第 514 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Create a non-stock Purchase Order
1. ChooseLogistics>MaterialsManagement>Purchasing>Purchase
order>Create>VendorknownortransactionME21N.
2. OntheinitialscreenentertheVendorandpressENTER.
3. Go to the Org Data Tab and enter the Purchasing Organisation,
PurchasingGroupandCompanyCodeasnecessary.
4. PressENTERtocall up the itemoverview.
Enter the following information:
Material
Leavethematerialfieldblank. Enterashort descriptionof the
materialinthetextfieldandthematerialgroupintheMaterial
Group field.
Account Assignment Category
EnterKtospecifyapostingtoaCostCenter.
Price
IfyouleavethefieldemptyandthenpressENTER,adialogbox
appears. Hereyoumustentereitherthepriceorthenumberofthe
InfoRecordcontainingconditionsfortheitem.
Price unit/Order PriceUnit
Order Quantity
Delivery Data
Plant/Storage Location
5. Choose Item > Account Assignment to enter additional account
assignmentdata(forexample,thenumberoftheGLAccount)
6. Save the purchase order with .
Commitments
Onceposted,thepurchaseorderrecordcreatesacommitmentlineitemforthe
costcenterenteredinthepurchaseorderitem. Theinformationsystemcanreport
onoutstandingcommitmentsforagivencostcenter.
Subsequently,whenactualcostsareincurred(forexample,whentheorderedgoods
aredelivered),theSAPsystemclearsthecommitmentandpoststheactualcosts.
506
©2006SAPAG.Allrightsreserved. 2006/Q2
第 515 页 / 共 689 页
AC050 Lesson: Commitments Management
Figure 175: Commitments
Commitments for future costs are created in the Purchasing function of the
Materials Management component.
• Apurchaserequisition isaninternalprocurementrequirement(fromthe
requestor to the buyer). A purchase requisition represents aprovisional
commitment, which can be changed at any time. To represent the
commitmentinManagementAccounting, youmustassignaManagement
Accounting objecttoapurchaserequisitionitem.
• Apurchaseorderisacontractualagreementtopurchasegoodsorservices
fromavendoraccordingtoagreedconditions. Apurchaseorderisafirm
commitmentbecauseitisbasedonacontractualagreement. Ifapurchase
itemistobeentered under acostelement, you must enter aManagement
Accountingobject. TheitemisthenrepresentedinManagementAccounting.
Whenyou createapurchaseorder with referencetoapurchaserequisition, the
commitmentisreclassifiedinManagementAccounting.
Youreducethecommitmentbypostingagoodsreceiptagainstapurchaseorder.
Actual costs are posted to the Management Accounting object. This process
continuesuntilthepurchaseorderisclosedandthecommitmentisreducedtozero.
YoumustactivatecommitmentmanagementinManagementAccountingforeach
controlling area.
507
2006/Q2 © 2006 SAP AG. All rights reserved.
第 516 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Run a Commitments Report for the Cost Center
1. Select Accounting . Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/ActualComparisons>AdditionalKeyFigures>CostCenters:
Actual/Plan/CommitmentsortransactionS_ALR_87013620.
2. Enter the parameters for the report.
Hint:
You can enter individual Cost Centers and Cost Elements,
RangesorGroups. ThisisoneoftheusesofGroupingMaster
Data.
3. Execute the report with .
Thereportshowsactuals,commitments,assignedamounts(actualplus
commitments) and planned values.
4. You can drill down to the commitments by double clicking on one
of thecellsintheCommitmentcolumnanddoubleclickingonCost
Centers: Commitment line items.
5. Exit the report with .
508
©2006SAPAG.Allrightsreserved. 2006/Q2
第 517 页 / 共 689 页
AC050 Lesson: Commitments Management
Exercise 19: Commitments Management
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Explain the concept of commitment management within Management
Accounting
Business Example
Costs are initiated in the purchasing function of Materials Management when
a purchase requisition or a purchase order is created; they are represented in
standardreportinginManagementAccountingasacommitment.
Task 1:
Create a purchase order for a cost center and check the resulting commitment
in Management Accounting.
1. Create a purchase order for vendor 1000, purchasing organisation1000,
purchasing group001, and companycode 1000.
Specify that thepurchase order isto becharged to a cost center (account
assignmentcategoryK).Order10piecesofmaterialR-T200atapriceof24
for your service cost center, SERV-##.
Specify today as the delivery date and ignore any delivery date warning
messages.
2. RuntheCostCenters: Actual/Plan/Commitmentreportforthecurrentperiod
andplanversion0. RunthereportfortheservicecostcenterSERV-##.
3. Drilldowntotheoriginaldocumentforthelineitemforacommitment.
Task 2:
Createagoodsreceiptwithreferencetoyourpurchaseorder.
1. UsethetransactionMIGO,goodsreceiptforpurchaseorder(MIGO).Ifyou
donotknowthepurchaseordernumber, searchforitbymaterialnumber.
Post the goods receipt.
2. RuntheCostCenters: Actual/Plan/Commitmentreportforthecurrentperiod
andplanversion0. Runthereportfortheservicecostcenter,SERV-##).
3. Drill down to the original document.
509
2006/Q2 © 2006 SAP AG. All rights reserved.
第 518 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Solution 19: Commitments Management
Task 1:
Create a purchase order for a cost center and check the resulting commitment
in Management Accounting.
1. Create a purchase order for vendor 1000, purchasing organisation 1000,
purchasing group001, and companycode 1000.
Specify that the purchase order isto bechargedto a cost center (account
assignmentcategoryK).Order10piecesofmaterialR-T200atapriceof24
for your service cost center, SERV-##.
Specify today as the delivery date and ignore any delivery date warning
messages.
a) ChooseLogistics>MaterialsManagement>Purchasing>Purchase
Order > Create > Vendor/Supplying Plant Known or transaction
ME21N.
Hint: Ifthehelpopensup,selectthe Closetoremoveit.
b) Totherightoftheshoppingbasketsymbol,chooseStandardPO.
c) IntheVendorfield(thesecondboxalong),enter1000.
d) Choose Header(ifnotalreadyexpanded). ChoosetheOrgDatatab
(if not already selected).
e) Enter the following data:
Field Value or Action
PurchasingOrganisation 1000forIDESDeutschland
Purchasing Group 001 for Dietl, B.
Company Code 1000 (IDES AG)
f) Choose ItemOverview(ifnotalreadyexpanded).
g) Enter the following data:
Field Value or Action
AccountAssignmentCategory K
(column A)
Material R-T200
Continued on next page
510
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| PurchasingOrganisation | 1000forIDESDeutschland |
| Purchasing Group | 001 for Dietl, B. |
| Company Code | 1000 (IDES AG) |
| Field | Value or Action |
|---|---|
| AccountAssignmentCategory (column A) | K |
| Material | R-T200 |
第 519 页 / 共 689 页
AC050 Lesson: Commitments Management
Field Value or Action
PO Quantity 10
Deliv Date today
Net Price 24 per item
Plant 1000
h) Choose Enter .
Ifawarningisdisplayedforthevendor,chooseEnteragaintoremove
the warning.
i) IntheCostCenterfield,enterSERV-##. ChooseEnter .
j) Enterpastanywarningsaboutdeliverydates. ChooseSave .
k) Choose to exit the transaction.
2. RuntheCostCenters: Actual/Plan/Commitmentreportforthecurrentperiod
andplanversion0. RunthereportfortheservicecostcenterSERV-##.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/ActualComparisons>AdditionalKeyFigures>CostCenters:
Actual/Plan/CommitmentsortransactionS_ALR_87013620.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
Continued on next page
511
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| PO Quantity | 10 |
| Deliv Date | today |
| Net Price | 24 per item |
| Plant | 1000 |
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 520 页 / 共 689 页
Unit7: CostCenterAccounting AC050
3. Drilldowntotheoriginaldocumentforthelineitemforacommitment.
a) Double-clickthereportlineforcostelement400000
b) Double-clicktheCostCenters: CommitmentLineItemsreport.
c) Double-click the line item.
ThesystemtakesyoutothePurchaseOrder.
d) Keepselecting to exit the transaction.
Task 2:
Createagoodsreceiptwithreferencetoyourpurchaseorder.
1. UsethetransactionMIGO,goodsreceiptforpurchaseorder(MIGO).Ifyou
donotknowthepurchaseordernumber,searchforitbymaterialnumber.
Post the goods receipt.
a) 1. Choose Logistics → Materials Management → Inventory
Management→Goodsmovement→Goodsreceipt→Forpurchase
order→PONumberknownortransactionMIGO.
b) VerifythatthefirstfieldisGoodsreceiptandthesecondisPurchase
order. EnteryourpurchaseordernumberinthethirdfieldandEnter .
Note: If you do not know the number, click in the field,
right-clickandchooseSearch forPOand enterR-T200 as
the material number.
c) Select ItemOKat thebottomof thescreenandpost thedocument
with .
d) Select to exit the transaction.
Continued on next page
512
©2006SAPAG.Allrightsreserved. 2006/Q2
第 521 页 / 共 689 页
AC050 Lesson: Commitments Management
2. RuntheCostCenters: Actual/Plan/Commitmentreportforthecurrentperiod
andplanversion0. Runthereportfortheservicecostcenter,SERV-##).
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/ActualComparisons>AdditionalKeyFigures>CostCenters:
Actual/Plan/CommitmentsortransactionS_ALR_87013620.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
3. Drill down to the original document.
a) Double-clickthereportlineforcostelement400000.
b) Double-clicktheCostCenters: ActualLineItemsreport. Double-click
the lineitem. Select the lineitem with thevalue of about 1100 and
chooseEnvironment>RelationshipBrowser.
The system displays the original document and all the accounting
documents that were created.
c) Keep selecting to exit the transaction.
513
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 522 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Lesson Summary
You should now be able to:
• Explain the concept of commitment management within Management
Accounting
514
©2006SAPAG.Allrightsreserved. 2006/Q2
第 523 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Lesson: Cost Center Transactions
Lesson Overview
ThislessonlooksatafewtypicalpostingtransactionsinManagementAccounting,
suchasdirectactivityallocationsandcross-applicationtimesheets.
Lesson Objectives
After completingthislesson, youwillbeable to:
• PostManagementAccountingrepostingdocuments
• Explainthepurposeofandpostadirectactivityallocation
• Explain thepurpose of andenter time sheets
Business Example
Numerous financial transactionsare carried out during the course of a period.
Sometimes an expenseisposted tothe wrong Management Accountingobject
(costcenter,internalorder,andsoon). Asamemberoftheprojectteam,youwill
explainhowthispostingerror can becorrected.
Inaddition,youwanttoexplainhowtoallocatecostsforservicesperformedfor
anothercostcenterandthedifferentwaysthatareavailable.
Correcting Posting Errors
Onewayofcorrectingpostingerrorsistoreversetheoriginaldocumentandposta
correcteddocumentintheoriginalapplication. Anotherwayistocorrectthedata
recordsinManagement Accounting. Youcancorrectdatarecordsbyreposting
costsmanuallyorrepostinglineitems. Thesecorrectionmethodsarerestricted
toManagement Accounting. You canusethesecorrectionmethods only if the
correctionisnotrelevantintheoriginalapplication(forexample,iftheoriginal
expenseaccountiscorrect, butthecost objectisnot).
515
2006/Q2 © 2006 SAP AG. All rights reserved.
第 524 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Figure 176: Reposting Line Items
You can repost primary costs from one controlling object to another, using
transaction-basedreposting. Theoriginalcostelementisretained. Thisfunction
enablesyoutocorrectpostingerrors. Preferably,postingerrorsshouldbecorrected
intheapplicationcomponentinwhichtheyoccurred,sothatexternalaccounting
(Financial Accounting) andinternal accounting(Management Accounting) are
always reconciled. If this is not possible, incorrect assignments to controlling
objects(costcentersorinternalorders)canbecorrectedusingtransaction-based
reposting in Management Accounting.
Therearetwo types of reposting: manual reposting of costs (or revenues) and
reposting of line items.
• Manualrepostingof costssimplytransferscostsfromoneManagement
Accounting object to another. Thistypeof reposting doesnot preserve a
directlinkbetweentheamounttransferredandthetransactionthatoriginally
postedthecoststoManagement Accounting.
• Whenyourepostlineitems, ontheotherhand, youspecifytheFinancial
Accountingdocumentnumber. Therepostingdocumentcontainsareference
totheoriginalFinancialAccountingdocument. Thismeansthatthelinkto
the original document from Financial Accounting is preserved after the
correctionpostingandthereceiveroftherepostingcanthusjumpdirectlyto
the Financial Accounting document.
Youcanspecifymorethanonereceiverwhenyourepostlineitems.
516
©2006SAPAG.Allrightsreserved. 2006/Q2
第 525 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Reposting Line Items
1. ChooseAccounting>Controlling>CostCenterAccounting>Actual
Posting>RepostLineItems>EnterortransactionKB61.
2. Enterthefollowingdataontheinitial screen:
• Document Number
• Company Code
• Fiscal Year
Youcanalsoenteroneormoreindividualvalues,intervalsorgroups
for each of thefieldsoffered by the system.
Hint:
IfthefieldsofferedbytheSAPsystemontheinitialscreenfor
selectinglineitemsforrepostingarenot sufficient, youcan
showmorefields. Choose Changeselectionparameters.
3. Choose Execute .
On the screen are all the line items of the document that met the
selection criteria.
4. The following options exist:
• Postvaluespreviouslyallocatedtooneaccountassignmentobject
(suchasacostcenter)totwoaccountassignmentobjects
– Reducethevalueallocatedtothepreviouscostcenter.
– ChooseEnter. Thesystemdisplaysthedifferenceforthe
posted value quantity in a new row, using the current
account assignment object.
– Enterthenewaccountassignmentobjecttowhichyouwant
to repost the difference.
Hint:
Youcannot increasethe value posted previously. The
sumoftheamountsforallthedocumentitemsentered
foronelineitemmustcorrespondtotheamountfromthe
original line item.
• PostingLineItemstoaDifferentAccountAssignmentObject
Continued on next page
517
2006/Q2 © 2006 SAP AG. All rights reserved.
第 526 页 / 共 689 页
Unit7: CostCenterAccounting AC050
– Change the CO account assignment object of the prior
primary cost posting.
– Ifrequired, overwritetheObjectType.
• Using Auxiliary Account Assignments During Line Item
Reposting.
– Entertheobjecttypesandtheaccountassignmentobjects
fortheauxiliaryaccountassignments(statisticalpostings)
in the list.
Youcanselectfromfouraccountassignmentobjects. The
systemalwaysmakesatruepostingforoneoftheseobjects,
enablingyoutomakeadditionalstatisticalpostingsforup
to three objects.
5. Toreachthedocumentheader,choose Header.
Inthedocumentheaderyouenterthepostingdateandthedocument
date, plus adescription for thereposting
Hint:
The posting date must be in the same fiscal year as the
document you want to repost.
6. ChooseOlddocumentrowsbuttontobranchtothesourcedocument
7. To executethereposting, choose Post .
518
©2006SAPAG.Allrightsreserved. 2006/Q2
第 527 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Reposting Cost and Revenues Manually
1. Choose Accounting > Controlling > Cost Center Accounting >
ActualPostings>ManualRepostingofCostsorManualRepostingof
Revenues>EnterortransactionsKB11NandKB41N.
YouuserepostingofCostsforPrimaryCostElementsandrepostingof
Revenuesforrevenueelements. Thisisdeterminedbythecostelement
category of theitemthat you want to post.
2. Ontheupperscreenarea,enterthedocumentdateandthepostingdate.
Thesystemdefaultsthecurrentdate,whichyoucanhoweveroverwrite.
3. Toavoidneedingtoreenterthesamebusinesstransactionrepeatedly,
youcanuseexistingdocumentsasatemplateforfurtherpostings. To
doso,enterthenumberofthereferencedocument.
Ifyouwish, youcandisplayfurtherinformationonthepostingsuch
astheuser or theexchangeratetype. To doso, choosethetab strip
Additional information.
4. Chooseascreenvariant. Ifyoudonotenterascreenvariant,thesystem
usesthestandardvariantintendedforthegivenallocation. Youdefine
yourownscreenvariantsformanualactualpostinginCustomising(per
businesstransaction). Thisscreenvariantiseffectivelyacollectionof
settingsthatdetermineswhichfieldsappearontheentryscreen.
5. SpecifywhetheryouwanttoenterdatausingListentryorIndividual
entry.
IfyouchooseListentry,youcanentermorethanonepostingrowfor
theselecteddocumentandbusinesstransaction.
IfyouchooseIndividualentryyoucanonlyenteronepostingrowata
timeforthedocumentandbusinesstransactionselected.
Belowtheindividualentryscreen,thesystemdisplaysalisttowhich
youcantransfereverypostingrow. Tonavigatebetweentheseposting
rows,selectthepostingrowthatyouwanttomoveupto/downto. The
systemdisplaysthedataontheselectedpostingrowontheindividual
entry screen.
6. Enter the data for your posting. The list entry columns and the
ready-for-input fields on the individual entry screen are set in line
with the selected screen variant.
Hint:
Continued on next page
519
2006/Q2 © 2006 SAP AG. All rights reserved.
第 528 页 / 共 689 页
Unit7: CostCenterAccounting AC050
YoucanexecuterepostingsbetweentheindividualControlling
objects,suchascostcentersororders,inanycurrencystoredin
thesystem. Repostingsaremadeautomaticallyattheaverage
ratesetinCustomising(M).IntheCurrencyfield, enter the
currencyinwhichthegivendocumentsaretobeposted.
Hint:
Whenenteringquantities,youdonotneedtospecifyunitsof
measure. Thesystemautomaticallyadoptstheunitsofmeasure
from the totals transaction data.
7. Choose to post the transaction.
520
©2006SAPAG.Allrightsreserved. 2006/Q2
第 529 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Allocating Direct Activities
Duringday-to-dayoperations,acostcentermightperformaserviceforanother
ManagementAccountingobject. For example, aplant maintenancecostcenter
performs services for cost centers for preventive maintenance or for repairs.
The costs for this service are based on thenumber of unitsof theactivity type
performed in preventive maintenance.
Figure 177: Direct Activity Allocation
Allocationdatamustbeenteredinthesystemusingoneofthesemethods: activity
allocationsand cross-application time sheets.
For indirect activity allocation, enter and allocate the quantity of an activity
type provided by a cost center.
Fordirectactivityallocation,enterthecostcenterprovidingtheactivity(sender
cost center), the object receiving the activity (receiver), the type of activity
provided, and the activity quantity. Only a cost center can be the sender in an
activity allocation. The receiver, however, can be any controlling object, for
example, a cost center, order or a project.
Direct activity allocation credits the sender cost center and debits the receiver
cost center using a secondary cost element (cost element category 43). This
cost element is already stored in the activity type master record. The activity
allocationvalueisobtainedbymultiplyingtheprovidedquantitybytheplanned
price of the period.
521
2006/Q2 © 2006 SAP AG. All rights reserved.
第 530 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Entering Direct Activity Allocations
1. ChooseAccounting>Controlling>CostCenterAccounting>Actual
Postings>ActivityAllocation>EnterortransactionKB21N.
2. Ontheupperscreenarea,enterthedocumentdateandthepostingdate.
Thesystemdefaultsthecurrentdate,whichyoucanhoweveroverwrite.
3. Toavoidneedingtoreenterthesamebusinesstransactionrepeatedly,
youcanuseexistingdocumentsasatemplateforfurtherpostings. To
doso, enterthenumberofthereferencedocument.
Ifyouwish, youcandisplayfurtherinformationonthepostingsuch
astheuser or theexchangeratetype. To do so, choose the tab strip
Additional information.
4. Chooseascreenvariant. Ifyoudonotenterascreenvariant,thesystem
usesthestandardvariantintendedforthegivenallocation. Youdefine
yourownscreenvariantsformanualactualpostinginCustomising(per
businesstransaction). Thisscreenvariantiseffectivelyacollectionof
settingsthatdetermineswhichfieldsappearontheentryscreen.
5. SpecifywhetheryouwanttoenterdatausingListentryorIndividual
entry.
IfyouchooseListentry,youcanentermorethanonepostingrowfor
theselecteddocument andbusinesstransaction.
IfyouchooseIndividualentryyoucanonlyenteronepostingrowata
timeforthedocumentandbusinesstransactionselected.
6. EnteraSenderCostCenterandSenderActivity,aReceiverCostCenter
and a Quantity.
Hint: Youdo notneedtoenteraprice.
Ifthereceiveroftheactivityallocationisnotacostobject(i.e.
it isa, cost center, businessprocess, or internalorder), then
thefollowingapplies: Ifnopricewassetmanually, thenthe
planpriceisused. Ifyouhavenotexecutedaniterativeprice
calculation,thenthemanuallysetpricefortheactivitytypeis
usedfordirectactivityallocation(thepriceintheplan/actual
(000) version).
Ifthereceiveroftheactivityallocationisacostobject(suchas,
aproductionorderoraproductcostcollector),thentheprice
used for valuation is determined according to the valuation
variant(whichislinkedtothecostobjectforthesimultaneous
Continued on next page
522
©2006SAPAG.Allrightsreserved. 2006/Q2
第 531 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
costingviathecostingvariant). Ifthereceivingcostobjectis
not linked toa costingvariant forthesimultaneouscosting,
thentheplanpriceforthevaluationperiodisused
7. Choose to post the transaction.
523
2006/Q2 © 2006 SAP AG. All rights reserved.
第 532 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Cross Application Time Sheets
TheSAPTimeSheetsimplifiesstandardised,cross-applicationtimeentry. The
time sheet combines the functions for recording working times from various
applicationsinonetransaction. Usingthetimesheet,youcansupplythefollowing
componentswith informationabout working times:
• AttendanceandabsenceinHumanCapitalManagement
• InternalactivityallocationinManagementAccounting
• ConfirmationsfromPlantMaintenance,ProgramandProjectManagement,
and Service Management
Figure 178: Time Sheet
Internalemployeesandexternalserviceproviderscanusethetimesheettoenter
theirworkingtimeinthesystem. Ononeeasy-to-usescreen,workingtimedata
can be entered centrally for all persons.
Working time is always entered in hours or times, and is always related to an
individual. IntheSAPsystem, apersonnelnumber isassignedtoeachinternal
employeeorexternalserviceprovider. Youcanthencreatetheminimummaster
recordrequiredifyoudonotusemySAPERPHumanCapitalManagement.
Usersdisplay thetime sheet via specificdata entry profiles. Whenyou define
these profiles in Customising, you can adjust the entry process to the level of
knowledgeandareaofactivityoftheuser. Youcanusethefieldselectionfunction
fortheentryprofilestorestrictthefieldsthataredisplayedontheentryscreen.
524
©2006SAPAG.Allrightsreserved. 2006/Q2
第 533 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Using CATS Classic
1. SelectAccounting>Controlling>CostCenterAccounting>Actual
Posting > Time Sheet > CATS Classic > Record Working Times or
transaction CAT2.
The Time Sheet: Initial Screen appears.
2. Enter thedata entry profileyou require
Hint:
Thedataentryprofiledeterminesthemethodofdataentry,the
layoutofthedataentryscreen,andthefollowingfactors:
• Whethertimescanbeenteredforindividualemployeesor
for groups of employees
• Whichdatacanbemaintained(confirmations,services,
and so on)
• Whethertimesheetdataisenteredonadaily,weeklyor
monthly basis
• Whetherornotthedataenteredissubjecttoapproval
3. If the Personnel number field appears on the screen, enter your
personnelnumber. Otherwise,ithasbeenassignedautomatically.
Choose Enter Times .
Hint:
Whenyou call CATS classic for thefirst time after logging
on to the system, the Key date field appears. The key date
determinestheperiodforwhichthetimesheetiscalled.
Depending on your system settings, other fields may also
appear on the initial screen
4. Ifnecessary,overwritethekeydate. Youcanedittheweeknumberor
usethe to movebetween the weeks.
5. Enter the working time attributes required for the employee whose
working timesyou want torecord. Youwillnormallywant toenter
datainall thefieldsinthedataentrysection.
Continued on next page
525
2006/Q2 © 2006 SAP AG. All rights reserved.
第 534 页 / 共 689 页
Unit7: CostCenterAccounting AC050
YoumayneedtoenterSenderCostCentersandActivitiesaswellas
recipient Cost Objectsand thetimeworked.
Hint:
To reducetheamount of data you haveto enter, thesystem
canautomaticallycopydefaultvaluesfortheemployeetothe
relevantfields. Thedefaultvaluesareenteredintherowsin
whichyouhavealready recorded times. Theyappear when
youchooseENTER . Youcanoverwritethedefaultvalues
as required.
6. Check thedatayouhaveentered with .
7. If necessary, correct data that has generated an error or warning
message.
8. Release the Data only when you are sure you do not want to make
anyfurtherchanges. Thedataisthenreadyforfurtherprocessingby
the person assigned to approve the data, or for transfer to the target
components.
Dependingonthesettingsforyourdataentryprofile,youuseoneof
thefollowing procedurestoreleasethedata:
• Releaseonsaving. Inthiscase,thedataisreleasedautomatically
whenyousaveit. Releaseddataisassignedtheprocessingstatus
Released for approval.
• Releasedatausingthe ReleaseView.
Inthiscaseswitchto ReleaseView, selectthedatarecords
youwanttoreleaseandchoose Release.
9. Save the data with .
10. Depending on the Configuration typically, the time sheet will now
go through an approval process.
526
©2006SAPAG.Allrightsreserved. 2006/Q2
第 535 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Transfer CATS Data to Controlling
1. SelectAccounting>Controlling>CostCenterAccounting>Actual
Postings>TimeSheet>Transfer>AccountingortransactionCAT7.
ThisisusedtopostapprovedorcanceledrecordsfromtheTimeSheet
toControlling. ThereportgeneratesCOdocuments. Thetimesheet
data you transfer to Controlling triggers internal activity allocation
in Controlling.
2. EnteraPersonnelnumberorRangeandtheDatesyouwanttotransfer
togetherwithaPostingDateforthedocumenttobeposted.
3. Execute the program with .
527
2006/Q2 © 2006 SAP AG. All rights reserved.
第 536 页 / 共 689 页
Unit7: CostCenterAccounting AC050
528
©2006SAPAG.Allrightsreserved. 2006/Q2
第 537 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Exercise 20: Cost Center Transactions
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Use thereposting function to correct postingsto thewrong Management
AccountingobjectbyothercomponentssuchasFinancialAccounting
• Analyzethecombinedquantityandvalueflowofadirectactivityallocation
• Use the cross-application time sheet
• Checkthebudgetingandavailabilitycontrolforoverheadorders
Business Example
TheaccountantassignedthewrongpostingobjectduringapostinginFinancial
Accounting. You would like to correct this without reversing the posting in
Financial Accounting.
Task 1:
Enter a posting in Financial Accounting.
1. Repost200oftheoperatingsuppliesandconsumablescostsfromtheservice
costcenter, SERV-##, toyour productioncostscenter, PROD-##. Donot
referenceaFinancialAccountingdocument; usecostcenterasthescreen
variant. Thecostelementis403000. Postyourdocument.
2. RuntheCostCenters: Actual/Plan/Variancereport for thecurrentperiod
and plan version 0. Execute the report for service cost center SERV-##
andfor productioncost center PROD-##. Makesurethattheservicecost
center was credited with the amount 200 and the production cost center
was debited with this amount.
Task 2:
Process an activity allocation using the following information and see how it
affects your service cost center.
Note: Yourservicecostcenterspent50hoursinspectingtheassetsofyour
productioncostcenter. Thedetecteddamagetosomeassetswasrepaired
with90hoursof repairactivity. Anactivityreport(paperdocument)is
nowpassedtotheinternalaccountingdepartment.
1. Create a direct activity allocation to allocate 50 hours of activity type
CHK-##and90hoursofactivitytypeREP-##fromcostcenterSERV-##
tocostcenterPROD-##. Usetheentryvariantscost center andlistentry.
Post your document.
Continued on next page
529
2006/Q2 © 2006 SAP AG. All rights reserved.
第 538 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. Executethereportfortheservicecostcenter,SERV-##.
Check the quantity and cost flows from the service cost center to the
production cost center.
Note: Ifyouscrolltotheendofthereport,youcanseethequantities
of the activity type allocation.
Task 3:
Createanentryusingthecross-applicationtimesheetandtransfertheinformation
toManagementAccounting. Checktheresultontheservicecostcenter.
1. Usethecross-applicationtimesheetwiththedataentryprofileCO2torecord
therepairactivityREP-##,whichyouremployeewiththepersonnelnumber
10##providedfortheproductioncostcenterPROD-##.
Note: If a messageappearstelling youthat you haveto assign a
plant, skip it by choosing Continue.
Use today as the key date. The sender cost center is SERV-## and the
employeehasprovidedarepairservicetodaythatlasted8hours.
Switch to the release view, select your entered row, and choose Release.
Save the time entry.
2. Update the time sheet data directly.
Note: Youcandothisbecauseyourenteredactivitydoesnotrequire
approvalaccordingtothesettingsintheentryprofile.
Foryourentrydate,transferthetimesheetdataaccordinglytoManagement
Accountingonly. Use10##,thepersonnelnumberofyouremployee,forthe
selection. MakeanoteoftheManagementAccountingdocumentnumber.
3. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. Executethereportfortheservicecostcenter,SERV-##.
Open the Cost Centers: Actual Line Items report for the allocation cost
element615000anddrilldowntothesourcedocument.
530
©2006SAPAG.Allrightsreserved. 2006/Q2
第 539 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Solution 20: Cost Center Transactions
Task 1:
Enter a posting in Financial Accounting.
1. Repost200oftheoperatingsuppliesandconsumablescostsfromtheservice
costcenter, SERV-##, toyour productioncostscenter, PROD-##. Donot
referenceaFinancialAccountingdocument; usecostcenterasthescreen
variant. Thecostelementis403000. Postyourdocument.
a) ChooseAccounting>Controlling>CostCenterAccounting>Actual
Postings>ManualRepostingofCosts>EnterortransactionKB11N.
b) IntheScreenVariantfield,entercost center. ChooseListEntry.
c) Enter the following data:
Field Value or Action
Cost Center (Old) SERV-##
Cost Element 403000
Amount 200
Currency EUR
Cost Center (New) PROD-##
d) Choose Post .
e) Choose to exit the transaction.
Continued on next page
531
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Cost Center (Old) | SERV-## |
| Cost Element | 403000 |
| Amount | 200 |
| Currency | EUR |
| Cost Center (New) | PROD-## |
第 540 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
and plan version 0. Execute the report for service cost center SERV-##
andforproductioncostcenterPROD-##. Makesurethattheservicecost
center was credited with the amount 200 and the production cost center
was debited with this amount.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/Actual Comparisons>Cost Centers: Actual/Plan/Varianceor
transaction S_ALR_87013611.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
d) Double click on the 403000 line item.
e) DoubleclickonCostCenters: Actuallineitems
f) Double lick on the line for -200 EUR.
Thisshouldbethedocument thatyouposted.
g) Keepselecting to exit the transaction.
h) RunthereportagainforcostcenterPROD-##.
Continued on next page
532
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 541 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Task 2:
Process an activity allocation using the following information and see how it
affects your service cost center.
Note: Yourservicecostcenterspent50hoursinspectingtheassetsofyour
productioncostcenter. Thedetecteddamagetosomeassetswasrepaired
with90hoursof repairactivity. Anactivityreport(paperdocument)is
nowpassedtotheinternalaccountingdepartment.
1. Create a direct activity allocation to allocate 50 hours of activity type
CHK-##and90hoursofactivitytypeREP-##fromcostcenterSERV-##
tocostcenterPROD-##. Usetheentryvariantscost center andlistentry.
Post your document.
a) ChooseAccounting>Controlling>CostCenterAccounting>Actual
Postings>ActivityAllocation>EnterorKB21N.
b) Enter the following data:
Field Value or Action
Doc Date today
Version 0
Screen Variant cost center
c) Choose List Entry.
d) Enterthefollowingdatainthefirstandsecondrows:
Column Row 1 Row 2
SenderCostCenter SERV-## SERV-##
SenderActivityType CHK-## REP-##
ReceiverCostCenter PROD-## PROD-##
TotalQuantity 50 90
e) Choose Post .
f) Choose
Continued on next page
533
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Doc Date | today |
| Version | 0 |
| Screen Variant | cost center |
| Column | Row 1 | Row 2 |
|---|---|---|
| SenderCostCenter | SERV-## | SERV-## |
| SenderActivityType | CHK-## | REP-## |
| ReceiverCostCenter | PROD-## | PROD-## |
| TotalQuantity | 50 | 90 |
第 542 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. Executethereportfortheservicecostcenter,SERV-##.
Check the quantity and cost flows from the service cost center to the
production cost center.
Note: Ifyouscrolltotheendofthereport,youcanseethequantities
of the activity type allocation.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/Actual Comparisons>Cost Centers: Actual/Plan/Varianceor
transaction S_ALR_87013611.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
d) Scrolltotheendofthereporttoseethequantitiesoftheactivitytype
allocation.
e) Keepselecting to exit the transaction.
Task 3:
Createanentryusingthecross-applicationtimesheetandtransfertheinformation
toManagementAccounting. Checktheresultontheservicecostcenter.
1. Usethecross-applicationtimesheetwiththedataentryprofileCO2torecord
therepairactivityREP-##,whichyouremployeewiththepersonnelnumber
10##providedfortheproductioncostcenterPROD-##.
Note: If a messageappearstelling youthat you haveto assign a
plant, skip it by choosing Continue.
Use today as the key date. The sender cost center is SERV-## and the
employeehasprovidedarepairservicetodaythatlasted8hours.
Continued on next page
534
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 543 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Switch to the release view, select your entered row, and chooseRelease.
Save the time entry.
a) ChooseAccounting>Controlling>CostCenterAccounting>Actual
Postings> TimeSheet > CATS Classic> Record WorkingTimesor
transaction CAT2.
b) Enter the following data:
Field Value or Action
Data Entry Profile CO2
Personnel Number 10##
c) ChooseEnterTimes . Ifamessageappearstellingyouthatyouhave
toassignaplant,skipitbychoosingContinue .
d) Enter the following data:
Field or Column Value or Action
SenderCost Center SERV-##
Activity Type REP-##
ReceiverCostCenter PROD-##
e) Inthecolumncontainingtoday'sdate,enter8. ChooseReleaseView .
f) Selectyour entryrowandchooseRelease .
g) ChooseSave . Enter pastanywarnings.
h) Go back to the main menu with .
2. Update the time sheet data directly.
Note: Youcandothisbecauseyourenteredactivitydoesnotrequire
approvalaccordingtothesettingsintheentryprofile.
Continued on next page
535
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Data Entry Profile | CO2 |
| Personnel Number | 10## |
| Field or Column | Value or Action |
|---|---|
| SenderCost Center | SERV-## |
| Activity Type | REP-## |
| ReceiverCostCenter | PROD-## |
第 544 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Foryourentrydate,transferthetimesheetdataaccordinglytoManagement
Accountingonly. Use10##,thepersonnelnumberofyouremployee,forthe
selection. MakeanoteoftheManagementAccountingdocumentnumber.
a) ChooseAccounting>Controlling>CostCenterAccounting>Actual
Postings>TimeSheet>Transfer>AccountingortransactionCAT7.
b) Enter the following data:
Field Value or Action
Personnel Number 10##
Date today
Posting Date today
c) Choose Execute .
The system displays a log with a message informing you that a
document was posted.
d) Exit the transaction with .
3. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. Executethereportfortheservicecostcenter,SERV-##.
Continued on next page
536
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Personnel Number | 10## |
| Date | today |
| Posting Date | today |
第 545 页 / 共 689 页
AC050 Lesson: Cost Center Transactions
Open the Cost Centers: Actual Line Items report for the allocation cost
element615000anddrilldowntothesourcedocument.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/ActualComparisons>CostCenters: Actual/Plan/Varianceor
transaction S_ALR_87013611.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
d) Double-clickthereportlineforcostelement615000.
e) Double-clicktheCostCenters: ActualLineItemsreport.
f) ChooseSelectLayout andselectlayout1SAP.
g) Double-clickthelineitemwithaquantityof 8.
You can now see your CATS posting.
h) Keep selecting to exit the transaction.
537
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 546 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Lesson Summary
You should now be able to:
• Post ManagementAccountingrepostingdocuments
• Explainthepurposeofandpostadirectactivityallocation
• Explain thepurposeof and enter time sheets
538
©2006SAPAG.Allrightsreserved. 2006/Q2
第 547 页 / 共 689 页
AC050 Lesson: Cost Center Period End
Lesson: Cost Center Period End
Lesson Overview
This lesson presents the most important periodic transactions in Cost Center
Accounting.
Youwillseethatthereisadistinctionbetweentransactionsthatclosecostcenters
attheexpenseofotheroverheadcostobjects(withinOverheadCostManagement)
andtransactionsthattransferunderabsorptionoroverabsorptionofthe(main)cost
centersto Cost Object Controllingor ProfitabilityAnalysis(outsideOverhead
Cost Management).
Lesson Objectives
After completingthislesson, youwillbeable to:
• List the possibilities for period end closing
• PoststatisticalkeyfigurestoaManagementAccountingobject
• Understand the difference between a reposting, distribution and an
assessment
• Performacostassessmentfromonecostcentertoseveralothercostcenters
Business Example
You want to review the necessary steps for period-end closing in Cost Center
Accounting. Attheendofeveryperiod,overheadcostsmustbeallocatedtothe
auxiliarycostcentersand,inturn,totheproductioncostcenters.
The rent could be allocated from the financial and administration cost center
to other cost centers (such as IT and production machines). This allocation is
basedonthesquaremetersoffloorspaceusedbytheindividualcostcenters(this
informationwasenteredearlierasstatisticalkeyfigures).
The costs of the IT cost center could be then allocated to the individual cost
centers,includingtheproductionmachinecostcenter. Thisallocationisbasedon
thenumberofpersonalcomputers(PCs)intheshopfloorarea.
Aftertheproductionmachinecostcenterhasreceivedalltheallocatedcosts,you
can calculate the actual costs of the various activity types (for example, setup
times,machinehours,andworkinghours)and,therefore,alsotheactualprice.
539
2006/Q2 © 2006 SAP AG. All rights reserved.