
第 96 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Activity price selected for planned costs:
a) SelecttheValuationVariantviewontheDetailsscreen.
Select the Activity Types/Processes tab.
Thestrategysequenceforactualcostsis:
1. Plan price for the period
Todisplaytheplannedcoststrategy,returntotheIMGnodeandchoose
CheckCostingVariantsforProductCostCollectors ChooseCosting
VariantstoDetermineActivityQuantities(OKKN)
Select Costing Variant PREM.
Choose Details.
Choose Valuation Variant.
Select the Activity Types/Processes tab.
The price selection strategy sequence is:
1. Planpriceasaverageofallfiscalyearperiods
2. Plan price for the period
No, they do not use the same price.
84
© 2009 SAP AG. All rights reserved. 2009/Q2
第 97 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Lesson Summary
You should now be able to:
• Carryoutgoodsmovementsandconfirmationsfortheproductionorder
• MakedirectpostingsfromFinancialAccountingtotheproductcostcollector
85
2009/Q2 © 2009 SAP AG. All rights reserved.
第 98 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Lesson: Period-End Closing
Lesson Overview
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Describethetypicalstepsforperiod-endclosinginmake-to-stockproduction
with Product Cost by Period
• Calculateworkinprocess(WIP)attargetcostandexplaintheassociated
Customizing
• Carry out variance analysis
• Describetheintegrationofperiod-endclosing
Business Example
Amanufacturerproducesvarioustypesofpumpsmake-to-stock. Salescontrolling
isonlycarriedoutinProfitabilityAnalysis(CO-PA).
Thepopulartypesareproducedinacontinuousproductionprocessandmappedin
thesystemwithrepetitivemanufacturing. Alesspopulartypeshouldinsteadbe
onlyproducedbasedonlotsizewithproductionordersandonlywhenthestockin
thewarehousedropsbelowthereorderpoint. Tobeabletobettercomparethe
costobjects,allproductionprocessesshouldbeaccompaniedbycontrollingby
period. Each pump has a production version for repetitive manufacturing and
anotherproductionversionfororder-relatedproduction.
Inthisexample,wewilltakeacloselookattheproductionforproductionorders.
Period-endclosingiscarriedoutcompletelyonthecostobjectinControlling;in
this scenario, on the product cost collector.
86
© 2009 SAP AG. All rights reserved. 2009/Q2
第 99 页 / 共 443 页
AC520 Lesson: Period-End Closing
Template Allocation, Revaluation, Overhead
Figure50: Period-EndClosingfortheProductCostCollector
Functionsintheperiod-endclosingprocessforproductcostcollectors:
• Templateallocationforautomaticallocationofprocesscostsandactivity
types.
• Revaluation,atactualprices,ofactivitytypesandbusinessprocesseswith
which cost objects were debited.
• Allocation of overhead.
• Calculationofworkinprocess(WIP):InProductCostbyPeriod,thework
in process is calculated at target cost.
• Variance calculation: The variance calculation function investigates the
causesoftheorder'sbalance. Thisfunctionprovidesanswerstoquestions
suchas: Whydidtheproductionprocesscostmorethananticipated?
• Settlement
– The work in process is settled to Financial Accounting and Profit
Center Accounting
– TheorderbalanceissettledtoFinancialAccountingandProfitCenter
Accounting(alsototheMaterialLedger,ifactive)
– ThevariancecategoriesaresettledtoProfitabilityAnalysis
TheScheduleManagersimplifiestheperiod-endclosingprocess. Itisaddressed
extensively in course AC690.
87
2009/Q2 © 2009 SAP AG. All rights reserved.
第 100 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure 51: Template Allocation
TemplateallocationisanewtechniqueforpassingonthecostsoftheOverhead
Cost Controlling to cause as closely and “as comfortably as possible” (that is,
without manual effort). All objects of the Controlling are suitable for use as
receivers,especiallycostobjectsandprofitabilitysegmentsoftheCO-PA.
• The template allocation technique allocates ABC processes and activity
typesofthecostcenters. Inprinciple,allinformationinthesystemcanbe
used as the cause value (cost driver).
• The process template is determined dynamically based on the following
parameters:
– Thecostingsheetfortheapplicationofoverheadisselectedwiththe
valuation variant.
– Theoverheadkeyiseitherentereddirectlyinthecostobjectorderived
fromtheoverheadgroupfromthematerialmaster(costingview1).
– With the combination of overhead key and costing sheet, you can
assign a template in Customizing.
For the previous example, you must define a template in which you use the
function ORDER_TARGET_PROCESS_QUANTITY to calculate the actual
processquantity. Inthisfunction,thetargetcostsoftheprocessarecalculatedon
the basis of the current standard costs.
88
© 2009 SAP AG. All rights reserved. 2009/Q2
第 101 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure 52: Revaluation at Actual Prices (1)
Youcandeterminetheactualpricesforactivitytypesandbusinessprocessesatthe
endoftheperiod. Theactualpricesaretheactualcostsdividedbytheactivityand
process quantities consumed.
YoucontrolwhetherrevaluationatactualpricesispossibleinCustomizinginthe
parametersfortheactualversionthatdependonthefiscalyear,aswellasinthe
master data of the activity type.
YoucalculateactualpricesinOverheadCostControlling.
Revaluationatactualpricesisperformedintheperiod-endclosingprocessforthe
productcostcollector. Thecostobjectischargedwiththedifferencebetweenthe
actualpriceandthepriceoriginallyallocatedtoit.
You can revaluate activities and business processes at actual prices in the
following components:
• In Cost Object Controlling, for all cost objects (product cost collectors;
productionordersandprocessorders,salesorderitems(iftheyarebeingused
ascostobjects),internalorders;costobjecthierarchies;generalcostobjects)
• In the Project System (projects (WBS elements), networks, network
activities)
89
2009/Q2 © 2009 SAP AG. All rights reserved.
第 102 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure 53: Revaluation at Actual Prices (2)
In this example, the planned cost center cost differs from the actual cost. The
plannedpriceis10.00perhour. However,only9hourswereallocatedinsteadof
the 10 that were planned in the preliminary costing. At the planned price, this
resultsin90.00beingallocatedtotheproductcostcollector.
At the end of the period, the total activity-related cost at the cost center is
determinedtobe117.00. At9allocatedhours,thisresultsinatargetpriceof13.00
perhour,thatis,9x13.00=117.00intotal. Thedifferenceof27.00ischargedto
theproductcostcollectorwiththerevaluationatactualpricesfunction.
Inthisexample,revaluationatactualpricesisillustratedusinganactivitytype.
It also applies to business processes.
90
© 2009 SAP AG. All rights reserved. 2009/Q2
第 103 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure 54: Actual Overhead Calculation
Actualoverheadcalculationallocatescostobjectswithactualoverhead.
Overheadisallocatedtocostobjectsusingquantity-basedorpercentageallocation
rates.
Youcansimulateoverheadallocation(testrun).
Theoverheadcalculationprocessgeneratesthefollowingpostings:
• Overhead costs are charged to the cost objects (product cost collectors,
manufacturingorders, orgeneralcostobjects).
• TheOverheadCostObject(costcenter,order,process)iscredited.
Thecostsareupdatedusingthesecondarycostelementsspecifiedinthecredit
rows in the costing sheet.
Actual overhead calculation uses the costing sheet entered in the product cost
collector.
91
2009/Q2 © 2009 SAP AG. All rights reserved.
第 104 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Work in Process
Figure55: WorkinProcess(WIP)atTargetCost
CalculatingtheWIPmeansvaluatingtheunfinishedgoods(workinprocess).
InProductCostbyPeriod,workinprocessisvaluatedattargetcost. Theoperation
quantities confirmed for the manufacturing orders or production versions are
valuated at the target cost of the operation provided that the quantities are not
scrap and no goods receipt has been entered.
In Customizing, you can use a valuation variant to define which cost estimate
should be used to calculate the target costs for the valuation of the work in
processandthescrap. Ifyouareusingaproductcostcollector,inmanycasesit
isappropriatetocalculatethetargetcostsusingthepreliminarycostingforthe
product cost collector.
Thedifferencebetweentheworkinprocessinthecurrentperiodandtheworkin
processinthepreviousperiodcorrespondstotheinventorychangeofunfinished
goodsandistransferredtofinancialaccountingwhenyousettle.
92
© 2009 SAP AG. All rights reserved. 2009/Q2
第 105 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure56: Customizing: WorkinProcessatTargetCost
Youcanspecifyavaluationvarianttoselectthecostestimateforthevaluation
ofworkinprocessandscrapvariancesattargetcost.
Target costs can be calculated on the basis of:
• Planned costs (that is, the costs calculated in preliminary costing for the
manufacturingorderorfortheproductcostcollector).
• Basedonanalternativematerialcostestimate(suchasamodifiedstandard
cost estimate or an actual cost estimate). To identify the costing, enter a
costing variant and costing version.
• The current standard cost estimate.
Youassignavaluationvariantforworkinprocessandscraptoacombinationof
controllingarea,ResultsAnalysisversion,andResultsAnalysiskey.
TheonlyResultsAnalysiskeysthatarerelevantarethoseusedforthecalculation
of work in process at target cost.
93
2009/Q2 © 2009 SAP AG. All rights reserved.
第 106 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure 57: Customizing: Assignment Table
YouassignthefollowingcostelementstolineIDs:
• Allcostelementswithwhichanorderisdebitedandcredited.
• Withworkinprocessattargetcost,allcostelementsinthecostingusedfor
thecalculationoftargetcostsforthevaluationofworkinprocess(suchas
allcostelementslistedinthepreliminarycostestimatefortheproductcost
collector).
– Forvaluation-relevantcosts(suchasdirectmaterialcosts),youmust
create line IDs of category “K” (costs).
– IfyouwantnoworkinprocesstobecreatedforentirelineIDs(for
example,becausethecostsareaccrued),youmustassigntheselineIDs
to category “N” (not included).
ThelineIDsbreakdownthecostsincurredfortheorderintodirectmaterialscosts,
directproductioncosts,materialoverhead,andsoon. Thesegroupscanbebased
onthestructureofthecostofgoodsmanufacturedinthecostcomponentstructure
(costcomponentsplit),forexample. Youcanspecifyapercentagethatcannotbe
capitalized separately for each line ID.
Youcanmaskyourentries. Theentry00004+++++includesthecostelements
from 400000 to 499999. If you want particular cost elements to be treated
separately,enterthemunmasked(example: 0000415000).
94
© 2009 SAP AG. All rights reserved. 2009/Q2
第 107 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure 58: Customizing: Update Table
In this step, you specify with a Results Analysis category how the Results
Analysis is handled and which Results Analysis cost elements of type 31 the
ResultsAnalysisissavedunderonthecostobject.
• Forvaluation-relevantcosts(suchasdirectmaterialcosts),youmustcreate
line IDs of category “K” (costs).
• If you want no work in process to be created for an entire line ID (for
example, because the costs are accrued), you must assign this line ID to
category “N” (not included).
Figure 59: Customizing: Posting Rules Table
95
2009/Q2 © 2009 SAP AG. All rights reserved.
第 108 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Inthisstep,youspecifytowhichG/LaccountsinFinancialAccountingworkin
processissettled. Theassignmentiscarriedout:
• ByResultsAnalysiscategory: Inmanycasesitwillbesufficienttogenerate
a posting rule for the work in process with a requirement to capitalize
(category WIPR).
• By Results Analysis cost element.
Youassignabalancesheetaccountandanaccountoftheincomestatementto
each Results Analysis category (such as each Results Analysis cost element).
YoucannotcreatecostelementsinCOfortheG/Laccountsthatyouspecifyin
the posting rules.
Whentheworkinprocessissettled,apostingdocumentisgeneratedinFI.When
thesystemcapitalizestheworkinprocess,itdebitsUnfinishedGoodsInventory
(WIP)(balancesheetaccount)andcreditsChangesinUnfinishedGoodsInventory
(WIP) (income statement account).
If you have specified a profit center in the product cost collector, data is also
transferred to Profit Center Accounting.
Variance Calculation
Figure 60: Variance Calculation: Target Version
96
© 2009 SAP AG. All rights reserved. 2009/Q2
第 109 页 / 共 443 页
AC520 Lesson: Period-End Closing
AsofRelease4.5, youcandeductthescrapvariancesfromtheactualcostsfor
thecalculationofcontrolcosts. Thescrapvariationiscalculatedbyvaluatingthe
unplannedscrapquantitieswiththetargetcostsminustheplannedscrapcosts.
Theunplannedscrapquantityisthedifferencebetweentheactualscrapquantity
of the operation and its target scrap quantity.
Invariancecalculation, targetcostversionsareusedmainlytocontrolthetype
of variance (total variance, production variance, or planning variance). They
can also be used to valuate the scrap variances. The standard system uses the
following target cost versions:
• Targetcostversion0(totalvariance). Thetotalvarianceequalstheorder
balance. For this version, choose actual costs as the control costs and
standard cost estimate as the target costs.
• Targetcostversion1(productionvariance). Forthisversion,chooseactual
costsasthecontrolcostsandplannedcostsasthetargetcosts.
• Target cost version 2 (planning variance). With target cost version 2, the
costsinthepreliminaryordercostestimateareinterpretedascontrolcosts.
For this version, choose planned costs as the control costs and current
standard cost estimate as the target costs. You cannot calculate planning
variances for product cost collectors.
• Targetcostversion3(productionvarianceoftheperiod). Youcomparethe
plannedcostsoftheperiodcalculatedonthebasisofanalternativematerial
cost estimate (such as a modified standard cost estimate) with the actual
costs of the period on the basis of the yield delivered to inventory in the
period. The base quantity for variance calculation is the yield. For this
version,chooseactualcostsasthecontrolcostsandalternativematerialcost
estimate as the target costs.
InProductCostbyPeriod,WIPandscrapvariancesarealwaysdeductedfromthe
actual costs.
97
2009/Q2 © 2009 SAP AG. All rights reserved.
第 110 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure61: VarianceCalculation: VarianceCategories
Examples for variance categories:
Input price variances:
Rawmaterial1wasvaluatedat10inthestandardcostestimate. Whenthe
materialwaswithdrawnfrominventory,however,thegoodsmovementwas
valuated at 11 (the price control specifies that valuation is at the moving
averageprice). Thisresultsinapricevarianceof1.
Input quantity variance:
Machinetimeof15minuteswasplanned,but17minuteswereconfirmed.
The activity price for the machine time is 5 per minute. This results in a
quantity variance of 10.
Resource-usage variance:
Raw material 2 is used instead of raw material 1. The costs for both raw
materialsarereportedasresource-usagevariances.
Remaining input variance:
Becausethepriceformaterial1changed, thematerialoverheadishigher
than planned. The difference between the planned and actual material
overheadexpenseisreportedasaremaininginputvariance.
Mixed-price variance:
Ifthestandardpriceofamaterialwascostedusingmultipleprocurement
alternatives(mixedcostestimate),alaterproductionwithoutvarianceswill
stillhaveadifferencetothestandardprice. Thisisthemixed-pricevariance.
98
© 2009 SAP AG. All rights reserved. 2009/Q2
第 111 页 / 共 443 页
AC520 Lesson: Period-End Closing
Lot size variance:
Ifanotherquantitywasusedforproductionthanpreviouslygeneratedinthe
product costing, the fixed costs are adjusted proportionally with another
quantity,thatis,thefixedcostsperpiecechange. Thisisthelotsizevariance.
Output price variance:
The material is transferred to inventory at a price other than the standard
price(suchasamovingaverageprice). Thedifferenceisdeterminedasan
output price variance.
Remaining variance:
If the system cannot determine the target costs, it will determine only
remaining variances.
Figure62: Addendum: AssemblyScrapandOperationScrap
99
2009/Q2 © 2009 SAP AG. All rights reserved.
第 112 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure 63: Addendum: Planned Scrap
Theplannedscrapratereflectstheplannedmaterialrequirementsandtheplanned
internalactivities,andisincludedinthestandardcostestimateofthematerial.
Component scrap refers to materials that are faulty before they enter the
productionprocess. Componentscrapincreasesthequantityofinputmaterials.
Plannedcomponentscrapistakenintoaccountinthestandardcostestimateand
thereforeaffectsthestandardprice. Variancesintheactualsareconsideredinput
quantity variances.
Plannedoperationscrapisthescrapthatisexpectedtobeincurredinanoperation.
Assembly scrap can be calculated by the system on the basis of the operation
scrap. Assemblyscrapincreasestheplannedorderquantityandalsothequantity
oftheinputmaterials. Forexample,iftheassemblyscrapforamaterialis56.25%
andyoucreateaproductionorderforthematerialwithaplannedorderquantityof
100units,thesystemincreasestheplannedorderquantityto156.25.
If you do not want the assembly scrap to affect the input quantities of certain
inputmaterials,settheNetindicatorintheBOMforthesematerialsandenterthe
operation scrap in the BOM.
100
© 2009 SAP AG. All rights reserved. 2009/Q2
第 113 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure64: VarianceCalculation: ScrapVariance(1)
Thescrapvarianceisthevalueofthescrapvariancequantity. Thescrapvariance
quantityisthedifferencebetweenthetargetscrapquantity(plannedscrapquantity
convertedtoyield)andtheactualscrapquantity(confirmedscrapquantity).
Thescrapvariancequantityisvaluatedattargetcostlessplannedscrapcost.
The following formula calculates the target scrap quantity: 850 units = 80%
(yield), 20% scrap = x
Therefore: (850 x 0.2) 0.8 = 212.5.
101
2009/Q2 © 2009 SAP AG. All rights reserved.
第 114 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure65: VarianceCalculation: ScrapVariance(2)
Figure66: VarianceCalculation: LotSizeVariance
Lot size variances can be calculated for all target cost versions that report
variances on the output side.
Lotsizevariancesarecalculatedinthefollowingformula:
Lotsizevariance=Lotsize-independenttargetcostsx(1–Controlquantity
/ Planned quantity).
Lotsizevariancesareonlycalculatediftheplannedquantitydoesnotequalthe
confirmed quantity (the delivered quantity).
Inthisexample,thecoststhatareindependentoflotsize(suchasthesetupand
teardown costs) are 40.00 per unit.
Example: The standard price for a finished product as calculated in the
standard cost estimate is 120.00.
102
© 2009 SAP AG. All rights reserved. 2009/Q2
第 115 页 / 共 443 页
AC520 Lesson: Period-End Closing
Thecostsfor10unitsoffinishedproductdeliveredtoinventoryintheperiod
wereupdatedtotheproductcostcollector. Theactualcostis840.00. The
goods receipts are valuated at 1,200.00 (quantity delivered to inventory
multipliedbythestandardpriceascalculatedinthestandardcostestimate).
Thetargetcosts,however,are10x40.00formaterials,10x40.00forinternal
activities, and 1 x 40.00 for setup = 840.00. The difference between the
targetcostsandcreditisthelotsizevariance.
Figure67: VarianceCalculation: Mixed-PriceVariance
IfyouwanttoperformmixedcostinginProductCostPlanning,youmustcreate
aprocurementalternativeforeachproductionversionandthendefineamixing
ratio. Themixedcostestimatecalculatesamixedprice. Thispricecanbewritten
to the material master as the standard price.
Mixed-price variances arise when the system updates the mixed price as the
standard price in the material master and valuates the stock with it. The
mixed-pricevarianceresultsfromthedifferencebetweenthetargetcredit(actual
quantityxstandardcostofprocurementalternative)determinedinthevariance
calculationprocessandtheactualcreditpostedatthetimeofthegoodsreceipt
(actual quantity x standard price).
Ifyouhavenotactivatedthefieldmixed-pricevarianceinthevariancevariant,
mixed-pricevariancesarereportedasoutputpricevariances.
103
2009/Q2 © 2009 SAP AG. All rights reserved.
第 116 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure68: CustomizingforVarianceCalculation
Youalwaysenterthevaluationvariantforscrapintargetcostversion0. Even
if you calculate variances in a different target cost version (such as target cost
version1),thescrapvariancemaybevaluatedwiththevaluationvariantspecified
in target cost version 0.
Younormallyusethesamevaluationvariantforthevaluationofworkinprocess
attargetcostandforthevaluationofscrapvariances.
Inthevariancevariant,youspecifywhichvariancecategoriesyouwantthesystem
toreport. Youlinkthevariancevarianttothetargetcostversion.
Variancescanonlybecalculatedonacostobjectifyouhavestoredavariance
keyinitsmasterrecord. Youspecifythevariancekeyinthecostingviewofthe
materialmasterrecord;itistransferredfromthereintotheproductcostcollector
(inProductCostbyOrder,itistransferredintothemanufacturingorder). Youcan
specifythevariancekeyasaplant-baseddefaultvalueinCustomizingforProduct
CostbyPeriodorProductCostbyOrder. Thevariancekeyisthentransferred
intoallmaterialmasterrecordscreatedintheplantinquestion.
104
© 2009 SAP AG. All rights reserved. 2009/Q2
第 117 页 / 共 443 页
AC520 Lesson: Period-End Closing
Settlement
Figure 69: Settlement
If the price control indicator is set to S, settlement debits the price difference
accountandcreditstheinventorychangeaccount. Thevalueofthetotalvariance
is posted.
IfthepricecontrolindicatorissettoV,settlementdebitstheinventoryaccount
and credits the inventory change account.
SettlementalsotransferstheworkinprocesstoFinancialAccounting.
Thevalueofthetotalvarianceandtheworkinprocesscanalsobetransferred
to Profit Center Accounting.
ThevalueofthetotalvarianceisalsoupdatedintheMaterialLedger(ifactive).
YoucansettlethevariancecategoriestoCosting-BasedProfitabilityAnalysis
(CO-PA). The only variances that are relevant for settlement to Profitability
Analysisarethosecalculatedonthebasisoftargetcostversion0. Thevaluefields
areassignedtothevariancesforeachcategoryandcostelement.
If the price difference account has a corresponding cost element, the price
differenceissettledtoAccount-BasedProfitabilityAnalysisinasimilarwayas
to Financial Accounting.
105
2009/Q2 © 2009 SAP AG. All rights reserved.
第 118 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
Figure 70: Customizing: Settlement Profile
The settlement profile for a product cost collector must allow settlement to a
material. IfyouwanttosettlevariancestoProfitabilityAnalysis,theVariances
indicator must be selected and settlement to a profitability segment must be
allowed.
The settlement profile is defaulted through the order type of the product cost
collector.
The settlement profile also has fields for the allocation structure and the PA
transferstructure. Thesestructurescontrolsettlementtocosting-basedProfitability
Analysis.
Inthesettlementstructure,youindicatewhetheryouwanttosettlewithsource
costelementsorwithsettlementcostelements.
106
© 2009 SAP AG. All rights reserved. 2009/Q2
第 119 页 / 共 443 页
AC520 Lesson: Period-End Closing
Figure 71: Customizing: PA Transfer Structure
InthePAtransferstructure,youspecifywhichvariancecategoryandcostelement
groupsareassignedtowhichvaluefieldsinProfitabilityAnalysis.
Valuesandquantitiesmustbetransferredintodifferentvaluefields. Thevalues
caneitherbedifferentiatedbythefixed/variableindicatorortransferredasasum
(Fixed/variable indicator = 3).
107
2009/Q2 © 2009 SAP AG. All rights reserved.
第 120 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
108
© 2009 SAP AG. All rights reserved. 2009/Q2
第 121 页 / 共 443 页
AC520 Lesson: Period-End Closing
Exercise 3: Period-End Closing
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Allocate process costs to the product cost collector using the allocation
templateandreviewthecustomizingsettingsforthetemplate
• Allocate overhead costs to the product cost collector and review the
customizing settings for the costing sheet
• CalculateWIPattargetcostfortheproductcostcollectorandexplainthe
customizing settings
• Executevarianceanalysisfortheproductcostcollectorandanalyzetheresult
• Analyzethetargetcostforunplannedscrapofthefinishedproduct
• ExecutesettlementoftheWIPbalanceandthevariancestoFIandPA
Business Example
At the end of the period, all cost objects are processed in period-end closing,
whichconsistsofthetypicalstepsasfollows: templateallocation, revaluation
of activity and process allocation at actual price, WIP calculation, variance
calculation, and cost object settlement.
YourcontrollingdepartmenthasdecidedtouseABCtoallocateorderprocessing
costs. Indirectwarehousingcostsareallocatedtotheproductcostcollectorusing
thecostingsheet. Afterallocationofallactualcostsofthecurrentperiodtothe
productcostcollector, WIPmustbecalculatedattargetcostandtransferredto
FinancialAccounting. Duringthesubsequentvariancecalculation,period-based
variancesaregeneratedaccordingtotheircauses(variancecategories),savedto
theorder,andlatertransferredtoFinancialAccounting(asasum)andProfitability
Analysis (in detail).
Task 1:
Completetheprocesscostallocationfortheproductcostcollectorformaterial
R-F1##.
1. Using the individual processing transaction for Business Process Cost
Allocation,applytheactualprocesscosttotheproductionorderforversion0
of the current period.
Continued on next page
109
2009/Q2 © 2009 SAP AG. All rights reserved.
第 122 页 / 共 443 页
Unit3: ProductCostControllingbyPeriod AC520
2. From the detailed list display, determine the value of the process cost
allocation. Whatisthetotalcostandquantityforprocess300900?
3. Check the configuration settings for the determination of the process
template. Whatprocesstemplateisselectedfortheproductcostcollector?
Task 2:
1. The performance of period-end closing activities, such as revaluation of
activities,whichhavealreadybeenposted,isimprovedbyusingproductcost
collectors. Thisisbecausethenumberofcostobjectsislessthanproduct
costs per order.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
2. The revaluation of activity prices can be used to support the valuation
strategyofActualactivitypriceofpreviousperiod.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
3. Therevaluationofactualpricesfollowstheallocationofprocesscostsand
overhead costs.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
Continued on next page
110
© 2009 SAP AG. All rights reserved. 2009/Q2
第 123 页 / 共 443 页
AC520 Lesson: Period-End Closing
Task 3:
CalculatetheoverheadcostsfortheproductcostcollectorforR-F1##.
1. Usingtheindividualprocessingtransaction,calculatetheoverheadcostsfor
thecurrentperiodtotheproductcostcollector.
2. From the detailed list display, determine the value of the overhead
calculation. Whatarethetotaloverheadcosts? Whatcostcenterhasbeen
credited for the overhead allocation?
3. Display the configuration settings for the determination of the overhead
costing sheet. What costing sheet is assigned to the valuation variant for
actual costs, valuation variant 007?
Task 4:
Calculate WIP for your product cost collector.
1. Usingtheindividualprocessingtransaction,calculate(WIP)valueforyour
productcostcollector,usingthecurrentperiodandResultsAnalysisversion
0.
2. FromtheproductcostcollectorWIPdisplayaccessthedetailedreportby
selecting WIP Explanation.
3. Thereportdynamicallyexplodesthecostingdetailsforoperation0010. This
shouldreflectthequantitiesconfirmedfortheprevioustransactions. Ayield
oftenpumpswasconfirmedforoperation0010. Then,ayieldof5pieces
wereconfirmedforoperation0070where1piecewasalsoreportedasscrap.
ThisleavesaremainingWIPquantityof4piecesforoperation0010.
4. RemainintheWIPexplanationreport. Usingadifferentsession,displaythe
preliminarycostestimatefortheproductcostcollector. Changethecosting
displayto4piecestomatchtheWIPquantity.
Continued on next page
111
2009/Q2 © 2009 SAP AG. All rights reserved.