第 162 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
3. Check the master recipe for material T-FF1##, plant 1100, production
version 0001.
Ifyouseethataclassificationhasbeenenteredfortheresourceinoperation
200(shownbyacheckmarkintheClassificationcolumn): Gotothedetail
screenforoperation200bydouble-clickingtheoperationnumber. Gotothe
resource selection criteria by clicking on the symbol behind the resource
name. SelecttheentryREAK_00anddeleteit. Thensavetherecipe.
a) Check the master recipe.
Logistics→Production-Process→MasterData→MasterRecipes
→ Recipe and Material List → Change
MaterialT-FF1##,Plant1100,Productionversion0001
If you see that a classification has been entered for the resource in
operation200(shownbyacheckmarkintheClassificationcolumn):
Go to the detail screen for operation 200 by double-clicking the
operation number. Go to the resource selection criteria by clicking
onthesymbolbehindtheresourcename. SelecttheentryREAK_00
and delete it. Then save the recipe.
Task 2:
Createaprocessorderfortheproductionofthefertilizer,andanalyzethemaster
data of the process order.
Logistics→Production-Process→ProcessOrder→ProcessOrder→Create
→ With Material. (COR1)
Before continuing, choose Add to favorites.
1. Createaprocessorderfor1000litersofmaterialT-FF1##. Enterproduction
plant1100andordertypePI01. Useforwardsschedulingandentertoday’s
date as the start date. Select Enter.
a) Create a process order for 1000 liters of material T-FF1##. Use
forwardsschedulingandentertoday’sdateasthestartdate.
Enter material T-FF1##.
Enter production plant 1100.
Enterprocess order type PI01.
Select Enter.
Enter the quantity of 1000.
Entertoday’s dateasthestartdate.
ChangetheschedulingtypetoForwards.
Continued on next page
148
© 2009 SAP AG. All rights reserved. 2009/Q2
第 163 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
2. DisplaytheMateriallistandcheckwhethertheco-productindicatorisactive
formaterialT-FF3##. Ifthisindicatorisnotselected,willthismaterialbe
managed as a co-product or by-product?
Is the indicator selected?
Ifnot,willthematerialbemanagedasaco-productorby-product?
a) DisplaytheMateriallistandcheckwhethertheco-productindicatoris
activeformaterialT-FF3##. Ifthisindicatorisnotselected,willthis
materialbemanagedasaco-productorby-product?
Choose Goto → Materials List.
Double-click item 0040.
Theco-productindicatorisselectedforT-FF3##.
Ifthisisnotselected,thematerialwillbemanagedasaby-product.
3. Fromtheprocessorderheader,displaythesettlementrule. Whichreceivers
are entered? Why?
Receivers:
Why?:
a) From the process order header, display the settlement rule. Which
receivers are entered?
Goto → Header
Header → Settlement Rule
BothT-FF1##andT-FF3##areenteredasreceivers.
Thisisduetotheapportionmentrulefoundinthematerialmasterfor
T-FF1##.
4. Which settlement type is entered? What are the consequences of this for
settlement?
Settlement type:
Consequences:
a) ThesettlementtypeisFUL=fullsettlement. Thismeansthatyoucan
onlycalculatevariancesandsettletheorderwhenthestatusiseither
“delivered(final)”or“technicallycomplete”. Asarule,settlementtype
FULisusedforthecontrollingmethodProductCostbyOrder.
5. Display the Control data for the process order. What costing variants are
enteredforthepreliminarycostingandsimultaneouscosting? Howwerethe
costing variants determined?
Planned costing variant:
Continued on next page
149
2009/Q2 © 2009 SAP AG. All rights reserved.
第 164 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Actual costing variant:
Determined by:
a) Exitthesettlementrulebyselectingthegreenarrowtogoback.
Select the Control data view.
Planned costing variant: PPP1
Actual costing variant: PPP2
Thiswasdeterminedbytheordertype/plantdefaultvalues.
6. Whichcostingsheetwasassignedtotheprocessorder? Howwasthecosting
sheet determined?
Costing sheet:
Determined by:
a) Costing sheet: COGM
ThenameofthecostingsheetisprovidedontheControldatatabpage.
Thecostingsheetwasdeterminedbythevaluationvariantassignedto
the costing variant.
7. Whichoverheadkeyisassignedtotheprocessorder? Howistheoverhead
key determined?
Overhead key:
Determined by:
a) Overhead key: SAP10
Theoverheadkeyisdeterminedfromtheoverheadgroup,assignedto
thematerialT-FF1##inthecostingviewofthematerialmaster.
8. Willtheplannedcostsbecalculatedautomaticallywhentheorderissaved?
Answer: True
Theplannedcostsarecalculatedautomaticallywhentheorderissaved. This
isdeterminedbytheplannedcostcalculationsetting: Determineplanned
costs when saving.
9. Releasetheprocessorder. Ifyoureceiveanerrormessagestatingthatrelease
is not possible, examine the error message closely. If material T-RF2##
requires batch determination, branch to the Material List. Here, change
Continued on next page
150
© 2009 SAP AG. All rights reserved. 2009/Q2
第 165 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
the requirement quantity for the first entry (without batch) to 0 KAI, the
secondentry(withbatch)to30KAI.Whenpromptedbythesystem,have
thequantitiescalculatedagain. Nowyoucanreleasetheprocessorder.
a) Release the process order.
Select Release.
If you receive an error message stating that release is not possible,
examine the error message closely.
Goto → Logs → On Release
If material T-RF2## requires batch determination, branch to the
MaterialList. Here,changetherequirementquantityforthefirstentry
(without batch) to 0 KAI, the second entry (with batch) to 30 KAI.
Whenpromptedbythesystem, havethequantitiescalculatedagain.
Nowyoucanreleasetheprocessorder. Ifyoureceiveanerrormessage
statingthatreleaseisnotpossible,examinetheerrormessageclosely.
10. Savetheprocessorder. Whichordernumberisgiven? Ifpromptedto,assign
thebatchnumbersA##toT-FF3#andB##toT-FF3##
Process order no.:
a) Savetheprocessorder. Whichordernumberisgiven? Ifpromptedto,
assignthebatchnumbersA##toT-FF3#andB##toT-FF3##
Select Save.
Task 3:
Generate an Order Costs Report in the information system of Product Cost by
Order. Examinethecalculatedcostsgeneratedfortheprocessorderandcheckthe
apportionmentoftheplannedcostsfortheco-products.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Information system → Reports for
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Settings → Order Items ## On/Off
SelectLayoutsandselectlayout1SAP02(costtrend).
Enter your order number.
Choose Execute.
1. ThetotalplannedcostsforT-FF1##aredisplayed.
Continued on next page
151
2009/Q2 © 2009 SAP AG. All rights reserved.
第 166 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Total planned costs:
a) ThetotalplannedcostsforT-FF1##aredisplayed.
ThetotalplannedcostsforT-FF1##aredisplayed.
2. Execute the report again, but only for order item 2, T-FF3##. What
apportionmenttoco-productT-FF3##waspostedforcomponentT-FF1##?
Apportionment to T-FF3##:
a) ThetotalplannedcostsforT-FF1##aredisplayed.
3. Is this consistent with the apportionment of material costs defined in the
settlement rule of the process order?
Answer: True
Yes, this is consistent with the apportionment structure found in the
settlement rule for the process order.
152
© 2009 SAP AG. All rights reserved. 2009/Q2
第 167 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Exercise 5: Alternative: Master Data and
Preliminary Costing - Production Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Createaproductionorderandanalyzethecontroldataoftheproductionorder
• Explainthesettlementparametersofaproductionorder
• ExplainthesettlementruleforthesettlementtypeFULL
• Analyzepreliminarycostingforaproductionorder
Business Example
EngineeringhasrequestedthataprototypebemanufacturedforpumpR-F1##.
Althoughaproductcostcollectorexistsforthispump,theprototypeprocessis
bestsuitedtotheProductCostbyOrdermethodinordertoprovidebettercost
analysis for this prototype.
Task 1:
You already have a BOM for the new pump to be built as a prototype. The
production process is supplied by plant 1000. Create a production order for
the production of the pump, and analyze the master data used by cost object
controlling.
Logistics → Production → Shop Floor Control → Order → Create → With
Material (CO01)
1. Createaproductionorderfor10piecesofmaterialR-F1##inplant1000.
UseordertypePP01andforwardscheduling,andentertoday'sdateasthe
start date.
2. SelectComponentoverviewandsetthebackflushflagforeachcomponent.
3. Towhichoperationarethematerialcomponentsassigned?
4. Changethecontrolkeyassignedtooperation70fromPP97toPP98. What
functionsdoesthecontrolkeyPP98perform?
5. From the production order header, display the settlement rule. Which
receivers are entered?
6. Which settlement type is entered? What are the consequences of this for
settlement?
7. DisplaytheControldatafortheproductionorder. Whatcostingvariantsare
enteredforthepreliminarycostingandsimultaneouscosting? Howwerethe
costing variants determined?
Continued on next page
153
2009/Q2 © 2009 SAP AG. All rights reserved.
第 168 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
8. Whichcostingsheetwasassignedtotheprocessorder? Howwasthecosting
sheet determined?
9. Whichoverheadkeyisassignedtotheprocessorder? Howistheoverhead
key determined?
10. Willtheplannedcostsbecalculatedautomaticallywhentheorderissaved?
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
11. Release the production order.
12. Savetheproductionorder. Recordtheordernumber.
Task 2:
UsingtheOrderCostreportfromtheProductCostbyOrderinformationsystem,
reviewthecalculationoftheplannedcostsfortheproductionorderandverifythe
planneddistributionofcostsfortheco-products.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Enter your order number.
Choose Execute.
ChooseSelectlayoutandselectlayout1SAP02(costtrend).
1. DeterminethetotalplannedcreditforR-F1##.
ThetotalplannedcreditforR-F1##is_________________.
2. Is there a planned variance for this order? If there is a planned variance
record the amount.
The planned variance is _____________.
154
© 2009 SAP AG. All rights reserved. 2009/Q2
第 169 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Solution 5: Alternative: Master Data and
Preliminary Costing - Production Order
Task 1:
You already have a BOM for the new pump to be built as a prototype. The
production process is supplied by plant 1000. Create a production order for
the production of the pump, and analyze the master data used by cost object
controlling.
Logistics → Production → Shop Floor Control → Order → Create → With
Material (CO01)
1. Createaproductionorderfor10piecesofmaterialR-F1##inplant1000.
UseordertypePP01andforwardscheduling,andentertoday'sdateasthe
start date.
a) Enter your material R-F1##.
Enter production plant 1000.
Enter order type PP01.
Select Enter.
Enter the quantity of 10.
Entertoday’s dateasthestartdate.
ChangetheschedulingtypetoForwards.
2. SelectComponentoverviewandsetthebackflushflagforeachcomponent.
a) Select Component overview.
Expandthecolumnswiththecolumnheading‘B…’todeterminewhich
column is the backflush indicator.
Setthebackflushindicatorforeachcomponent.
3. Towhichoperationarethematerialcomponentsassigned?
a) Select Operation overview.
Choose the first operation and select the Components for operation
button at the bottom of the screen.
Thematerialcomponentsareassignedtothefirstoperation.
Continued on next page
155
2009/Q2 © 2009 SAP AG. All rights reserved.
第 170 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
4. Changethecontrolkeyassignedtooperation70fromPP97toPP98. What
functionsdoesthecontrolkeyPP98perform?
a) Return to Operation overview.
Replacethecontrolkeyforoperation0070withcontrolkeyPP98. Once
thechangeismade,placeyoucursoronthePP98controlkeyassigned
tooperation70andchoosethedropdowniconorfunctionkeyF4.
Control Key PP98 performs scheduling, capacity requirements,
costing,printtimetickets,print,printconfirmation,andisamilestone
confirmation for this operation.
Automaticgoodsreceiptwillnotbeperformed.
Choose Continue.
5. From the production order header, display the settlement rule. Which
receivers are entered?
a) Goto→ Header
Header → Settlement Rule
MaterialR-F1##isenteredasthereceiver.
6. Which settlement type is entered? What are the consequences of this for
settlement?
a) ThesettlementtypeisFUL=fullsettlement. Thismeansthatyoucan
onlycalculatevariancesandsettletheorderwhenthestatusiseither
delivered (final) or technically complete. As a rule, settlement type
FULisusedforthecontrollingmethodProductCostbyOrder.
7. DisplaytheControldatafortheproductionorder. Whatcostingvariantsare
enteredforthepreliminarycostingandsimultaneouscosting? Howwerethe
costing variants determined?
a) Exitthesettlementrulebyselectingthegreenarrowtogoback.
Select the Control data view.
Costing variant for planned costs: PPP1
Costing variant for actual costs: PPP2
Thiswasdeterminedbytheordertype/plantdefaultvalues.
Continued on next page
156
© 2009 SAP AG. All rights reserved. 2009/Q2
第 171 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
8. Whichcostingsheetwasassignedtotheprocessorder? Howwasthecosting
sheet determined?
a) Costing sheet: COGM
ThenameofthecostingsheetisprovidedontheControldatatabpage.
Thecostingsheetwasdeterminedbythevaluationvariantassignedto
the costing variant.
9. Whichoverheadkeyisassignedtotheprocessorder? Howistheoverhead
key determined?
a) Overhead key: SAP11
Theoverheadkeyisdeterminedfromtheoverheadgroupassignedto
thematerialR-F1##inthecostingviewofthematerialmaster.
10. Willtheplannedcostsbecalculatedautomaticallywhentheorderissaved?
Answer: True
Theplannedcostsarecalculatedautomaticallywhentheorderissaved. This
isdeterminedbytheplannedcostcalculationsetting: Determineplanned
costs when saving.
11. Release the production order.
a) Select Release.
12. Savetheproductionorder. Recordtheordernumber.
a) Select Save.
Task 2:
UsingtheOrderCostreportfromtheProductCostbyOrderinformationsystem,
reviewthecalculationoftheplannedcostsfortheproductionorderandverifythe
planneddistributionofcostsfortheco-products.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Enter your order number.
Choose Execute.
ChooseSelectlayoutandselectlayout1SAP02(costtrend).
1. DeterminethetotalplannedcreditforR-F1##.
ThetotalplannedcreditforR-F1##is_________________.
a) ThetotalplannedcreditforR-F1##is_________________.
Continued on next page
157
2009/Q2 © 2009 SAP AG. All rights reserved.
第 172 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
2. Is there a planned variance for this order? If there is a planned variance
record the amount.
The planned variance is _____________.
a) Theplannedvarianceis_____________.
158
© 2009 SAP AG. All rights reserved. 2009/Q2
第 173 页 / 共 443 页
AC520 Lesson: Master Data and Preliminary Costing
Lesson Summary
You should now be able to:
• DescribethefeaturesofProductCostbyOrder
• DescribethefeaturesofCostObjectControllingforjointproduction
• Explain process manufacturing master data
159
2009/Q2 © 2009 SAP AG. All rights reserved.
第 174 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Lesson: Simultaneous Costing
Lesson Overview
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Performgoodsmovementstransactionsandconfirmationsfortheprocess
order
Business Example
The production type is make-to-stock. Sales Controlling is performed only in
Profitability Analysis (CO-PA).
Fertilizerisproducedinaprocessmanufacturingenvironment.
Fertilizermanufacturingalsoproducessideproducts,whicharetobemappedas
co-products.
Rawmaterialsandmachinetimeareconsumed. Additionalcostsareincurredby
quality control checks and waste removal.
TheproceduresforProductCostbyOrderarethesameregardlessofwhethera
manufacturerusesprocessordersorproductionorders. Inthisscenario,wewill
useaprocessordertodemonstrateProductCostbyOrder.
Afertilizermanufacturerwantstomeasureandanalyzehisprocesscostswiththe
SAPSystem. Thefertilizerproducedisnotmake-to-order.
• The manufacturer enters the actual costs for the materials, activities, and
overheadwithreferencetotheprocessorder. Whenfertilizerandacidare
receivedinthewarehouse,theorderisdebitedatthestandardprice.
160
© 2009 SAP AG. All rights reserved. 2009/Q2
第 175 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Figure 86: Process Order: Process Chain
Figure87: ProcessOrder: SimultaneousCosting
Process orders usually are charged with actual costs through confirmations in
Logistics.
• Acostobjectcanbechargedbyinternalactivityallocations. Thisoccurs
• automaticallyinconfirmations. Thecostobjectsarechargedwithsecondary
costs.
161
2009/Q2 © 2009 SAP AG. All rights reserved.
第 176 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Acostobjectcanbechargedthroughmaterialwithdrawals. Whentheconfirmation
isentered,thecostobjectsarechargedautomatically(materialbackflushes,goods
issues) with primary costs.
Inaddition,thegoodsreceiptcanbepostedautomaticallywhentheconfirmation
is entered.
Actualcostsarechargedtotheorderheaderastheyareincurred. Whenagoods
receiptforaco-productisposted,theorderitemiscreditedaccordingly.
Toseetheactualcostsforeachco-product, youmustperformthePreliminary
SettlementforCo-Products,Reworkfunctionintheperiod-endclosingprocess.
Note on logistical processing: If you are using milestone confirmations, you
mustconfirmthemilestonesinthespecifiedsequence. Operationsthatarenot
milestonesareautomaticallyconfirmedwhenthemilestoneisconfirmed. You
specify which operations are milestones in the routing with the control key of
the operation.
162
© 2009 SAP AG. All rights reserved. 2009/Q2
第 177 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Exercise 6: Simultaneous Costing -
Process Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Analyzetheactualcostsfortheprocessorderandorderitems
Business Example
In preparation, several goods receipts and goods issues need to be posted and
confirmation entered for the process order.
Task 1:
When the process order has been released to the shop floor, stock issues and
receiptsandproductionconfirmationscanbepostedfortheorder. Simultaneous
costing will occur on the process order.
1. Enterafinalconfirmationforoperation/phase230oftheprocessorder. Enter
ayieldof1000litersandsavetheconfirmation.
2. Enter a partial confirmation for 400 liters for operation/phase 330 of the
processorder. Changethedefaultamountto15minutes.
3. Bookagoodsreceiptfor400litersofartificialmanure(T-FF1##)and3liters
ofsulphuricacid(T-FF3##)withmovementtype101.
Hint: SelectNextScreentocontinuepasttheclassificationscreenfor
thebatchspecificationsforbothmaterials(T-FF1##andT-FF3##).
Enter1 g/ccmforthedensityand90%fortheactiveingredient
content. Tocontinuepastthewarningmessagesregardingthedeficit
quantity, select Enter.
Continued on next page
163
2009/Q2 © 2009 SAP AG. All rights reserved.
第 178 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 2:
Usetheactualcostreporttoreviewthepostedamountsforthegoodsmovements
and confirmations.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Settings → Order Items → On/Off
SelectLayoutandselectlayout1SAP02(costtrend).
Enter your order number.
1. TodisplaytheactualcostsforthesulphuricacidT-FF3##,usethecostreport
andentertheprocessordernumber. Next,changetheSettingstoOrderItems
On/Off,enterorderitem2,andexecutethereport. Displaythecostreport
anddeterminethevalueusedtocredittheprocessorderforthegoodsreceipt
for the sulphuric acid T-FF3##.
T-FF3##:
2. Executetheactualcostreportagainanddisplaythecostsforthefertilizer,
orderitem1. Determinethevalueusedtocredittheprocessorderforthe
goods receipt for the fertilizer T-FF1##.
T-FF1##:
3. Todisplaytheactualcostsforallitemsintheorder, opentheactualcosts
reportforallorderitems. Recordtheorderbalance.
Order balance:
4. Usethecosttrendlayouttoexecutethereportagain. Determinewhether
actual costs are distributed to T-FF1##.
Answer:
164
© 2009 SAP AG. All rights reserved. 2009/Q2
第 179 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Solution 6: Simultaneous Costing -
Process Order
Task 1:
When the process order has been released to the shop floor, stock issues and
receiptsandproductionconfirmationscanbepostedfortheorder. Simultaneous
costing will occur on the process order.
1. Enterafinalconfirmationforoperation/phase230oftheprocessorder. Enter
ayieldof1000litersandsavetheconfirmation.
a) Logistics→Production-Process→ProcessOrder→Confirmation
→EnterforPhase→Timeticket(COR6N)
Beforecontinuing, chooseAddtofavorites.
Entertheprocess order numberandphase 230.
Select Enter.
EntertheconfirmationtypeFinalconfirmation.
Confirm a yield of 1000 liters.
Save the confirmation.
2. Enter a partial confirmation for 400 liters for operation/phase 330 of the
processorder. Changethedefaultamountto15minutes.
a) Favorites → Confirmation → Enter for Phase → Time Ticket
(COR6N)
Entertheprocess order numberandphase 330.
Select Enter.
EntertheconfirmationtypePartial confirmation.
Confirm a yield of 400 liters.
Save the confirmation.
Continued on next page
165
2009/Q2 © 2009 SAP AG. All rights reserved.
第 180 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
3. Bookagoodsreceiptfor400litersofartificialmanure(T-FF1##)and3liters
ofsulphuricacid(T-FF3##)withmovementtype101.
Hint: SelectNextScreentocontinuepasttheclassificationscreenfor
thebatchspecificationsforbothmaterials(T-FF1##andT-FF3##).
Enter1 g/ccmforthedensityand90%fortheactiveingredient
content. Tocontinuepastthewarningmessagesregardingthedeficit
quantity, select Enter.
a) Logistics→Production-Process→Processorder→Environment
→MaterialMovement→PostMaterialtoStock(MB31)
Beforecontinuing, chooseAddtofavorites.
Enterthemovementtype101,plant1100,andstoragelocation0001.
Choose To Order.
Entertheprocess order number. SelectEnter.
ChangethegoodsreceiptquantityforT-FF1##from1000 to400
liters,andchangethegoodsreceiptquantityforT-FF3##to3liters.
Choose Adopt.
Hint: Select Next Screen to continue past the classification
screenforthebatchspecificationsforbothmaterials(T-FF1##
andT-FF3##). Enter1 g/ccmforthedensityand90%for
the active ingredient content. To continue past the warning
messagesregardingthedeficitquantity,selectEnter.
Save the goods receipt.
Continued on next page
166
© 2009 SAP AG. All rights reserved. 2009/Q2
第 181 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Task 2:
Usetheactualcostreporttoreviewthepostedamountsforthegoodsmovements
and confirmations.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Settings → Order Items → On/Off
SelectLayoutandselectlayout1SAP02(costtrend).
Enter your order number.
1. TodisplaytheactualcostsforthesulphuricacidT-FF3##,usethecostreport
andentertheprocessordernumber. Next,changetheSettingstoOrderItems
On/Off,enterorderitem2,andexecutethereport. Displaythecostreport
anddeterminethevalueusedtocredittheprocessorderforthegoodsreceipt
for the sulphuric acid T-FF3##.
T-FF3##:
a) TodisplaytheactualcostsforthesulphuricacidT-FF3##,enterorder
item2andexecutethereport. Determinethevalueusedtocreditthe
processorderforthegoodsreceiptforthesulphuricacidT-FF3##.
Enter order item 2.
Choose Execute.
Thevalueforthecreditisdisplayedasgoodsreceipt.
2. Executetheactualcostreportagainanddisplaythecostsforthefertilizer,
orderitem1. Determinethevalueusedtocredittheprocessorderforthe
goods receipt for the fertilizer T-FF1##.
T-FF1##:
a) Enter order item 1.
Choose Execute.
Thevalueforthecreditisdisplayedasgoodsreceipt.
3. Todisplaytheactualcostsforallitemsintheorder, opentheactualcosts
reportforallorderitems. Recordtheorderbalance.
Order balance:
a) Enter order item *.
Choose Execute.
Record the order balance.
Continued on next page
167
2009/Q2 © 2009 SAP AG. All rights reserved.
第 182 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
4. Usethecosttrendlayouttoexecutethereportagain. Determinewhether
actual costs are distributed to T-FF1##.
Answer:
a) Choose Select Layout.
Choose Layout 1SAP02.
Choose order item 1.
There are no actual costs listed for the activities, overheads, or
materials. Thesecostshavenotyetbeendistributedtotheco-products.
168
© 2009 SAP AG. All rights reserved. 2009/Q2
第 183 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Exercise 7: Alternative: Simultaneous
Costing - Production Order
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Entergoodsmovementsandconfirmationsfortheproductionorder
• Analyzetheactualcostsfortheproductionorder
Business Example
Whiletheproductionprocessisproceeding,severalgoodsreceipts,goodsissues
andorderconfirmationsmustbepostedfortheproductionorder.
Task 1:
When the production order has been released, inventory transactions and
confirmations of production activities can be posted for the production order.
Simultaneouscostingiscarriedoutfortheproductionorder.
1. Enterafinalconfirmationforoperation10oftheproductionorder. Entera
yieldof10unitsandincreasethenumberofcomponentsusedforcomponent
R-B1##. Save the confirmation.
2. Willthisconfirmationcauseagoodsmovementforcomponents?
3. Enter a partial confirmation of 5 units for operation 70 of the production
order.
4. Usemovementtype101topostagoodsreceiptforthe5pumps.
Task 2:
Usetheactualcostreporttoreviewthepostedamountsforthegoodsmovements
and confirmations.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Enter your order number.
SelectLayoutsandselectlayout1SAP02(costtrend).
Choose Execute.
1. Whatactualcostshavebeenpostedfortheproductionorder?
Goods Issues _______________
Continued on next page
169
2009/Q2 © 2009 SAP AG. All rights reserved.
第 184 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Confirmations _______________
Goods Receipts _______________
170
© 2009 SAP AG. All rights reserved. 2009/Q2
第 185 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Solution 7: Alternative: Simultaneous
Costing - Production Order
Task 1:
When the production order has been released, inventory transactions and
confirmations of production activities can be posted for the production order.
Simultaneouscostingiscarriedoutfortheproductionorder.
1. Enterafinalconfirmationforoperation10oftheproductionorder. Entera
yieldof10unitsandincreasethenumberofcomponentsusedforcomponent
R-B1##. Save the confirmation.
a) Logistics→Production→ShopFloorControl→Confirmation→
Enter→ForOperation→TimeTicket(CO11N)
Entertheproductionordernumberandoperation10.
Select Enter.
EntertheconfirmationtypeFinal confirmation.
Confirm a yield of 10 units.
2. Willthisconfirmationcauseagoodsmovementforcomponents?
a) SelecttheGoodsmovementsoverviewandincreasethequantityfor
component R-B1## by 1 unit.
Yes, thereisagoodsmovementbecausetheindicatorwassetinthe
order and, as a result of the components assigned to operation 10, a
goodsissuepostingwillbeperformedwhentheconfirmationissaved.
Save the confirmation.
3. Enter a partial confirmation of 5 units for operation 70 of the production
order.
a) Favorites → Production Order → Confirmation → Enter → For
Operation → Time Ticket (CO11N)
Enteryourordernumberandoperation70.
Select Enter.
EntertheconfirmationtypePartial confirmation.
Confirm a yield of 5 units.
Save the confirmation.
Continued on next page
171
2009/Q2 © 2009 SAP AG. All rights reserved.
第 186 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
4. Usemovementtype101topostagoodsreceiptforthe5pumps.
a) Logistics→Production→ShopFloorControl→GoodsMovements
→ Goods Receipt. (MB31)
Entermovementtype101,plant1000,andstoragelocation0001.
Choose To Order.
Enter the production order number.
Select Enter.
ChangethegoodsreceiptquantityforR-F1##to5 units.
Save the goods receipt.
Tocontinuepastthewarningmessagesregardingthedeficitquantity,
select Enter.
Task 2:
Usetheactualcostreporttoreviewthepostedamountsforthegoodsmovements
and confirmations.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling→ProductCostbyOrder→InformationSystem→Reportsfor
ProductCostbyOrder→DetailedReports→ForOrders(KKBC_ORD)
Enter your order number.
SelectLayoutsandselectlayout1SAP02(costtrend).
Choose Execute.
1. Whatactualcostshavebeenpostedfortheproductionorder?
Goods Issues _______________
Confirmations _______________
Goods Receipts _______________
a) Goods Issues _______________
Confirmations _______________
Goods Receipts _______________
172
© 2009 SAP AG. All rights reserved. 2009/Q2
第 187 页 / 共 443 页
AC520 Lesson: Simultaneous Costing
Lesson Summary
You should now be able to:
• Performgoodsmovementstransactionsandconfirmationsfortheprocess
order
173
2009/Q2 © 2009 SAP AG. All rights reserved.
第 188 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Lesson: Period-End Closing with Partially Delivered
Production Orders
Lesson Overview
Lesson Objectives
Aftercompletingthislesson, youwillbeableto:
• Explainperiod-endclosingwithpartiallydeliveredproductionorders
• Explain WIP at actual cost
Business Example
The production type is make-to-stock. Sales Controlling is performed only in
Profitability Analysis (CO-PA).
Fertilizerisproducedinaprocessmanufacturingenvironment.
Fertilizermanufacturingalsoproducessideproducts,whicharetobemappedas
co-products.
Rawmaterialsandmachinetimeareconsumed. Additionalcostsareincurredby
quality control checks and waste removal.
TheproceduresforProductCostbyOrderarethesameregardlessofwhethera
manufacturerusesprocessordersorproductionorders. Inthisscenario,wewill
useaprocessordertodemonstrateProductCostbyOrder.
Afertilizermanufacturerwantstomeasureandanalyzehisprocesscostswiththe
SAPSystem. Thefertilizerproducedisnotmake-to-order.
If the process order has not been delivered by the end of the period, the
manufacturercancalculateWIPforthesalesorderitems.
174
© 2009 SAP AG. All rights reserved. 2009/Q2
第 189 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Preliminary Settlement of Co-Products
Figure 88: Process Order: Process Chain
In Release 4.5, the period-end closing activities for co-product orders were
enhancedtoenableintegratedcostcontrollingforindividualco-products.
Once the period costs have been allocated to the order header, the costs are
calculatedfromtheorderheadertotheorderitems.
WIPcalculation,variancecalculation,andsettlementarethenperformedatthe
order item level.
175
2009/Q2 © 2009 SAP AG. All rights reserved.
第 190 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Figure89: Period-EndClosingwithCo-Products
Functionsintheperiod-endclosingofProductCostbyOrder:
• Template allocation
• Revaluationofactivitytypesandbusinessprocessesatactualprices
• Allocation of overhead
• Preliminarysettlementofco-products, rework
• Calculationofworkinprocess(WIP):InProductCostbyOrder,thesystem
evaluates the work in process at actual cost
• Variance calculation
• Settlement
– Work in process is settled to Financial Accounting (FI) and Profit
Center Accounting (EC-PCA).
– The order balance is settled to FI, Actual Costing/Material Ledger
(CO-PC-ACT) and EC-PCA.
– ThevariancecategoriesaresettledtoProfitabilityAnalysis(CO-PA).
• The Schedule Manager supports efficient execution of the period-end
closingprocess. ItisaddressedextensivelyincourseAC690.
176
© 2009 SAP AG. All rights reserved. 2009/Q2
第 191 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Figure90: PreliminarySettlementofCo-Products
Inperiod-endclosing,theactualcostscollectedontheorderheaderarecalculated
totheindividualorderitems. Thischargeseachco-productwithitsshareofthe
actual costs. When it settles the actual costs, the system uses the equivalence
numbersdefinedintheapportionmentstructure. Insomecasesitmayalsousethe
sourcestructure. Tosettletheactualcosts, usethePreliminarySettlementfor
Co-Products,Reworkfunction. Thecostsaresettledfortheco-productsusingthe
original cost elements.
You make the necessary settings in Customizing for Product Cost by Order to
ensure that:
• Settlementtoanorderitemisallowed(youmakethissettinginthesettlement
profile)
• Eitherproportionalsettlement(indicatorEquivalenceNumber)orpercentage
settlement (indicator %-Settlement) is allowed (you make this setting in
the settlement profile)
• The allocation structure contains all cost elements with which the order
header can be debited
ActualcostsmustbesettledintheorderitemsbeforeyoucancalculateWIPand
variances or settle the order.
Ifyouhavenotspecifiedanapportionmentstructureinthematerialmasterrecord
orintheproductionversion,youmustenterequivalencenumbersforcalculation
inthesettlementruleoftheorderheader. Inthiscaseyoucannotuseasource
structure.
177
2009/Q2 © 2009 SAP AG. All rights reserved.
第 192 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Work in Process
Figure 91: WIP Calculation for Co-Products
Work in process (WIP) for co-products is always valuated at actual cost. The
WIP is valuated using the actual costs posted to the order item less the credits
from goods receipts.
ValuatingWIPattargetcostrequiresthattheorderitemhasasettlementrulewith
settlementtypeFUL(fullsettlement). SettlementtypeFULisderivedfromdefault
rulePP1(ProductionMaterialFullSettlement)whichisspecifiedintheordertype.
Ifamanufacturingorderincludingco-productsusessettlementtypePER(default
rulePP2), noworkinprocesscanbedeterminedforit. Ifyouareusingacost
objecthierarchywithco-products,youcannotformanyworkinprocessbecause
onlyperiodicmanufacturingorderscanbeassignedtoacostobjecthierarchy.
Thecalculationofworkinprocessdependsonthestatusofthemanufacturing
order. Thesystemcontinuestocalculateworkinprocessfortheco-productsuntil
theheaderofthemanufacturingorderhasthestatusDLV(delivered)orTECO
(technicallycompleted). ThemanufacturingorderreceivesthestatusDLVonly
whenallorderitemshavebeendelivered. WhentheorderhasthestatusDLVand
TECO,theWIPcalculationfunctioncancelsanyWIPfromthepreviousperiod.
Toseewhetherparticularorderitemshavebeendelivered,accessthemateriallist
fromtheprocessorder. Fromthematerialslist,accessthedetailviewandlook
attheindicatorDeliveryCompleted(finaldelivery).
178
© 2009 SAP AG. All rights reserved. 2009/Q2
第 193 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Figure 92: Settlement of Work in Process
Whenyousettletheworkinprocess,itistransferredtoFinancialAccounting(FI).
• If the debit of the order item is greater than the credit, the system debits
UnfinishedGoodsInventoryandcreditsUnfinishedGoodsInventoryChange.
• Ifthedebitoftheorderitemislessthanthecredit,thesystemdebitsExpense
forReservesforUnrealizedCostsandcreditsReservesforUnrealizedCosts.
Thisexpensepostingcorrespondstoavalueadjustmentforfinishedproducts
that have already been capitalized in FI.
179
2009/Q2 © 2009 SAP AG. All rights reserved.
第 194 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
180
© 2009 SAP AG. All rights reserved. 2009/Q2
第 195 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Exercise 8: Period-End Closing with
Partially Delivered Process Orders
Exercise Objectives
Aftercompletingthisexercise, youwillbeableto:
• Analyzetheactualcostsfortheprocessorderandorderitems
• Allocateprocesscostsandoverheadcoststotheprocessorder
• Distribute the actual costs from the process order to the order items
(co-products)
• UseactualcoststocalculateWIPfortheco-products
• Review the settings for the WIP calculation
• Settle the WIP to Financial Accounting
Business Example
Becausetheprocessorderisnotcompletedbytheendoftheperiod,itisnecessary
tocalculatetheactualWIPvalueandsettletheamountsforinformationpurposes
toFinancialAccounting. Inaddition,processcostsandoverheadratesmustbe
allocatedtotheorderpriortotheWIPcalculation.
You have been asked to perform the period-end closing tasks for your process
order. Because this is a joint production order, you will need to distribute the
actualcostsfromtheorderheadertotheorderitems. Thisisnecessarytosupport
thecalculationofWIPfortheindividualorderitems.
Task 1:
Use the single functions to allocate process costs and overhead rates to your
process order.
1. UsetheTemplateAllocationtoallocatetheprocesscoststotheprocessorder
for version 0 of the current period.
2. Allocatetheoverheadratesforthecurrentperiodtotheprocessorder.
Continued on next page
181
2009/Q2 © 2009 SAP AG. All rights reserved.
第 196 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Task 2:
Ifusingjointproduction, itispossibletocalculateWIPandvariancesforeach
co-product separately. However this calculation can be performed only if the
actual costs from the process order header are distributed to the co-products
(order items).
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→PreliminarySettlementforCo-Products,Rework→Individual
Processing (CO8B)
Before continuing, choose Add to favorites.
1. Usetheindividualprocessingtodistributetheactualcoststothe co-products
for your process order for the current period. Remain in the Preliminary
Settlement Results screen.
2. SelecttheDetaillistfortheactualsettlementanddisplaythesenders. The
individual cost elements that debited the process order are listed as the
senders. Next,accessthereceivers. Thesettlementreceiversshouldlistthe
orderitems(co-products)asthereceiversforeachindividualsendingcost
element. Is the value split according to the apportionment defined in the
process order?
3. Displaythecostaccountingdocumentfromthelistofaccountingdocuments.
Expandthedocumentdetailandnotethateachactuallineitempostedtothe
orderwassettledtothetwoindividualprocessorderitems,theco-products
T-FF1## and T-FF3##.
4. Returntothecostreport. Reviewthepostedactualcoststhatwerechanged
by the distribution to the co-products.
Task 3:
Calculateworkinprocessforyourprocessorder.
1. UsetransactionIndividualProcessingtocalculatetheWIPvalueofyour
processorder. UseResultsAnalysisversion0forthecurrentperiod.
2. Create another session and display the cost report. Enter * for the order
item. Executethereport. Recordtheorderbalance. Comparethecalculated
total WIP amount with the remaining balance for your process. Are they
the same value?
(circle one) Yes or No
Continued on next page
182
© 2009 SAP AG. All rights reserved. 2009/Q2
第 197 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
3. IsitarequirementtovalueWIPusingonlyactualcostswhenjointproduction
is used?
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
4. Returntoyourfirstsession. RecordtheWIPforT-FF1##andT-FF3##.
T-FF1##:
T-FF3##:
5. AccesstheWIPreportandrecordtheWIPvalueforeachcostelementfor
T-FF1##.
672111 (WIP direct costs):
672121 (WIP overhead):
672131 (WIP production costs):
6. ReviewthesettingsfortheWIPcategories. Whatcostelementsareassigned
tothefollowingWIPcategoriesforControllingarea1000,ResultsAnalysis
version 0:
EK (direct costs):
FK (production costs):
GK (overhead costs):
7. Display the actual report for T-FF1##. What are the subtotals of actual
costsforthefollowingWIPcategories? WhatistheWIPbalanceforeach
of these categories?
Actual costs EK: ____________
(400000–499999;820000–894999;896000–899999)
Actual costs FK: ____________
(600000 – 654999; 656000 – 699999)
Actual costs GK: ____________
(655100 – 655199)
Total Actual costs:
Order balance:
TodisplaytheWIPbalances,changetoWorkinProcesslayout1SAP03.
ThesystemallocatestheremainingorderbalancetotheWIPcategoriesby
dividingthetotalcostsbytheactualcostspercategory. Thisdeterminesthe
percentageoftheremainingcoststhatshouldbeallocatedtoeachcategory.
Continued on next page
183
2009/Q2 © 2009 SAP AG. All rights reserved.
第 198 页 / 共 443 页
Unit4: ProductCostControllingbyOrder AC520
Example:
Actual costs EK 8000 80% of Total
Actual costs FK 2000 20% of Total
Total costs 10000 100%
Remainingorderbalanceafterpartialdelivery: 4000
Calculated WIP for each order category:
WIP category EK 3200
WIP category FK 800
Task 4:
OncetheWIPhasbeencalculated,theWIPbalancemustbepostedtoFinancial
Accounting for period-end closing. This is accomplished using the settlement
transaction.
Accounting → Controlling → Product Cost Controlling → Cost Object
Controlling → Product Cost by Order → Period-End Closing → Single
Functions→Settlement→IndividualProcessing(KO88)
Before continuing, select Add to Favorites
1. UsetheindividualprocessingtransactiontosettlethecalculatedWIPcosts
foryourprocessordertofinancialaccountingforthecurrentperiod.
2. IntheActualSettlementDetailList,notethateachorderitemisasender.
3. Display the accounting documents for the posting to FI. Why is there no
Controlling document listed?
Answer:
184
© 2009 SAP AG. All rights reserved. 2009/Q2
第 199 页 / 共 443 页
AC520 Lesson: Period-EndClosingwithPartiallyDeliveredProductionOrders
Solution 8: Period-End Closing with
Partially Delivered Process Orders
Task 1:
Use the single functions to allocate process costs and overhead rates to your
process order.
1. UsetheTemplateAllocationtoallocatetheprocesscoststotheprocessorder
for version 0 of the current period.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→TemplateAllocation→IndividualProcessing
(CPTA)
Beforecontinuing, chooseAddtofavorites.
Enter your order number.
Version: 0
Period: current month
Fiscalyear: Current fiscal year
Deselect Test Run.
Select Detail Lists.
Choose Execute.
2. Allocatetheoverheadratesforthecurrentperiodtotheprocessorder.
a) Accounting → Controlling → Product Cost Controlling → Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→Overhead→IndividualProcessing(KGI2)
Beforecontinuing, chooseAddtofavorites.
Enter your order number.
Period: current month
Fiscalyear: Current fiscal year
Deselect Test run.
Choose Execute.
Continued on next page
185