第 313 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
2. Since you want to distinguish the air cargo shipments from the other
shipmentsbysimplylookingatthedocumentnumber,assignnumberrange
03 to the shipment type.
a)
NR int. assgt.: 03
3. Theshipmentcancontainseveraldeliveriesfordifferentship-toparties. You
do not need to map it as amulti-modal shipment becausetheforwarding
agentisresponsibleforthis. Itisthereforeacollectiveshipmentwithone
mode of transport.
a)
Process Control: Collective shipment
using one mode of
transport
4. Sincetheshipment isnot linked toother shipments, you select theDirect
leg leg indicator.
a)
Leg indicator: Direct leg
5. The goods are shipped by air.
a)
Shipping type: 05
6. Since the shipment costs are to be calculated per shipment, you need
a separate leg for each ship-to party. To do this, you can use the leg
determinationtypePrelim. legperloadingpoint,subsqntlegpership-topty.
a)
Determine legs: Prelim. leg per
loading point, subsqnt
leg per ship-to pty
Continued on next page
289
2009 © 2009 SAP AG. All rights reserved.
第 314 页 / 共 341 页
Unit9: ConcludingExercise SCM611
7. The weight unit default should bekilograms and the volume unit default
should be CDM.
a) Default:
Weight unit: KG
Volume unit: CDM
8. Thedeadlinesfortheoutbounddeliveriesshouldbecopiedtotheshipment
headerasplanneddeadlines. YouthereforesettheDeadlinescopyroutine.
All other settings should remain the same.
Save your entries.
a)
Copy routine: 8 (Deadlines)
ShTypePrelimLeg: 01
SubseqLegShType: 01
Task 3:
You usually create air cargo shipments online. To do this, select all outbound
deliveriesduetobeshippedthatalreadyhavetheAirplaneshippingtypeinthe
order.
Toreducethemanualworkrequiredfortransportationplanning,defineaplanning
profileforyourshipmenttypethatmeetsthefollowingrequirements:
• The outbound deliveries should be combined to form shipments in
accordancewithyourroute(=oneshipmentperroute).
• Transportation planningpoint Z0## processestheshipments, which have
shipment type Z0##.
• T-S11K## (SLL Cargo Services) is the forwarding agent assigned to the
shipments.
• The shipping type is Airplane.
• Thedocumentsarerelevantfor shipment costs.
• You need to execute leg determination.
1. To define the planning profile:
Continued on next page
290
©2009SAPAG.Allrightsreserved. 2009
第 315 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
CallupZ0##shipmenttypeinChangemode. InthePlanningProfilefield,
enter Z0##-Plan as the description, and choose Maintain to maintain
the profile.
a) Maintainplanningprofileforshipment type:
InIMGchoose: LogisticsExecution→Transportation→Shipments
→ Define Shipment Types
GototheDetailsscreenforshipmenttypeZ0##.
Planning profile: Z0##Plan
Choose Maintain.
2. Selection variant:
It is not considered in the planning profile. Choose the existing variant
1000/1200.
a)
Selection variant: 1000/1200
3. Grouping criteria:
Create the Z0##-Route variant.
Select the route as the grouping criterion.
a)
Grouping criteria: Z0##Route
Choose Maintain.
SelecttheRoutefieldintheblockgroupingcriteria.
Click the attributes button, then Save the variant and give it a
description.
4. Data and options:
Create the Z0##-Cargo variant.
Continued on next page
291
2009 © 2009 SAP AG. All rights reserved.
第 316 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Filloutthefieldsaccordingtotheaboverequirements.
a)
Data and options: Z0##Cargo
Choose Maintain.
TransportPlanPt: Z0##
Shipping type: Z0##
Service agent: T-S11K##
Shipping type: 05
Shpt. Cost Rel.: Select
LegDeterminationindicator: Select
5. Clicktheattributesbutton,thengiveitaname. Savethevariant,thensave
the Shipment type..
a) Save
Task 4:
When the forwarding agent picks up the goods, the shipment is considered
completed. Youthenreceivetheordernumberoftheforwardingagent,whichyou
havetoenterintheshipmentdocumentasthecontainerID.Youshouldpostthe
goodsissueforalltheoutbounddeliveriesintheshipment. Thesalesdepartment
createsthebillingdocument separatelyatalater time.
1. Define an activity profile for your shipment type that models the above
requirementswhentheCompletedstatusisset.
Continued on next page
292
©2009SAPAG.Allrightsreserved. 2009
第 317 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
Profile name: Z0##-05
Description: ## Air cargo completion
a) Define activity profile:
InIMGchoose: LogisticsExecution→Transportation→Shipments
→Define and Assign Activity Profiles
In the table, enter the profileZ0##05 for shipment type Z0## and
status At completion.
Choose Maintain.
SelecttheflagDialogboxforfastentryduringsettingofstatus.
Select Fld Selectn.
SettheContainerIDfield(VTTK-SIGNI)asaRequiredField.
Choose Copy.
UnderPostGoodsIssue,settheCarryoutgoodsissuepostingduring
save indicator.
Choose Attributes.
In the Name field, enter ## Air cargo shipment
completion and save the profile.
Task 5:
For your shipmentsof theAirCargoshipment type, theshipment costsshould
becalculatedpershipment, meaningpership-toparty. Becauseofthis, alegis
determined for each ship-to party in the shipment, and the shipment costs are
calculated based on the legs.
1. Whenyouprocessyourshipmentcosts,usetheexistingStandardshipment
cost type.
a) Assigntheshipmentcosttypeandsettheshipmentcostrelevance:
InIMG, choose LogisticsExecution →Transportation→Shipment
Costs→ShipmentCostDocument→ShipmentCostRelevanceand
Default for Shipment Cost Type
2. AssigntheStandardshipmentcosttypetoyourshipmenttype.
a) Assign shipment cost type:
ShipmenttypeZ0##: Ship. cost type0001
Continued on next page
293
2009 © 2009 SAP AG. All rights reserved.
第 318 页 / 共 341 页
Unit9: ConcludingExercise SCM611
3. Set theshipment cost relevancefor your shipment type. Leg-based costs
only should be calculated.
a) Set shipment cost relevance:
In the dialog structure, choose Define shipment cost relevance for
shipment type.
Select the Leg indicator for your shipment type. Then save your
changes.
4. Checkwhichitemcategoriesthesystemcreatesautomaticallywithreference
toashipmentlegfortheStandardshipmentcosttype.
_________________________________________________________
a) Checkitemcategorydeterminationforshipmentcosttype0001:
InIMG,chooseLogisticsExecution→Transportation→Shipment
Costs→ShipmentCostDocument→ShipmentCostTypesandItem
Categories
Select entry 0001 and choose Assign shipment cost types and item
categories in the dialog structure.
Itemcategory0001(shipmentcosts)wasfoundforcosttypeB(leg).
Task 6:
Since thecalculation method used for air cargo shipments differsgreatlyfrom
the method usedfor truck shipments, use a separate pricing procedure for this
shipping type.
1. Take alook at the ZFCL00 pricing procedure, which is already defined.
Whichconditiontypesdoesthisprocedurecontain?
_________________________________________________________
_________________________________________________________
_________________________________________________________
a) Check the ZFCL00 pricing procedure:
InIMG,choose: LogisticsExecution→Transportation→Shipment
Costs → Pricing → Pricing Control
→ Define and Assign Pricing Procedures → Maintain Pricing
Procedure
Go to ZFCL00 in the control screen:
Condition types: ZL01, ZL02, ZL03
Continued on next page
294
©2009SAPAG.Allrightsreserved. 2009
第 319 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
2. Check the controlling elements of the condition types and their access
sequences. Establishwhateachconditiontypemodels.
a) Controlling condition types:
Define Condition Types
GotothedetailscreensfortheZL01,ZL02,andZL03conditiontypes.
ZL01 is the basic rate; access depends on the service agent and the
destination country of the shipment.
ZL02isasurchargeforthecreationoftheairwaybill; itdependson
the service agent.
ZL03 is a surcharge for delivery from the destination airport to the
ship-toparty;itdependsontheserviceagentandtheINCOTERMS.
3. Set up pricing procedure determination for your transportation planning
point Z0##.
Continued on next page
295
2009 © 2009 SAP AG. All rights reserved.
第 320 页 / 共 341 页
Unit9: ConcludingExercise SCM611
ItemCategoryProcedureGroup: 0001
ServiceAgentProcedureGroup: No entry
ShippingTypeProcedureGroup: 0005
Pricing procedure: ZFCL00
a) In the dialog structure, choose Transportation connection point,
followed by New Entries:
Points: : plant1000 - Hamburg
Plant
|(Reference Plant/Shipping 1000 Hamburg
Point) Plant
ClickSave, followedbyback. Thenchoosenewentriesforthenext
connection point.
b) Set up pricing proceduredetermination:
→ Define and Assign Pricing Procedures → Define pricing
proceduredetermination forshipment costs
SelecttheZ0##transportationplanningpoint andchoose Determine
pricingprocedureinthedialogstructure. ChooseNewEntries.
ItemCategoryProcedureGroup: 0001
ServiceAgentProcedureGroup: No entry
ShippingTypeProcedureGroup: 0005
Pricing procedure: ZFCL00
Task 7:
Youdefinethetariffagreementswith“SLLCargoServices”asconditionrecords
in the system.
1. First maintain condition records for the ZL01 condition type (Air Cargo
Tariff):
Service agent: T-S11K##(SLLCargoServices)
Currency: EUR
Continued on next page
296
©2009SAPAG.Allrightsreserved. 2009
第 321 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
FR DE
Countryofdest.
Weight group
Up to 20 kg 280 200
Up to 32 kg 450 330
a) Create condition records:
Choose Logistics → Logistics Execution → Master Data →
Transportation→ShipmentCosts→Prices→Create
b) Conditionrecordfor ZL01 condition type:
Condition type: ZL01
Service agent: T-S11K##
CountryofDestination: Germany (DE)
Unit: EUR
Choose Scales.
Confirmthescaleassignment(scaleID63)inthedialogbox. Maintain
the values according to the table.
Service agent: T-S11K##
CountryofDestination: France (FR)
Unit: EUR
Choose Scales.
Confirmthescaleassignment(scaleID63)inthedialogbox. Maintain
the values according to the table.
2. Youshouldalsomaintainaflatrateforcreatinganairwaybill. Youcanuse
condition type ZL02 for this (AWB fee):
Continued on next page
297
2009 © 2009 SAP AG. All rights reserved.
| Countryofdest. Weight group | FR | DE |
|---|---|---|
| Up to 20 kg | 280 | 200 |
| Up to 32 kg | 450 | 330 |
第 322 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Service agent: T-S11K##
Amount: 20
Unit: EUR
a) Condition record for ZL02 conditiontype:
Condition type: ZL02
Service agent: T-S11K##
Amount: 20
Unit: EUR
3. Depending on the INCOTERMS, the goods are transported from the
destinationairporttotheship-toparty. Theforwardingagentchargesafee
forthis(ZL03conditiontype,deliveryfee). Createaconditionrecordfor
this as well:
Service agent: T-S11K##(SLLCargoServices)
INCOTERMS: FH (free house)
Quantity: 60
Unit: EUR
a)
Condition type: ZL03
Service agent: T-S11K##
INCOTERMS: FH
Quantity: 60
Unit: EUR
Task 8:
For the settlement, you need to assign the relevant organizational units in
Purchasing to the organizational units in Transportation. These settings are
required so that you can create accruals.
1. MaintainpurchasingdatainCustomizingforyourtransportationplanning
point Z0##:
Continued on next page
298
©2009SAPAG.Allrightsreserved. 2009
第 323 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
TransportPlanPt: Z0##
Shipment Cost Type: 0001
Purchasingorganization: 1000
Purchasing group: 000
Plant: 1200
a) Maintain purchasing data:
InIMG, choose LogisticsExecution →Transportation→Shipment
Costs→Settlement→AssignPurchasingData
Choose New Entries:
TransportPlanPt: Z0##
Shipment Cost Type: 0001
Purchasingorganization: 1000
Purchasing group: 000
Plant: 1200
Task 9:
Test the settings you have made so far:
1. Create a shipment of the ## Air Cargo type in the Z0##ttransportation
planning point.
a) CreateshipmentoftheAirCargoshipmenttype:
Logistics→LogisticsExecution→Transportation→Transportation
Planning →Create →SingleDocuments
TransportPlanPt: Z0##
Shipment type: ## Air cargo
2. Foroutbounddeliveriesrelevantfortransportationusingthefollowingdata:
Continued on next page
299
2009 © 2009 SAP AG. All rights reserved.
第 324 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Shipping point: X0##
Shipping type: 05
a) Select outbound deliveries:
Choose Select Further Deliveries.
Shipping point: X0##
Shipping type: 05
Choose Execute.
3. Select all the outbound deliveries you chose and execute the planning
proposal.
How many shipments are created?
_________________________________________________________
a) Execute the planning proposal:
Select all outbound deliveries.
ChooseCreateplanningproposalforselecteddeliveries.
Choose Execute.
Two shipments are created in accordance with the Route grouping
criteria.
4. Go to one of the shipments and check whether the data has been copied
from the data profile.
Which stages have been created?
_________________________________________________________
_________________________________________________________
Whichserviceagentwasassignedtotheshipments?
Continued on next page
300
©2009SAPAG.Allrightsreserved. 2009
第 325 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
_________________________________________________________
a) Check data:
Go to of one of the shipments in the overview screen (Overview of
Current Shipment pushbutton).
Stages tab:
Shipment 1: 2 stages
Shipment 2: 1 stage
Service agent: T-S11K##
5. SetthePlannedstatusforbothshipments. Donotdeterminethelegsagain.
Checkwhethertheplanneddeadlineshavebeencopiedfromtheoutbound
deliveries to the shipment.
Check-In: ______________________
Loading Start: ______________________
Loading End: ______________________
Shipment Completion: ______________________
Shipment Start: ______________________
Shipment End: ______________________
a) SetPlannedstatusandcheckplanneddeadlines
Go to the overview screen of each shipment (Overview of Current
Shipment pushbutton) andsetthePlannedstatus. Donotdetermine
the legs again.
Deadlines tab:
The system copies the deadlines from the outbound deliveries as
planned deadlines for the shipment.
6. Assumethattheforwardingagentpicksupthegoodsfromyourplant. Set
the Shipment Completion status.
Whatinformationdoesthesystemrequireyoutoenter?
______________________________________
Continued on next page
301
2009 © 2009 SAP AG. All rights reserved.
第 326 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Enter any number.
a) Set the Shipment Completion status:
Deadlines tab:
According to the settings in the activity profile, the system should
request you to enter a container ID.
Enter any number.
7. Save your document.
Whatactivitiesareperformedinthebackground? Why?
a) Save your document.
Thesystempoststhegoodsissueinthebackgroundforalloutbound
deliveries involved in the shipment.
Task 10:
To calculate the shipment costs for both shipments, create shipment cost
documents for them.
1. Create the shipment cost documents individually or using collective
processing.
Hint: IfyoucreatethedocumentsusingCollectiveProcessing,make
sureyouonlycalculatethecostsforyourownshipmentdocuments.
SelecttheshipmentdocumentsusingyouruserID.
a) Createshipmentcost documentsindividually:
Logistics → Logistics Execution → Transportation → Shipment
Costs→ Create → Single Document
Entertheshipmentnumbersoneaftertheother.
CreateshipmentcostdocumentsusingCollectiveProcessing:
Logistics → Logistics Execution → Transportation → Shipment
Costs→Create→ CollectiveProcessing
Chooseyourdocumentsusingthefollowingdata:
Service agent: T-S11K##
Created by: Your course user ID
SelecttherelevantshipmentdocumentsandchooseExecute.
Continued on next page
302
©2009SAPAG.Allrightsreserved. 2009
第 327 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
2. Whatistheshipmentcosttypeofthesedocuments?
_________________________________________________________
a) Shipment cost type of the documents:
Display a shipment cost document:
Logistics → Logistics Execution → Transportation → Shipment
Costs → Display
Bothdocumentshaveshipmentcosttype0001(standard).
3. Identify whichshipment cost itemswerecreated.
_________________________________________________________
_________________________________________________________
Why?
_________________________________________________________
a) Shipment cost items:
Thesystemcreatedashipmentcostitemwithitemcategory0001for
each shipment leg.
AccordingtotheCustomizingsettingsforitemcategorydetermination,
the system creates shipment cost items (item category 0001) with
referencetoeach shipmentleg(cost typeB).
4. Go to one of the items.
Whichpricingproceduredidthesystemdetermine?
_________________________________________________________
a) Pricing procedure:
Details screen for the item
ThesystemshouldhavefoundtheZFCL00pricingprocedure.
5. Try to understand the pricing. Check whether the correct amount was
calculated.
a) Understand pricing:
Conditions tab
The system determined ZL01 and ZL02 condition types with the
corresponding values. ZL03 condition type is used only if the
INCOTERMS of the delivery are FH.
Continued on next page
303
2009 © 2009 SAP AG. All rights reserved.
第 328 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Task 11:
YounowwanttocreateaccrualsandthereforetransfertheshipmentcoststoFI
and CO.
1. Checkoneoftheshipmentcostdocumentstoensurethataccountassignment
has been completed fully.
a) Check account assignment:
Logistics → Logistics Execution → Transportation → Shipment
Costs→ Change → Single Document
TheAssignedstatusisC(accountassignmentfullycompleted).
Details screen for the item
Choose Account Assignment.
2. Totransferthecosts,youneedavalidexternalserviceorder. Logistics→
materials management → Purchasing → Purchase order → Create →
Vendor/Supplying Plant Known
InPurchasing,createthepurchaseorderforyourforwardingagent:
Enter the following values:
Order type: Standard purchase order
Vendor: T-S11K##
Order Date: Today’s date
Organizational Data:
Purchasing org.: IDES Germany
Purchasing group: Chef, H.
Company code IDES AG
Item overview:
Acct. Assign. Category: U
Item Category: D
Short Text: Shipping service
Type of delivery date: M (month format)
Delivery date: Current month
Continued on next page
304
©2009SAPAG.Allrightsreserved. 2009
第 329 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
Material group: 007
Plant: 1200 (Dresden)
Storage location: 0001(materialstorage)
Item Detail: Limits tab:
Select the No Limit indicator.
Enter EUR10,000 as the expected value.
Continued on next page
305
2009 © 2009 SAP AG. All rights reserved.
第 330 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Inaddition,enter1IasthetaxcodeontheInvoicetab.
a) Create external service order:
Order type: Standard purchase
order
Vendor: T-S11K##
Order Date: Today’s date
OrganizationalData:
Purchasing org.: IDES Germany
Purchasing group: Chef, H.
Company Code: IDES AG
Item overview:
Acct. Assign. Category: U
Item Category: D
Short Text: Shipping service
Typeofdeliverydate: M (month format)
Delivery date: Current month
Material group: 007
Plant: 1200 (Dresden)
Storage location: 0001(materialstorage)
Item Detail:
Limits tab:
Select the No Limit indicator.
Enter EUR10,000 astheexpected value.
Item Detail:
Limits tab:
Tax code: 1I
Select SRV-based IV when prompted
Save the purchase order.
Continued on next page
306
©2009SAPAG.Allrightsreserved. 2009
第 331 页 / 共 341 页
SCM611 Lesson: Concluding Exercise
3. Now transfer the shipment costs. You can do this for all shipment cost
documents using collective processing.
a) Transfer the costs:
Collectiveprocessingforallshipmentcostdocuments:
Logistics → Logistics Execution → Transportation → Shipment
Costs→Change →CollectiveProcessing
Selectthedocumentsusingthefollowingfields,forexample:
Service agent: T-S11K##
Created by: Your course user ID
Select the documentsandchooseExecute.
4. Check one of the shipment cost documents to make sure the costs have
been transferred.
Gotothedocumentflowandviewtheserviceacceptanceandtheassociated
accounting documents.
Which accounts were posted to?
_________________________________________________________
a) Check transfer:
Calluponeoftheshipmentcostdocumentstobechanged:
Logistics → Logistics Execution → Transportation → Shipment
Costs→ Change → Single Document
Transferred: C status:
→ Environment → Document flow
Place the cursor on the Services Acceptance document and choose
Display Document.
The services acceptance document records the service provided by
the forwarding agent. Accruals were posted based on the services
acceptance document:
Choose→AccountingDocuments→DisplayAccountingDocument
Thesystempostedtoaccounts417000and191100.
307
2009 © 2009 SAP AG. All rights reserved.
第 332 页 / 共 341 页
Unit9: ConcludingExercise SCM611
Lesson Summary
You should now be able to:
• Define anew transportation planning point
• Create a new shipment type
• Defineaplanning profilefortheshipmenttype
• Defineanactivityprofileandassignittotheshipmenttype
• Setupshipmentcostcalculationforthenewshipmenttype
• Create new condition records
• Maintainpurchasingdataforshipmentcostsettlement
308
©2009SAPAG.Allrightsreserved. 2009
第 333 页 / 共 341 页
SCM611 Unit Summary
Unit Summary
You should now be able to:
• Define anew transportation planning point
• Create a new shipment type
• Defineaplanning profilefor theshipmenttype
• Defineanactivityprofileandassignittotheshipmenttype
• Setupshipmentcostcalculationforthenewshipmenttype
• Create new condition records
• Maintainpurchasingdataforshipmentcostsettlement
309
2009 © 2009 SAP AG. All rights reserved.
第 334 页 / 共 341 页
UnitSummary SCM611
310
©2009SAPAG.Allrightsreserved. 2009
第 335 页 / 共 341 页
第 336 页 / 共 341 页
第 337 页 / 共 341 页
SCM611 Course Summary
Course Summary
You should now be able to:
• Describe the position of transportation processing and shipment cost
processing within the supply chain
• Defineandcreateinboundandoutboundshipments
• Calculate and settle shipment costs
• MakethenecessaryCustomizingsettingstoadaptyoursystemtomeetyour
specific requirements
311
2009 © 2009 SAP AG. All rights reserved.
第 338 页 / 共 341 页
CourseSummary SCM611
312
©2009SAPAG.Allrightsreserved. 2009
第 339 页 / 共 341 页
Appendix 1
Data Sheet
Youcanenteryourdocumentnumbersinthefollowingtable.
Doc- Exer- Document type Search term / Documentno.:
u- cise refersto:
ment
no.
Unit: Shipments in Logistics Execution
1 1 Inboundshipment External ID 1:
GR##-1
2 Individualshipmentroad External ID 1:
GR##-2
3 Shipmentcostdocument for document
number 2
Unit: Creating Shipments
4 5 InboundshipmentStuttgart
→Mannheim→Hamburg
5 6 Collective shipment road Created by
Hamburg→Berlin. planning
proposal
6 Collective shipment road
Hamburg→Frankfurt→
Stuttgart→Munich
7 Collective shipment road
Hamburg→Stuttgart
313
2009 © 2009 SAP AG. All rights reserved.
| Doc- u- men no. | Exer- cise t | Document type | Search term / refersto: | Documentno.: |
|---|---|---|---|---|
| Unit: Shipments in Logistics Execution | ||||
| 1 | 1 | Inboundshipment | External ID 1: GR##-1 | |
| 2 | Individualshipmentroad | External ID 1: GR##-2 | ||
| 3 | Shipmentcostdocument | for document number 2 | ||
| Unit: Creating Shipments | ||||
| 4 | 5 | InboundshipmentStuttgart →Mannheim→Hamburg | ||
| 5 | 6 | Collective shipment road Hamburg→Berlin. | Created by planning proposal | |
| 6 | Collective shipment road Hamburg→Frankfurt→ Stuttgart→Munich | |||
| 7 | Collective shipment road Hamburg→Stuttgart |
第 340 页 / 共 341 页
Appendix1: DataSheet SCM611
Doc- Exer- Document type Search term / Documentno.:
u- cise refersto:
ment
no.
8 7 Individual shipment road Created in
Dresden→Berlin collective
processing
9 Individual shipment road
Dresden→Munich
10 Individual shipment road
Dresden→Stuttgart
11 Individual shipment road
Dresden→Frankfurt
Unit: Shipment Cost Processing
12 13 Shipmentcostdocument for collective
shipment (no.
6) Hamburg
→ Frankfurt
→ Stuttgart →
Munich
13 Shipmentcostdocument For individual
shipmentsfrom
14 Shipmentcostdocument
Exercise 7 (no.
15 Shipmentcostdocument
8 - 11)
16 Shipmentcostdocument
Unit: Shipment Cost Calculation
17 16 Shipmentcostdocument For inbound
shipment from
Exercise 5
Stuttgart →
Mannheim →
Hamburg (no.
4)
18 17 Shipmentcostdocument For collective
shipment from
Exercise 6
Hamburg →
Stuttgart(no. 7)
Unit: Shipment Cost Settlement
19 18 Externalserviceorder
20 19 Credit memo
314
©2009SAPAG.Allrightsreserved. 2009
| Doc- u- men no. | Exer- cise t | Document type | Search term / refersto: | Documentno.: |
|---|---|---|---|---|
| 8 | 7 | Individual shipment road Dresden→Berlin | Created in collective processing | |
| 9 | Individual shipment road Dresden→Munich | |||
| 10 | Individual shipment road Dresden→Stuttgart | |||
| 11 | Individual shipment road Dresden→Frankfurt | |||
| Unit: Shipment Cost Processing | ||||
| 12 | 13 | Shipmentcostdocument | for collective shipment (no. 6) Hamburg → Frankfurt → Stuttgart → Munich | |
| 13 | Shipmentcostdocument | For individual shipmentsfrom Exercise 7 (no. 8 - 11) | ||
| 14 | Shipmentcostdocument | |||
| 15 | Shipmentcostdocument | |||
| 16 | Shipmentcostdocument | |||
| Unit: Shipment Cost Calculation | ||||
| 17 | 16 | Shipmentcostdocument | For inbound shipment from Exercise 5 Stuttgart → Mannheim → Hamburg (no. 4) | |
| 18 | 17 | Shipmentcostdocument | For collective shipment from Exercise 6 Hamburg → Stuttgart(no. 7) | |
| Unit: Shipment Cost Settlement | ||||
| 19 | 18 | Externalserviceorder | ||
| 20 | 19 | Credit memo |
第 341 页 / 共 341 页
Feedback
SAP AG has made every effort in the preparation of this course to ensure the
accuracy and completeness of the materials. If you have any corrections or
suggestionsforimprovement,pleaserecordthemintheappropriateplaceinthe
course evaluation.
315
2009 © 2009 SAP AG. All rights reserved.