第 455 页 / 共 537 页
AC505 Lesson: Cost Estimate
Figure 191: Planning Form
The top nodein thecosting structure isthe object being planned in the ad hoc
cost estimate.
Theentryscreendefinesthequantitystructurethatiscostedbythecostingmodel
template.
Afterenteringthedataintheentryscreen,usetheConfirmbuttontoactivatethe
templatetocosttheitemsandaddthecostedobjectstothecostingstructure.
Figure 192: Planning Results
427
2009 © 2009 SAP AG. All rights reserved.
第 456 页 / 共 537 页
Unit11: EasyCostPlanning AC505
Toviewthedetailitemsthatarecostedandnowavailableinthecostingstructure,
usethe“Show/HideItemView”toaccessthedetailitemdata.
Theitemviewareaisusedtoenter,change,anddisplaythecosteditems.
Youcanoverwritetheprice, cost element, ordescriptionfor anitemwithinthe
item view.
You can add items by appending or inserting rows. Choose an item category
and enter the appropriate data.
Figure 193: Ad hoc Cost Estimate Header Data
Intheadhoccostestimateheader,youcanenteracostingsheetandoverheadkey
to apply overhead to the costing structure.
428
©2009SAPAG.Allrightsreserved. 2009
第 457 页 / 共 537 页
AC505 Lesson: Cost Estimate
Figure 194: Execution Services
AsofRelease4.6C,youcanuseExecutionServicestoentercommitmentsand
actualcostsforplanneditemsusingEasyCostPlanning.
The following postings are possible:
• Internalactivityallocation(forinternal activities)
• Direct process allocation (for processes)
• Reservations (for material items)
• Goods issues (for material items)
• Purchase requisitions (for material items, external activity items, service
items, and variable items)
• Purchaseorders(formaterialitems, external activityitems, serviceitems,
and variable items)
To beable to trigger execution servicein an ad hoc cost estimate, you need to
assign an account assignment object such as a WBS element, cost center, or
internal order.
429
2009 © 2009 SAP AG. All rights reserved.
第 458 页 / 共 537 页
Unit11: EasyCostPlanning AC505
Figure 195: Customizing Execution Services
The assignment category of the document is proposed in the settings for the
ExecutionServicesPurchaseorderandPurchaserequisition.
InthesettingsforReservation/goodsissue,amovementtypeisproposed,butthere
is no assignment category. The movement type, however, definesthe account
assignment.
ThepathintheIMGtomaintaintheExecutionServicesis:
SAPReferenceIMGProjectSystem→Costs→PlanCosts→EasyCostPlanning
andExecutionServices→ExecutionServices→DefineSettingsforExecution
Services
430
©2009SAPAG.Allrightsreserved. 2009
第 459 页 / 共 537 页
AC505 Lesson: Cost Estimate
Exercise 18: Create an Ad Hoc Cost
Estimate Using a Costing Model
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Createcharacteristicsthatcanbeusedineasycostplanning
• Createacostingmodelthatcanbeusedineasycostplanning
• Buildatemplateusingthevariouscharacteristicscreatedtouseinquantity,
activation, and price formulas
• Createanhoccostestimateforaproducttoincludeoverhead
Business Example
Customers often require you to install the pumps you sell. You want to use a
consistentcostestimatingmodel. Youneedtoensurethatalltheformulasusedin
thecostmodelarecorrect. Youalsowantto apply overheadto theadhoccost
estimate for pump installation.
Task:
Createanadhoccostestimatetoinstall10T-F1##pumps.
1. Install T-F1## pumps
At the bottom of the Create with planning form tabbed page, enter the
costing model Group##.
Select the Addnl Data tab.
Enter the following data:
Company code 1000
Profit Center 1000
Plant 1000
ClicktheDefaultValuesbuttontoacceptthedates. Re-enterthecompany
code, profit center, and plant, if required.
2. What does the planning screen display?
3. Enterthefollowingcharacteristicvaluestotestthecostingmodel.
Number of pumps to install: 10
Type of pump connection: ACME
Distance to customer site: 300 KM
Continued on next page
431
2009 © 2009 SAP AG. All rights reserved.
第 460 页 / 共 537 页
Unit11: EasyCostPlanning AC505
Hotel cost per night: 139.00 EUR
Airfare to customer site: 700.00 EUR
Costof shipping toolstocustomer: 500.00EUR
Van rental per day: 90.00 EUR
4. Whyisthecostforairfareandvanrentalnotincludedinthecostingstructure?
5. Whichmaterialsarecostedforthepumpinstallationandwhy?
6. Changethevalueofthedistancetothecustomersitetoavaluegreaterthen
500. What arethechangesinthecost estimate?
7. Whathappenstothecostestimateifyouchangethenumberofpumpsto1?
8. WhatisthevaluationstrategyassignedtothecostingvariantPADH?
9. Howcanyouaddoverheadtothisadhoccostestimate?
10. Whichadditionalcostsareaddedtothecostestimate?
432
©2009SAPAG.Allrightsreserved. 2009
第 461 页 / 共 537 页
AC505 Lesson: Cost Estimate
Solution 18: Create an Ad Hoc Cost
Estimate Using a Costing Model
Task:
Createanadhoccostestimatetoinstall10T-F1##pumps.
1. Install T-F1## pumps
At the bottom of the Create with planning form tabbed page, enter the
costing model Group##.
Select the Addnl Data tab.
Enter the following data:
Company code 1000
Profit Center 1000
Plant 1000
ClicktheDefaultValuesbuttontoacceptthedates. Re-enterthecompany
code, profit center, and plant, if required.
a) Accounting→Controlling→ProductCostControlling→Product
CostPlanning→EasyCostPlanning&ExecutionServices→Edit
AdHocCostEstimate(transactioncodeCKECP)
Double-clickthetransactiontoexecutetheadhoccostestimate.
Enter adescription. Install T-F1##pumps.
AtthebottomoftheCreatewithplanningformtabbedpage,enterthe
costing model Group##.
Select the Addnl Data tab.
Enter the following data:
Company code 1000
Profit Center 1000
Plant 1000
Click the Default Values button to accept the dates. Re-enter the
companycode,profitcenter,andplant,ifnecessary.
Clickthecreatebuttonorchooseentertoinvokethecostingmodel.
Continued on next page
433
2009 © 2009 SAP AG. All rights reserved.
第 462 页 / 共 537 页
Unit11: EasyCostPlanning AC505
2. What does the planning screen display?
a) TheCharacteristic descriptionsforthe assigned characteristics
from thecosting model aredisplayed for input or selection of a
value.
3. Enterthefollowingcharacteristicvaluestotestthecostingmodel.
Number of pumps to install: 10
Type of pump connection: ACME
Distance to customer site: 300 KM
Hotel cost per night: 139.00 EUR
Airfare to customer site: 700.00 EUR
Costof shipping toolstocustomer: 500.00EUR
Van rental per day: 90.00 EUR
a) Choose “Confirm”.
4. Whyisthecostforairfareandvanrentalnotincludedinthecostingstructure?
a) Click the “Show/hide item view” icon.
Thecharacteristicsforairfare,shipmentoftools,andvanrentaluse
anactivationformula,whichrequiresthedistancetothecustomer
tobegreaterthan500KM.Notethatmileageexpensesareincluded
forthedistanceyouenteredattherateof.31EURperKM.
5. Whichmaterialsarecostedforthepumpinstallationandwhy?
a) Materials100-250 and100-251are costed.
These materials meet the activation formula where the
characteristicConnectionisavalueofACME.
6. Changethevalueofthedistancetothecustomersitetoavaluegreaterthen
500. What arethechangesinthecost estimate?
a) Enteravalueforthedistancetothecustomersitethatisgreaterthan
500.
ClicktheConfirmicon(youmayneedtodragtheitemviewdown
to see this icon).
ValuesforAirfare,shipmentoftools,andvanrentalarenowadded
tothecostestimateandmileageexpensesareremoved.
Continued on next page
434
©2009SAPAG.Allrightsreserved. 2009
第 463 页 / 共 537 页
AC505 Lesson: Cost Estimate
7. Whathappenstothecostestimateifyouchangethenumberofpumpsto1?
a) Changethenumberofpumpsto1andclicktheConfirmicon.
Thematerialsquantityisadjustedbasedonthequantitiesrequired
per pump.
The labor is adjusted to 4.5 hours.
Thetravelperdiemandvanrentalisadjustedto1daybasedon
thequantityformulatorounduptothenexthighestwholenumber.
Theairfareandshipmentcostremainunchanged.
8. WhatisthevaluationstrategyassignedtothecostingvariantPADH?
a) IMG → Controlling → Product Cost Planning → Ad Hoc Cost
Estimate → Define Costing Variant
Valuationstrategy12isassignedforbaseplanningobject.
9. Howcanyouaddoverheadtothisadhoccostestimate?
a) Choose“DisplayCost EstimateHeader”.
In the header screen, enter costing sheet COGS and Overhead
key SAP10.
Select Continue.
10. Whichadditionalcostsareaddedtothecostestimate?
a) Raw material overhead
Administrative overhead
Sales and Distribution overhead
435
2009 © 2009 SAP AG. All rights reserved.
第 464 页 / 共 537 页
Unit11: EasyCostPlanning AC505
Lesson Summary
You should now be able to:
• Createanadhoccostestimateusinganeasycostplanningtemplate
• Useexecutionservicestoentercommitmentsandactualcosts
436
©2009SAPAG.Allrightsreserved. 2009
第 465 页 / 共 537 页
AC505 Unit Summary
Unit Summary
You should now be able to:
• Describetheapplicationoptionsofeasycostplanning
• Createacostingmodel todefineaplanningscreen
• Createcharacteristicsfor easy cost planning
• Create a costing template for a costing model
• Createandapplyformulasinthecostingtemplate
• Createanadhoccostestimateusinganeasycostplanningtemplate
• Useexecutionservicestoentercommitmentsandactualcosts
437
2009 © 2009 SAP AG. All rights reserved.
第 466 页 / 共 537 页
UnitSummary AC505
438
©2009SAPAG.Allrightsreserved. 2009
第 467 页 / 共 537 页
AC505 Test Your Knowledge
Test Your Knowledge
1. Thecostingmodeldeterminesthestructureoftheentryscreenaccordingto
the collectiverequirementsof planningforms.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
2. To ensure that values are chosen from the list of permitted characteristic
values,donotsetthe indicator.
Fillintheblankstocompletethesentence.
3. Whichentriescanyoumakeinthetemplatetable?
4. What isthe function of activation formula?
5. Howdo you create or edit acosting model?
6. Youneedtoassignan
tobeabletotriggerexecutionservicesinanadhoccostestimate.
Fillintheblankstocompletethesentence.
7. Whichdataappearsforinputorselectionontheplanningscreen?
439
2009 © 2009 SAP AG. All rights reserved.
第 468 页 / 共 537 页
TestYourKnowledge AC505
Answers
1. Thecostingmodeldeterminesthestructureoftheentryscreenaccordingto
thecollectiverequirementsof planningforms.
Answer: False
Thecostingmodeldeterminesthestructureoftheentryscreenaccordingto
theindividualrequirementsfor eachplanningform.
2. To ensure that valuesare chosen from the list of permitted characteristic
values, donot settheadditionalvaluesindicator.
Answer: additional values
3. Whichentriescanyoumakeinthetemplatetable?
Answer: Youcanmakethefollowingentriesinthetemplatetable:
• Item category
• Object, such as a material
• Quantity
• Activation rules
• Prices
4. What isthe function of activation formula?
Answer: The activation formula specifies the condition under which an
item is active.
5. Howdo you createor edit a costing model?
Answer: Youcancreateoreditacostingmodelinthedefinitionareaofthe
Easy cost planning screen.
6. You need to assign an account assignment object to be able to trigger
executionservices inanadhoccost estimate.
Answer: account assignment object
7. Whichdataappearsforinputorselectionontheplanningscreen?
Answer: Thecharacteristicdescriptionsfortheassignedcharacteristicsfrom
thecostingmodelaredisplayedforinputorselectionontheplanningscreen.
440
©2009SAPAG.Allrightsreserved. 2009
第 469 页 / 共 537 页
第 470 页 / 共 537 页
第 471 页 / 共 537 页
Unit 12
Case Study
Unit Overview
After completingthecourse, thiscasestudywillenableyoutocreateacosting
variant and a costing type. You will also be able to create a valuation variant
and an overhead costing sheet. You will learn to maintain the assignment of a
templatetoacostestimateandtomaintainthecontrollingdatarequiredtoobtain
anaccuratecostestimate. Youwillalsolearntomaintainthelogisticmasterdata
required to obtain an accurate cost estimate.
Unit Objectives
After completing thisunit, you will beableto:
• Create a costing variant
• Create a costing type
• Create a valuation variant
• Create an overhead costing sheet
• Maintaintheassignmentofatemplatetoacostestimate
• Maintainthecontrollingdatarequiredtoobtainanaccuratecostestimate
• Maintainthelogisticmasterdatarequiredtoobtainanaccuratecostestimate
Unit Contents
Lesson: Case Study............................................................442
Exercise 19: Main Business Scenario ..................................445
Exercise 20: Create Costing Variant ....................................449
Exercise 21: Costing Sheet ..............................................455
Exercise 22: Business Process Template ..............................463
Exercise 23: Cost Estimate ...............................................465
441
2009 © 2009 SAP AG. All rights reserved.
第 472 页 / 共 537 页
Unit12: CaseStudy AC505
Lesson: Case Study
Lesson Overview
After completingthecourse, thiscasestudywill enableyoutocreateacosting
variant and a costing type. You will also be able to create a valuation variant
andan overhead costing sheet. You will learn to maintain the assignment of a
templatetoacostestimateandtomaintainthecontrollingdatarequiredtoobtain
anaccuratecostestimate. Youwillalsolearntomaintainthelogisticmasterdata
required to obtain an accurate cost estimate.
Lesson Objectives
After completingthislesson, you will beable to:
• Create a costing variant
• Create a costing type
• Create a valuation variant
• Create an overhead costing sheet
• Maintaintheassignmentofatemplatetoacostestimate
• Maintainthecontrollingdatarequiredtoobtainanaccuratecostestimate
• Maintainthelogisticmasterdatarequiredtoobtainanaccuratecostestimate
Business Example
ReadthebusinessscenariogivenunderthefolioCaseStudy: BusinessScenario.
Case Study
• Atthecompletionof thisunit, youwillbeableto:
– Create a costing variant
– Create a costing type
– Create a valuation variant
– Maintaintheassignmentofatemplatetoacostestimate
– Maintain the controlling data required to obtain an accurate cost
estimate
– Maintainthelogisticmasterdatarequiredto obtainanaccuratecost
estimate
442
©2009SAPAG.Allrightsreserved. 2009
第 473 页 / 共 537 页
AC505 Lesson: Case Study
443
2009 © 2009 SAP AG. All rights reserved.
第 474 页 / 共 537 页
Unit12: CaseStudy AC505
Figure 196: Course Overview Diagram
• You have been commissioned to perform an analysis of the costs of
manufacturing T-F1## and T-B1## and to present your findings to
management.
• EngineeringhasupdatedtheexistingBOMsandroutingsforthematerials.
Purchasing has also been proactive in reviewing the BOMs and the
procurementcostsformaterialsT-F1##andT-B1##.
• Youwillneedtocreateindividualcostestimatesoracostingruntocreate
cost estimates for producing T-F1## and T-B1## internally. You also
determinethatyouneedtocreateacostingvarianttoenableyoutocreatea
cost estimate for this analysis.
Hint: Please follow the casestudy requirements and solutionsfor the
configuration requirements.
• Read the business scenario presented.
• Maintain the customizing parameters for costing variant, costing type,
valuationvariant,costingsheet,andtemplateassignmentasdefinedinthe
business scenario.
• Review the logistics master data to include the material master, BOM,
routing, andworkcenters. Correctanyknownerrors.
• Createcostestimates. Reviewtheerrorlogstodeterminewhatmasterdata
objects need to be corrected.
• Repeat the cost estimate process and error correction until your cost
estimates are error-free.
• Business Scenario
• Recommended Procedure
• Case Study
Note: This is an optional unit.
444
©2009SAPAG.Allrightsreserved. 2009
第 475 页 / 共 537 页
AC505 Lesson: Case Study
Exercise 19: Main Business Scenario
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Evaluatethebusinessscenariofor thecasestudy
• Determinetheconfigurationtasksrequiredtocompletethecasestudy
Business Example
Earlier, your companyproducedmaterialsT-F1## andT-B1##internally. You
havebeenpurchasingthesematerialsoverthepastyeartoavailthecostsavings
offered by the vendor. These materials are either retained as spare parts or
eventually used in the manufacturing process of another product. For greater
controloverthequalityofproductsandtotakeadvantageofimprovementsinthe
manufacturing process, management considers manufacturing these materials
internally. Your task is to perform an analysis of the manufacturing costs for
T-F1##andT-B1##. Theresultsoftheanalysisandyourrecommendationswill
beimplementedonthefirstdayofthefollowingmonth. Youwillneedtoconsider
indirectcosts,butforthisanalysisignorethecostsofidlecapacityorunabsorbed
overheadasaresultofnotproducingthematerialsin-house.
EngineeringupdatedexistingBOMsandroutingsforthematerials. Purchasing
reviewed the BOMs of materials T-F1## and T-B1## and where possible,
negotiated lower rates for purchased items. Purchasing created a purchasing
informationrecordor updatedthePlannedPrice2fieldonthesematerialswith
new rates, where applicable.
Youwillneedtocreateindividualcostestimatesoracostingruntocreatecost
estimatesforproducingT-F1##andT-B1##internally. Youalsodeterminethat
youneedtocreateacostingvarianttoenableyoutocreateacostestimateforthis
analysis. YouhavebeentoldtoupdatethePlannedPrice3fieldonthematerials
T-F1## and T-B1## to store these values for future analysis. You have been
instructedthatanycomponentmaterialsincludedinT-F1##andT-B1##shouldbe
burdenedwith3%overheadwithanadditional 6%overheadshouldbeapplied
to the manufacturing expenses associated with assembling the materials. You
willneedtocreateacostingsheetforthispurpose. Thisanalysisfactorsinonly
with the Cost of GoodsManufactured and not theCostsof Goods Sold. Also,
youneedtoincludeproductionadministrativeoverheadcostsformanufacturing
T-F1##andT-B1##,becausethesecostsarenotincludedintheroutingandthe
6%manufacturingoverheadappliedbythecostingsheet. Yourcostaccountants
setupabusinessprocesstemplateCOPC-10forthispurpose. Youneedtoensure
thatthecostestimateincludesthese processcosts.
In the process of completing the Case Study, you may find a few errors or
omissionsinthelogisticsmasterdataforthematerialsyoucost. Usethecosting
analysis and error logs to help determine the changes that need to be made to
445
2009 © 2009 SAP AG. All rights reserved.
第 476 页 / 共 537 页
Unit12: CaseStudy AC505
performaccurateerror-freecosting. Youwillneedtocorrecttheseerrorsbefore
youcanreceiveanerror-freecostestimate. Youmayfindthatyouhavetoedit
master data to eliminate errors.
Task:
1. Listtheconfigurationtasksyouneedtocompletebeforecreatingthenew
cost estimates.
446
©2009SAPAG.Allrightsreserved. 2009
第 477 页 / 共 537 页
AC505 Lesson: Case Study
Solution 19: Main Business Scenario
Task:
1. Listtheconfigurationtasksyouneedtocompletebeforecreatingthenew
cost estimates.
a)
• Createacostingtypethatenablestheupdateoftheplannedprice
3fieldwith theresult of thecostestimate.
• Createavaluationvariantthatincludesthepurchasinginforecord
andtheplannedprice2fieldinthesearchforamaterialprice.
• Createadatecontrolkeythatenablesthecostestimatetobevalid.
• Createacostingtypethatenablestheupdateoftheplannedprice
3fieldwith theresult of thecostestimate.
• Createanoverheadcostingsheetthatincludesa3%overheadfor
materialcostsanda6%overheadformanufacturing. Assignthis
overheadcostingsheettothevaluationvariant.
• Assign the template COPC-10 to the costing environment for
materials T-F1## and T-B1##.
447
2009 © 2009 SAP AG. All rights reserved.
第 478 页 / 共 537 页
Unit12: CaseStudy AC505
448
©2009SAPAG.Allrightsreserved. 2009
第 479 页 / 共 537 页
AC505 Lesson: Case Study
Exercise 20: Create Costing Variant
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Createa Costing Variant andits Components
Business Example
Youwillcreateacostingvariantanditscomponentstocreateacostestimatefor
youranalysis. Youwanttosaveyourdataincludingtheitemizationandthelog.
YoualsowanttoupdatethePlannedPrice3fieldonthematerialmaster.
Task:
CreateacostingvariantbyfirstcreatingthecomponentsCostingType,Valuation
Variant, Date Control, and Quantity Structure Control. You determined that
you will not be using Transfer Control or Reference Variants. Assign these
components to your Costing Variant.
1. CreateaCostingTypeC#(where#standsfortheletterofthealphabetthat
correspondstothegroupnumber, forexample, Group10=CJandGroup
12 = CI) with the description Group ## Costing Type. You will use the
sameparametersusedfor thestandardcostestimates, butyouwillenable
update of the Planned Price 3 field insteadof the Standard Price field on
the material master.
2. Create a Valuation Variant V## with the description Group ## Valuation
Variant. Usethesamestrategythatwasusedinthestandardcostestimates,
excludingmaterialvaluation. Tolocatethepriceinformationprovidedby
purchasing, read the info record for priority 1, the planned price 2 field
as priority 2, the standard price for priority 3, and the moving average
price for priority 4.
3. CreateaDateControlD##withthedescriptionGroup##DateControl. The
resultsofthecost estimateshouldbevalid from thefirstofthefollowing
month. Ensurethatthecostestimatedoesnotexpire. Thequantitystructure
and valuation date should correspond with the effective date of the cost
estimate.
4. CreateaQuantityStructureControlsQ##withthedescriptionGroup##Qty
Structure. Youwanttousethesameparametersyouusedforthestandard
cost estimates.
5. CreateCostingVariantCV##withthedescriptionGroup##CostingVariant.
Mostoftheheaderdataforthecostingvariantwillbesimilartothatusedfor
the standard cost estimates.
Continued on next page
449
2009 © 2009 SAP AG. All rights reserved.
第 480 页 / 共 537 页
Unit12: CaseStudy AC505
6. Assign the Costing Variant Components C#, V##, D##, and Q## to the
Costing Variant CV##.
450
©2009SAPAG.Allrightsreserved. 2009
第 481 页 / 共 537 页
AC505 Lesson: Case Study
Solution 20: Create Costing Variant
Task:
CreateacostingvariantbyfirstcreatingthecomponentsCostingType,Valuation
Variant, Date Control, and Quantity Structure Control. You determined that
you will not be using Transfer Control or Reference Variants. Assign these
components to your Costing Variant.
1. CreateaCostingTypeC#(where#standsfortheletterofthealphabetthat
correspondstothegroupnumber, forexample, Group10=CJandGroup
12 = CI) with the description Group ## Costing Type. You will use the
sameparametersusedfor thestandardcostestimates, butyouwillenable
update of the Planned Price 3 field insteadof the Standard Price field on
the material master.
a) FirstverifythesettingsusedfortheStandardCostEstimates.
IMG→Controlling→Product Cost Controlling →Product Cost
Planning → Material Cost Estimate with Quantity Structure →
Define Costing Variant
SelecttheRowforCosting Variant PPC1.
Choose Details.
Click the Costing Type button.
VerifythatCostingType01StandardCostest. (mat)isassigned.
VerifythatthefirstUpdatetabindicatesStandardPrice.
Click Back once.
Also verify that the following components are assigned to the
Costing Variant:
Click the Valuation Variant button and verify that Valuation
Variant 001 Planned valuation - mat. is assigned to theCosting
Variant.
Click Back once.
ClicktheDateControlbuttonandverifythatDateControlPC01
Std cost est.-month is assigned.
Click Back once.
Click the Quantity Structure button and verify that Quantity
StructureControlPC01Stdqtystruct. determ.2isassignedtothe
Costing Variant.
Return to the IMG screen.
Continued on next page
451
2009 © 2009 SAP AG. All rights reserved.
第 482 页 / 共 537 页
Unit12: CaseStudy AC505
IMG→Controlling→Product Cost Controlling →ProductCost
Planning → Material Cost Estimate with Quantity Structure →
CostingVariantComponents→DefineCostingTypes
The system does not permit you to copy a costing type with the
Update for Standard Price. You need to create the costing type
without referencetoCosting Type 01.
Choose Edit → New entries.
Enter C# (where # stands for the letter of the alphabet that
correspondstothegroupnumber,forexample,Group10=CJand
Group 03 = CC).
EnterGroup##CostingTypeintheDescriptionfield.
Make the following settings:
• PriceUpdateMaterialMaster: PricesOtherthanStandard
• ValuationView: LegalValuation Update
• CostEstimatewithQuantityStructure: WithStartofPeriod
• AdditiveCostEstimates: WithStartofPeriod
• Cost Portion for Overhead Calculation: Cost of Goods
Manufactured
Click Save.
ReturntotheIMGscreenandremainthereforthenextexercise.
2. Create a Valuation Variant V## withthe description Group ## Valuation
Variant. Usethesamestrategythatwasusedinthestandardcostestimates,
excludingmaterialvaluation. Tolocatethepriceinformationprovidedby
Continued on next page
452
©2009SAPAG.Allrightsreserved. 2009
第 483 页 / 共 537 页
AC505 Lesson: Case Study
purchasing, read the info record for priority 1, the planned price 2 field
as priority 2, the standard price for priority 3, and the moving average
price for priority 4.
a) Choose Define Valuation Variants.
SelecttherowwithValuationvariant001Plannedvaluation-mat.
Click theCopy as icon in thetoolbar.
EnterV##andtheDescriptionGroup##ValuationVariant
Choose Enter.
Choose V##.
Choose Details.
Changepriority2formaterialvaluationtoPlannedPrice2.
Choose Save.
ReturntotheIMGscreenandremainthereforthenextexercise.
3. CreateaDateControlD##withthedescriptionGroup##DateControl. The
resultsofthecost estimateshouldbevalid from thefirstofthefollowing
month. Ensurethatthecostestimatedoesnotexpire. Thequantitystructure
and valuation date should correspond with the effective date of the cost
estimate.
a) Choose Define Date Control.
SelecttherowwithDateControlPC01Stdcostest. -month.
Click theCopy as icon in thetoolbar.
EnterD##andtheDescriptionGroup##DateControl
Choose Enter.
Choose Save.
ReturntotheIMGscreenandremainthereforthenextexercise.
Continued on next page
453
2009 © 2009 SAP AG. All rights reserved.
第 484 页 / 共 537 页
Unit12: CaseStudy AC505
4. CreateaQuantityStructureControlsQ##withthedescriptionGroup##Qty
Structure. Youwanttousethesameparametersyouusedforthestandard
cost estimates.
a) ChooseDefineQuantityStructureControl.
SelecttherowwithQuantityStructureControlPC01Stdqtystruct.
determ.2
Click the Copy as icon in the toolbar.
EnterQ##andtheDescriptionGroup##QtyStructure.
Choose Enter.
Choose Save.
ReturntotheIMGscreenandremainthereforthenextexercise.
5. CreateCostingVariantCV##withthedescriptionGroup##CostingVariant.
Mostoftheheaderdataforthecostingvariantwillbesimilartothatusedfor
the standard cost estimates.
a) Choose Define Costing Variants.
Selecttherowwith CostingVariant PPC1.
Click the Copy as icon in the toolbar.
EnterCV##andtheDescriptionGroup##CostingVariant
Choose Enter.
Donotsave. Continuewith thenext step.
6. Assign the Costing Variant Components C#, V##, D##, and Q## to the
Costing Variant CV##.
a) SelectTherowwithCostingVariantCV##.
Click the Detail icon in the toolbar.
Click the Available Entries icon and enter Costing type C#,
ValuationVariantV##,DateControlD##,andQuantityStructure
Control Q##.
Choose Enter.
ChooseCheck. Iftherearenoerrors,clickSave.
Return to the IMG screen.
454
©2009SAPAG.Allrightsreserved. 2009
第 485 页 / 共 537 页
AC505 Lesson: Case Study
Exercise 21: Costing Sheet
Exercise Objectives
After completingthisexercise, youwillbeableto:
• SetupCostingSheetandassignittoacostingvariant
Business Example
You will apply overhead to a cost estimate. These overhead costs are for the
indirectcostsassociatedwiththecostestimate,whichincludewarehouseexpenses
andmanufacturingexpenses. Todothis,youneedtosetupanoverheadstructure
and assign it to the costing variant.
Task:
Createanoverheadstructuresothat youcanaddoverheadtothecostestimate.
This will be3% of material costsand6% for manufacturing costs. Assign the
structure to the costing variant.
1. Create a base (BM##) for the material overhead calculation. Name the
base: Group##Mat. Base. Definethebaseforcontrollingarea1000and
cost element interval 400000 to 410000. Save the base. Create another
base(BP##)withthedescriptionGroup##PrdBaseforthemanufacturing
overheadcalculation. UsethesameassumptionsasinBM##,butusecost
elements619000, 620000, 623000, and625000.
2. Createapercentageplannedoverhead(OM##)fortheoverheadcalculation.
NametheoverheadGroup##OHrateandusedependencyD000(overhead
type). The 3% rate should be valid for plan overhead calculations in
controlling area 1000 for the current fiscal year. Save the overhead rate.
Createanotherpercentageplannedoverhead(OP##)forthemanufacturing
overhead calculation with the same assumptions as OM##, but use 6%.
NamethispercentageoverheadGroup##PrdOHrate.
3. Create a credit key (M##) for theoverhead calculation. Namethe credit
keyGroup##Mat OHCredit. Definethecredit keyfor controllingarea
1000. Thedataisvaliduntiltheendofthecurrentfiscalyear. Theoverhead
rateconsistsof100%fixedcosts. Thecostelementusedfortheoverhead
posting is 655100. Overhead rate- miscellaneousmaterial andthecredit
object is the Warehouse cost center (4130). Save the credit key. Create
another credit key(P##)forthemanufacturing overheadcalculationwith
thesameassumptionsasM##,butusethecostelement655100. Namethe
credit key Group## Prd OH Credit.
Continued on next page
455
2009 © 2009 SAP AG. All rights reserved.
第 486 页 / 共 537 页
Unit12: CaseStudy AC505
4. Createa costingsheet (OHD##) to definetheoverheadcalculation. Call
thesheetGroup##OHCostingsheet. Inthefirstrow(row10),thebase
(BM##) you used in exercise 1-1-1 should be assigned. In the second
row(row20), theoverhead ratekey (OM##) that wascreated inexercise
1-1-2 and the credit key (M##) that was created in exercise 1-1-3 should
beassigned. Notethatthesecond rowshouldreferto thefirstrow. Also,
check for errors. Save the costing sheet. Create rows 30 and 40 for the
manufacturing overhead calculation.
5. AssignyourcostingsheetOHD##toyourCostingVariantCV##forfinished
and semifinished materials. Do not assign a costing sheet for material
components.
456
©2009SAPAG.Allrightsreserved. 2009
第 487 页 / 共 537 页
AC505 Lesson: Case Study
Solution 21: Costing Sheet
Task:
Createanoverheadstructuresothat youcanaddoverheadtothecostestimate.
This will be3% of material costsand6% for manufacturing costs. Assign the
structure to the costing variant.
1. Create a base (BM##) for the material overhead calculation. Name the
base: Group##Mat. Base. Definethebaseforcontrollingarea1000and
cost element interval 400000 to 410000. Save the base. Create another
base(BP##)withthedescriptionGroup##PrdBaseforthemanufacturing
overheadcalculation. UsethesameassumptionsasinBM##,butusecost
elements619000, 620000, 623000, and625000.
a) IMG→Controlling→ProductCostControlling→ProductCost
Planning → Basic Settings for Material Costing→ Overhead →
CostingSheet: Components→DefineCalculationBases
Choose Edit → New entries.
Enter BM## in the Base column.
EnterGroup##MatBaseintheDescriptioncolumn.
Choose Enter.
Choose the BM## row.
Choose Details.
IntheControllingareadialogbox,enter1000intheControlling
area field and choose Enter.
Choose Edit → New entries.
Enter400000intheFrom-costelementcolumn.
Enter410000intheTo-cost element column.
Choose Save.
Goback totheCalculation BaseOverview.
Choose Edit → New entries.
Enter BP## in the Base column.
EnterGroup##PrdBaseintheDescriptioncolumn.
Choose Enter.
Choose the BP## row.
Choose Details.
Continued on next page
457
2009 © 2009 SAP AG. All rights reserved.
第 488 页 / 共 537 页
Unit12: CaseStudy AC505
IntheControllingareadialogbox,enter1000intheControlling
area field and choose Enter.
Choose Edit → New entries.
Enter619000intheFrom-costelementcolumn.
Inthenextline,enter620000intheFrom-costelementcolumnand
repeatforcost elements623000and625000.
Choose Save.
ReturntotheIMGscreenforthenextexercise.
2. Createapercentageplannedoverhead(OM##)fortheoverheadcalculation.
NametheoverheadGroup##OHrateandusedependencyD000(overhead
type). The 3% rate should be valid for plan overhead calculations in
controlling area1000 for the current fiscal year. Save the overhead rate.
Createanotherpercentageplannedoverhead(OP##)forthemanufacturing
overhead calculation with the same assumptions as OM##, but use 6%.
NamethispercentageoverheadGroup##PrdOHrate.
a) ChooseDefinePercentageOverheadRates.
Choose Edit → New entries.
Enter OM## in the overhead column.
EnterGroup##MatOHrateintheDescriptioncolumn.
Choose dependency D000.
Choose Enter.
Choose the OM## row.
Choose Details.
Choose Edit → New entries.
EnterthestartofthecurrentfiscalyearintheValidfromfield.
EntertheendofthecurrentfiscalyearintheTofield.
Enter1000 in theControllingareafield.
Enter 2 in the Ovrhd type field.
Enter 3 in the Percent field.
Choose Save.
ReturntotheNewEntries: Overviewscreen.
Choose Edit → New entries.
Enter OP## in the overhead column.
Continued on next page
458
©2009SAPAG.Allrightsreserved. 2009
第 489 页 / 共 537 页
AC505 Lesson: Case Study
EnterGroup##PrdOHrateintheDescriptioncolumn.
Choose dependency D000.
Choose Enter.
Choose the OP## row.
Choose Details.
Choose Edit → New entries.
EnterthestartofthecurrentfiscalyearintheValidfromfield.
EntertheendofthecurrentfiscalyearintheTofield.
Enter 1000in theControllingareafield.
Enter 2 in the Ovrhd type field.
Enter 6 in the Percent field.
Choose Save.
ReturntotheIMGscreenforthenextexercise.
3. Create a credit key (M##) for theoverhead calculation. Namethe credit
keyGroup##Mat OHCredit. Definethecredit keyfor controllingarea
1000. Thedataisvaliduntiltheendofthecurrentfiscalyear. Theoverhead
rateconsistsof100%fixedcosts. Thecostelementusedfortheoverhead
posting is 655100. Overhead rate- miscellaneousmaterial andthecredit
object is the Warehouse cost center (4130). Save the credit key. Create
another credit key(P##)forthemanufacturing overheadcalculationwith
thesameassumptionsasM##,butusethecostelement655100. Namethe
credit key Group## Prd OH Credit.
a) Choose Define credits.
Choose Edit → New entries.
Enter M## in the Credit column.
EnterGroup##MatOHCreditintheDescriptioncolumn.
Choose Enter.
Choose the M## row.
Choose Detail.
IntheSetcontrollingareadialogbox,enter1000intheControlling
area field and choose Enter.
Choose Edit → New entries.
EntertheendofthecurrentfiscalyearintheValidtocolumn.
Continued on next page
459
2009 © 2009 SAP AG. All rights reserved.
第 490 页 / 共 537 页
Unit12: CaseStudy AC505
Enter655100 intheCost element column.
Enter 100 in the % Fixed column.
Enter 4130 in theCost centercolumn.
Choose Save.
Return to the IMG screen.
Choose Define credits.
Choose Edit → New entries.
Enter P## in the Credit column.
EnterGroup##PrdOHCreditintheDescriptioncolumn.
Choose Enter.
Choose the P## row.
Choose Detail.
IntheSetcontrollingareadialogbox,enter1000intheControlling
area field and choose Enter.
Choose Edit → New entries.
EntertheendofthecurrentfiscalyearintheValidtocolumn.
Enter 655100 intheCost element column.
Enter 100 in the % Fixed column.
Enter 4130 in theCost centercolumn.
Choose Save.
ReturntotheIMGscreenforthenextexercise.
4. Createa costingsheet (OHD##) to definetheoverheadcalculation. Call
thesheetGroup##OHCostingsheet. Inthefirstrow(row10),thebase
(BM##) you used in exercise 1-1-1 should be assigned. In the second
row(row20), theoverhead ratekey (OM##) that wascreated inexercise
1-1-2 and the credit key (M##) that was created in exercise 1-1-3 should
beassigned. Notethatthesecond rowshouldreferto thefirstrow. Also,
check for errors. Save the costing sheet. Create rows 30 and 40 for the
manufacturing overhead calculation.
a) Choose Define costing sheets.
Choose Edit → New entries.
EnterOHD##in theCostingsheetcolumn.
EnterGroup##OHCostingsheetintheDescriptioncolumn.
Continued on next page
460
©2009SAPAG.Allrightsreserved. 2009
第 491 页 / 共 537 页
AC505 Lesson: Case Study
Choose Enter.
Choose the OHD## row.
Choose Costing sheet rows.
Choose Edit → New entries.
In the first row, enter the following:
10 in the Row column
BM## in the Base column.
In thesecond row, enter thefollowing:
20 in the Row column
Enter OM## in the Overhead column.
Enter 10 in the From column.
Enter 10 in the To column.
Enter M## in the Credit column.
Choose Save.
Move one screen backwards.
Choose Edit → New entries.
In the third row, enter thefollowing:
30 in the Row column
BP## in the Base column.
In the fourth row, enter the following:
40 in the Row column
Enter OP## in the Overhead column.
Enter 30 in the From column.
Enter 30 in the To column.
Enter P## in the Credit column.
Choose Enter.
Move one screen backwards.
ChooseCheck. Ifyoudonotfindanyerrors,chooseSave.
Return to the IMG Screen.
Continued on next page
461
2009 © 2009 SAP AG. All rights reserved.
第 492 页 / 共 537 页
Unit12: CaseStudy AC505
5. AssignyourcostingsheetOHD##toyourCostingVariantCV##forfinished
and semifinished materials. Do not assign a costing sheet for material
components.
a) IMG→Controlling→Product Cost Controlling →ProductCost
Planning → Material Cost Estimate with Quantity Structure →
Define Costing Variants
SelectCosting Variant CV##fromthelist.
Choose Details
Select the Valuation Variant
Select the Overhead tab
Enter Costing Sheet OHD## for both Finished & Semi-finished
materials. DeletethecostingsheetentryforMaterialComponents.
Choose Save.
462
©2009SAPAG.Allrightsreserved. 2009
第 493 页 / 共 537 页
AC505 Lesson: Case Study
Exercise 22: Business Process Template
Exercise Objectives
After completingthisexercise, youwillbeableto:
• AssigntheBusinessProcessTemplatetotheCostEstimate
Business Example
YouneedtoincludesetupcostsformanufacturingT-F1##andT-B1##,because
thesecostsarenotincludedintheroutingandinthe6%manufacturingoverhead
applied by the costing sheet. Your cost accountants set up a business process
templateCOPC-10forthispurpose. Toensurethatthecostestimatecapturesthese
costs, youneedtoassignthebusinessprocesstemplate.
Task:
Assign thetemplateCOPC-10tothecost estimate.
1. Inthecostingviewof thematerialmasterrecord, determinetheoverhead
group assigned to the material.
2. IntheIMG,determinetheoverheadkeyassignedtotheoverheadgroupin
plant 1000.
3. AssignBusinessprocesstemplateCOPC-10tothecostestimate.
463
2009 © 2009 SAP AG. All rights reserved.
第 494 页 / 共 537 页
Unit12: CaseStudy AC505
Solution 22: Business Process Template
Task:
AssignthetemplateCOPC-10tothecostestimate.
1. Inthecostingviewof thematerialmasterrecord, determinetheoverhead
group assigned to the material.
a) Logistics→Materialsmanagement→Materialmaster→Material
→ Display →Display current (MM03)
Enter material T-F1## or T-B1##
Select Costing 1 view
Enter plant 1000
Verify Overhead Group SAP10
2. IntheIMG,determinetheoverheadkeyassignedtotheoverheadgroupin
plant 1000.
a) SAPReferenceIMG→Controlling→ProductCostControlling→
Product Cost Planning → Basic Settings for Material Costing →
Overhead → Define Overhead Groups
Overhead key: SAP10
3. AssignBusinessprocesstemplateCOPC-10tothecostestimate.
a) SAPReferenceIMG→Controlling→ProductCostControlling→
Product Cost Planning → Basic Settings for Material Costing →
Templates → Assign Templates
Choose Edit → New Entries
Enter the following:
Controlling Area: 1000
CostSheet: OHD##
OH Key: SAP10
Environment: 001
Template: COPC-10
Choose Save
464
©2009SAPAG.Allrightsreserved. 2009
第 495 页 / 共 537 页
AC505 Lesson: Case Study
Exercise 23: Cost Estimate
Exercise Objectives
After completingthisexercise, youwillbeableto:
• CreateacostestimateforT-F1##andT-B##usingthecostingvariant
• Correctthelogisticalmasterdataerrorsforthecostestimate
• Update the results of the cost estimate to the planned price 3 field in the
material master
Business Example
Using the costing variant C##, create accurate cost estimates for T-F1## and
T-B1##. Ensurethatthecostestimatesareerror-freeandincludealltherouting
operationsandBOMcomponents. Updatetheresultstotheplannedprice3field
in the material master.
Task 1:
1. Create the cost estimates using costing variant CV##. Ensure that all
operationsandBOMcomponentsareincludedinthecostestimate. Correct
the master data as required.
Task 2:
1. Afterdeterminingthatthecostestimateisaccurateandcomplete,updatethe
plannedprice3fieldwiththeresultsforT-F1##andT-B1##.
Continued on next page
465
2009 © 2009 SAP AG. All rights reserved.
第 496 页 / 共 537 页
Unit12: CaseStudy AC505
Figure 197: Cost Estimate
466
©2009SAPAG.Allrightsreserved. 2009
第 497 页 / 共 537 页
AC505 Lesson: Case Study
Solution 23: Cost Estimate
Task 1:
1. Create the cost estimates using costing variant CV##. Ensure that all
operationsandBOMcomponentsareincludedinthecostestimate. Correct
the master data as required.
a) Create the Cost Estimate
Accounting→Controlling→ProductCostControlling→Product
CostPlanning→MaterialCosting→CostEstimatewithQuantity
Structure → Create (CK11N)
b) Edit Material Master
Logistics → Production → Master Data → Material Master →
Material→Change→Immediately(MM02)
Enter the relevant material number.
Choose Select Views and Select the views of interest, either
accounting or costing.
Choose Enter
Enter Plant 1000
Choose Enter
Makechangesasnecessaryandchoose Save
Edit Routing
Logistics→Production→MasterData→Routings→Routings→
Standard Routings →Change (CA02)
Enter the relevant material number
Enter Plant 1000
Choose Header from the toolbar
Check the usage and status
Choose Operations from the toolbar
Check the relevancy tocostingindicator
Edit Bill of Material
Logistics→Production→MasterData→BillsofMaterial→Billof
Material→MaterialBOM→Change(CS02)
Enter the relevant material number
Continued on next page
467
2009 © 2009 SAP AG. All rights reserved.
第 498 页 / 共 537 页
Unit12: CaseStudy AC505
Enter Plant 1000
Enter Usage 1
Choose Header from the toolbar
Check the usage and status
Choose ItemOverview fromthe toolbar
Checkthe relevancy tocostingindicator
Edit Work Center
Logistics→Production→MasterData→WorkCenters →Work
Center → Change (CR02)
Enter Plant 1000
Enter the relevant Work Center
Choose Enter
Verifytheassignedcostcenter,activitytypesandformulas
Task 2:
1. Afterdeterminingthatthecostestimateisaccurateandcomplete,updatethe
plannedprice3fieldwiththeresultsforT-F1##andT-B1##.
Continued on next page
468
©2009SAPAG.Allrightsreserved. 2009
第 499 页 / 共 537 页
AC505 Lesson: Case Study
Figure 198: Cost Estimate
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCostPlanning→MaterialCosting→PriceUpdate(CK24)
Select Other prices
Make the following entries:
Company code:1000
Plant:1000
Material:T-F1##
Costing Variant:CV##
Costing Date:1st of next month
Costing Version01
Select Planned Price 3
Validity date 1st of next month
Cost Component View: COGM
DeselecttheTestrunindicatorandchooseExecute.
469
2009 © 2009 SAP AG. All rights reserved.