第 43 页 / 共 537 页
AC505 Lesson: Base Planning Objects
Solution 1: Base Object Costing
Task 1:
The engineering department informs you that the new product proposal is for
a pump, the data structures of which are similar to those of an existing base
planning object.
1. Createabaseplanningobjectforthenewproduct. Namethebaseplanning
objectPump_##. CreatethecostestimateusingthebaseunitofmeasurePC.
Assigncostelement892000becausethepumpwillbeafinishedproduct. It
willbemanufacturedinplant1000,whichbelongstocompanycode1000.
EnterthecostingsheetCOGS,whichwillcalculateoverheadtothelevelof
thecostofgoodssold. Enteranameandashortdescriptionfortheproduct
and the purpose of simulation costing.
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCostPlanning→ReferenceandSimulationCosting→Create
Base Planning Object (KKE1)
Controlling area: 1000
Base planning object: Pump_##
Select Enter.
Base unit of measure: PC
Cost element: 892000
Company code: 1000
Plant: 1000
Costing sheet: COGS
Enter a name and description.
2. Aftermaintainingthebasicdataforthebaseplanningobject,createthecost
estimatewiththelotsizeas100. Whichcostingvariantisavailable?
a) Click the Calculator icon (CreateCost Estimate) in the toolbar.
ThecostingvariantforReferenceandSimulationCostingisPG.
Enteralotsizeof100piecesandselectEnter.
Continued on next page
33
2009 © 2009 SAP AG. All rights reserved.
第 44 页 / 共 537 页
Unit2: ReferenceandSimulationCosting AC505
3. Afterevaluatingtheinformationprovidedbyengineering,youdecidethat
themostefficientwaytocreatethecostestimateistousetheexistingbase
planningobjectcostestimateforpumpP-100(pumpGGstandard). Enter
100unitsunderitemcategoryBtoyourbaseplanningobject,andexplode
them to one level.
a) Inthelistscreenoftheunit costestimate, select itemcategoryB
(base planning object).
Resource: P-100
Quantity: 100
Select Enter.
ChooseFunctionsandthenExplodeBasePlanningObject.
No. of levels: 1
SelecttheitemP-100 and chooseExplode.
ContinuepasttheinformationmessagebyselectingEnter.
Task 2:
Engineeringinformsyouthatthereareadditionalmachinerequirementsinvolved
in the production of the new pump. To include these in the base object cost
estimate,youneedtoaddanadditionalinternalactivitytothecostestimate.
1. Add a new item for the additional machine requirements. Engineering
informs you that the additional machine hours (activity type 1420) are
required at work center 1310 of production plant 1000. To produce 100
pumps,anadditionalthreehoursarerequired. Enterthisnewitemusingthe
detail screen (double-click on theinput line).
a) Placethecursoronthenextavailableitemandclickthemagnifying
glass(detailscreen) icon in the toolbar.
Item category: Internal activity
Activity type: 1420
Quantity: 3
Work center: 1310
Plant of work center: 1000
Select Confirm and continue past the information message by
pressing Enter..
Select Confirm again.
Continued on next page
34
©2009SAPAG.Allrightsreserved. 2009
第 45 页 / 共 537 页
AC505 Lesson: Base Planning Objects
2. Checkthecostingiteminformationtomakesurethatcostcenter4230(Pump
Assembly)isassignedtoworkcenter1310. Usingtheexplanationfacilities,
displaythepriceforcostcenter/activitytype4230/1420inordertoanalyze
the result of the unit cost estimate.
a) Selecttheinternalactivityyoucreatedintheearlierexercise,place
the cursor onthe row, and click theicon i (Information on Cost
EstimateItem)inthetoolbar. Navigatetotheworkcenter,andin
thecostingtabchecktomakesurethatcostcenter4230Assembly
Pumps isassigned to work center1310.
Close the work center display and return to the explanation
facilities. Navigate to the price for cost center/activity type
4230/1420.
Total price: _______ (EUR)
Navigate to the price unit by clicking the Period Screen icon in
the tool bar.
Price unit: _______
To view the Activity Unit, go back to the Overview screen and
change the display layout to include the activity unit field or
navigate to the activity type master data record by placing the
cursoronthefieldforactivitytype1420andclickingthemaster
databuttonfromthetoolbar. Clickthebasicdatatab.
Activity unit: ______ (H)
Exittheoverviewscreenandexittheexplanationfacilities.
Continued on next page
35
2009 © 2009 SAP AG. All rights reserved.
第 46 页 / 共 537 页
Unit2: ReferenceandSimulationCosting AC505
Task 3:
Thenewpumpshouldbespeciallydesignatedasnew. Astickerisaffixedtoeach
pumpforthispurpose. AmaterialmasterhasnotbeencreatedintheSAPERP
system, becausethestickersare not yet in stock.
1. Toincludethecostsofthestickerinthebaseobjectcostestimate,createa
variableitemusingcostelement400000. Yourvendorprovidesthestickers
inapackingunitof10piecesat30EURsperunit. Notethatthelotsizefor
the new pump cost estimate is 100.
a) In the next free row, create an item with category V (variable)
and enter the following:
Quantity: 100
Unit: PC
Description: Pump stickers_##
Price total: 30
Price unit: 10
Cost element: 400000
Confirmyourentriesby pressing Enter.
Task 4:
Variousservicesareplannedinlinewiththewarrantyforthenewproduct. Costs
are consequently incurred for the warranty at order acceptance. Travel costs
shouldbeincludedinthewarrantyestimate, becauserejectedpumpsshouldbe
checkedon-siteatcustomers'premises. Thewarrantyspecifiesthatcomponents
thatarefoundfaultywithinthewarrantyperiodshallbereplacedfreeofcharge.
Thisservicepackageisofferedwithothernewproducts. Consequently,youneed
tocreateaseparatebaseplanningobjectfortheservicepackagetobeintegrated
with the cost estimatefor the pump and exploded in the cost estimate. At this
stage,theestimatedcostsarisingfromthewarrantyneedtobecalculated.
1. Createanewsessiontocreateabaseplanningobjectfortheservicepackage
called Service_##. Choose PC for the base unit of measure, and enter
company code1000, plant 1000, and cost element 476900 (Other Costs)
for the lot size 1.
Enterthetimefortheorderacceptancethatwillbecompletedbycostcenter
4279(ExternalServices). Thedurationoftimewillbe1laborhour(activity
type 1421).
Enter the travel costs as a variable item with cost element 476900. An
estimated15hoursoftraveltimeisrequiredatEUR150perhour.
Continued on next page
36
©2009SAPAG.Allrightsreserved. 2009
第 47 页 / 共 537 页
AC505 Lesson: Base Planning Objects
Also, engineering estimates that an average of three materials will be
replacedunderthewarrantyforapriceofEUR1,000perunit. Enterthisasa
variableitemundercostelement400000. Savethebaseplanningobject.
a) CreateanewsessionbychoosingeitherSystem→Createsessionor
the icon Creates a new session.
Menu→Accounting→Controlling→ProductCostControlling→
Product Cost Planning → Reference and Simulation Costing →
Create Base Planning Object (KKE1)
Base planning object: Service_##
Select Enter.
Base unit of measure: PC
Cost element: 476900
Company code: 1000
Plant: 1000
Enter a name and a description.
Click the icon Calculator (Create Cost Estimate) in the toolbar.
SelectcostingvariantPG,enteralotsizeof1,andchooseEnter.
Foritem1,selectitemcategoryE(internalactivity).
Resource: 4279
Plant/activity: 1421
Quantity: 1
Confirm with Enter.
Foritem2,selectitemcategoryV(variableitem).
Quantity: 15
Unit: H
Description: Travel costs
Price total: 150
Price unit: 1
Cost element: 476900
Confirm with Enter.
Foritem3,selectitemcategoryV(variableitem).
Quantity: 3
Continued on next page
37
2009 © 2009 SAP AG. All rights reserved.
第 48 页 / 共 537 页
Unit2: ReferenceandSimulationCosting AC505
Unit: PC
Description: Materials cost
Price total: 1000
Price unit: 1
Cost element: 400000
Confirm with Enter.
Save your unit cost estimate entries.
Savethemasterdataofthebaseplanningobject.
2. Go back to the base planning object for your pump and add the service
packageusageforyour100pumpsviaitemcategoryB.Youestimatethat
it will require 1 service package per 100 pumps. Using the explanation
facilities,displaythecostestimatefortheservicepackage.
a) Gotothesessioninwhichyoucreatedthebaseplanningobjectfor
the pump and select item category B (base planning object) in
the next available row.
Resource: Service_##
Quantity: 1
Confirm your entries with Enter.
Select theitem row, and click thesymbol i (Informationon cost
estimateitem)inthetoolbar. Navigateintheexplanationfacilities
for the base planning object to access the cost estimate for the
service package.
Exit the display of the cost estimate and exit the explanation
facilities.
3. Inorderto includethedetail oftheindividuallineitemsfromtheservice
packageusethefunctionExplodeBasePlanningObjecttolisttheservice
items in the spreadsheet.
a) ChooseFunctionsandthenExplodebaseplanningobject. Select
thelinecontainingthewarrantyservicebaseplanningobject.
No. of levels:1
SelecttheitemService_##andchooseExplode.
Continued on next page
38
©2009SAPAG.Allrightsreserved. 2009
第 49 页 / 共 537 页
AC505 Lesson: Base Planning Objects
Task 5:
Engineering now informsyou that thereareno further costs for the prototype.
Sinceyouhavetopresentthecostingresultstoyourcompanymanagement,you
arelooking for suitable reportsand evaluations for thecost estimate. You will
use the Information System for this.
1. Sincecostingisnowcompleted,saveyourresults. Whenyousavethecost
estimate,thesystemautomaticallyappliesoverheadbecauseyouenteredthe
COGScostingsheet inthemaster dataofthebaseplanningobjectforthe
pump. Call up the cost estimate again by choosing thecalculator symbol
in the toolbar. Theresult of the overhead application is listed using item
category G.
a) SavethecostingresultsbychoosingtheSavesymbolinthetoolbar
or by choosing Costing → Save.
Click the calculator (Process Cost Estimate Further) symbol to
displaytheresultoftheoverheadapplication(itemcategoryG).
Remaininthelistscreenoftheunitcostestimate.
2. Without going into reporting, you can obtain an initial overview of the
costingresultbychoosingPrintinthelistscreenoftheunitcostestimate.
Whatarethetotalcostsforthenewpump? Chooseanotherlayoutthatdoes
notgrouptheitemsbyeitheritemcategoryorcostelement.
Whatistheamountofthematerialcostsforthecostestimate? Todetermine
thischooseareportlayoutthatgroupstheitemsbytheitemcategory.
Choosethereportlayoutthatgroupsthecostsbycostelementanddetermine
whichcostelementrepresentstheconsumptionofsemi-finishedproducts.
Continued on next page
39
2009 © 2009 SAP AG. All rights reserved.
第 50 页 / 共 537 页
Unit2: ReferenceandSimulationCosting AC505
Save the base planning object.
a) Choose Costing → Print.
Click the symbolSelect layout inthe toolbarand then select the
displaylayout1SAP02Costingitems(overview). Thetotalcostis
__________ EUR (100 pumps).
Click the symbolSelect layout inthe toolbarand then select the
displaylayout1SAP01Itemcategories(grouped).Thematerialcost
is __________EUR (100 pumps).
ClickthesymbolSelectlayoutinthetoolbarandthenthedisplay
layout 1SAP09Cost elements (grouped).
Theconsumption of thesemi-finishedproductisrepresented by
cost element 890000.
Exit thereport displayand theunit cost estimatelist screen and
savethecostestimateandmasterdataforPump_##.
3. Forthepresentation, gointotheobjectlist intheInformationSystemand
chooseanoverviewofthebaseplanningobjectPump_##. Fromthislistgo
to the costed multilevel BOM which will display the materials for your
baseplanningobject. Changethereportsettingstodisplayallitemsofyour
base planning object.
a) Menu→Accounting→Controlling→ProductCostControlling→
Product Cost Planning → Information System → Object List →
For Base Planning Object→Overview of Base Planning Objects
(S_ALR_87013028)
Base Planning Object: Pump_##
ClickExecuteinthetoolbartocallthereport.
Go to the Costed Multilevel BOM by clicking the icon Display
Cost Estimate.
CallthelistbychoosingSettings→ShowAllItems.
Continued on next page
40
©2009SAPAG.Allrightsreserved. 2009
第 51 页 / 共 537 页
AC505 Lesson: Base Planning Objects
4. Defineyourownlayoutbyaddingthefieldsforfixedandvariablevalues.
Inaddition,movethefixedandvariablevaluefieldstothethirdandfourth
column. Savethispersonallayout,andmaintainanameanddescriptionfor
thelayout. Assignthelayout nameAC505_##.
a) Click the icon Change Layout.
IntheColumn Setlist, selecttheFixedvalueand Variablevalue
fieldsandshowthem. Adjustthecolumnpositionbyselectingthe
columnname,anddragginganddroppingittothecorrectposition.
Tosavethelayout,clicktheTransfer(enter)iconandthentheSave
layouticon. Enterthe layout name AC505_##, activatetheuser
specificcheckboxandaddadescription. ClicktheSavelayouticon.
b) Exit the report.
41
2009 © 2009 SAP AG. All rights reserved.
第 52 页 / 共 537 页
Unit2: ReferenceandSimulationCosting AC505
Lesson Summary
You should now be able to:
• Describe base planning objects
• Explain the information system
• Describe the explanation facilities
42
©2009SAPAG.Allrightsreserved. 2009
第 53 页 / 共 537 页
AC505 Unit Summary
Unit Summary
You should now be able to:
• Explainthepurposeofthecostingvariantforproductcostplanning
• Identifytheitemcategoriesavailableforcostplanning
• Describe base planning objects
• Explain the information system
• Describe the explanation facilities
43
2009 © 2009 SAP AG. All rights reserved.
第 54 页 / 共 537 页
UnitSummary AC505
44
©2009SAPAG.Allrightsreserved. 2009
第 55 页 / 共 537 页
AC505 Test Your Knowledge
Test Your Knowledge
1. Thecontrolparametersinthecostingvariantandthesettingsdonotdepend
onwhetherornotyoucreateamaterialcostestimateorbaseobjectestimate
planning.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
2. itemsareusedbythesystemtocalculatetotalsforrows.
Fillintheblankstocompletethesentence.
3. Therearetwooptionsforenteringcostingitemsinunitcosting: listscreen
and screen.
Fillintheblankstocompletethesentence.
4. Write a short note on display variants.
5. Howdotheexplanationfacilitieshelpthecostplanner?
45
2009 © 2009 SAP AG. All rights reserved.
第 56 页 / 共 537 页
TestYourKnowledge AC505
Answers
1. Thecontrolparametersinthecostingvariantandthesettingsdonotdepend
onwhetherornotyoucreateamaterialcostestimateorbaseobjectestimate
planning.
Answer: False
Thecontrolparametersinthecostingvariantandthesettingsaredependent
on whether or not you create a material cost estimate or a base object
estimate planning.
2. Totalitemsareusedbythesystemtocalculatetotalsforrows.
Answer: Total
3. Therearetwooptionsforenteringcostingitemsinunitcosting: listscreen
and detail screen.
Answer: detail
4. Write a short note on display variants.
Answer: Displayvariantsenableyoutocreatereportcolumnsandsavethem
underadisplayvariant. Thefollowingfunctionsareavailable: Sort,display
sum,subtotal,andfilter. Ifrequired,youcanalsosavethesesettingsunder
thedisplayvariant. TheSAPdisplayvariantsareusedasthedefault.
5. Howdotheexplanationfacilitieshelpthecostplanner?
Answer: Theexplanationfacilitiesenablethecostplannerto:
• Quicklyaccessdataandinformationinthecostingenvironment.
• Remaininthecostestimateortheanalysiswhileaccessingtheabove
data.
46
©2009SAPAG.Allrightsreserved. 2009
第 57 页 / 共 537 页
第 58 页 / 共 537 页
第 59 页 / 共 537 页
Unit 3
Material Costing Without Quantity
Structure
Unit Overview
Thisunitexplainshowtomaintainanddescribetherequiredentriesinthematerial
master. It also explains how to execute a single-level unit cost estimate for
materialsandamulti-levelunitcostestimateformaterials. Theunitalsoprovides
informationaboutthethreetypesofcostingresultsforamaterialcostestimate.
Unit Objectives
After completing thisunit, you will beableto:
• Definethemostimportantmaterialmasterviewsformaterialcosting
• Describe the fields relevant to costing
• Describe prices in material master
• Executeasingle-levelcostestimatefor materials
• Executeamulti-levelunitcostestimateformaterials
• List the basicstepsof multi-level unit costing
• Define and describe the three types of costing results for a material cost
estimate
• Explainthecostingstructureforenhancedefficiency
• Describe the global cut and pastefunction
• Explain how to use global filters
• Define and implement worklists
Unit Contents
Lesson: Material Master ........................................................48
Lesson: Unit Cost Estimates...................................................54
Lesson: Enhanced Efficiencies for Multi-Level Unit Cost Estimates......64
Exercise 2: Multilevel Unit Costing........................................73
Exercise 3: Optional Exercise: Multi-level Unit Costing with
Worklists......................................................................79
47
2009 © 2009 SAP AG. All rights reserved.
第 60 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Lesson: Material Master
Lesson Overview
ThislessonprovidesanoverviewoftheorganizationalstructuresforMaterialCost
Estimates. Italsodescribesmaterialmasterviews,prices,andfieldsrelevantto
costing.
Lesson Objectives
After completingthislesson, you will beable to:
• Definethemostimportantmaterialmasterviewsformaterialcosting
• Describe the fields relevant to costing
• Describe prices in material master
Business Example
ManagementdecidestoincludethepumpthatyoualreadycostedusingReference
and Simulation Costing in the production program. The Cost Of Goods
Manufactured(COGM)andCostOf GoodsSold(COGS) shouldbecalculated
before you can create the final BOMs and routings. You need to study and
understandthecostingandaccountingviewsofmaterialmaster,becauseamaterial
masterrecordalreadyexistsforthenewpumpintheSAPERP.
48
©2009SAPAG.Allrightsreserved. 2009
第 61 页 / 共 537 页
AC505 Lesson: Material Master
Organizational Structures for Material Cost Estimates
Figure22: OrganizationalStructuresforMaterialCostEstimates
Materialcostestimatesaresavedwithreferencetoaplant.
• Example: Productsproduced inmorethanoneplant havea separatecost
estimate for each plant.
TovaluematerialmovementsinLogistics,thesystemaccessesthecostingresults.
The valuation areadeterminestheorganizational level atwhichthematerial is
valuated. Tousematerialcosting,itismandatorythatyouestablisheachplantas
a valuation area.
49
2009 © 2009 SAP AG. All rights reserved.
第 62 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Views in the Material Master
Figure 23: Views in the Material Master
Thesynonymsforthetermmaterialmasterarematerial, itemmaster,product,
and assembly.
ThematerialmasterisdescribedindetailinMaterialsManagement(MM)courses.
In costing, the material master is involved in the calculation of material costs
and updating prices.
TheAccounting,Costing,andMRPviewsarerelevanttocosting.
• Accounting view:
– Relevant to material valuation, material price control, and account
determination
• Costing view:
– Containscontrolparametersformaterialcosting
– AlsocontainscharacteristicsrequiredforCostObjectControlling
– TheCostingviewshouldbemaintainedtobeabletocostamaterial.
• MRP view:
– Material status in PP
– Scrap factors
– Special procurement
– Indicators: Co-product/Bulk material
– Production version
50
©2009SAPAG.Allrightsreserved. 2009
第 63 页 / 共 537 页
AC505 Lesson: Material Master
Costing and Accounting Views of Material Master
Figure 24: Material Master: Fields Relevant to Costing
Thematerial typedetermineswhether acostingviewisallowed for amaterial.
Thematerialtypecontainsdefaultvaluesthatareusedwhenamaterialiscreated.
Lotsize. Thelotsizeenteredhereisusedasthedefaultvalueforthematerialcost
estimate. Thelotsizecanbeoverwritteninindividualprocessing. It cannot be
overwritten in mass processing.
Valuation class. The valuation class controls account determination. The
consumption account is determined, which also appears as the primary cost
element in the itemization.
Origingroupassubgroupofacostelement. Ifanorigingroupisenteredfora
material,thecombinationoforigingroupandcostelementisupdatedintheCO
system. You can thus define the following:
• Overheadforspecificmaterialgroups,suchasinputmaterialgroups
• Costcomponentsfor specificrawmaterial groups
Overheadgroup: Keythatgroupsmaterialsmanufacturedforthesametypeof
overhead application, based on the product.
51
2009 © 2009 SAP AG. All rights reserved.
第 64 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure 25: Material Master: Prices
Planned Prices 1, 2 and 3: These can be maintained for raw materials and
purchasedpartsandusedtovaluatematerialsinthecostestimate.
Tax-basedandcommercialprices:Thesepricesareenteredforpurchasedparts
ininventorycostingtodeterminevaluessuchasthelowestvalue. Aninventory
costestimatecanusethesepricesforvaluationandthenupdatethecostingresults
for finishedandsemi-finishedproductsinthesefields.
Pricecontrol: Indicatorforpricecontrolaccordingtowhichtheinventoryofa
materialisvaluated. Thefollowingoptionsareavailable:
• Standard price
• Moving average price
Astandardcostestimatecanbeusedtoupdatethestandardprice.
Youcanbranchfromtheaccountingandcostingviewstotheresultsofstandard
costestimates. Theseresultsupdatethestandardprice.
52
©2009SAPAG.Allrightsreserved. 2009
第 65 页 / 共 537 页
AC505 Lesson: Material Master
Lesson Summary
You should now be able to:
• Definethemostimportantmaterialmasterviewsformaterialcosting
• Describe the fields relevant to costing
• Describe prices in material master
53
2009 © 2009 SAP AG. All rights reserved.
第 66 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Lesson: Unit Cost Estimates
Lesson Overview
Thislessonexplainssingle-levelunit costing. It alsodescribesmulti-levelunit
costing and its layout. It also explains the three types of costing results for a
material cost estimate.
Lesson Objectives
After completingthislesson, you will beable to:
• Executeasingle-levelcostestimatefor materials
• Executeamulti-levelunitcostestimateformaterials
• List the basicstepsof multi-level unit costing
• Define and describe the three types of costing results for a material cost
estimate
Business Example
Themanagementofyourcompanydecidestoincludethepumpthatyoucosted
using Referenceand Simulation Costing in theproduction program. TheCost
OfGoodsManufactured (COGM)and CostOfGoodsSold(COGS) should be
calculated before you can create the final BOMs and routings. You will use
material costing without quantity structure by incorporating the existing base
planningobject,becauseamaterialmasterrecordalreadyexistsforthenewpump
intheSAPERP.Fortechnicalreasons,engineeringisdebatingwhetherornotto
useasteelflywheelinsteadofanormalone. Youneedtosimulatetheproposed
change using multi-level unit costing.
54
©2009SAPAG.Allrightsreserved. 2009
第 67 页 / 共 537 页
AC505 Lesson: Unit Cost Estimates
Single-level Unit Costing
Figure 26: Single-level Unit CostEstimate fora Material
Materialcostingwithoutquantitystructureisdesignedtocostmaterialswithout
accessingBOMsand/orroutings. Thecostingresultscanbewrittentopricefields
in the material master.
IfBOMsorroutingsdonotexist,youcanmanuallyentertheitemsthatrepresent
thequantitystructureandvaluethemwiththecostestimate.
Price selection and overhead calculationaredetermined automatically and are
basedonthevaluationvariantthatisassignedtothecostingvariant.
Youcanusematerialcostingwithoutquantitystructure:
• Whencostingandupdatingpricesfornewmaterials
• Whenyouwanttoperformcostingusingnon-SAPproductionplanningdata
55
2009 © 2009 SAP AG. All rights reserved.
第 68 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure 27: Single-level Unit Costing
Enterthematerialandplantforwhichthecostestimateshouldbecreated.
Select a costing variant:
• When you select the costing variant, you establish the valuation strategy
for costing items
• Also,thecostingvariantproposesvaliditydatesforthecostingvariantand
valuation datesfor materialand activity prices
• Ifyoudonotenteralotsize,thesystemusesthelotsizefromthematerial
master.
Acostestimateheaderiscreatedautomatically. Thiscanbeusedto:
• Change the lot size
• Enter various text
Whenyousavethecostingitems,theoverheadandprocesscostsarecalculated
automatically. Theitemizationand costcomponent split arethen availablefor
analysis.
After saving the costing items , the material cost estimate is updated to the
database.
56
©2009SAPAG.Allrightsreserved. 2009
第 69 页 / 共 537 页
AC505 Lesson: Unit Cost Estimates
Multi-level Unit Costing
Figure 28: Multi-level Unit Costing: Basic Scenarios
Multi-level unit costing is a highly flexiblescreen that allows the hierarchical
structureeditingofbaseplanningobjectsandmaterialswithoutbillsofmaterial
androutings. Single-levelunitcostingonlysupportseditingasinglebaseplanning
object or material.
Multi-levelunitcostingcanbeusedinthefollowingscenarios:
Scenario 1: New product
• Youarecreatingnewmaterialmastersorcostestimatesfornewmaterials.
• As a rule, you create the structurefrom top to bottom by making further
refinements.
Scenario 2: Similar product
• Youwanttocostanewproductthatissimilartoanexistingone. Youcan
copy the subordinate structure to the new product and make changes to
the new (copied) structure.
Scenario 3: Product changes
• Youwanttomakechangestoanexistingproduct.
• Copytheexistingcostestimateandmakechangestothecopy.
57
2009 © 2009 SAP AG. All rights reserved.
第 70 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure29: Example: MaterialCostEstimateWithoutQtyStruct.
Prerequisite: Material master with costing view (accounting view also
recommended).
Selecting the costing variant:
• When you select the costing variant, you establish the valuation strategy
for costing items
• ThecostingvariantismaintainedinCustomizingformaterialcosting
• Youenterthecostinglot sizetobeusedasabase
Acostestimateheaderiscreatedautomatically. Thiscanbeusedto:
• Change the lot size
• Enter various text
If you drag-and-drop a different material cost estimate from the worklist, the
system prompts you to specify if you want to insert the original cost estimate
or make a copy. Subsequent changes in thecopied structure do not affect the
original cost estimate.
Enterthemissingquantityinthelistscreenoftheunitcostestimate.
Ifyouaregoingtoeditanentirechangepackage,youshouldrevaluatethewhole
structure to maintain a consistent status.
Aftersaving,thecostestimateisupdatedinthedatabase.
58
©2009SAPAG.Allrightsreserved. 2009
第 71 页 / 共 537 页
AC505 Lesson: Unit Cost Estimates
Figure 30: Layout of Multi-level Unit Costing
Thescreenformulti-levelunitcostingisdividedintothreeareas:
• Costing structure
Thesystemcansimultaneouslydisplayandprocessacostedmulti-levelBOM,
multiplematerialcostestimates(withandwithoutquantitystructure), andbase
planningobjectsin the costing structure. Thestructure enables you to quickly
editinacomplexhierarchyand providesfast overview. Italsooffersthesame
analytical possibilitiesasthecostedmulti-levelBOM.
• Unit cost estimateorcost estimate header
Forbaseplanningobjectsandmaterialcostestimateswithoutquantitystructure,
theunitcostestimatelistscreenisdisplayed. Youcanusethemethodsdescribed
intheReferenceandSimulationCostingunit. Youcanalsoalternatebetweenthe
costestimateheaderandthelistscreen. Afterthechangesaremade,thecosting
structure is automatically updated.
• Worklist or detail lists
The worklist is designed so that frequently-used structures and resources are
availabletothecostplanner. Youcandraganddropsubstructuresandindividual
costingitemsfromtheworklisttothecostestimateinthecostingstructure. This
functionalsoworksinthereversedirection. Or,youcanusethisareatoprepare
reportsfor analyticalpurposesor displayerror logs.
Costing Results
Cost Estimate Results: Itemization
59
2009 © 2009 SAP AG. All rights reserved.
第 72 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Cost EstimateResults: Costed Multilevel
Cost EstimateResults: Cost Component Split
Figure 31: Cost Estimate Results: Itemization
Costing results can be displayed and saved as an itemization. The report can
includethe cost element assigned to each item.
Theitemizationprovidesdetaileddataabouttheresourcesrequired toproduce
a product. The costing information for each item includes details such as the
quantity, unit of measure, and value.
Examples:
• The following data isstored for amaterial:
– Material and text
– Plant
– Quantity used
– Price of material
• Thefollowingdataisstoredforaninternalactivity:
– Cost center and text
– Quantity used
– Activity type
– Price
60
©2009SAPAG.Allrightsreserved. 2009
第 73 页 / 共 537 页
AC505 Lesson: Unit Cost Estimates
Figure 32: Cost EstimateResults: CostedMultilevel BOM
TheCostedMultilevelBillofMaterialreportprovidesahierarchicaloverviewof
the value added for each assembly item.
Thedisplayofcostsforeachcomponent(assembliesandinputmaterials)inthe
costed multi-level BOM is based on the structure and content of the BOM for
the costed material.
Youcanalsodisplayotheritemssuchasmanufacturingactivitiesandoverhead
costs.
Figure 33: CostEstimate Results: CostComponentSplit
61
2009 © 2009 SAP AG. All rights reserved.
第 74 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
The cost component split groups cost elements in cost components. When a
multi-level structureis costed, the cost component splitis rolledupsothat the
originalidentityofthecostsfromthelowerlevelsisretainedforanalysis.
Foreachproduct,thecostcomponentsplitprovidesinformationabout:
• The value addedof thematerial (upper level)
• ThecostsofsubordinatematerialsintheBOM(lowerlevel)
Thecostcomponentsplitisavailableformaterialcostestimateswithandwithout
quantity structure.
62
©2009SAPAG.Allrightsreserved. 2009
第 75 页 / 共 537 页
AC505 Lesson: Unit Cost Estimates
Lesson Summary
You should now be able to:
• Executeasingle-levelcostestimatefor materials
• Executeamulti-levelunitcostestimateformaterials
• List the basicstepsof multi-level unit costing
• Define and describe the three types of costing results for a material cost
estimate
63
2009 © 2009 SAP AG. All rights reserved.
第 76 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Lesson: Enhanced Efficiencies for Multi-Level Unit Cost
Estimates
Lesson Overview
Thislessondescribesthecostingstructure,globalcutandpastefunctions,global
filters, and worklistsfor enhanced efficiency.
Lesson Objectives
After completingthislesson, you will beable to:
• Explainthecostingstructureforenhancedefficiency
• Describethe global cut and paste function
• Explain how to use global filters
• Define and implement worklists
Business Example
Themanagementofyourcompanydecidestoincludethepumpthatwasalready
costedusingReferenceandSimulationCostingintheproductionprogram. The
cost of goods manufactured (COGM) and cost of goods sold (COGS) should
becalculated before you can createthefinal BOMsand routings. Engineering
informsyouthatthenewpumpisdefinedinmaterialmaster. Youneedtousethe
WorklistfunctionswithMulti-levelcostingtocompletethisestimate.
64
©2009SAPAG.Allrightsreserved. 2009
第 77 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Costing Structure
Figure 34: Enhanced Efficiency – Costing Structure 1
The costing structure can display one or more cost estimates in the form of a
multi-level BOM. You cannavigate quickly to the detailed information on the
rightofthescreen. Thecostingstructurealsoprovidesthesamereportingfacilities
as the costed multi-level BOM.
Multi-levelunitcostingenablesyoutoeditbaseplanningobjectsandmaterialcost
estimates without quantity structure.
Recommendation: Thefollowingfunctionsareavailabletoenableyoutowork
withmulti-levelunitcostingasefficientlyaspossible:
• Context menu: Access this by placing the cursor on the selected item
(suchasacostestimate)andright-clicking. Variouscontextmenusappear
depending on the object or item selected.
• Buttons in respective areas.
Whenyoustartediting, onlycostestimatesappearinthecostingstructure. You
can also display all the costing items.
Arrowsenableyoutooptimizecolumnwidthstorequirements.
65
2009 © 2009 SAP AG. All rights reserved.
第 78 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure 35: Enhanced Efficiency – Costing Structure 2
Thedrag-and-dropfunctionenablesyoutocopyandreplacecostestimates.
Copying:
Selectacostestimateorpartofoneand“drag”ittotheCostingstructureicon.
Thesystempromptsyoutospecifyinwhichcostingvariantandcostingversion
thecopyshouldbemade. Theresourcesaretransferredtothenewcostestimate
andvaluated accordingto the specifiedcosting variant. Thenewcostestimate
is displayed in the structure. If you do not save it, the copy is created only
temporarily.
Insertion:
Selectacostestimateorpartofoneanddragittotherequiredposition. Thesystem
asksyouifthiscostestimateshouldbeinsertedasanoriginaloracopy. Ifyou
chooseCopy,thesystemautomaticallytakesthesamecostingvariantandcosting
version from the cost estimate in which the insertion is made. If you choose
Original,notethatanychangesyoumakecanaffectotherareaswherethiscost
estimateisused. Youneedtoenterthequantityintheunitcostestimatelistscreen.
Deletion:
The Deletion function deletes an object only from the costing structure. This
meansthatifacostestimateissavedtothedatabase,itcanbereadbythedatabase
atany time. Theonlycost estimatesthatcanbedeleted usingthisfunctionare
thosethathavebeenusedtemporarilyintheworksession.
66
©2009SAPAG.Allrightsreserved. 2009
第 79 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Figure 36: Enhanced Efficiency – Costing Structure 3
Thedefaultvariantprovidedwiththestandardsystemincludesbothstatuses.
The Changed statusenablesthecostplanner to seeif changesin substructures
haveaffectedthehigher levelsof thecost estimateafterrevaluation. Acosting
structureisconsistentwhenallthestatusindicatorsaregreen.
Example: Theabovefigureshowsthefollowingsituation:
Changessuchaspricechangesaremadetothelowestlevel. Thesechangesare
indicatedbythestatus“yellow”. Atthisstage,higherlevelstructuresareyettobe
revaluated. Afterthechanges, thesystemautomaticallysetsthe“red”statusin
allthehigherlevelcostestimatestoindicatethatthechangeshavenotyetbeen
reflected in the higher level costing results.
Revaluation can beperformedfor theentirestructure andsubstructures. Anet
changeisalsoavailable,whichpermitsonlythosehigher-levelstructuresthatare
directly affected by thechangesto berevaluated.
Initially, base planning objects and material cost estimates without quantity
structure have the status yellow, because the system does not knowif thecost
estimate was consistent when it was saved. Revaluation changes the status to
green.
67
2009 © 2009 SAP AG. All rights reserved.
第 80 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure 37: Enhanced Efficiency –Examples ofLayouts
Theabovefigureshowstheflexibilityinthelayoutofmulti-levelunitcosting.
The initial screen shows the basic layout, which displays only the costing
structure. Youcanadaptthelayouttoyourrequirementsatanytimeduringthe
work session, if you:
• Have to make many changes
• Use the worklist frequently
• Need to focus on analysis and reporting
68
©2009SAPAG.Allrightsreserved. 2009
第 81 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Global Functions
Figure 38: Enhanced Efficiency – GlobalCut &Paste
The copy andcut and pastefunctionsfacilitatethetransfer of multiple costing
itemsfromamaterialcostestimatewithoutaquantitystructuretoanotherorfrom
one base planning object to another.
Procedure:
• Navigatetothecostestimatewhoseitemsyouwanttotransfer.
• Select the items and choose Cut.
• Navigate to the cost estimate in which you want to insert theitems. Use
the costing structure.
• In the list screen of the unit cost estimate, select the item in which items
shouldbeinsertedandpastetheitemsfromtheclipboard.
Note: Thequantitiesaretransferredona1:1basis. Theoriginalquantity
ratioofthecostinglotsizetotheresourceinputquantityisnottransferred
to the new costing lot size.
69
2009 © 2009 SAP AG. All rights reserved.
第 82 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
Figure 39: Enhanced Efficiency – Global Filters
Filters: Use the list screen filter to reduce the number of items displayed.
Procedure:
• Selectoneor morecolumns inthelist screen.
• Click the filter icon.
• Enter the filter requirements.
• Ifyouwanttoviewalltheitemsagain,choosetheDeletefilter.
Globalfilters: Thefiltersetforthecostingitemsremainsthesame, evenifyou
navigateinthecostingstructuretoanothercostestimate.
Use filter: This function is accessed through the context menu in the costing
structure. It selects all the nodesin the structure that contain at least one item
corresponding to the filter.
Example: Youaresearchinginacomplexstructureforalltheactivitiesperformed
by cost center XYZ. To do this, you define a suitable filter and apply it to the
costingstructure. Youthennavigatetothehighlightedstructures.
70
©2009SAPAG.Allrightsreserved. 2009
第 83 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Worklists
Figure 40: Enhanced Efficiency – Worklists
Worklist: Theworklistisdesignedsothatfrequently-usedstructuresandresources
are available to the cost planner. You can drag and drop substructures and
individual costing items from the worklist to the cost estimate in the costing
structure.
Folders/containers: Youcancreateprivateorglobalfolders. Foldersarearranged
incontainers. Whenyoucreateacontainer,youcanspecifyifitcontainsaspecific
item category only, such as base planning objects, or whether it can contain
several item categories.
Conversion of container tofolder: If the container becomestoolarge, you can
eithercreateanewoneorconverttheexistingonetoafolder.
Insertion of container contents:
• SelectthecontainernodeinafolderandchooseFindinthecontextmenu.
• Depending on the item category, a range of search help functions are
available.
By double-clicking the selected resources, you can branch to other data, such
as the master data.
Selectedcostestimatesintheworklistaredisplayedasamulti-levelBOM,which
can, in turn, be displayed by double-clicking.
71
2009 © 2009 SAP AG. All rights reserved.
第 84 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
72
©2009SAPAG.Allrightsreserved. 2009
第 85 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Exercise 2: Multilevel Unit Costing
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Edit multilevel unit cost estimates
• Accessanexistingcostestimatefromaworklistandchangethecostingitems
• Usethedetailfunctionsofmultilevelunitcostingefficiently
• Revaluate the costing structure
Business Example
Managementhasdecidedtoincludethepumpthatyouhavealreadycostedusing
ReferenceandSimulationCostingintheproductionprogram. Thecostofgoods
manufactured (COGM) and cost of goods sold (COGS) have to be calculated
beforeyoucancreatethefinalBOMsandroutings. Sinceamaterialmasterrecord
alreadyexistsforyournewpumpintheSAPERPsystem,youwillusematerial
costing without quantity structure by incorporating the existing base planning
object. Fortechnical reasons, engineering isconsideringwhethertouseasteel
flywheelinsteadofanormalone. Theproposedchangeistobesimulatedusing
multilevel unit costing.
Task:
Engineeringhasinformedyou thatthenewpumphasbeendefinedasmaterial
T-FY##. Thepumpwillbeproducedinplant1000inalotsizeof100.
1. Use themultilevel unit costing functions withincosting without quantity
structure, and createamaterial cost estimateforyour materialT-FY##in
plant1000. SelectthecostingvariantSIM1forthesimulationandenter02
astheversion. AcceptthedefaultdatesincostingvariantSIM1.
2. Youfirstwant toincludethecostingitems from thebase planningobject
P-100inyournewpump. AddthebaseplanningobjectP-100tothecosting
estimate for pump T-FY##. Once the base planning object is listed as a
costed iteminthelistscreen, choosethefunctionExplodeBasePlanning
Objectandexplodethebaseplanningobjecttoonelevel.
3. Revaluate the costing structure for pump T-FY##. The resulting costing
statusshouldbeindicatedbyagreentrafficlight.
4. Display thehierarchical structureof your cost estimateby expanding the
costingstructureofyourpump. Navigatetothecostestimateforthebase
planning object 100-100, spiral casing.
Continued on next page
73
2009 © 2009 SAP AG. All rights reserved.
第 86 页 / 共 537 页
Unit3: MaterialCostingWithoutQuantityStructure AC505
5. Return to thecost estimate for T-FY##. Replace theFly wheel, material
100-200, with materialR-B2##. Thequantity isunchanged. Transfer the
change to the costing structure.
6. Revaluate the costing structure for pump T-FY##. The resulting costing
statusshouldbeindicatedbyagreentrafficlight.
7. ReturntothecostestimateforT-FY##. Switchfromthebasicviewofthe
costing items to the header screen and display the itemization report for
the cost estimate.
8. Save the cost estimate.
74
©2009SAPAG.Allrightsreserved. 2009
第 87 页 / 共 537 页
AC505 Lesson: EnhancedEfficienciesforMulti-LevelUnitCostEstimates
Solution 2: Multilevel Unit Costing
Task:
Engineeringhasinformedyou thatthenewpumphasbeendefinedasmaterial
T-FY##. Thepumpwillbeproducedinplant1000inalotsizeof100.
1. Use themultilevel unit costing functions withincosting without quantity
structure, and createamaterial cost estimateforyour materialT-FY##in
plant1000. SelectthecostingvariantSIM1forthesimulationandenter02
astheversion. AcceptthedefaultdatesincostingvariantSIM1.
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCostPlanning→MaterialCosting→CostEstimateWithout
QuantityStructure→EditMultilevel(CKUC)
From the toolbar, choose Create and then Create Material Cost
Estimate.
Enter the following costing data:
Material: T-FY##
Plant: 1000
Costing variant: SIM1
Costing version: 02
Costing lot size: 100
Go to the Dates tab and accept the default dates by choosing
Default Values.
After entering theheader information, continue tothelist screenby
selecting Enter. A list screen appearsfor the creation of a unit cost
estimate.
Continued on next page
75
2009 © 2009 SAP AG. All rights reserved.