第 297 页 / 共 537 页
AC505 Lesson: Mixed Costing
Exercise 12: Mixed Costing
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Execute a mixed cost estimate
• Definewheretomaintainthequantitystructuretypeandassignthecosting
version
• Createprocurementalternativesformixedcostinganddefinemixingratios
Business Example
Yourcompanyusuallymanufacturesassembliesforthepumpin-house,butfora
fewsemi-finishedproducts,thein-housemanufacturingcapacityisnotsufficient
tomeetthedemand. Youdecidetoprocureapercentageoftheseproductsfrom
external vendors. Until now, costing was based on the assumption of 100%
in-houseproduction. Management nowrequiresthat costingreflectthecurrent
practiceofmeetingpartofthedemandthroughexternalprocurement. Yourtaskis
tounderstandmixedcostingusingamaterialasanexample.
Task:
Verifythecustomizingsettingsandmasterdatausedfor amixedcostestimate,
andcreateamixedcostestimateformaterialN-2110,inplant1100.
1. Mixedcostingconfigurationsarealreadysetupforamaterialinproduction
plant 1100. To create mixed cost estimates, you first need to make afew
settingsinCustomizing. Themixingratiosaremanagedwithreferenceto
a quantity structure type. Verify that the customizing settings have been
maintained.
a. UsingCustomizing, determinethetimedependencywithwhichmixing
ratioscanbemaintainedformixedcosting. Whattimedependencyhasbeen
maintainedforthequantity structuretypeMIX?
b. Basedonthecustomizingsettingsmade,willthequantitystructuretype
MIXbeusedwhencreatingacostestimateusingcostingvariantPPC1?
2. NowcreateacostestimatewithquantitystructureformaterialN-2110,to
beproducedinplant1100. SelectcostingvariantPPC1andcostingversion
1. Accept the default costing dates.Please Note: If this class is being
taughtinDecember, useDecember1oftheCurrentYearasthevalue
fortheCostingDateFromfield. Ignoreanymessagesthatappearwhile
creating the cost estimate.
a. Whatisthecostinglotsizeandstatusofthecostestimate?
Continued on next page
275
2009 © 2009 SAP AG. All rights reserved.
第 298 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
b. Whatisthetotalcostofgoodsmanufacturedfortheacid? Whatquantity
wasprocuredexternallyandhowmucharethecosts? Fromwhichvendor
was the acid purchased? Use the itemization report to determine this
information.
c. Using the explanation facilities in the mixed cost estimate, determine
the process categories that were entered in procurement alternatives for
the current fiscal year.
d. Inthedisplayofmixingratios,determinewhichquantitystructuretype
was used in the current fiscal year?
3. Gotothemasterdataformixedcostinganddeterminetheprocesscategories
thatcanbeselectedwhenprocurementalternativesaredefined. Usematerial
N-2110, plant1100 to determinethisinformation.
276
©2009SAPAG.Allrightsreserved. 2009
第 299 页 / 共 537 页
AC505 Lesson: Mixed Costing
Solution 12: Mixed Costing
Task:
Verifythecustomizingsettingsandmasterdatausedfor amixedcostestimate,
andcreateamixedcostestimateformaterialN-2110,inplant1100.
1. Mixedcostingconfigurationsarealreadysetupforamaterialinproduction
plant 1100. To create mixed cost estimates, you first need to make afew
settingsinCustomizing. Themixingratiosaremanagedwithreferenceto
a quantity structure type. Verify that the customizing settings have been
maintained.
a. UsingCustomizing, determinethetimedependencywithwhichmixing
ratioscanbemaintainedformixedcosting. Whattimedependencyhasbeen
maintainedforthequantity structuretypeMIX?
Continued on next page
277
2009 © 2009 SAP AG. All rights reserved.
第 300 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
b. Basedonthecustomizingsettingsmade,willthequantitystructuretype
MIXbeusedwhencreatingacostestimateusingcostingvariantPPC1?
a) Menu→Tools→Customizing→IMG→ExecuteProject→SAP
Reference IMG (SPRO)
ImplementationGuideforSAPCustomizing(IMG)→Controlling
→ProductCostControlling→ProductCostPlanning→Selected
FunctionsinMaterialCosting→MixedCosting→DefineQuantity
Structure Types
Inthepop-updialogbox, selectDefineQuantityStructureTypesfor
Mixed Costing.
1. IntheTimefieldforquantitystructuretypeMIX,youcanseethe
time dependency that can be defined.
0 No time-dependency
1 Based on fiscal year
2 Based on period
Timedependency1hasbeensetforquantitystructuretypeMIX.
2. Menu → Tools → Customizing → IMG → Edit Project → SAP
Reference IMG
ImplementationGuideforSAPCustomizing(IMG)→Controlling
→ProductCostControlling→ProductCostPlanning→Selected
FunctionsinMaterialCosting→MixedCosting→DefineCosting
Versions
The table shows that costing type 01 and valuation variant 001 are
assigned toquantitystructuretypeMIX. Costingvariant PPC1uses
costing type 01 and valuation variant 001 The correct Customizing
settings have been made.
2. NowcreateacostestimatewithquantitystructureformaterialN-2110,to
beproducedinplant1100. SelectcostingvariantPPC1andcostingversion
1. Accept the default costing dates.Please Note: If this class is being
taughtinDecember,useDecember1oftheCurrentYearasthevalue
fortheCostingDateFromfield. Ignoreanymessagesthatappearwhile
creating the cost estimate.
a. Whatisthecostinglotsizeandstatusofthecostestimate?
b. Whatisthetotalcostofgoodsmanufacturedfortheacid? Whatquantity
wasprocuredexternallyandhowmucharethecosts? Fromwhichvendor
was the acid purchased? Use the itemization report to determine this
information.
Continued on next page
278
©2009SAPAG.Allrightsreserved. 2009
第 301 页 / 共 537 页
AC505 Lesson: Mixed Costing
c. Using the explanation facilities in the mixed cost estimate, determine
the process categories that were entered in procurement alternatives for
the current fiscal year.
d. Inthedisplayofmixingratios,determinewhichquantitystructuretype
was used in the current fiscal year?
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCost Planning→MaterialCosting→CostEstimatewith
Quantity Structure →Create(CK11N)
Enter the following:
Material: N-2110
Plant: 1100
Costing variant: PPC1
Costing version: 1
Accept the default dates. Choose Enter.Confirm any messages by
pressingEnter. Thesystemautomaticallyexecutesthecostestimate.
a. You see the costing lot size in the overview screen (top right of
the screen). It is 10000 G.
Todeterminethestatus, select the Costing data tab. Agreen traffic
lightisdisplayed. ThestatusisCostedwithouterrors.
b. SelecttheCoststab. ThetotalCOGMoftheacidis_______EUR.
To determine the procurement quantity and vendor, display the
itemizationinthelowerpartofthescreen. Thescenarioisasfollows:
9000gofthematerialwasproducedin-house: Productionversion0001
1000 g of the material were procured externally: Vendor 1060
(purchasing organization 1000)
10%ofthetotalquantitywasprocuredexternally. Thematerialcostfor
thisis_____EUR.Theacidwaspurchasedfromvendor1060.
c. Choosethesymboli(InformationonCostEstimate)tonavigateto
theexplanationfacilitiesfor themixingratios.
Two process categories were entered:
BB Purchase order
BF Production
d. ThequantitystructuretypeforthefiscalyearisMIX.
Continued on next page
279
2009 © 2009 SAP AG. All rights reserved.
第 302 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
3. Gotothemasterdataformixedcostinganddeterminetheprocesscategories
thatcanbeselectedwhenprocurementalternativesaredefined. Usematerial
N-2110, plant1100 to determinethisinformation.
a) Menu →Accounting →Controlling→ Product Cost Controlling
→ProductCostPlanning→MaterialCosting→MasterDatafor
MixedCostEstimate→EditProcurementAlternatives(CK91N)
Material: N-2110
Plant: 1100
Choose the symbol Create.
Thefollowingselectionoptionsareavailablefortheprocesscategory
field:
Purchase order
Production
Subcontracting
Stock transfer
Procurement (changeinvolving stocks)
280
©2009SAPAG.Allrightsreserved. 2009
第 303 页 / 共 537 页
AC505 Lesson: Mixed Costing
Lesson Summary
You should now be able to:
• Create procurement alternatives
• Maintain Mixing Ratios
• Execute a mixed cost estimate
• Interpret the resultsof mixed cost estimate
281
2009 © 2009 SAP AG. All rights reserved.
第 304 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Lesson: Special Procurement
Lesson Overview
Thislessondescribesthepurposeandrelevanttypesofspecialprocurement. The
lesson will also describe the phantomassembly.
Lesson Objectives
After completingthislesson, you will beable to:
• Describethepurposeandrelevanttypesofspecialprocurement
• Define Phantom Assembly
Business Example
Your company usually manufactures assemblies for the pump in-house, but
for certain semi-finishedproducts, the in-house manufacturing capacity is not
sufficienttomeetthedemand. Consequently, youneedtoprocureapercentage
of these products from external vendors. Until now, costing was based on the
assumptionof100%in-houseproduction. Managementnowrequiresthatcosting
reflect the current practice of meeting part of the demand through external
procurement. Youneedtounderstandhowspecialprocurementkeysareusedto
define specific procurement processes.
Purpose of Special Procurement
Figure 120: Purpose of Special Procurement
282
©2009SAPAG.Allrightsreserved. 2009
第 305 页 / 共 537 页
AC505 Lesson: Special Procurement
Essentially, special procurement describes how amaterial is procured. Thisis
definedinthespecialprocurementkey,whichenablesyoutocontrolamaterial
for the type of procurement selected.
Thespecialprocurementkeycanbeenteredinthematerialmasterrecordinthe
MRP view and/or in the Costing view. The entry in the Costing view has the
higherpriorityinthecostestimate. IfthereisnoentryintheCostingview, the
settingintheMRPviewisused. Ifnot,thesystemproceedsasusual.
Example:
Thereisasalesplantandaproductionplant. Thecostestimateoftheproduction
plantshouldbeusedforthesalesplant. Inthematerialmasterrecordstobecosted
inthesalesplant, setaspecialprocurementkeythat, for example, referstothe
production plant through the stock transfer.
Whenmaterialsaretransferredfromoneplanttoanother,thesystemcanfunction
in the following ways:
• Itcantransferthecostestimatefromthesupplyingplant
• Itcanexplodeandcostthequantitystructure(cross-plant)
• Iftheplantsbelongtodifferentcompanycodesandcross-companycostingis
notenabled,thesystemcancalculateamaterialmasterprice.
Type of Special Procurement
Figure 121: Special Procurement, In-House/External
283
2009 © 2009 SAP AG. All rights reserved.
第 306 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
IfthereisnospecialprocurementplannedforamaterialandnovalidBOM,the
systemcreatesarawmaterialcostestimate. Itusesthematerialpriceaccordingto
thevaluationvariantandincludesitinthecostcomponentsplit.
Ensurethattheroutingdataisincludedbyselectingthespecialprocurementkey
In-house production for the material.
Ifaproduct withthespecialprocurement typeExternal procurement iscosted,
thequantitystructureisignored. Valuationisperformedaccordingtothematerial
valuationstrategy, despitethevalidBOM androuting.
Phantom Assembly
Figure 122: Phantom Assembly
Rather than being assembled in their header material, phantom assemblies are
exploded in requirements planning and installed directly in the higher-level
assembly. They areessentially logical groupings of components that facilitate
planning and maintenance of BOMs.
Example:
• ThecostestimateformaterialAshowsthematerialcostsoftheindividual
components of the phantom assembly, rather than the material costs for
the phantom assembly.
• You can maintain phantom assemblies by entering the relevant special
procurementkeyintheMRPscreenoftheassembly.
• Cisonlymanufacturedinexceptionalcasesasareplacementpart.
284
©2009SAPAG.Allrightsreserved. 2009
第 307 页 / 共 537 页
AC505 Lesson: Special Procurement
Lesson Summary
You should now be able to:
• Describethepurposeandrelevanttypesofspecialprocurement
• Define Phantom Assembly
285
2009 © 2009 SAP AG. All rights reserved.
第 308 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Lesson: Subcontracting and External Processing
Lesson Overview
This lesson describes the difference between sub-contracting and external
processing. Itexplainshowtoimplementcontrolonsub-contractinganddescribes
themasterdataforexternalprocessingandvaluatingexternalprocessing.
Lesson Objectives
After completingthislesson, you will beable to:
• Explainthedifferencebetweensub-contractingandexternalprocessing
• Implement control on sub-contracting
• Describe the master data for external processing and valuating external
processing
Business Example
Your company frequently experiences capacity bottlenecks in the casing
production area. Capacity cannot be increased at short notice. Consequently,
management decides to hire a subcontractor to produce this assembly. A
subcontractor who meetsthetechnicalrequirementsof the job isfound. There
arehighqualitystandardsforthecomponentsoftheassembly(slug,flatgasket,
andhexagonheadscrew). Tomaintainthesehighstandards,managementdecides
to supply the subcontractor with these components. It is your task to cost the
sub-contracting work.
286
©2009SAPAG.Allrightsreserved. 2009
第 309 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
Difference Between Sub-contracting and External
Processing
Figure123: DifferenceBetweenSub-contractingandExternalProcessing
Example–Subcontracting: Bottlenecksoftenoccurintheturnerysectionofthe
pumpmanufacturingplant. Consequently,youhireasubcontractorwhohasthe
necessarytechnicalcapabilitiestoproduceshaft100-300for$100perpiece. You
provideblank100-310forthesubcontractor, becauseyouneedtocomplywith
strict quality controls for the raw material.
Example–ExternalProcessing: Inmetalproduction,particularlyturningand
drilling,thematerialsneedtobedegreasedbeforetheycanbeprocessedfurther.
Thedegreasingofshaft100-300afterthe“turning”operationisallocatedtothe
externalprocessor. Thereasonsforthisarecommercialandenvironmental.
287
2009 © 2009 SAP AG. All rights reserved.
第 310 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Subcontracting
Figure 124: Subcontracting: Business Process
Besides in-house production and external procurement, materials can also be
processedbyasubcontractor. Thistypeofprocessingiscontrolledbyaspecial
procurementkeyinthematerialmasteroftheassembly.
Apurchaserequisitionisgeneratedforsuchanassemblyintheorder. Purchasing
usesthe purchaserequisition tocreatea subcontract order for thevendor. The
purchaseorderspecifieswhichcomponentsoftheassemblyaresenttothevendor.
TheBOMcomponentshavenomaterialprovisionindicator.
Agoodsreceiptisenteredfortheproductproducedbythevendor.
Thecostsfortheassemblyarecalculatedinthematerialcostestimateusing:
• The price agreed with the subcontractor
• Thematerialcostsofcomponentsdeliveredtothesubcontractor
288
©2009SAPAG.Allrightsreserved. 2009
第 311 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
External Processing
Figure 125: External Processing of Operations
Youcanassignseparateoperationstoanexternalsupplierforprocessing.
When an operation is processed externally, data that is relevant to costing is
maintained directly in the operation. You can use purchasing info records to
maintain the data.
YouusethevaluationvariantinCustomizingtospecifyifcostingusesthepricein
theoperationoroneofthepricesintheassociatedpurchasinginforecord.
289
2009 © 2009 SAP AG. All rights reserved.
第 312 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
290
©2009SAPAG.Allrightsreserved. 2009
第 313 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
Exercise 13: Subcontracting
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Configurehowsubcontracting iscontrolled
• Describehow subcontracting itemsare valued
• Recognizethedifferencebetweensubcontractingandexternalprocessing
Business Example
Your company frequently experiences capacity bottlenecks in the casing
production area. Because capacity cannot be increased at short notice,
managementhasdecidedtohavethisassemblyproducedbyasubcontractor. A
subcontractor hasalready beenfound whomeetsthetechnical requirementsof
the job. There are high quality standards for the components of the assembly
(slug,flatgasket,hexagonheadscrew). Inordertomaintainthesehighstandards,
managementhasdecidedtosupplythesubcontractorwiththesecomponents. Itis
your task to cost the subcontracting work.
Task 1:
Up to now, all components required to manufacture pump R-F1## have been
producedin-house. Sincetheproductionofthecasing(materialR-B1##)istobe
subcontractedinfuture,thischangemustbereflectedinthematerialmaster.
1. Usingthematerialmasterchangetransaction,gotothematerialmasterfor
assemblyR-B1##inplant1000andselecttheMRP2view. Enterthespecial
procurement key 30 for subcontracting.
2. Save your entry.
Task 2:
Verify howthesubcontracting itemisto bevalued:
1. Verify how the subcontracting item is to be valued. To do this, go to
CustomizingforProductCostPlanninganddisplaythevaluationstrategies
that are used for costing variant PPC1.
2. Whichstrategyhasbeenenteredforthevaluationofsubcontracting?
3. Whatisthesignificanceoftheentryfortheplannedquotaarrangement?
Continued on next page
291
2009 © 2009 SAP AG. All rights reserved.
第 314 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Task 3:
Tomaintainqualitystandards,thesubcontractorissuppliedwithallcomponents
needed to produce the casing. Casing R-B1## consists of three material
components: SlugR-T1##,flatgasketR-T2##,andhexagonheadscrewR-T3##.
1. GototheproductionmasterdataandcallupthematerialBOMR-B1##of
usage1inplant1000. Displaythelistofmaterialcomponents. Whichtab
containstheentryforthematerialprovisionindicator?
2. For each component, what entry was made in the Material provision
indicatorfield? Areallcomponentstobesuppliedtothesubcontractor?
Task 4:
Managementhasdecidedtohavethecasingsubcontractedtoavendorwhohas
alreadyundergonestringenttests. Thepricenegotiationswiththisvendorhave
also been completed. Any further subcontractors found who meet the high
standardsofyourcompanywillalsobesubjecttotheseconditions.
1. Go to the purchasing master dataand create a purchasing info record for
material R-B1##. Set the info category indicator Subcontracting. The
subcontractorisvendor100(C.E.B.Berlin),whoisassignedtopurchasing
organization1000inplant1000. AcceptallofthedefaultsfortheGeneral
data.
2. Go toprice maintenancein Purchasing Organization 1. Enter 1 piecefor
the standard quantity and enter 210.00 EUR per piece as the price for
subcontracting.
3. Savethedataandmakeanoteofthenumberofthepurchasinginforecord.
Task 5:
Nowthatyouhavemadeallthesettingsforsubcontracting,youcangotoProduct
CostPlanningtocreateacostestimatefor yourpump.
1. CreateacostestimateformaterialR-F1##withcostingvariantPPC1and
acceptthedefaultdates. Usecostingversion99.
2. WhatistheCOGMofyourpumpbasedonthecostinglotsize?
3. GotothecostestimateformaterialR-B1##. Displaytheitemizationreport
forthecasinganddeterminethecostingitemcategorywhichwasusedfor
the subcontracting service.
4. WhatistheCOGMforthesubcontractedassembly?
5. Save the costing results with all options.
Continued on next page
292
©2009SAPAG.Allrightsreserved. 2009
第 315 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
6. Go to the Information System for Product Cost Planning and select
a comparison report that enables you to compare the materials in the
itemization. Select thereport formaterial R-B1##, costingvariant PPC1.
Compare version 01 with version 99. Enter today’s date for version 01
and the first day of the next month for version 99. Is subcontracting a
cost-effectiveoption? Orshouldmanagementconsiderincreasingin-house
casing production capacity instead?
293
2009 © 2009 SAP AG. All rights reserved.
第 316 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Solution 13: Subcontracting
Task 1:
Up to now, all components required to manufacture pump R-F1## have been
producedin-house. Sincetheproductionofthecasing(materialR-B1##)istobe
subcontractedinfuture,thischangemustbereflectedinthematerialmaster.
1. Usingthematerialmasterchangetransaction,gotothematerialmasterfor
assemblyR-B1##inplant1000andselecttheMRP2view. Enterthespecial
procurement key 30 for subcontracting.
a) Menu→Logistics→MaterialsManagement→MaterialMaster→
Material →Change→Immediately(MM02)
Enter material R-B1##.
Choose Enter.
Select the MRP 2 view.
Choose Enter
Enter plant 1000.
Choose Enter
EnterthefollowingintheProcurementscreenarea:
Special procurement:30(subcontracting)
Choose Enter
Continuepastthewarningmessageregardingtheprocurementtype.
2. Save your entry.
a) Save your entry.
Continued on next page
294
©2009SAPAG.Allrightsreserved. 2009
第 317 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
Task 2:
Verify howthesubcontracting itemisto bevalued:
1. Verify how the subcontracting item is to be valued. To do this, go to
CustomizingforProductCostPlanninganddisplaythevaluationstrategies
that are used for costing variant PPC1.
a) Menu → Tools → Customizing → IMG → Edit Project → SAP
Reference IMG (SPRO)
Controlling→ProductCostControlling→ProductCostPlanning
→MaterialCostEstimatewithQuantityStructure→DefineCosting
Variants
Double-click on costing variant PPC1. Then double-click on the
valuationvariant. SelecttheSubcontractingtab.
2. Whichstrategyhasbeenenteredforthevaluationofsubcontracting?
a) For the valuation of subcontracting, the net quotation price has the
highest priority.
3. Whatisthesignificanceoftheentryfortheplannedquotaarrangement?
a) If quota arrangements have been entered for multiple vendors for
a subcontracting item, the system uses the vendor with the highest
planned quota.
Continued on next page
295
2009 © 2009 SAP AG. All rights reserved.
第 318 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Task 3:
Tomaintainqualitystandards,thesubcontractorissuppliedwithallcomponents
needed to produce the casing. Casing R-B1## consists of three material
components: SlugR-T1##,flatgasketR-T2##,andhexagonheadscrewR-T3##.
1. GototheproductionmasterdataandcallupthematerialBOMR-B1##of
usage1inplant1000. Displaythelistofmaterialcomponents. Whichtab
containstheentryforthematerialprovisionindicator?
a) Menu→Logistics→Production→MasterData→BillsofMaterial
→BillofMaterial→MaterialBOM→Display(CS03)
Enter the following:
Material: R-B1##
Plant: 1000
Usage: 1
Choose Enter.
You can find the entry for the materials provision indicator in the
Status/longtexttabforthecostingiteminquestion.
Youaccessthistabbyplacingyourcursorontheiteminthelistand
double-clicking. SelectthetabStatus/longtext.
2. For each component, what entry was made in the Material provision
indicatorfield? Areallcomponentstobesuppliedtothesubcontractor?
a) NoentryhasbeenmadeintheMat. prov. ind. fieldforanyofthethree
components (R-T1##, R-T2## and R-T3##). This means that your
companyissupplyingthecomponentstothesubcontractor.
Continued on next page
296
©2009SAPAG.Allrightsreserved. 2009
第 319 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
Task 4:
Managementhasdecidedtohavethecasingsubcontractedtoavendorwhohas
alreadyundergonestringenttests. Thepricenegotiationswiththisvendorhave
also been completed. Any further subcontractors found who meet the high
standardsofyourcompanywillalsobesubjecttotheseconditions.
1. Go to the purchasing master dataand create a purchasinginfo recordfor
material R-B1##. Set the info category indicator Subcontracting. The
subcontractorisvendor100(C.E.B.Berlin),whoisassignedtopurchasing
organization1000inplant1000. AcceptallofthedefaultsfortheGeneral
data.
a) Menu → Logistics → Materials Management → Purchasing →
MasterData→InfoRecord→Create(ME11)
Enter the following:
Vendor: 100
Material: R-B1##
Purchasing organization: 1000
Plant: 1000
Info category: Subcontracting
Choose Enter.
2. Go toprice maintenancein Purchasing Organization 1. Enter 1 piece for
the standard quantity and enter 210.00 EUR per piece as the price for
subcontracting.
a) Choose the Purch. org. data 1 button.
Enter1forthestandardquantity. Enter210.00EURforthenetprice.
3. Savethedataandmakeanoteofthenumberofthepurchasinginforecord.
a) Thenumberofthepurchasinginforecordis530000####.
Continued on next page
297
2009 © 2009 SAP AG. All rights reserved.
第 320 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Task 5:
Nowthatyouhavemadeallthesettingsforsubcontracting,youcangotoProduct
CostPlanningtocreateacostestimatefor yourpump.
1. CreateacostestimateformaterialR-F1##withcostingvariantPPC1and
acceptthedefaultdates. Usecostingversion99.
a) Menu→Accounting→Controlling→ProductCostControlling→
Product Cost Planning→MaterialCosting→Cost Estimatewith
Quantity Structure→ Create(CK11N)
Enter the following:
Material: R-F1##
Plant: 1000
Costing variant: PPC1
Costing version: 99
GototheDatestabandacceptthedefaultvalues.
ChooseEnter. Thesystemexecutesthecostestimateautomatically.
2. WhatistheCOGMofyourpumpbasedonthecostinglotsize?
a) Basedonacostinglotsizeof100,theCOGMforthepumpisEUR.
3. GotothecostestimateformaterialR-B1##. Displaytheitemizationreport
forthecasinganddeterminethecostingitemcategorywhichwasusedfor
the subcontracting service.
a) Double-clickonthecasingiteminthecostingstructure. Then,display
theitemizationreportinthelowerscreenarea.
4. WhatistheCOGMforthesubcontractedassembly?
a) TheCOGMofthesubcontractedassemblyisEUR.
5. Save the costing results with all options.
a) Save thecosting results with all options.
6. Go to the Information System for Product Cost Planning and select
a comparison report that enables you to compare the materials in the
itemization. Select thereport for material R-B1##, costingvariant PPC1.
Compare version 01 with version 99. Enter today’s date for version 01
Continued on next page
298
©2009SAPAG.Allrightsreserved. 2009
第 321 页 / 共 537 页
AC505 Lesson: Subcontracting and External Processing
and the first day of the next month for version 99. Is subcontracting a
cost-effectiveoption? Orshouldmanagementconsiderincreasingin-house
casing production capacity instead?
a) Menu →Accounting →Controlling →Product Cost Controlling
→ Product Cost Planning → Information System → Object
Comparisons→ForMaterial→MaterialvsMaterial→Itemization
(CK79_99)
Make the following settings:
Report object 1.
Material: R-B1##
Plant: 1000
Costing variant: PPC1
Costing version: 1
Costing date: Today's date
Report object 2
Material: R-B1##
Plant: 1000
Costing variant: PPC1
Costing version: 99
Costingdate: 1st day of following month
Costcomponentview: Cost of goods manufactured
Execute the report.
Thecostsforthepumpwiththesubcontractedcasingarehigherthan
thoseforthecompletepumpproducedin-house. Therefore,ifacheaper
vendorcannotbefound, managementshouldconsiderincreasingthe
company’scapacityintheareaofcasingproduction.
299
2009 © 2009 SAP AG. All rights reserved.
第 322 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Lesson Summary
You should now be able to:
• Explainthedifferencebetweensub-contractingandexternalprocessing
• Implement control on sub-contracting
• Describe the master data for external processing and valuating external
processing
300
©2009SAPAG.Allrightsreserved. 2009
第 323 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Lesson: Raw Material Costing
Lesson Overview
Thislessondescribesthedatainapurchasinginforecordandexplainshowthe
valuationstrategyaccessesdatainpurchasinginforecords. Italsoexplainshowto
distinguishbetweenprocurementcostsandhowtodeterminethevendor.
Lesson Objectives
After completingthislesson, youwillbeable to:
• AccessthePurchasingdataforrawmaterialcosting
• Use cost components to distinguish between different elements of the
procurement costs for purchasing
Business Example
Yourplanningdepartmentasksforadetailedcostestimateforpurchasedmaterials
withtheabilitytoidentifythevariouscostfactorsofapurchasedmaterialthrough
the cost component split. You will create arawmaterial cost estimateto meet
this requirement.
Purchasing Info Record and Costing Variant
Figure 126: Purchasing Info Record
301
2009 © 2009 SAP AG. All rights reserved.
第 324 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Purchasinginforecordsareusedtorecordpurchasinginformationaboutmaterials
and vendors (either manually or automatically). The following data can be
accessed for material costing purposes:
• Prices from the info record
• Pricesfromthelastpurchaseorderenteredintheinforecord
• Conditions from the info record
• Conditionsfromthelastpurchaseorderenteredintheinforecord
What do the prices represent?
• Netprice=Grossprice-discount+purchasingoverhead
• Effectiveprice=Netprice-cashdiscount+deliverycosts
Formoreinformationaboutpurchasinginforecords,seetheSAPLibraryunder
Materials Management.
Figure 127: Costing Variant
In the main planning strategy, specify that information from purchasing info
records should be accessed.
Youcanuseamaximumofthreeoptionsinastrategyforpurchasinginforecords
to specify howthesystemshouldsearchfor aprice.
302
©2009SAPAG.Allrightsreserved. 2009
第 325 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Figure 128: Which Price?
In the main planning strategy, specify that information from purchasing info
records should be accessed.
Youcan thenuseamaximum of threeoptionsinastrategyforpurchasinginfo
recordstospecifyhowthesystemshouldsearchforaprice.
You can find quotation prices and/or quotation conditions directly in the
purchasing info record.
Purchase order prices and/or conditions are derived from the purchase order
assigned in the info record.
Distinguishing Between Procurement Costs
Figure 129: Distinguishing Between Procurement Costs
303
2009 © 2009 SAP AG. All rights reserved.
第 326 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
InCustomizingforthecostingvariant,youcanassignaseparateoverheadcosting
sheet for the raw material cost estimate.
The conditions inthe purchasing inforecord contain procurement information
that can be used in material costing:
• Intheitemizationforrawmaterialsandpurchasedparts.
• Inspecificcostcomponentsofthecostcomponentstructure.
Note: Overhead costs should go into cost components that are
non-stock-related,becausetheoverheadcostingsheetcannotbeusedwith
thepurchasingprocess. Systematicpricedifferencesandpostingsoccur
forprocurementbecausethisoverheadcannotbeallocatedsimilarlywhen
postinggoodsreceiptsandinvoices(actuals)asinplanneddata.
Figure 130: Conditions in Material Costing
Two-levelassignmentenablesyoutomakeadifferentiationonlyintheitemization.
The system creates an itemization row under the same cost element for each
assigned origin group.
When you assign the cost component structure, you can transfer these origin
groups in separate cost components.
Recommendation: Whenyouuseconditiontypesinmaterialcosting,youneedto
liaise closely with purchasing.
304
©2009SAPAG.Allrightsreserved. 2009
第 327 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Determining the Vendor
Figure 131: Determining the Vendor I
There can be more than one vendor for a sub-contracted assembly or raw
material/purchased material.
Incosting,astrategysequenceisusedtoselectavendororpurchasinginforecord.
Theselectioncriteriaareasfollows(intheorderspecified):
• Quota arrangement for material.
• Source list for material.
• Purchasing info records.
• Prices of vendors.
305
2009 © 2009 SAP AG. All rights reserved.
第 328 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Figure 132: Determining the Vendor II
Thesystemfirstsearchesforaquotaarrangement. Ifaquotaarrangementexists,
thesystemdeterminesifpermittedvendorsexist. Iftheyexist, thevendorwith
the highest planned quota is selected.
Ifaquotaarrangementorpermittedvendorcannotbefound,thesystemsearches
forasourcelistforthematerial. Ifoneexists,thevendorindicatedasthefixed
supplysourceisused. Ifthereisnosuchvendor,thesystemchecksinCustomizing
toseeifaregularvendorwasdefinedattheplantlevel. Ifonehasbeendefined,
thesystemsearchesthevendorsinthesourcelist. Ifthereisnoregularvendor,the
cheapest vendor in the source list is used.
Datafortheregularvendorismaintainedinthepurchasinginforecord.
Ifthesearch inthesourcelistalsoyieldsno results, thesystemdeterminesif a
regularvendorwasdefinedattheplantlevelinCustomizing. Ifonewasdefined,
the system searches for a regular vendor in the list of all existing vendors. If
there is no regular vendor, the system uses the cheapest of all the vendors to
determine a price.
Afterthevendorisdetermined,thesystemusesthevaluationvarianttoselecta
price from the purchasing info record.
Formoreinformationaboutrawmaterialcosting,seetheProductCostPlanning
section in the SAP Library.
306
©2009SAPAG.Allrightsreserved. 2009
第 329 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Exercise 14: Raw Material Costing
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create a raw material cost estimate
• Maintainthevaluationstrategytoselectpriceinformationfromapurchasing
info record
• Maintain the configuration settings to assign delivery costs to a separate
cost component
Business Example
Theplanningdepartmentasksforadetailedcostestimateforpurchasedmaterials
withtheabilitytoidentifythevariouscostfactorsofapurchasedmaterialusing
thecostcomponentsplit. Youneedtocreatearawmaterialcostestimatetomeet
this requirement.
Task 1:
Toprovideamoredetailedcostcomponentsplit,youneedtousethefeaturesof
RawMaterialCostingtodistinguishthevariousconditionsofprocurementcosts.
Thepurchasingdepartmentnegotiatedapurchasepricefor materialR-T2##. It
also negotiated afreight cost of 5% per one unit.
1. CreateapurchasinginforecordformaterialR-T2##. Thevendoris1000and
isassigned topurchasingorganization1000inplant 1000. Acceptallthe
defaults for the General data.
2. GotopricemaintenanceinPurchasingOrganization1. Enter1pieceasthe
standardquantityandenter20.00EURperpieceasthenetprice.
3. Enter the freight condition FRA1 of 5%.
4. What is the effective price?
5. Savethedataandmakeanoteofthenumberofthepurchasinginforecord.
Task 2:
Displaythecustomizingtablesforrawmaterialcosting.
Select SAP Reference IMG
1. Displaythevaluationstrategyforthevaluationvariant001. Whatisthefirst
sub-strategytodeterminethepurchasinginforecordprice?
Continued on next page
307
2009 © 2009 SAP AG. All rights reserved.
第 330 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
2. Display the assignment of freight conditions to cost components. What
origingroupistheconditiontypeFRA1assignedtoforvaluationview0,
valuation variant 001, Controlling area 1000, Company code 1000, and
valuation area 1000?
3. DisplaytheassignmentoforigingroupFRA1tothecostcomponentlayout
01. TowhichcostcomponentistheorigingroupFRA1assigned? Whatisthe
advantageofassigningthepricingconditionstovariouscostcomponents?
Task 3:
Createa cost estimate for product R-T2##. Select costing variant PPC1, plant
1000,costinglotsize100pieces,andcostingversion4. Acceptthedefaultdates.
Enter the following:
Material: R-T2##
Plant: 1000
Costing variant: PPC1
Costing version: 4
Costing lot size: 100
Accept the default dates by selectingEnter.
ChooseEnter. Thesystemautomaticallyexecutesthecostestimate.
1. Whatis the error statusof your cost estimate?
2. ThecostingresultofR-T2##isshownintheitemizationreport. Whatitems
are included in the itemization?
3. Display the cost component report. To which cost components have the
purchasepriceand freightcostbeenassigned?
4. Save the result.
308
©2009SAPAG.Allrightsreserved. 2009
第 331 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Solution 14: Raw Material Costing
Task 1:
Toprovideamoredetailedcostcomponentsplit,youneedtousethefeaturesof
RawMaterialCostingtodistinguishthevariousconditionsofprocurementcosts.
Thepurchasingdepartmentnegotiatedapurchasepricefor materialR-T2##. It
also negotiated afreight cost of 5% per one unit.
1. CreateapurchasinginforecordformaterialR-T2##. Thevendoris1000and
isassigned topurchasingorganization1000inplant 1000. Acceptallthe
defaults for the General data.
a) Menu → Logistics → Materials Management → Purchasing →
MasterData→InfoRecord→Create(ME11)
Enter the following:
Vendor: 1000
Material: R-T2##
Purchasing Org: 1000
Plant: 1000
Info Category: Standard
Choose Enter.
2. GotopricemaintenanceinPurchasingOrganization1. Enter1pieceasthe
standardquantityandenter20.00EURperpieceasthenetprice.
a) Choose the Purch. org. data 1 button.
Enter 1 as the standard quantity.
Enter 20.00 EUR as the net price.
3. Enter the freight condition FRA1 of 5%.
a) Choose conditions.
Enter condition type FRA1.
Enter an amount of 5%.
Clickthegreenarrowtogoback onescreen.
4. What is the effective price?
a) TheeffectivepriceisdisplayedatthebottomofthePurch. org. data
1screen. Theeffective priceis21.00EUR.
Continued on next page
309
2009 © 2009 SAP AG. All rights reserved.
第 332 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
5. Savethedataandmakeanoteofthenumberofthepurchasinginforecord.
a) Thenumberofthepurchasinginforecordis530000####.
Task 2:
Displaythecustomizingtablesforrawmaterialcosting.
Select SAP Reference IMG
1. Displaythevaluationstrategyforthevaluationvariant001. Whatisthefirst
sub-strategytodeterminethepurchasinginforecordprice?
a) FromtheIMGnodeMaterialCostEstimatewithQuantityStructure
CostingVariantComponents→DefineValuationVariants
Select Valuation Variant 001.
ThefirstpriorityistheQuotationPriceviaConditionTable.
2. Display the assignment of freight conditions to cost components. What
origingroupistheconditiontypeFRA1assignedtoforvaluationview0,
valuation variant 001, Controlling area 1000, Company code 1000, and
valuation area 1000?
a) Select Delivery Costs in the Material Valuation tabbed page of
valuation variant 001.
TheconditiontypeFRA1isassignedtotheorigingroupFRA1.
3. DisplaytheassignmentoforigingroupFRA1tothecostcomponentlayout
01. TowhichcostcomponentistheorigingroupFRA1assigned? Whatisthe
advantageofassigningthepricingconditionstovariouscostcomponents?
a) From theIMGnode Product Cost Planning
Basic Settings for Material Costing → Define Cost Component
Structure
Select Cost Component Structure 01.
Double click on the dialog Assignment: Cost Component – Cost
Element Interval
Origin group FRA1 is assigned to Cost Component 25, Freight
Costs. Theadvantageofassigningpricingconditionstovariouscost
components is that the cost component split can reflect the various
factorsof raw material procurement costs.
Continued on next page
310
©2009SAPAG.Allrightsreserved. 2009
第 333 页 / 共 537 页
AC505 Lesson: Raw Material Costing
Task 3:
Createa cost estimate for product R-T2##. Select costing variant PPC1, plant
1000,costinglotsize100pieces,andcostingversion4. Acceptthedefaultdates.
Enter the following:
Material: R-T2##
Plant: 1000
Costing variant: PPC1
Costing version: 4
Costing lot size: 100
Accept the default dates by selectingEnter.
ChooseEnter. Thesystemautomaticallyexecutesthecostestimate.
1. What isthe error statusof your cost estimate?
a) SelecttheCostingdatatab. ThestatusshouldbeCostedwithouterrors.
2. ThecostingresultofR-T2##isshownintheitemizationreport. Whatitems
are included in the itemization?
a) Theitemizationreportincludestwoentries,oneforthepurchaseprice
of20EURperpiece,andaseconditemforthefreightcostof5%.
3. Display the cost component report. To which cost components have the
purchasepriceand freightcost been assigned?
a) Click the Cost Component report icon.
Thecostcomponent010,RawMaterialsincludesthepurchasecostof
20EURperpiece. Thecostcomponent025,FreightCostsincludesthe
freight condition of 5% per piece.
4. Save the result.
a) Savethecostestimatewithalloptionsselected.
311
2009 © 2009 SAP AG. All rights reserved.
第 334 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Lesson Summary
You should now be able to:
• AccessthePurchasingdataforrawmaterialcosting
• Use cost components to distinguish between different elements of the
procurement costs for purchasing
312
©2009SAPAG.Allrightsreserved. 2009
第 335 页 / 共 537 页
AC505 Lesson: Scrap
Lesson: Scrap
Lesson Overview
This lesson explains how to distinguish between various scrap categories and
describes how they affect the cost of materials and production activities. It
explains how to maintain the scrap rate for an assembly. It also explains how
toexecuteacostestimatethatincludesassemblyscrapandcomparetheresults
of two cost estimates.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Distinguishbetweenthedifferentscrapcategoriesandhowtheyaffectthe
cost of the materials andproductionactivities
• Maintain the scrap rate for an assembly
• Executeacostestimatethatincludesassemblyscrap
• Compare the results of two cost estimates
Business Example
In a few manufacturing processes, scrap is an unavoidable event that must be
consideredduringplanning. Inordertocreateastandardcostfortheseproducts
that includes the scrap value, you need to maintain planned scrap rates in the
appropriate master data and include these planned scrap costs in the product
standard. Sinceyourcorporationwillneedtousetheseplannedscrapfields,you
havedecidedtotestsomeofthesescrapfieldsandreviewtheiraffectonthecost
estimates.
313
2009 © 2009 SAP AG. All rights reserved.
第 336 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Scrap Categories
Figure 133: Examples: Planned Scrap
Planned scrap is considered unavoidable scrap and is included in inventory
valuation.
Assemblyscrap: Basedontheassemblyscrap,thesystemincreasesthequantity
to beproduced by thescrap quantity calculated.
Example: Assumethatthequantity to beproducedis200units. If youspecify
assembly scrap as 10%, the scrap quantity is 20 units. The actual quantity
produced is then 220 units. The system increases the lot size and the quantity
of input materials.
Component scrap: Component scrap is used in MRP to determine the input
quantitiesofcomponents. WhentheBOMisexploded,thesystemincreasesthe
inputquantitiesofcomponentsbythescrapquantitycalculated.
Example:
• Input quantity: 200 units
• Component scrap: 10%
• Scrap quantity: 20 units
• Quantity used: 220 units
314
©2009SAPAG.Allrightsreserved. 2009
第 337 页 / 共 537 页
AC505 Lesson: Scrap
Figure 134: Scrap Categories and their Effects
Operationscrap: Percentageofscrapthatoccursfortheoperation. Thisscrap
resultsinadropinthequantityofthenextoperation,becausethequantitytobe
processedisreducedbythescrap. Thereductioninquantityistakenintoaccount
in scheduling and the cost estimate.
ComponentscrapintheBOM:IfcomponentscrapwasenteredintheBOM,the
specifiedvalueapplies. Ifnot,thevalueinthematerialmasterrecordapplies.
315
2009 © 2009 SAP AG. All rights reserved.
第 338 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Planned Scrap and Itemization
Figure 135: Planned Scrap on the Output Side
Itisimportanttounderstandthedifferencebetweenassemblyscrapandoperation
scrap.
Operationscrapreferstolossesthat occurat individualworklevels. Assembly
scrapisrequiredinMRPtoincreasethestartingquantitysothattherequiredyield
isoutputdespitelossesresultingfromsub-standardassemblies.
Figure 136: Updating Assembly Scrap
316
©2009SAPAG.Allrightsreserved. 2009
第 339 页 / 共 537 页
AC505 Lesson: Scrap
Thereisonlyonefieldin thematerial master for assembly scrap. Youneed to
choosearoutingusingwhichyouwillupdatetheassemblyscrap.
Figure 137: Planned Scrap in the Itemization
Figure 138: Scrap in Detail
317
2009 © 2009 SAP AG. All rights reserved.
第 340 页 / 共 537 页
Unit8: FurtherValuationMethods AC505
Figure 139: Itemization Without Scrap
Figure 140: Component Scrap
318
©2009SAPAG.Allrightsreserved. 2009