第 479 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Activity price calculation is the final stage of the planning process. The SAP
system calculates the prices for all combinations of cost centers and activity
typesiteratively. Theactivitypricesarethenusedtovaluatetheplannedactivity
exchange.
Assigning Planning Methods to Controlling Methods
Insimplescenarios,planningisoptionalandnoactivitytypesarenecessary. Only
costsareplanned. Plancostallocationscanbeaccomplishedwithdistributions
and assessments.
Activitytypescanalsobeconsumedbycost centersandinternalorders. When
activityinputplanningisperformed,thequantityofactivitiesthatothercontrolling
objects have planned to consume shows up on the sender cost center as the
scheduledquantity. Youcanuseplanreconciliationtoadjusttheplannedactivity
quantities to thescheduled activity quantities.
After cost and activity planning is complete, the system can calculate activity
pricesbydividingtheplancostsbytheplannedactivityoutputquantities. Ifmore
thanoneactivityisproducedbyacostcenter,youhavetodistributethecoststo
thedifferentactivitytypesfirst,usingequivalencenumbersorthesplittingtool.
Moredetailedplanningmethodsprovidefarmoreinformationaboutcosts,activity
outputs and operating rates.
To address the operation level of a cost center in the analysis of actual costs,
during planning planned costs and activity input should be classified aseither
activity-independentcostsoractivity-dependentcosts. Thiswillgivethesystem
theinformationnecessarytocalculatetargetcosts. Achangeintheoperatinglevel
foranactivitytyperesultsinachangedvaluefortargetcosts. Theoperatingrate
representstheactualactivityquantityofanactivitytypeinaperioddividedbythe
planned activity quantity of an activity type.
Targetcosts=plannedfixedcosts+plannedvariablecostsxoperatingrate
Thetargetcostsarecoststhatareexpectedforacertainoperatingrate. Theyform
thebasisofthetarget/actualcostcomparison,inadditiontotheplan/actualcost
comparison. Plancostvaluesarestatisticalvaluesthatdonottakeintoaccount
the changesin operating rates. Target costs, however, aredynamic values that
continuously change according to theactivity types. As a result, these values
provide much moreinformation regardingthecalculationof theoperatingrate
by the cost center.
Theseplanningmethodsareusedtoenableflexiblemarginalcosting.
Product Cost Planning
IfyouwanttouseCostObjectControllingalso,youmustbeabletoallocatethe
overheadcoststoproductionordersandothercostobjects.
471
2006/Q2 © 2006 SAP AG. All rights reserved.
第 480 页 / 共 689 页
Unit7: CostCenterAccounting AC050
The advantage of the activity type allocation is that it combines both quantity
flowsandvalueflows. Requiredactivityquantitiesarespecifiedinroutingsand
usedforproductcostplanningandforallocationtocostobjects.
Figure 168: Cost Estimates
When you create a cost estimate with a quantity structure, the quantity
structureisprovidedbytheProductionPlanningpartofthesystem. TheBOM
(Bill of Materials) is a list of the component parts needed broken down into
sub-components where necessary. The Routing is the route the product takes
through production. It lists the Operations that will take place and the Work
Centersatwhichtheywillhappen. TheWorkCentersequatetoCostCentersin
ControllingandtheOperationsarelinkedtoActivities. Thiswaythevolumesof
materials and activitiesneeded are quantified.
Whenyoucreateacostestimate,youenterthecostingvariant,thematerial,the
plant,andthelotsize. Thesecontrolwhichotherdataiscalledandhowtheproduct
istobecosted,Thesystemselectsandvaluesthequantitystructureautomatically.
472
©2006SAPAG.Allrightsreserved. 2006/Q2
第 481 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Thecostingresultscanbesavedanddisplayedasanitemization,acostelement
itemization, or a cost component split.
• Theitemizationshowsdetailedinformationontheoriginofthecosts,such
asthequantitiesandpricesofthematerialsandinternalactivitiesused.
• Thecostelementitemizationgroupstheindividualcostingitemsintocost
elements. The cost elementsgroupthecostsaccording to howthey were
incurred. For materials, cost elements are determined through account
determination; for activities, through the activity type master or through
activitytypeplanning;forprocesses,throughtheprocessmasterrecord.
• Thecostcomponentsplitgroupsthecostelementsintocostcomponents.
Whenamultilevelstructureiscosted,thecostcomponentsplitisrolledup
sothattheoriginalidentityofthecostsisretainedforanalysis
You can analyze the results of the cost estimate directly or in the information
system.
473
2006/Q2 © 2006 SAP AG. All rights reserved.
第 482 页 / 共 689 页
Unit7: CostCenterAccounting AC050
474
©2006SAPAG.Allrightsreserved. 2006/Q2
第 483 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Exercise 17: Cost Center Planning
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Usetheplanningtoolsandseehowcertaininformationisplannedinmaster
data records
Business Example
Tobeabletoforecast costsandrevenues, your enterprisewillusetheplanning
toolstoenterplanningdataintheSAPsystem. Thisplanningdatawillbeusedfor
plan/actualcomparisonstoseehowdifferentareasof responsibilityperformed.
The comparisons are also used to control and monitor processes, thus making
adjustmentsorcorrectionspossibleifanydeviationsfromtheplanoccur.
In these exercises, you examine different planning functions in Cost Center
Accountingandseesomeoftheoptionsforplanningcostcenterinputsandoutputs.
Task 1:
Forcostelementplanning,usetheSAPALLplannerprofile. Planprimarycosts
byenteringplanningdataforthecostelementsthataretobeusedforpostingthe
service or material consumptionasactual values.
1. Planthecostsforcostelement417000forservicesusedonyourcostcenter
SERV-##. Setuptheplanforperiods1to12ofthecurrentfiscalyear. Use
version0. Thefixedplan costsfortheyear are 31500. Havethisamount
distributed in equal amounts to the individual accounting periods. Save
the plan data.
2. Plan the cost element, direct labor costs (420000), on your cost center
PROD-##. Specifyperiods1to12andthecurrentfiscalyear. Useversion0.
Thefixedplancostsfortheyearare9600. Distributethisamountinequal
amountstotheindividualaccountingperiods. Savetheplandata.
Task 2:
Foractivitytypeplanning,enteraplanforyourcostcenteranditsactivitytypes,
whichdefinesameasurableoutput. Planthepriceandtheplanquantity. Distribute
all the enteredquantitiesequallyover theperiods.
1. PlantherepairhourstobeprovidedbyyourservicecostcenterSERV-##
usingactivitytypeREP-##. Theplannedactivityquantityis1000hoursand
thefixedpriceis30perunit. Changetheequivalencenumberto2.
Continued on next page
475
2006/Q2 © 2006 SAP AG. All rights reserved.
第 484 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. Setuptheservicecost center tocheckthefixedassetsona regularbasis.
DothisbygivingcostcenterSERV-##activitytypeCHK-##. Specifythe
planned activity quantity as500 hours and thefixed priceas20 per unit.
Makesurethat equivalencenumber1isentered.
3. Planactivitytype1421astheactivityoutputofyourproductioncostcenter
PROD-##. Specifytheplannedactivityquantityas540hoursandthefixed
activitypriceas90perunit. Theequivalencenumbershouldbe1.
Task 3:
Plan activity-dependent costs.
1. Toreflect that somecostswillbeincurred by acost center only ifcertain
activitytypesareproducedbythatcostcenter, planthosecostsasactivity
dependent. Plan the cost as a variable cost if it depends on the output
quantityofthisactivitytype. Planthecostasafixedcostif thecost does
not depend on the activity quantity.
SpecifythatoperatingsuppliescostsfortheservicecostcenterSERV-##
depend on activity type REP-##. Plan the operating suppliescosts (cost
element 403000) as activity-dependent costs, with 3000 fixed plan costs
and 9000 variable plan costs.
Task 4:
Plan activity input.
1. Specifythatyourproductioncost centerPROD-##planstoconsume480
ofactivitytypeCHK-##and950hoursofactivitytypeREP-##fromyour
service cost center SERV-##.
Note: Use the activity input planning layout (1-102) to enter
the planning data. Choose Next Layout to change the layout to
1-102. The activity provided by the service cost center, which
the production cost center wants to use, is not dependent on the
activityquantityprovidedbytheproductioncostcenter(itisactivity
independent). MakesuretheActivityTypefieldisblank.
Continued on next page
476
©2006SAPAG.Allrightsreserved. 2006/Q2
第 485 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Task 5:
Execute a planning overview report.
1. ExecutetheCostCenters: PlanningOverviewreportforperiods1to12of
thecurrentfiscalyearandplanversion0. Runthereporttoviewindetailthe
effectoftheplanningstepsontheservicecostcenter,SERV-##. Reviewthe
prices.
Hint: Scroll through the report to see the activities planned for
the selected cost center.
Task 6:
Calculate plan activity price automatically.
Note: If a cost center plans an activity type, you must also plan the
costs the cost center expects to incur when producing the planned
number of units of the activity. You must code costs that have been
plannedindependentlyoftheactivitysoyoucancalculatetheunit cost
of producing the activity. Automatic plan price calculation is used to
calculatethisunitcost. (Pricealwaysreferstoaunitoftheactivitytype
to be produced.)
Ifacostcenterproducesmorethanoneactivitytype,youmustdistribute
theactivity-independentplancostsamongtheactivitytypesofthecost
centertocalculatethepriceofeachsingleactivitytype. Inthisexample,
theequivalencenumbers,whichwereenteredintheexerciseonactivity
typeplanning, areusedasabasisforcostsplitting.
1. Runtheautomaticplanpricecalculationforyourserviceandproductioncost
centers. Useyourcostcenter groupCENTERS-##forperiods1to12in
thecurrentfiscalyear. SelectNoBusinessProcesses,TestRun,andDetail
Lists from the processing options.
Compare your results with the prices that were planned manually (in
exerciseforactivitytypeplanning). Makeanoteoftheplanactivityprices
determinedmanuallyandautomatically. Ifyourautomaticallyplannedprices
are acceptable, post the new prices.
Activity Type/Cost Manual Price AutomaticPrice
Center
CHK-##/SERV-##
REP-##/SERV-##
1421/PROD-##
477
2006/Q2 © 2006 SAP AG. All rights reserved.
| Activity Type/Cost Center | Manual Price | AutomaticPrice |
|---|---|---|
| CHK-##/SERV-## | ||
| REP-##/SERV-## | ||
| 1421/PROD-## |
第 486 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Solution 17: Cost Center Planning
Task 1:
Forcostelementplanning,usetheSAPALLplannerprofile. Planprimarycosts
byenteringplanningdataforthecostelementsthataretobeusedforpostingthe
service or material consumptionasactualvalues.
1. Planthecostsforcostelement417000forservicesusedonyourcostcenter
SERV-##. Setuptheplanforperiods1to12ofthecurrentfiscalyear. Use
version0. Thefixedplancostsfor theyear are 31500. Have thisamount
distributed in equal amounts to the individual accounting periods. Save
the plan data.
a) Choose Accounting < Controlling > Cost Center Accounting >
Planning>CostandActivityInputs>ChangeortransactionKP06.
b) intheVariablessectionenterthefollowingdata:
Field Value or Action
Version 0
From Period 1
To Period 12
Fiscal Year current fiscal year
Cost Center SERV-##
Cost Element 417000
Removeanyotherdatathatmayhavepopulatedautomatically
c) IntheEntrysectionselecttheForm-Basedradiobutton. Click .
d) InthePlanFixedCostscolumn,enter31500. IntheDistributionKey
column(nexttothevaluefortheplanfixedcosts),enter1.
Choose Post .
e) RemainintheChangeCostElement/ActivityInputPlanning: Initial
Screen for the next exercise.
Continued on next page
478
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Version | 0 |
| From Period | 1 |
| To Period | 12 |
| Fiscal Year | current fiscal year |
| Cost Center | SERV-## |
| Cost Element | 417000 |
第 487 页 / 共 689 页
AC050 Lesson: Cost Center Planning
2. Plan the cost element, direct labor costs (420000), on your cost center
PROD-##. Specifyperiods1to12andthecurrentfiscalyear. Useversion0.
Thefixedplancostsfortheyearare9600. Distributethisamountinequal
amountstotheindividualaccountingperiods. Savetheplandata.
a) IntheVariablessectionenterthefollowingdata:
Field Value or Action
Version 0
From Period 1
To Period 12
Fiscal Year current fiscal year
Cost Center PROD-##
Cost Element 420000
Removeanyotherdatathatmayhavepopulatedautomatically
b) IntheEntrysectionselecttheForm-Basedradiobutton.
Click .
c) InthePlanFixedCostscolumn,enter9600. IntheDistributionKey
columnimmediatelynexttothevaluefortheplanfixedcosts,enter1.
Choose Post .
d) Select to exit.
Continued on next page
479
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Version | 0 |
| From Period | 1 |
| To Period | 12 |
| Fiscal Year | current fiscal year |
| Cost Center | PROD-## |
| Cost Element | 420000 |
第 488 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Task 2:
Foractivitytypeplanning,enteraplanforyourcostcenteranditsactivitytypes,
whichdefinesameasurableoutput. Planthepriceandtheplanquantity. Distribute
all theentered quantitiesequallyover the periods.
1. PlantherepairhourstobeprovidedbyyourservicecostcenterSERV-##
usingactivitytypeREP-##. Theplannedactivityquantityis1000hoursand
thefixedpriceis30perunit. Changetheequivalencenumberto2.
a) Choose Accounting > Controlling > Cost Center Accounting >
Planning>ActivityOutput/Prices>ChangeortransactionKP26.
b) IntheVariablessectionenterthefollowingdata:
Field Value or Action
Version 0
From Period 1
To Period 12
Fiscal Year current fiscal year
Cost Center SERV-##
Activity Type REP-##
Removeanyotherdatathatmayhavepopulatedautomatically
c) IntheEntrysectionselecttheForm-Basedradiobutton.
Click .
Field Value or Action
Plan Activity 1000
Distribution Key 1
Fixed Price 30
Equi No 2
d) Choose Post .
RemainintheChangeActivityType/PricePlanning: InitialScreenfor
the next exercise.
Continued on next page
480
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Version | 0 |
| From Period | 1 |
| To Period | 12 |
| Fiscal Year | current fiscal year |
| Cost Center | SERV-## |
| Activity Type | REP-## |
| Field | Value or Action |
|---|---|
| Plan Activity | 1000 |
| Distribution Key | 1 |
| Fixed Price | 30 |
| Equi No | 2 |
第 489 页 / 共 689 页
AC050 Lesson: Cost Center Planning
2. Set up theservicecostcenter tocheckthefixedassetson aregular basis.
DothisbygivingcostcenterSERV-##activitytypeCHK-##. Specifythe
planned activity quantity as500 hours and the fixed price as 20 per unit.
Makesurethatequivalencenumber1isentered.
a) On the Change Activity Type/Price Planning: Initial Screen, enter
the following data:
Field Value or Action
Cost Center SERV-##
Activity Type CHK-##
b) Click .
Enter the following data:
Field Value or Action
Plan Activity 500
Distribution Key 1
Fixed Price 20
c) VerifythattheEquivalenceNumberfieldissetto1.
d) Choose Post .
RemainintheChangeActivityType/PricePlanning: InitialScreenfor
the next exercise.
Continued on next page
481
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Cost Center | SERV-## |
| Activity Type | CHK-## |
| Field | Value or Action |
|---|---|
| Plan Activity | 500 |
| Distribution Key | 1 |
| Fixed Price | 20 |
第 490 页 / 共 689 页
Unit7: CostCenterAccounting AC050
3. Planactivitytype1421astheactivityoutputofyourproductioncostcenter
PROD-##. Specifytheplannedactivityquantityas540hoursandthefixed
activitypriceas90perunit. Theequivalencenumbershouldbe1.
a) OntheChangeActivityType/PricePlanning: InitialScreen,enterthe
following data for activity type 1421:
Field Value or Action
Cost Center PROD-##
Activity Type 1421
b) Click .
c) Enter the following data:
Field Value or Action
Plan Activity 540
Distribution Key 1
Fixed Price 90
d) Choose Post .
e) Choose to exit.
Task 3:
Plan activity-dependent costs.
1. Toreflect that somecostswillbeincurred by acost center only ifcertain
activitytypesareproducedbythatcostcenter, planthosecostsasactivity
dependent. Plan the cost as a variable cost if it depends on the output
quantityofthisactivitytype. Planthecostasafixedcostif thecost does
not depend on the activity quantity.
Continued on next page
482
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Cost Center | PROD-## |
| Activity Type | 1421 |
| Field | Value or Action |
|---|---|
| Plan Activity | 540 |
| Distribution Key | 1 |
| Fixed Price | 90 |
第 491 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Specifythatoperatingsuppliescostsfor theservicecostcenterSERV-##
depend on activity type REP-##. Plan the operating supplies costs (cost
element 403000) as activity-dependent costs, with 3000 fixed plan costs
and 9000 variable plan costs.
a) Choose Accounting > Controlling > Cost Center Accounting >
Planning>CostsandActivityInputs>ChangeortransactionKP06.
b) IntheVariablessectionenterthefollowingdata:
Field Value or Action
Version 0
From Period 1
To Period 12
Fiscal Year current fiscal year
Cost Center SERV-##
Activity Type REP-##
Cost Element 403000
c) Inthe Entrysectionchoose Form-Based.
Click .
d) Enter the following data:
Field Value or Action
Plan Fixed Costs 3000
Distribution Key 1
PlanVariableCosts 9000
Distribution Key 1
e) Choose Post .
f) RemainintheChangeCostElement/ActivityInputPlanning: Initial
Screen for the next exercise.
Continued on next page
483
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Version | 0 |
| From Period | 1 |
| To Period | 12 |
| Fiscal Year | current fiscal year |
| Cost Center | SERV-## |
| Activity Type | REP-## |
| Cost Element | 403000 |
| Field | Value or Action |
|---|---|
| Plan Fixed Costs | 3000 |
| Distribution Key | 1 |
| PlanVariableCosts | 9000 |
| Distribution Key | 1 |
第 492 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Task 4:
Plan activity input.
1. Specifythatyourproductioncost centerPROD-##planstoconsume480
ofactivitytypeCHK-##and950hoursofactivitytypeREP-##fromyour
service cost center SERV-##.
Note: Use the activity input planning layout (1-102) to enter
the planning data. Choose Next Layout to change the layout to
1-102. The activity provided by the service cost center, which
the production cost center wants to use, is not dependent on the
activityquantityprovidedbytheproductioncostcenter(itisactivity
independent). MakesuretheActivityTypefieldisblank.
a) OntheChangeCostElement/ActivityInputPlanning: InitialScreen,
chooseNextLayout tochangethelayoutto1-102.
b) Enter the following data:
Field Value or Action
Cost Center PROD-##
Activity Type Makesurethisisblank.
SenderCost Center SERV-##
SenderActivityType CHK-##
To REP-##
c) Click .
d) Enter the following data:
Field Value or Action
PlanFixedConsumption 480forCHK-##,950forREP-##
Distribution Key 1
e) Choose Post .
f) Choose to exit.
Continued on next page
484
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Cost Center | PROD-## |
| Activity Type | Makesurethisisblank. |
| SenderCost Center | SERV-## |
| SenderActivityType | CHK-## |
| To | REP-## |
| Field | Value or Action |
|---|---|
| PlanFixedConsumption | 480forCHK-##,950forREP-## |
| Distribution Key | 1 |
第 493 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Task 5:
Execute a planning overview report.
1. ExecutetheCostCenters: PlanningOverviewreportforperiods1to12of
thecurrentfiscalyearandplanversion0. Runthereporttoviewindetailthe
effectoftheplanningstepsontheservicecostcenter,SERV-##. Reviewthe
prices.
Hint: Scroll through the report to see the activities planned for
the selected cost center.
a) Choose Accounting > Controlling > Cost Center Accounting >
InformationSystem>ReportsforCostCenterAccounting>Planning
Reports>CostCenters: PlanningOverviewortransactionKSBL.
b) Enter the following data:
Field Value or Action
Cost Center SERV-##
Fiscal Year current fiscal year
Period 1
To 12
Version 0
c) Execute the report with .
d) Intheactivitytypeoverview,selectanactivitytypeandchooseDisplay
ActivityPrice(thepileofmoneyintheredbox)intheuppertoolbar.
Continued on next page
485
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Cost Center | SERV-## |
| Fiscal Year | current fiscal year |
| Period | 1 |
| To | 12 |
| Version | 0 |
第 494 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Task 6:
Calculate plan activity price automatically.
Note: If a cost center plans an activity type, you must also plan the
costs the cost center expects to incur when producing the planned
number of units of the activity. You must code costs that have been
plannedindependentlyof theactivitysoyoucancalculatetheunitcost
of producing the activity. Automatic plan price calculation is used to
calculatethisunitcost. (Pricealwaysreferstoaunitoftheactivitytype
to be produced.)
Ifacostcenterproducesmorethanoneactivitytype,youmustdistribute
theactivity-independentplancostsamongtheactivitytypesofthecost
centertocalculatethepriceofeachsingleactivitytype. Inthisexample,
theequivalencenumbers,whichwereenteredintheexerciseonactivity
typeplanning,areusedasabasisforcostsplitting.
1. Runtheautomaticplanpricecalculationforyourserviceandproductioncost
centers. Useyourcostcenter groupCENTERS-##for periods1 to12in
thecurrentfiscalyear. SelectNoBusinessProcesses,TestRun,andDetail
Lists from the processing options.
Compare your results with the prices that were planned manually (in
exerciseforactivitytypeplanning). Makeanoteoftheplanactivityprices
determinedmanuallyandautomatically. Ifyourautomaticallyplannedprices
are acceptable, post the new prices.
Continued on next page
486
©2006SAPAG.Allrightsreserved. 2006/Q2
第 495 页 / 共 689 页
AC050 Lesson: Cost Center Planning
Activity Type/Cost Manual Price AutomaticPrice
Center
CHK-##/SERV-##
REP-##/SERV-##
1421/PROD-##
a) Choose Accounting > Controlling > Cost Center Accounting >
Planning>Allocations>PriceCalculationortransactionKSPI.
b) Choose Cost Center Group. In the Cost Center Group field, enter
CENTERS-##.
Choose No Business Processes.
c) Enter the following data:
Field Value or Action
Version 0
Period 1
To 12
Fiscal Year current fiscal year
d) Select Test Run and Detail Lists.
e) Choose Execute .
If your activity type prices have been calculated correctly, choose
Save .
ChooseContinue todeletethemessage. Exitthetransactionwith .
487
2006/Q2 © 2006 SAP AG. All rights reserved.
| Activity Type/Cost Center | Manual Price | AutomaticPrice |
|---|---|---|
| CHK-##/SERV-## | ||
| REP-##/SERV-## | ||
| 1421/PROD-## |
| Field | Value or Action |
|---|---|
| Version | 0 |
| Period | 1 |
| To | 12 |
| Fiscal Year | current fiscal year |
第 496 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Lesson Summary
You should now be able to:
• Explainthepurposeofstatisticalkeyfiguresandthemethodsusedtoplan
them
• Describetheobjectivesofactivitytypeplanning
• Namethetypicalsequenceofstepsinvolvedincostcenterplanning
• Describeafewsimpleandcomplexplanningoptions
488
©2006SAPAG.Allrightsreserved. 2006/Q2
第 497 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Lesson: Cost Centers Integrated postings from other
Applications
Lesson Overview
This lesson discusses the posting logic used when postings are made to
Management Accounting from other components. Primary postings arrive in
ManagementAccountingasone-sidedentries,whereasallocationsaretwo-sided
entries with a sender-receiver relationship.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Describe the posting logic
• ListthetypicalfeedersystemsthatpostdatatoManagementAccounting
Business Example
When actual costs/revenues are entered, the primary costs/revenues entered in
FinancialAccountingaretransferredtoManagementAccounting. InManagement
Accounting, this transfer takes place in real time from Financial Accounting,
MaterialsManagement,SalesOrderManagement,andAssetAccounting,where
a cost accounting object (such as a cost center, a profitability segment, or an
internalorder)isrecordedduringaccountassignment. Youwanttoseehowthis
affects other areas.
Posting Data to Management Accounting
WhenanFinancialAccountingdocumentiscreatedthatpoststoanexpense(or
revenue)accountusingacorrespondingcostelement,acontrollingdocumentis
also created.
489
2006/Q2 © 2006 SAP AG. All rights reserved.
第 498 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Figure 169: Posting Logic
ThisControllingdocumenthasauniquenumberandcontainsthefollowingdetails:
• Cost object that was posted to
• Cost element used
• Posted amount
In the example shown in the figure, the Financial Accounting document
debited a profit and loss (P&L) account and credited a balance sheet account.
The Management Accounting document debited the controlling object (using
the corresponding primary cost element of the same number). There is no
correspondingcreditentryintheControllingdocument.
WhenaprimarycostisinitiallypostedtoManagementAccounting,itistreatedas
aone-sidedjournal entry, unlikeaconventional, balancedfinancialaccounting
journal entry.
Note: AnytransactionsthatcreatecostmovementswithinManagement
Accounting are balanced entries. When a cost is moved from one
controlling object to another, such as from one cost center to another,
thesendingobjectiscreditedandthereceivingobjectisdebitedforthe
same amount.
490
©2006SAPAG.Allrightsreserved. 2006/Q2
第 499 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Posting from Financial Accounting and Human Capital
Management
WhenajournalentryiscreatedinFinancialAccountingthatincludesanexpense
lineitem,thatexpensecanbepostedtoManagementAccountingasacostifthe
following conditions are met:
• A primary cost element that corresponds to the expense account used in
thejournalentryinFinancialAccountinghasbeencreatedinManagement
Accounting.
• AvalidcostcenterisreferencedintheFinancialAccountinglineitem.
Figure170: PostingfromFinancialAccountingtoaCostCenter
As a result, two separate documents are created: an Financial Accounting
documentandaManagementAccountingdocument. Eachdocumenthasaunique
documentnumber, andit ispossibleto drill downineitherdocument to linkto
the other.
491
2006/Q2 © 2006 SAP AG. All rights reserved.
第 500 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Figure171: PostingfromAssetAccounting toa CostCenter
If Fixed Asset Accounting initiates a transaction in Financial Accounting that
affects a P&L account for which a primary cost element has been created, a
ManagementAccountingpostingwill alsobecreated.
Anassetmasterrecordhasacostcenterfieldthatcanbeusedtoassigntheassetto
a cost center.
Depreciationandinterestexpensepostingsareexamplesoftransactionsinitiated
inAssetAccountingthatcouldgeneratecostpostingstoManagementAccounting.
492
©2006SAPAG.Allrightsreserved. 2006/Q2
第 501 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Figure172: PostingfromHumanCapitalManagementtoaCostCenter
PayrollaccountinginHumanResourcescalculatesthevarioussalaryandwage
amounts. ThesystemthengeneratesFinancialAccountingpostingsandpoststhe
coststothecostcenterstowhichtheemployeesareassigned.
EmployeemasterdatainHumanCapitalManagementcanbeassignedtoinfotypes.
Theinfotypedeterminesthecompanycode,personnelarea,andpersonnelsubarea
towhichtheemployeeisassigned. Forexample,theOrganizationalAssignment
infotype (infotype 0001) enables you to determine the cost center to which
personnelcostsaredebitedandtoassignyouremployeetoabusinessarea.
Posting from Materials Management to a Cost Center
GoodsissuetransactionspostedintheMaterialsManagementcomponentcanbe
assignedtoacostcenter. AnexamplecouldbepartsissuedtoanR&Dcostcenter
for constructing a product prototype.
493
2006/Q2 © 2006 SAP AG. All rights reserved.
第 502 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Figure173: PostingfromMaterialsManagementtoaCostCenter
From the point of view of the cost center, this type of transaction is known as
materialconsumption. Whenyouenteragoodsissueinthesystem, youmust
enteramovementtypetodifferentiatebetweenthevariouscategoriesofgoods
movement. Amovementtypeisanidentificationkeythathasimportantcontrol
functions in Inventory Management, such as updating stock and consumption
accounts.
Agoodsissueto acostcenter createsanFinancialAccountingtransactionthat
debits a material consumption expense account and credits a material stock
(inventory)account. Thecostcenterisdebitedwiththevalueofthegoodsissued
using a primary cost element.
494
©2006SAPAG.Allrightsreserved. 2006/Q2
第 503 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Entering a Goods Issue to a Cost Center
1. SelectLogistics>MaterialsManagement>InventoryManagement>
GoodsMovement>GoodsIssueortransactionMB1A.
2. EnteraDocument DateandaPostingDate.
3. EnterMovementType201 (Consumption for Cost Center
from Warehouse)thePlantandtheStorageLocationfromwhich
the materials are to be issued.
4. Enter .
5. EnteraCostCenter,theMaterialNumberandaQuantity.
Hint:
Providedthecustomisingofaccountdeterminationiscomplete
youshouldnothavetoenteraGLAccount.
6. Save your entry with
Menu Paths
Menu Paths for Posting to Management Accounting
Action Menu path
EnteraGLaccountposting Accounting → Financial Accounting →
General Ledger → Posting → Enter GL
Account Document
Run Actual/Plan/Variance Accounting → Controlling → Cost Center
report Accounting → Information System →
Reports for Cost Center Accounting →
Plan/Actual Comparisons→CostCenters:
Actual/Plan/Variance
Enter agoodsissue Logistics → Materials Management →
InventoryManagement→GoodsMovement
→ Goods Issue
495
2006/Q2 © 2006 SAP AG. All rights reserved.
| Action | Menu path |
|---|---|
| EnteraGLaccountposting | Accounting → Financial Accounting → General Ledger → Posting → Enter GL Account Document |
| Run Actual/Plan/Variance report | Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Plan/Actual Comparisons→CostCenters: Actual/Plan/Variance |
| Enter agoodsissue | Logistics → Materials Management → InventoryManagement→GoodsMovement → Goods Issue |
第 504 页 / 共 689 页
Unit7: CostCenterAccounting AC050
496
©2006SAPAG.Allrightsreserved. 2006/Q2
第 505 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Exercise 18: Integrated Postings from
Other Applications
Exercise Objectives
After completingthisexercise, youwillbeableto:
• DescribetheaccountassignmentlogicandthepostingconceptintheSAP
system
Business Example
When business transactions are recorded in an application component such as
FinancialAccountingorMaterialsManagement, thecompanywantstobesure
thatthecorrespondingcost dataisalsotransferredtoManagementAccounting
withoutanyextradatatransfer or reconciliationruns.
You enter business transactions in Financial Accounting and Materials
Managementtoseehowthesystemusesthecorrespondingaccountassignment
logic to automatically transfer the information to Management Accounting.
Youalsocreateapurchaseorderin MaterialsManagementtotestcommitment
managementinManagementAccounting. YouprocessManagementAccounting
reportstodisplaythesebusinesstransactionsanddrilldowntoaccessthesource
documents.
Task 1:
IntheGeneralLedger(FinancialAccounting),postanexpensethatisrelevanttoa
costcenteranddeterminewhichcostsaretransferredtoManagementAccounting.
1. Createa G/L account posting, withtoday asthe date, for the purchaseof
raw materials for the German company code (1000) in currency EUR.
Enter a debit amount of 2500 for G/L account 403000. Specify that the
offsettingcreditistobemadetoG/Laccount113100. Whicherrormessage
is displayed?
Hint: In the G/L account master records, some of the expense
accountsareconfiguredtoindicatethattaxescanbeassociatedwith
these accounts, but this setting is not mandatory. A tax warning
message is thus issued by the system before the error message
mentionedhere. Thisistoensurethatyoudonotforgettoenteratax
codeifappropriate. Forthepurposeoftheseexercises,allexpenses
aretreatedasnon-taxable. Youcan,therefore,ignorethewarning
messageorentertaxcodeV0(inputtax0%)forthiscourse.
Continued on next page
497
2006/Q2 © 2006 SAP AG. All rights reserved.
第 506 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. ChargetherawmaterialscoststoyourservicecostcenterSERV-##. Post
the document.
Note: TofindtheCostCenterfield,scrolltotherightinthedebit
row.
3. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. ExecutethereportforservicecostcenterSERV-##.
4. Drilldowntotheoriginaldocumentforthelineitemwith2500.
Task 2:
EntertheconsumptionofamaterialbyacostcenterinInventoryManagement.
CheckwhichcostsaretransferredtoManagementAccounting.
1. EnteragoodsissueforyourservicecostcenterSERV-##. Usemovement
type201andremove20piecesof materialR-T200fromstoragelocation
0001 in the Hamburg plant (1000).
2. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. ExecutethereportfortheservicecostcenterSERV-##.
3. Drilldowntotheoriginaldocumentforthelineitem.
498
©2006SAPAG.Allrightsreserved. 2006/Q2
第 507 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Solution 18: Integrated Postings from
Other Applications
Task 1:
IntheGeneralLedger(FinancialAccounting),postanexpensethatisrelevanttoa
costcenteranddeterminewhichcostsaretransferredtoManagementAccounting.
1. Createa G/L account posting, withtoday asthe date, for the purchaseof
raw materials for the German company code (1000) in currency EUR.
Enter a debit amount of 2500 for G/L account 403000. Specify that the
offsettingcreditistobemadetoG/Laccount113100. Whicherrormessage
is displayed?
Hint: In the G/L account master records, some of the expense
accountsareconfiguredtoindicatethattaxescanbeassociatedwith
these accounts, but this setting is not mandatory. A tax warning
message is thus issued by the system before the error message
mentionedhere. Thisistoensurethatyoudonotforgettoenteratax
codeifappropriate. Forthepurposeoftheseexercises,allexpenses
aretreatedasnon-taxable. Youcan,therefore,ignorethewarning
messageorentertaxcodeV0(inputtax0%)forthiscourse.
a) Choose Accounting > Financial Accounting > General Ledger >
Posting>EnterG/LAccountDocumentortransactionFB50.
IfthesystemdisplaystheEnterCompanyCodedialogbox,enter1000
intheappropriatefield andthechoose .
b) In the Document Date field, enter today.
c) Enter the following data:
Field Value or Action
Currency EUR
G/LAccount(firstrow) 403000
D/C Debit
AmountinDocumentCurrency 2500
Tax Code V0
G/LAccount(secondrow) 113100
D/C Credit
AmountinDocumentCurrency 2500
Continued on next page
499
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Currency | EUR |
| G/LAccount(firstrow) | 403000 |
| D/C | Debit |
| AmountinDocumentCurrency | 2500 |
| Tax Code | V0 |
| G/LAccount(secondrow) | 113100 |
| D/C | Credit |
| AmountinDocumentCurrency | 2500 |
第 508 页 / 共 689 页
Unit7: CostCenterAccounting AC050
d) Choose Enter .
Thesystemdisplaystheerrormessage,“Account403000requiresan
assignment to a controlling object.”
2. ChargetherawmaterialscoststoyourservicecostcenterSERV-##. Post
the document.
Note: TofindtheCostCenterfield,scrolltotherightinthedebit
row.
a) IntheCostCenterfieldforthedebitentry,enterSERV-##.
b) Choose Enter .
ChoosePost . Makeanoteof thedocument number assignedby
the system.
c) Choose to exit.
3. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. ExecutethereportforservicecostcenterSERV-##.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/Actual Comparisons>Cost Centers: Actual/Plan/Varianceor
transaction S_ALR_87013611.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
Continued on next page
500
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 509 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
4. Drilldowntotheoriginaldocumentforthelineitemwith2500.
a) Double-clickthereportlineforcostelement403000.
b) Double-clicktheCostCenters: ActualLineItemsreport.
c) Selectthelineitemwiththevalueof2500andchooseEnvironment→
Accounting Documents.
Thesystemdisplaysalltheaccountingdocumentsthatwerecreated.
d) Choose toexitthemessageboxandthenkeepselecting toexit
the transaction.
Task 2:
EntertheconsumptionofamaterialbyacostcenterinInventoryManagement.
CheckwhichcostsaretransferredtoManagementAccounting.
1. EnteragoodsissueforyourservicecostcenterSERV-##. Usemovement
type201andremove20piecesof materialR-T200fromstoragelocation
0001 in the Hamburg plant (1000).
a) ChooseLogistics>MaterialsManagement>InventoryManagement
>GoodsMovement>GoodsIssueortransactionMB1A.Choosethe
second occurrence of Goods Issue.
b) Enter the following data:
Field Value or Action
Movement Type 201
Plant 1000
Storage Location 0001
c) Choose Enter .
d) Enter the following data:
Field Value or Action
Cost Center SERV-##
Material R-T200
Quantity 20
e) Choose Post .
f) Choose to exit the transaction.
Continued on next page
501
2006/Q2 © 2006 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Movement Type | 201 |
| Plant | 1000 |
| Storage Location | 0001 |
| Field | Value or Action |
|---|---|
| Cost Center | SERV-## |
| Material | R-T200 |
| Quantity | 20 |
第 510 页 / 共 689 页
Unit7: CostCenterAccounting AC050
2. Run theCost Centers: Actual/Plan/Variance reportfor thecurrentperiod
andplanversion0. ExecutethereportfortheservicecostcenterSERV-##.
a) Choose Accounting > Controlling > Cost Center Accounting >
Information System > Reports for Cost Center Accounting >
Plan/Actual Comparisons>Cost Centers: Actual/Plan/Varianceor
transaction S_ALR_87013611.
b) Enter the following data:
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute .
3. Drilldowntotheoriginaldocumentforthelineitem.
a) Double-clickthereportlineforcostelement400000
b) Double-clicktheCostCenters: ActualLineItemsreport.
c) Choose and select the 1SAP layout.
d) Select the line item with a quantity of 20. Choose Environment >
AccountingDocumentstoseealltheaccountingdocumentsthatwere
created.
e) Select toclosethemessageboxandthenkeepchoosing toexit
the transaction.
502
©2006SAPAG.Allrightsreserved. 2006/Q2
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 511 页 / 共 689 页
AC050 Lesson: CostCentersIntegratedpostingsfromotherApplications
Lesson Summary
You should now be able to:
• Describe the posting logic
• ListthetypicalfeedersystemsthatpostdatatoManagementAccounting
503
2006/Q2 © 2006 SAP AG. All rights reserved.
第 512 页 / 共 689 页
Unit7: CostCenterAccounting AC050
Lesson: Commitments Management
Lesson Overview
Thislessondiscussesthepostinglogicusedwhencommitmentpostingsaremade
toCostCenterAccountingfromothermaterialsmanagement.
Lesson Objectives
After completingthislesson, you will beable to:
• Explain the concept of commitment management within Management
Accounting
Business Example
In Management Accounting, you can display commitments for future costs in
additiontotheactualcosts. Thesecostsareinitiatedinthepurchasingfunction
of Materials Management when a purchase requisition or a purchase order is
created; theyarerepresentedinstandardreporting inManagementAccounting
as a commitment.
Posting Purchase Orders
Figure 174: Posting Purchase Orders to Cost Centers
504
©2006SAPAG.Allrightsreserved. 2006/Q2
第 513 页 / 共 689 页
AC050 Lesson: Commitments Management
Apurchaseorderisaformalrequestfromapurchasingorganisationtoavendoror
aplant to supplyorprovideacertainquantityofgoodsorservicesbyacertain
dateandtime. ApurchaseorderdoesnotcreateanentryinFinancialAccounting.
Eachiteminapurchaseordercanbeassignedtoaseparatecostcenter(orother
controlling object).
505
2006/Q2 © 2006 SAP AG. All rights reserved.