SCM611_EN_Col92_FV_Part_A4 (第3页)

第 87 页 / 共 341 页

SCM611 Lesson: Automatically Creating Shipments

5. Now,thecombinationofnewlycreatedvariantsshouldbesavedasavariant

for Collective Processing. In the case of error or warning messages, no

shipmentshouldbesaved,butanormallogshouldbesaved.

a) In the area Save created shipments, choose Do not save if

warning/error and in the Log area, choosethe Normal log

selection.

b) Choose SaveasVariantandenterinthenextscreenunderVariant

NameV##. AssigntheMeaningCollective processing.

Save by pressing .

Task 2:

CarryoutCollectiveProcessingbyusingtheabovevariants.

1. Start Collective Processing.

a) Ifyouexitedthetransactionaftertheprevioustask,chooseLogistics→

LogisticsExecution→Transportation→TransportationPlanning→

Create → Collective Processing.

b) Choose GetVariantandselectyourvariantwiththenameV##.

c) Then,carryoutCollectiveProcessingbychoosing Execute.

2. Howmany outbounddeliverieswerefound?

_______________________________________________________________

a) Expandtheloginorder todisplaythedetails.

Four outbound deliveries were found.

3. Whatshipmentswerecreated? Recordtheshipmentdocumentnumberson

lines 8, 9, 10, and 11 of your data sheet.

_______________________________________________________________

a) Fourshipmentswerecreated. Recordtheshipmentdocumentnumbers

on lines8, 9, 10, and 11of yourdata sheet.

4. Display oneof the shipments that was created and make sure that all the

fieldsspecifiedintheDataandOptionsvarianthavebeenfilledin:

Continued on next page

75

2009 © 2009 SAP AG. All rights reserved.

第 88 页 / 共 341 页

Unit3: CreatingShipments SCM611

TransportPlanPt:

Shipment type:

Service agent:

External ID 1:

Status:

a) PlacethecursorononeofthecreatedshipmentsandchooseDisplay

document.

TransportPlanPt: 1200

Shipment type: Individual shipment -

Road (0001)

Service agent: 1106

External ID 1: Shipment RUN##

Status: Planned

76

©2009SAPAG.Allrightsreserved. 2009

TransportPlanPt:
Shipment type:
Service agent:
External ID 1:
Status:
TransportPlanPt: 1200
Shipment type: Individual shipment - Road (0001)
Service agent: 1106
External ID 1: Shipment RUN##
Status: Planned

第 89 页 / 共 341 页

SCM611 Lesson: Automatically Creating Shipments

Lesson Summary

You should now be able to:

• Create shipments using Collective Processing and define the necessary

processing rules

• Defineplanningprofilesandcreateshipmentsusingtheplanningproposal.

77

2009 © 2009 SAP AG. All rights reserved.

第 90 页 / 共 341 页

Unit3: CreatingShipments SCM611

Lesson: Interfaces in External Transportation Planning

Systems and Other Scenarios

Lesson Overview

InsituationswherethetransportationplanningintheSAPsystemdoesnotmeet

all your requirements, it is possible to connect to another system or establish

acommunicationsystemallowingforcooperationwithforwardingagents. This

lesson explains the different options.

Lesson Objectives

After completingthislesson, you will beable to:

• Describetheconnectiontoexternaltransportationplanningsystems

• Describethedirectcommunicationbetweenshipperandforwardingagent

via the Internet

• Setthetenderingstatusintheshipmentdocument

• Describetheprocessofshipmenttenderingusingafreightexchange.

Business Example

The model company wants to examine how transportation planning can be

supportedwithoptimizationtools,aswellastheextentthatcollaborativescenarios

are possible.

78

©2009SAPAG.Allrightsreserved. 2009

第 91 页 / 共 341 页

SCM611 Lesson: InterfacesinExternalTransportationPlanningSystemsandOtherScenarios

Transportation Planning Using a Subsystem

Figure 25: Transportation Planning Using a Subsystem

Tomeetspecialcustomerrequirementsforefficientandoptimizedtransportation

planning,youcanusetheLE-TPSinterfacebetweentheECCsystemandoneor

morespecializedexternaltransportationplanningsystems(TPS).

For planning shipments using an external system, the system selects a set of

deliveriestobeshippedinthesystemandsendsthemtotheplanningsystemvia

theinterface. Theplanningsystemthencombinesthedeliveriestoformshipments

according to optimization criteria. The shipments are transferred back to the

systemviatheinterface,whichtriggersthegenerationoftheshipmentdocuments.

Thetransportationplanningsystemthuscombinesandchangestheshipments. All

other processingtasksfortheshipment(printingdocuments, reportingthestart

of shipment, and soon) areperformed in thesystem using standard document

processing functions.

TolinktheexternalsystemtotheSAPsystem,youassigntheexternalsystemtoa

transportation planning point.

Communication between the systems is based on ALE technology and the

transmission of IDocs.

Normally, data transfer is initiated by output control for deliveries. You must

firstdefineacorrespondingoutputtype(TPS0astemplate)forthetransportation

planning point.

79

2009 © 2009 SAP AG. All rights reserved.

第 92 页 / 共 341 页

Unit3: CreatingShipments SCM611

Transportation Planning with SAP SCM

With SAP SCM TP/VS (Transportation Planning / Vehicle Scheduling), you

can explicitly plan, optimize and perform all transportation planning between

organizations. The fundamentalsof planning are sales(sales orders, purchase

orders, returns or stock transfer orders) anddeliveriesthat youcreated inSAP

ECCandtransferredtoSAPSCMovertheSAPAPOCoreInterface(CIF).The

resultof TP/VS Planningareplannedshipmentsthatyoutransferto SAPECC

afterplanningiscompleted. There,youcarryouttheshipmentexecution.

Figure 26: Transportation Planning with TP/VS

Features

Interactive Planning

You use interactive planning to plan and edit manual shipments for your

sales and deliveries. The planning view with various planning boards is

available for interactive planning.

Optimization

You canoptimizetheplanning of shipmentsbasedupon costs, aswell as

determineoptimal deliverysequencesandtransportationdatesandtimes.

Constraints(suchasloadingcapacity,loadingresources,incompatibilities)

are taken into consideration. You can start optimization from interactive

planningorplanitinthebackground. Youcanfurtheredittheoptimization

results in interactive planning.

80

©2009SAPAG.Allrightsreserved. 2009

第 93 页 / 共 341 页

SCM611 Lesson: InterfacesinExternalTransportationPlanningSystemsandOtherScenarios

Transportation Service Provider Selection

Youcanmanuallyorautomaticallyassigntransportationserviceprovidersto

yourplannedshipmentsusingthetransportationserviceproviderselection.

Thesystembasesautomaticassignmentonatransportationserviceprovider's

profileusingthecriteriayoudefineforassignment,suchascostsorpriority.

Youcaninteractivelytriggerthetransportationserviceproviderselectionor

plan it in the background.

Communication with Forwarding Agents

Figure 27: Tendering for Service Agents

Acreatedshipmentcanbetenderedandofferedtoaserviceagent. Shippersand

serviceagentscommunicateovertheInternet,sotheserviceagentneedsneither

an R/3 System nor EDI.

An exampleof theusual tendering procedure:

• TheshippercreatesashipmentintheSAPsystem. Beforeitcanbetendered,

it must beplanned. In other words, the serviceagent and stagesmust be

defined.

• The shipper offers the shipment to the service agent via the Internet

(tendering).

• The service agent has Internet access to the shipments offered, and can

acceptthem,rejectthem,oracceptthemundercertainconditions.

• Theshipperconfirmstheacceptanceorrejectionbytheserviceagentand

sends further information if necessary.

• Theserviceagentstartstoprocesstheshipment,definingplanneddataand

setting a status for the shipment.

81

2009 © 2009 SAP AG. All rights reserved.

第 94 页 / 共 341 页

Unit3: CreatingShipments SCM611

Theforwardingagent canaccessinformationaboutnewshipmentsat anytime

fromthetenderinglist. Theforwardingagentcanviewtheprocessingstatusof

accepted shipments in the status list.

Figure 28: Tendering in the Shipment Document

The “tendering”tab in the shipment overview summarizes the most important

informationabout the tendering of the shipment.

Thetenderingstatusindicatesthecurrentstatusof ashipmentwithrespect to

negotiationswithaforwardingagentovertheInternet.

Certain conditions are defined for setting each individual tendering status.

Generally, youcanonly set astatusifaforwardingagentisdefined atheader

levelintheshipment,ifstagesaredefined,andaPlannedstatusisset.

Theshippermakessomestatussettings,andtheforwardingagentmakesothers.

Inthe“Acceptancecondition/rejectionreason”field,youcandefinetheconditions

underwhichaforwardingagentacceptsorrejectsashipment.

82

©2009SAPAG.Allrightsreserved. 2009

第 95 页 / 共 341 页

SCM611 Lesson: InterfacesinExternalTransportationPlanningSystemsandOtherScenarios

Figure 29: Tendering via Freight Exchange

Freight exchanges enable their members (who include both shippers and

forwarding agents) to match shippers who need transportation services with

forwardingagentswhoprovidetransportationservices.

The shipper and forwarding agent exchange information related to the

transportationrequirements,shippingconditionsandprices.

Whentheshipment iscompleted, thefreight exchangeissuesaninvoicetothe

shipper and pays the forwarding agent.

Generally, transportation plannersuse the freight exchange servicefor smaller

(Less than truck load/partial load) shipments in an environment in which the

forwardingagentsareseekingsmallershipmentstocompleteaload.

Inthesecases,theforwardingagentwillbemoreinclinedtoperformtheservice

at a lower price.

When the shipment is tendered to the freight exchange, the shipper specifies

themaximumpriceandatime. Acarriercanrespondwithanofferthat canbe

accepted or rejected by the shipper.

The freight exchange tendering process is performed via the Internet with the

use of XML documents.

83

2009 © 2009 SAP AG. All rights reserved.

第 96 页 / 共 341 页

Unit3: CreatingShipments SCM611

Figure30: Transportation PlanningbytheForwardingAgent

Inabusinessscenarioinwhichaforwardingagentworksprimarilyforaparticular

shipper(orashipperprimarilyforaparticularforwardingagent),collaboration

betweentheshipperandforwardingagentcansavebothpartnerstimeandmoney.

There are various scenarios for such cases.

Inone,theforwardingagentcanprincipallyworklikeanexternaltransportation

planningsystem. Theshippertransfersthedeliveriestotheforwardingagent;the

forwardingagentthengroupsthesedeliveriesinhisownsystem. Theseplanned

shipmentsarethentransferredbackfromtheforwardingagentandgeneratedin

theshipper'sSAPsystem,wheretheycanbefurtherprocessed.

84

©2009SAPAG.Allrightsreserved. 2009

第 97 页 / 共 341 页

SCM611 Lesson: InterfacesinExternalTransportationPlanningSystemsandOtherScenarios

Figure 31: Transportation Planning in Cooperation with the Forwarding

Agent

Anotherpossibilityisthattheforwardingagentcanaccesstheshipper'ssystemby

anInternetportal. Thus,theforwardingagentcansavethecostsofEDIorother

software. Theshipper maintainscontrol over theplanningprocessbecausethe

shipper candeterminewhichplanning functionstheforwardingagent receives

andwhichdatatheforwardingagentcanseeandchange. Theshipperdoesthis

intheconfigurationoftransportationprocessingforforwardingagentsusingthe

basicsettingsrequiredbyforwardingagentsfor transportation planning, status

andresultconfirmation. Theshippercanacceptorrejecttheforwardingagent's

planned shipmentsatany time. Ifthetenderingstatusissetto “confirmed”by

theshipper,anemailmessagecanbesentautomaticallytotheforwardingagent

using output controls.

85

2009 © 2009 SAP AG. All rights reserved.

第 98 页 / 共 341 页

Unit3: CreatingShipments SCM611

Lesson Summary

You should now be able to:

• Describetheconnectiontoexternaltransportationplanningsystems

• Describethedirectcommunicationbetweenshipperandforwardingagent

via the Internet

• Setthetenderingstatusintheshipmentdocument

• Describetheprocessofshipmenttenderingusingafreightexchange.

86

©2009SAPAG.Allrightsreserved. 2009

第 99 页 / 共 341 页

SCM611 Unit Summary

Unit Summary

You should now be able to:

• Describethepossiblecriteriafor creatingshipments

• Usethetransportation-relevantinformationintheorder,aswellasexplain

howtocopyitandexplainitssignificancefortransportation

• Create shipments individually

• Create shipments using Collective Processing and define the necessary

processing rules

• Defineplanningprofilesandcreateshipmentsusingtheplanningproposal.

• Describetheconnectiontoexternaltransportationplanningsystems

• Describethedirectcommunicationbetweenshipperandforwardingagent

via the Internet

• Setthetendering statusin theshipment document

• Describetheprocessofshipmenttenderingusingafreightexchange.

87

2009 © 2009 SAP AG. All rights reserved.

第 100 页 / 共 341 页

UnitSummary SCM611

88

©2009SAPAG.Allrightsreserved. 2009

第 101 页 / 共 341 页

第 102 页 / 共 341 页

第 103 页 / 共 341 页

Unit 4

Shipment Processing

Unit Overview

Depending on the situation, different information is required in transportation

documents,suchasforsettlementorexternalcommunication. Thisunitexplains

thevariousoptionsaswell asautomationfunctions.

Unit Objectives

After completing thisunit, you will beableto:

• Describetheconceptofshipmentstagesandhowtheyaredetermined

• Define routes, explain how they are determined, and describe their

importance in the shipment process.

• Give examples of message types

• Transferinformationfromthedeliverydocumentstotheshipmentdocument

• Call up various status information

• Define and assign activity profiles

• Describetheoptionofsplittingdeliveriesaftershipmentcreation(subsequent

delivery split)

• Processseveralshipmentdocumentsusingmasschanges

• Estimate shipment costs

• Pack and load the goods for shipment

• Explaintheconnectiontothedangerousgoodscheckinshipments

• Explaintheprocedureforthedangerousgoodscheck

• Generatedifferentliststoobtaininformationaboutshipments

• Usetheselistsasabasisforfurthershipmentprocessing

• Usegraphicaltransportationinformationasakeysourceofdata

Unit Contents

Lesson: Stages...................................................................91

Exercise 8: Stages..........................................................99

Lesson: Processing Functions in Shipments................................107

Exercise 9: Shipment Processing........................................113

89

2009 © 2009 SAP AG. All rights reserved.

第 104 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Lesson: Additional Functions in Shipments.................................121

Exercise 10: Using Mass Changes for Shipment Documents........125

Lesson: Packing and Loading in Shipments ................................129

Exercise 11: Packing and Loading in Shipments.......................131

Lesson: Dangerous Goods Management in Shipments...................135

Lesson: Shipment Monitoring.................................................141

Exercise 12: Shipment Monitoring .......................................149

90

©2009SAPAG.Allrightsreserved. 2009

第 105 页 / 共 341 页

SCM611 Lesson: Stages

Lesson: Stages

Lesson Overview

Thislessonexplainsthedifferentoptionsforcreatingstages.

Lesson Objectives

After completingthislesson, youwillbeable to:

• Describetheconceptofshipmentstagesandhowtheyaredetermined

• Define routes, explain how they are determined, and describe their

importance in the shipment process.

Business Example

Geographicalinformationintheshipmentdocumentthatismappedusingstagesis

necessaryfortransportationprocessingandshipmentcostcalculation.

Stages

Figure 32: Shipment Stages

Stagescontaininformationonthegeographicalcharacteristicsofashipment. This

informationisfrequentlyusedasabasisforcalculatingshipmentcosts.

91

2009 © 2009 SAP AG. All rights reserved.

第 106 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Thesystemdifferentiatesbetweenthefollowingstagetypes:

• Leg: Connectionbetweenastartingpointandanendingpoint;astartingor

endingpointcanbeatransportationconnectionpoint,ashippingpoint,an

unloadingpointatthecustomer'sorvendor'ssite,orsimilarlocation.

• Loadtransferpoint: Location/pointwhereashipmentisloaded/unloaded

ortransferredfromonemeansoftransporttoanother

• Bordercrossingpoint: Location/pointwhereashipmentcrossestheborder.

Foreachstage,youcanrecordinformation,suchastheresponsibleserviceagent,

deadlines,distance,shipmentcostrelevance,freightcode,andsoon.

Youcanalsoassignthedeliveriestotheindividualstages.

Figure 33: Determining the Shipment Stages

Thereareseveraloptionsfordeterminingstagesintheshipmentdocument.

Youcanmanuallycreatethestagesonthestagescreenoftheshipmentdocument.

You canuse all three types of stagesasrequired.

Onewayofsimplifyingmanualentryofstagesistoletthesystemautomatically

determine the legs. However, this function does not involve intelligent route

determination with geographic optimization!

Based on simple rules, the system generates legs only, determining the points

of departure, thedestinations, andsomeleg-relateddatasuchasshippingtype,

serviceagent,legindicator,andshipmentcostrelevance.

UsingtheDeterminelegsparameterinCustomizingfortheshipment type, you

can controlwhichtypeof legdeterminationisused.

92

©2009SAPAG.Allrightsreserved. 2009

第 107 页 / 共 341 页

SCM611 Lesson: Stages

Anotherwayofsimplifyingstagedeterminationistoadoptthestagesfromthe

routein the shipment document header. In thiscase, the stages defined in the

routearecopied. UsingtheAdoptrouteparameterintheshipmenttype,youcan

control if and which stages are to beadopted.

This method of determining stages is highly recommended for recurring

operations. It considerably reduces the amount of manual maintenance of the

stages.

Route Determination

Figure 34: Automatic Leg Determination

The system provides several automatic leg determination procedures. There

are currently 6 different procedures in the standard system. You control leg

determination using a leg determination indicator , which is defined for the

shipment type.

Example:

Leg determination indicator 1: Legs determined according to departure point

and itinerary.

Thegoodsaresequentiallypickedupattheshippingpoints(pick-upsequence)

andthensequentiallydeliveredtotheship-toparties(itinerary).

• Theitineraryisderivedfromthesequenceofthedeliveriesintheshipment

document.

• Thepick-upsequenceisderivedfromthefactthat thegoodsloadedlast

reachtheirshippingpointfirst;however,youcanchangethissequenceina

dialog box.

93

2009 © 2009 SAP AG. All rights reserved.

第 108 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

You cantriggerautomaticleg determinationby:

• InitiatingitdirectlyontheStagesscreenintheshipmentdocument

• Setting statusPlannedin theshipment header

If the leg determination procedures in the standard system do not meet your

requirements,youcanactivateacustomerenhancement(“V56SLDET”),which

letsyoucreateyourownlegdeterminationprocedure.

Routes in the Shipment

Figure 35: Route Information

You define routes in Customizing.

A route can contain many pieces of information that are important for the

shipment, such as distance, transportation lead time, travel duration, shipping

type, service agent, and so on.

Intheroutedefinition,youcandefineatotalweightallowed. Whenthisfieldis

filledinaroute,amessageisdisplayedforanyshipmentthatusesthisroutethat

exceeds theallowed totalweight. Theallowedtotal weight fieldisnotusedin

order or delivery processing.

If you define stages for the route, you first need to provide transportation

connectionpointsbycreatingstartingpointsanddestinationpointsforthelegs,

aswellasloadtransferpointsandbordercrossingpoints.

94

©2009SAPAG.Allrightsreserved. 2009

第 109 页 / 共 341 页

SCM611 Lesson: Stages

Atthestagelevel,youcanalsodefineinformationsuchasdistance,serviceagent,

legindicator,shippingtype,travelduration,andtotalduration.

Atransportationconnectionpointcouldbeanairport,arailwaystation,aharbor,

orabordercrossingpoint. However,youcanalsousetheconnectionpointtorefer

toaplant, ashippingpoint, acustomer, or avendor.

Figure 36: Route Definition

Arouteisthejourneytobecoveredbetweenadeparturepointandadestination.

Aroutecanbedefinedingreatdetailandconsistsofindividualstages,butitcan

alsobeaquitegeneraldescriptionorevensimplyadestinationarea.

Like a shipment stage, a stage can be a leg, a load transfer point, or a border

crossing point.

Example:

Theaboverouteconsistsof5stages-3legs,1loadtransferpoint,and1border

crossing point.

95

2009 © 2009 SAP AG. All rights reserved.

第 110 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Figure 37: Route Determination

The system determines theroute for each order item. The following criteria

play a role in this:

• Thedeparturezoneoftheshippingpoint(definitionoftheshippingpoint)

• The shipping condition from the customer (from the customer master of

the sold-to party)

• Thetransportationgroupofthematerial(fromthematerialmaster)

• Thetransportationzoneoftheship-toparty(fromthecustomer master of

the ship-to party)

Theroutecanberedeterminedintheoutbounddelivery. Inadditiontotheabove

criteria, theweightgroupofthedeliveryisconsidered.

If you are working with routes in the shipment (optional), you can enter a

differentroutehere. Thisroutedoesnothavetobeidenticaltooneoftheroutes

in the deliveries.

Itisalsopossibletotransfertheroutefromthedeliveriestotheshipment(ifit

isthesameforalldeliveries). Whenthestatusissetto“planned”intheshipment

document,therouteandsomeotherinformationarecopied.

Toadopttheroute,youmustdefineanappropriatecopyroutinefortheshipment

type (in the standard system: routine 2, 7, 11, or 12). The system does not

automaticallydeterminetherouteininbounddeliveries. Youcanentertheroute

manuallyintheheaderoftheinbounddelivery. Theroutecanalsobetransferred

totheshipmentdocument, aswithoutbounddeliveries.

96

©2009SAPAG.Allrightsreserved. 2009

第 111 页 / 共 341 页

SCM611 Lesson: Stages

Figure38: TransferofStagesFromtheRoutetotheShipment

Aroutecanbeusedintheshipmentheader,butthisisoptional.

Ifyoudefinedstagesfortheroute,andtheAdoptstagesfromrouteinshipment

header parameter is set for the shipment type, theroute stages are copied as

shipment stages.

97

2009 © 2009 SAP AG. All rights reserved.

第 112 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

98

©2009SAPAG.Allrightsreserved. 2009

第 113 页 / 共 341 页

SCM611 Lesson: Stages

Exercise 8: Stages

Exercise Objectives

After completingthisexercise, youwillbeableto:

• Execute stage determination

• Define stages in routes

Business Example

Oncetheshipmentshavebeencreated,stagesmustbecreatedorthelegsthatwere

determined must be checked.

Task 1:

Thesameforwardingagentalwayshandlestheinboundshipmentsfromvendors

toyourHamburgplant. Thisforwardingagentalwaysusesaparticularroute. This

route also provides the basis for calculating the shipment costs. You therefore

workwithroutesintheshipmentheaderfortheinboundshipments.

1. CreatethenewrouteRZ00##withthedescriptionInbound Shipments

Route TransLog ##.

2. Definetwonewconnectionpointsfor vendorsT-S11F## andT-S11H##.

Enterthenumberofthevendorasthedescriptionofthepoint.

Hint: Before stages can be created in the route, transportation

connection points need to be defined (this is one of the bigger

differencesfromcreatingstagesintheshipmentdocumentmanually:

Transportationconnectionpointscanbeusedthere,butdonothave

to be).

3. Now create the stages of your route.

Markbothstagesasrelevantforshipmentcostsandentershippingtype

01 TRUCK.

Stage1: ShipmentLeg Departurepoint T-S11F##

Dest. point T-S11H##

Serviceagent: T-S11G##

(TransLog)

Distance: 135 km

Continued on next page

99

2009 © 2009 SAP AG. All rights reserved.

Stage1: ShipmentLeg Departurepoint T-S11F##
Dest. point T-S11H##
Serviceagent: T-S11G## (TransLog)
Distance: 135 km

第 114 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Stage2: ShipmentLeg Departurepoint T-S11H##

Dest. point Plant1000

Serviceagent: T-S11G##

(TransLog)

Distance: 580 km

Task 2:

Youwouldnowliketoplantheinboundshipmentthatyoucreatedinthe“Creating

Shipments” unit (line 4 on the data sheet).

1. Call up the inbound shipment to Change.

2. Entertherouteyouhavejustcreatedintheshipmentoverview. Thengoto

thetotheStagestabinthelowerpartofthescreen. Whichshipmentstages

have been created? Why?

________________________________________________________

________________________________________________________

3. Determinewhichinbounddeliveriesareincludedineachstage.

Stage1: ______________________________________________

Stage2: ______________________________________________

Task 3:

YouarenowplanningthecollectiveshipmentHamburg–Frankfurt–Stuttgart–

Munich, whichyoucreatedusingtheplanningproposal (lineno. 6onthedata

sheet).

1. Call up the collective shipment to changeit.

2. Goto theStagestab. Which stageshavebeencreated? What setting was

these stages based on?

Stage1: ______________________________________________

Stage2: ______________________________________________

Stage3: ______________________________________________

________________________________________________________

100

©2009SAPAG.Allrightsreserved. 2009

Stage2: ShipmentLeg Departurepoint T-S11H##
Dest. point Plant1000
Serviceagent: T-S11G## (TransLog)
Distance: 580 km

第 115 页 / 共 341 页

SCM611 Lesson: Stages

Solution 8: Stages

Task 1:

Thesameforwardingagentalwayshandlestheinboundshipmentsfromvendors

toyourHamburgplant. Thisforwardingagentalwaysusesaparticularroute. This

route also provides the basis for calculating the shipment costs. You therefore

workwithroutesintheshipmentheaderfortheinboundshipments.

1. CreatethenewrouteRZ00##withthedescriptionInbound Shipments

Route TransLog ##.

a) IntheIMG,choose: LogisticsExecution→Transportation→Basic

Transportation Functions → Routes → Define Routes → Define

Routes and Stages

b) ChoosetheNewEntriesbutton. Enterthefollowingdata:

Route: RZ00##

Description: Inbound shipments

route TransLog ##

Save the new route.

Continued on next page

101

2009 © 2009 SAP AG. All rights reserved.

Route: RZ00##
Description: Inbound shipments route TransLog ##

第 116 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

2. Definetwo newconnectionpointsfor vendorsT-S11F## andT-S11H##.

Enterthenumberofthevendorasthedescriptionofthepoint.

Hint: Before stages can be created in the route, transportation

connection points need to be defined (this is one of the bigger

differencesfromcreatingstagesintheshipmentdocumentmanually:

Transportationconnectionpointscanbeusedthere,butdonothave

to be).

a) In the dialog structure, choose Transportation connection point,

followed by New Entries:

Enter the following data:

Points: T-S11F## - Sunny

Electronics

(Referencecust./vendor)Vendor: T-S11F##

Click Save, followedby Back. Thenchoose New Entriesfor

the next connection point:

Points: T-S11H## - PAQ

(Referencecust./vendor)Vendor: T-S11H##

After choosing Save, select Back twiceto returnto thenewly

defined route.

3. Now create the stages of your route.

Markbothstagesasrelevantforshipmentcostsandentershippingtype

01 TRUCK.

Stage1: ShipmentLeg Departurepoint T-S11F##

Dest. point T-S11H##

Serviceagent: T-S11G##

(TransLog)

Distance: 135 km

Continued on next page

102

©2009SAPAG.Allrightsreserved. 2009

Points: T-S11F## - Sunny Electronics
(Referencecust./vendor)Vendor: T-S11F##
Points: T-S11H## - PAQ
(Referencecust./vendor)Vendor: T-S11H##
Stage1: ShipmentLeg Departurepoint T-S11F##
Dest. point T-S11H##
Serviceagent: T-S11G## (TransLog)
Distance: 135 km

第 117 页 / 共 341 页

SCM611 Lesson: Stages

Stage2: ShipmentLeg Departurepoint T-S11H##

Dest. point Plant1000

Serviceagent: T-S11G##

(TransLog)

Distance: 580 km

a) Inthedialogstructure, chooseRouteStages.

Caution: Therearetwoicons, InsertNewEntryand Add

NewEntry. Inthefirststep,itdoesnotmatterwhichiconyou

use. Inthenextstep,however,thesequenceofstagesisdefined

by whether the stage is “added” (at the end) or “inserted”

(before the actual item). You can also shift between a

Single-ColumnandDouble-Columnview. Aslongasonlyone

stageisdefined,pressingShiftalwaysresultsinadetailedview.

Choose InsertNewEntryor AddNewEntry

Departure point: T-S11F##

Dest. point: T-S11H##

Service agent: T-S11G##

Distance: 135

Unit: km

Shipping type: 01

ShCR: Select

Save the stage and choose Back.

ChooseDouble-Columnandthen Back(thesystemgoestostage

details first),

Choose Add New Entry:

Departure point: T-S11H##

Dest. point: Plant1000

Service agent: T-S11G##

Distance: 580

Continued on next page

103

2009 © 2009 SAP AG. All rights reserved.

Stage2: ShipmentLeg Departurepoint T-S11H##
Dest. point Plant1000
Serviceagent: T-S11G## (TransLog)
Distance: 580 km
Departure point: T-S11F##
Dest. point: T-S11H##
Service agent: T-S11G##
Distance: 135
Unit: km
Shipping type: 01
ShCR: Select
Departure point: T-S11H##
Dest. point: Plant1000
Service agent: T-S11G##
Distance: 580

第 118 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Unit: kg

Shipping type: 01

ShCR: Select

Note: You must enter the destination point in the

double-columnviewfirst. Thenyoucanmaintainthevaluesin

the table or by using Details.

ClickSaveandexitroutemaintenancebyclicking Back.

Task 2:

Youwouldnowliketoplantheinboundshipmentthatyoucreatedinthe“Creating

Shipments” unit (line 4 on the data sheet).

1. Call up the inbound shipment to Change.

a) Logistics→LogisticsExecution→Transportation→Transportation

Planning→Change→SingleDocuments

Enter the number of the shipment document from the “Creating

Shipments”unit(seeLineno. 4onthedatasheet).

2. Entertherouteyouhavejustcreatedintheshipmentoverview. Thengoto

thetotheStagestabinthelowerpartofthescreen. Whichshipmentstages

have been created? Why?

________________________________________________________

________________________________________________________

a) Shipment Overview: Processing tab.

Shipment Route: RZ00##

Lower half of screen: Stages: tab:

Both stages of route RZ00## were copied: Section 1: Stuttgart -

Mannheim: FromvendorT-S11H##tovendorT-S11H##.

Stage2: Mannheim-Hamburg: FromvendorT-S11H##toplant1000

InboundShipment(0010)isstoredastheshipmenttypeinCustomizing

so that all stages of the route are copied in the shipment header as

shipment stages(Adopt Routeindicator).

3. Determinewhichinbounddeliveriesareincludedineachstage.

Stage1: ______________________________________________

Continued on next page

104

©2009SAPAG.Allrightsreserved. 2009

Unit: kg
Shipping type: 01
ShCR: Select

第 119 页 / 共 341 页

SCM611 Lesson: Stages

Stage2: ______________________________________________

a) Lower half of screen: Stages tab:

Selectthestagesand choosetheDeliveriesbuttonat thebottomleft

of the screen.

Stage1: TheinbounddeliveriesfromvendorT-S11F##only

Stage2: AlldeliveriesfrombothT-S11F##andT-S11H##

b) Save your document.

Task 3:

YouarenowplanningthecollectiveshipmentHamburg–Frankfurt–Stuttgart–

Munich, whichyou createdusingtheplanningproposal (lineno. 6onthedata

sheet).

1. Call up the collective shipment to changeit.

a) Logistics→LogisticsExecution→Transportation→Transportation

Planning →Change→Single Documents

Enterthenumberofthesecondcollectiveshipmentyoucreatedusing

theplanningproposalinExercise6ofthe“CreatingShipments”unit

(see line no. 6 on your data sheet).

2. Goto theStagestab. Which stageshavebeencreated? Whatsettingwas

these stages based on?

Stage1: ______________________________________________

Stage2: ______________________________________________

Stage3: ______________________________________________

________________________________________________________

a) Shipment stages:

ShipmentOverview: Stagestab: Lowerhalfofscreen.

Stage1: Hamburg(Plant1000)-Frankfurt(T-S11A##)

Stage2: Frankfurt(T-S11A##)-Stuttgart(T-S11B##)

Stage3: Stuttgart(T-S11B##)-Munich(T-S11C##)

The stages are automatically determined using leg determination;

the Data and Options variant of the planning proposal set the Leg

Determination indicator so that it is set automatically when the

planning proposal is created.

105

2009 © 2009 SAP AG. All rights reserved.

第 120 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Lesson Summary

You should now be able to:

• Describetheconceptofshipmentstagesandhowtheyaredetermined

• Define routes, explain how they are determined, and describe their

importance in the shipment process.

106

©2009SAPAG.Allrightsreserved. 2009

第 121 页 / 共 341 页

SCM611 Lesson: Processing Functions in Shipments

Lesson: Processing Functions in Shipments

Lesson Overview

Inthislesson,youwillbecomefamiliarwiththevariousprocessingfunctionsin

the shipment document.

Lesson Objectives

After completingthislesson, youwillbeable to:

• Give examples of message types

• Transferinformationfromthedeliverydocumentstotheshipmentdocument

• Call up various status information

• Define and assign activity profiles

Business Example

Texts and Messages

Figure 39: Texts in the Shipment Document (Examples)

Textscancontainessentialinformationontheshipmentprocess. Youcandefine

textsforeachshipmentasrequiredat theheader level.

Thetexttypeintheshipmentdocumentiscontrolledusingatextdetermination

procedurethatcanbeassignedtoeachshipmenttype.

107

2009 © 2009 SAP AG. All rights reserved.

第 122 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Figure 40: Messages in Shipments (Examples)

Messagesarecommunication aidsthat supportinformation exchangebetween

business partners and/or employees.

Youcandefinetransportationmessagestomeetyourrequirementsandcopythem

intotheshipmentdocument. Somemessageexamplesaregivenabove.

Inthestandardsystem,theALTRgeneralshipmentdocumentandtheCMRbillof

lading are already defined as message types.

The condition technique is used for message determination (message

determination isexplained indetail inSCM650).

108

©2009SAPAG.Allrightsreserved. 2009

第 123 页 / 共 341 页

SCM611 Lesson: Processing Functions in Shipments

Deadlines

Figure 41: Deadlines in the Shipment Document

You can record the times and deadlines for planning and executing the

transportation activities intheshipment document.

You can record planned and actual deadlines for standard activities such as

planning, check-in, loading,processing, shipmentstartandshipmentendinthe

shipment document at the header level. You can also specify exact times for

the deadlines.

You can also define planned and actual start and end datesfor each shipment

stage.

Similar to Shipping, you can specify additional individual deadlines that are

usedforfurthercontrollingshipmentprocesses. Inadditiontoplannedandactual

deadlinesandtimes,youcanalsoenter operationtypes, reasonsfordeviations,

and locations (points).

Foreachshipmentdocumenttype,youcandefineadeadlineprocedure(network

profile) for your individual deadlines.

109

2009 © 2009 SAP AG. All rights reserved.

第 124 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Copying Control

Figure 42: Copying Delivery Dates to the Shipment

You can have the system proposeplanned deadlinesfor individual shipment

activities in the shipment. You can copy them from the outbound deliveries

belonging to the shipment.

Inthestandardproposal(copyroutine“8”),thefollowingruleappliesforcopying

deadlines:

Outbound Delivery Shipment

Earliest load deadline Check-in

Earliest load deadline Loading start

LastplannedGI deadline Loading end

LastplannedGI deadline Shipment completion

LastplannedGI deadline Shipment start

Last delivery date Shipment end

You can create other ways of adopting deadlines by writing your own copy

routinesand storingthem in the shipment type.

Hint: Asopposedto“normal”copyingcontrol,thecopyingroutinefor

theshipmentdocumentisexecutedonlyafterthe“Planned”statushas

been set.

110

©2009SAPAG.Allrightsreserved. 2009

Outbound Delivery Shipment
Earliest load deadline Check-in
Earliest load deadline Loading start
LastplannedGI deadline Loading end
LastplannedGI deadline Shipment completion
LastplannedGI deadline Shipment start
Last delivery date Shipment end

第 125 页 / 共 341 页

SCM611 Lesson: Processing Functions in Shipments

Status Information and Activity Profiles

Figure 43: Status Information in the ShipmentDocument

When transportation activities such as planning, checking in, and loading are

finished,youcansetastatus. Assoonasthestatusisset,theactivityisconsidered

completed.

Thusyoualwaysknowthecurrentprocessingstatusofashipmentandcanquickly

provide information on it.

You can set the status by

• Choosingthecorrespondingpushbutton; thecurrent dateiscopiedas the

actual date.

• Enteringtheactualdate;thestatusisthensetbythesystem.

Atrafficlightsymboldisplaystheoverallstatusoftheshipment.

• Red: “Planned” status is set.

• Yellow: At least the“Checkedin”statusisset.

• Green: Atleastthe“Shipmentcompletion”statusisset.

Hint: You do not have to use all of the statuses. For shipment cost

calculation,however,thePlannedstatusmustbesetatleast. Inaddition,

thisstatusistheprerequisiteforeveryother status.

111

2009 © 2009 SAP AG. All rights reserved.

第 126 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

Figure 44: Activity Profiles

Whenyousetthestatusofashipmentdocument,thesystemexecutesactivities

and checks for certain data automatically. This is controlled by the activity

profile.

Intheactivityprofile,youdefinewhichactivitiesthesystemshouldexecutewhen

thestatusisactivated. Forexample,goodsissuecanbepostedforthedeliveriesin

theshipment,billingdocumentsoroutputcanbecreated.

Youcanalsospecifythatadialogboxappearswhenyousetastatus. Youhave

theoptionofenteringdata. Forinstance,duringplanningyoumaywantadialog

boxtoappear thattellsyoutospecifyaserviceagent.

You define the activity profiles in Customizing and assign them to shipment

types. You can create your own activity profile for every shipment type and

every status.

112

©2009SAPAG.Allrightsreserved. 2009

第 127 页 / 共 341 页

SCM611 Lesson: Processing Functions in Shipments

Exercise 9: Shipment Processing

Exercise Objectives

After completingthisexercise, youwillbeableto:

• Enteranadditionalpartnerontheshipmentdocument

• Createactivityprofilesandassignshipment types

Business Example

In your company, some shipments may be processed by several partners.

Follow-upactivitiesforshipmentsshouldbeautomatedasmuchaspossible.

Task 1:

You would now like to process the inbound shipment that you created in the

“CreatingShipments”unit(line4onthedatasheet)furtherandcompleteit.

1. Thegoodsshouldbehandledwithcareduringshipment. Createatextnote

tothiseffect(Handlewithcare!!!) fortheforwardingagent.

2. Nowthatyouhavecompletedyourorganizationalactivities,setthePlanned

status. Make sureall the entries required for setting the status have been

made in the dialog box that appears.

3. Optional

Whichfunctionisresponsibleformakingthedialogboxappearwhenthe

Planned status is set?

________________________________________________________

Where do you make the settings?

________________________________________________________

GototherelevantsettingsinCustomizingandfamiliarizeyourselfwiththem.

Task 2:

YouarenowplanningthecollectiveshipmentHamburg–Frankfurt–Stuttgart–

Munich, whichyou createdusingtheplanningproposal (lineno. 6onthedata

sheet).

1. Asanexception,adifferentforwardingagentwillbehandlingtheshipment

fromFrankfurt. Youthereforeassign“SchmalenbachShipping”(1930)as

the service agent to stages 2 and 3.

Continued on next page

113

2009 © 2009 SAP AG. All rights reserved.

第 128 页 / 共 341 页

Unit4: ShipmentProcessing SCM611

2. Youhavetakenoutadditionaltransportationinsuranceforriskssuchastheft

andindirectlossesfortheentireshipment. Entertheinsurancecompanywith

thenumber1920aspartner andthepartner roleInsuranceonthepartner

screen of the shipment header.

3. NowsetthePlannedstatus. Inthedialogboxthatappears,confirmtheCopy

Means of Transport Type from Deliveryactivity, butdo not redetermine

the legs.

4. Go to the Means of Transport and Packaging Material screen. What

happenedwhenyoucopiedthemeansoftransport?

_________________________________________________________

5. Whichshipmentmessageswerefound? Whatstatusdotheyhave?

_________________________________________________________

6. After you have carried out all necessary activities, set the Shipment

completedstatusintheshipmentheader. Youhavetoenterthenameofthe

truck driver in the dialog box that appears.

7. Saveyourdocument. Whatactivitiesareperformedinthebackground?

_________________________________________________________

8. Now go back into change mode for this shipment. Check the message

processing status on the output screen.

_________________________________________________________

9. InCustomizing, displaythesetting responsibleforexecutingtherelevant

activitieswhentheShipmentcompletionstatusisset.

10. Using one of the outbound deliveries included in the shipment, check

whethertheactivitieshaveactuallybeencarriedout.

Hint: Thebestwaytodothisistogotothedocumentflowofthe

outbound delivery.

Save the shipment.

114

©2009SAPAG.Allrightsreserved. 2009

第 129 页 / 共 341 页

SCM611 Lesson: Processing Functions in Shipments

Solution 9: Shipment Processing

Task 1:

You would now like to process the inbound shipment that you created in the

“CreatingShipments”unit(line4onthedatasheet)furtherandcompleteit.

1. Thegoodsshouldbehandledwithcareduringshipment. Createatextnote

tothiseffect(Handlewithcare!!!) fortheforwardingagent.

a) Choose Logistics → Logistics Execution → Transportation →

TransportationPlanning→Change→SingleDocuments

Enter the number of the shipment document from the “Creating

Shipments”unit(seeLineno. 4onthedatasheet).

SelecttheTextstabinthelowerhalfofthescreen:

DoubleclickonHeadernoteandenteryourtextHandlewithcare!!!

on the right hand side.

2. Nowthatyouhavecompletedyourorganizationalactivities,setthePlanned

status. Make sureall the entries required for setting the status have been

made in the dialog box that appears.

a) SelecttheDeadl. tabinthelowerhalfofthescreen:

Click Planning.

Theshipmentroutemustbeenteredinthedialogbox.

Choose Copy and Savethedocument.

3. Optional

Whichfunctionisresponsibleformakingthedialogboxappearwhenthe

Planned status is set?

________________________________________________________

Where do you make the settings?

________________________________________________________

Continued on next page

115

2009 © 2009 SAP AG. All rights reserved.

返回FICO参考资料列表