AC505 Lesson: Prices in Material Master
Thesystemcan usethe itemizationof standard cost estimatestodeterminethe
target costs for manufacturing orders. The difference between target cost and
actual costcanbeanalyzedatthelevelofvariancecategories, suchasquantity
or price variances. The saved itemization provides the basis for the variance
calculation.
InProfitabilityAnalysis,youcanusestandardcostestimates(orothermaterial
cost estimates) to compare the revenues of the billed quantity with the cost
component split of the product.
AstandardpriceisalsorequiredintheMaterialLedgertodeterminetheactual
price.
Figure 88: Procedure: Update of Standard Price
Execute material cost estimate: Use a costing variant that is applicable to a
standardcostestimate(costingtype). Example: InDecember2000,youcreatea
newstandardcostestimateforJanuary2001(thatis,avaliditydateof01.01.2001
valid until 12.31.9999).
Accuracyofcostingresults: Thesystemcannotifytheuserofpossibleerrorsvia
thetechnicalstatus. Contenterrors,suchasincorrectpricesorquantites,cannotbe
detected by the system.
Recommendation: IntheProductCostPlanningreporting,useobjectlistswhich
can becompared with material master pricesand set the inspectionseverity in
accordance with your requirements.
Updateallowed: Youmustgrantanallowanceonceforthebusinessperiod. This
iscarriedoutforthecompanycode,valuationvariant,andcostingversion. Ensure
thatthevaluationvariantisalsousedinyourcostingvariant.
193
2009 © 2009 SAP AG. All rights reserved.
第 210 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
Marking: Oncetheabovestepshavebeencarriedout,thematerialcostestimate
can be marked. Thefuture planned priceisupdatedin thematerial master and
linkedtothestandardcostestimate. YoucanmarkthecostestimateinDecember
for January.
Release: Youcanonlyreleasecostestimatesonce. Itcanalsoonlybecarriedout
in a period corresponding tothevalidfromdate.
Figure 89: Example: Update of Standard Price
Situation: The“old”standardcostestimatehasalreadybeenreleasedandhasset
acurrentplannedpriceof10. ThematerialmasterissubjecttoSpricecontroland
the inventory is valuated with 10 * 10 = 100.
Marking: Thefutureplannedpriceof15issetinthematerialmasterandalinkto
the“new”standardcostestimateestablished. Norevaluationtakesplace.
Release: Releaseconvertsthefuturestandardpriceof15tothecurrentstandard
price. The previouscurrent standardprice of 10 isnowshown astheprevious
plannedpriceandislinkedtothe“old”standardcostestimate.
Revaluation: If the material has inventory, the inventory is revalued. In this
example,theinventoryvalueisincreasedby50andaprofitposting“Profitfrom
revaluation”of50isdisplayed. Thevaluationclass(anditsaccountdetermination)
in the material master control howthesystemfindsthebalancesheet accounts
and profit and loss accounts.
194
©2009SAPAG.Allrightsreserved. 2009
第 211 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Changing the Standard Price
Figure 90: Changing the Standard Price
Pricechangewithoutaffectingthereleasedstandardcostestimate
• YouchangetheSpricewithpricechangetransactionMR21.
• Thestandardsystemdoesnotallowthistypeofpricechangeifareleased
standardcostestimateexists. Authorizationmaybegrantedviauser-defined
errormanagementinCustomizingfortheMaterialLedgertoallowthis.
• Changingthematerialpricecreatesadocumentfromwhichyoucangoto
the accounting documents generated.
• Thestandardpriceischanged. However,thereleasedstandardpriceandits
linktothestandardcostestimateremain. Notetheeffectsofthepricechange
inCostObjectControllingandinthevaluationinProfitabilityAnalysis.
Pricechangewitheffectonreleasedstandardcostestimate
• Delete the cost estimate. Use the menu option Delete Test Data for this.
When you delete the current standard cost estimate, the cost component
splitanditemizationareremovedfromthedatabase. Similarly,thelinkto
thematerialmasterisdeleted,andthecurrentplannedpriceissetto_. The
standard price is unaffected.
• Executeanew,correctedstandardcostestimateandproceedwiththeprice
update process described above.
195
2009 © 2009 SAP AG. All rights reserved.
第 212 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
Figure91: Distinguishing Between MaterialCostEstimates
Ifyoucreatemorethanonecostestimateforthesamematerial,severalbusiness
questions arise, such as:
• Whatistheproportionofcostsattributabletotechnicalandorganizational
improvements?
Example: Useofcurrentquantitystructureandvaluationathistoricalprices.
Subsequentcomparisonwithstandardcostestimate.
• What is the influenceof changed raw material prices and potential wage
increases?
Example: Useofhistoricalquantitystructureandvaluationwithcurrentor
futureprices. Subsequentcomparisonwithstandardcostestimate.
• Howare the current costs broken down?
Example: Currentquantitystructurewithcurrentprices.
• “What If” analyses.
Example: Maintaining and valuating make-or-buy acceptances, prices,
quantitiesandstructuresunderaseparateversion.
196
©2009SAPAG.Allrightsreserved. 2009
第 213 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Exercise 9: Price Update
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Usetheconceptofupdatingpricesinthematerialmaster
• Definetheprerequisitesandtheproceduretousecostsforinventoryvaluation
• Checkthepriceupdateresultsinthematerialmaster
Business Example
YoucreateamaterialcostestimateforpumpR-F1##andanalyzethesavedresult.
Thiscostingresultisusedtotriggerarevaluationofyourinventories. Initially,
only the costing result of an assembly of the semi-finished product should be
updatedtothestandardpricefieldinthematerialmaster. Theresultoftheprice
updateprocessisobserved inthematerial master.
Task 1:
Inthefollowingexercisesyouwillupdatethestandardcostfieldsinthematerial
master withtheresultsof thematerialcostestimate.
1. Display the material master records of your product R-F1## and
semi-finished material R-B1## in plant 1000. Select the accounting and
costing views.
2. Enter the prices in the table below.
Field R-F1## R-B1##
Tax price 1
Future standard cost
estimate price
Current standard cost
estimate price
Previous standard cost
estimate price
3. To which periodsdo the cost estimatesrefer?
Continued on next page
197
2009 © 2009 SAP AG. All rights reserved.
| Field | R-F1## | R-B1## |
|---|---|---|
| Tax price 1 | ||
| Future standard cost estimate price | ||
| Current standard cost estimate price | ||
| Previous standard cost estimate price |
第 214 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
Task 2:
Createastandardcostestimateforproduct R-F1##.
1. Useplant1000,costingvariantPPC1,andcostingversion1. Enteracosting
lotsizeof 100pieces. Choosetoday'sdateforthecostingfromdate. The
costestimateshouldbevaliduntil31.12.2010. Acceptthedefaultquantity
structure date and valuation date.
2. Whatis the error statusof your cost estimate?
3. Gotothematerialoverview. Whichproductswerecostedinthistransaction?
4. GotoCustomizingusingtheexplanationfacilities,andverifythatyoucan
updatethestandardpriceforassemblyR-B1##withthisresult.
5. Save the cost estimate, including the log.
Task 3:
Gotothemenu option for thepriceupdatetoverifythat markingforcompany
code1000isallowedfor thecurrentposting period.
1. For which costing variant and version was marking and release allowed
for the current period?
Task 4:
MarkthecostestimateofassemblyR-B1##,plant1000,forthecurrentperiodin
the current fiscal year.
1. Turnofftheindicatorforthetestrunintheprocessingoptions. Donotleave
theresultlist until answeringquestions5and6.
Task 5:
DisplaythematerialmasterrecordofyourcomponentR-B1##:
1. Fromtheresultlist,displaythematerialmasterrecordofyourcomponent
R-B1##inplant1000byselectingthematerialfromtheresultlist. Selectthe
costing 2 view.
Enter the prices in the table below.
What is the period?
Continued on next page
198
©2009SAPAG.Allrightsreserved. 2009
第 215 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Field PriceforR-B1## Period
Futurestandardcostestimateprice
Current standard cost estimate
price
Previous standard cost estimate
price
2. Whatisthecurrent stock balance ofR-B1##? Go totheaccountingview
1 to determine this.
Task 6:
Release cost estimate R-B1##, plant 1000.
1. Gotothelogintheresultlist,andnavigatefromthepricechangedocument
tothedisplayoftheaccountingdocuments. Donotleavetheresultlistuntil
answering the questions in Task 7.
Task 7:
Display the material master record of R-B1##:
1. Fromtheresultlist, displaythematerialmasterrecordofR-B1##inplant
1000. Go to costing view 2.
2. What are the prices?
3. What is the period?
Task 8:
1. Go to the material master of the finished product R-F1## and select the
Costing 2 view.
2. Hasthepricefieldthatyouenteredearlierchanged?
3. Give reasons for your answer.
199
2009 © 2009 SAP AG. All rights reserved.
| Field | PriceforR-B1## | Period |
|---|---|---|
| Futurestandardcostestimateprice | ||
| Current standard cost estimate price | ||
| Previous standard cost estimate price |
第 216 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
Solution 9: Price Update
Task 1:
Inthefollowingexercisesyouwillupdatethestandardcostfieldsinthematerial
master withtheresultsofthematerialcostestimate.
1. Display the material master records of your product R-F1## and
semi-finished material R-B1## in plant 1000. Select the accounting and
costing views.
a) Menu→Logistics→MaterialsManagement→MaterialMaster→
Material→Display→DisplayCurrent(MM03)
Enter material R-F1## and choose Select view(s). Select both
accounting viewsand both costing views.
Choose Continue (Enter).
Enterplant1000andchooseContinue(Enter).Doexactlythesame
for material R-B1##.
2. Enter the prices in the table below.
Field R-F1## R-B1##
Tax price 1
Future standard cost
estimate price
Current standard cost
estimate price
Previous standard cost
estimate price
a) 1. ThetaxpriceisfoundontheAccounting2view. Theremaining
pricescanbefoundontheCosting2view.
Field R-F1## R-B1##
Tax price 1 ________EUR ________EUR
Futurestandardcostestimate Blank Blank
price
Current standard cost ________EUR ________EUR
estimate price
Previous standard cost ________EUR ________EUR
estimate price
Continued on next page
200
©2009SAPAG.Allrightsreserved. 2009
| Field | R-F1## | R-B1## |
|---|---|---|
| Tax price 1 | ||
| Future standard cost estimate price | ||
| Current standard cost estimate price | ||
| Previous standard cost estimate price |
| Field | R-F1## | R-B1## |
|---|---|---|
| Tax price 1 | ________EUR | ________EUR |
| Futurestandardcostestimate price | Blank | Blank |
| Current standard cost estimate price | ________EUR | ________EUR |
| Previous standard cost estimate price | ________EUR | ________EUR |
第 217 页 / 共 537 页
AC505 Lesson: Prices in Material Master
3. To which periodsdo the cost estimatesrefer?
a) 2. Theperiodforthecostestimatescanbefounddirectlyabovethe
pricefieldintheCostingview2inthematerialmaster.
Task 2:
CreateastandardcostestimateforproductR-F1##.
1. Useplant1000,costingvariantPPC1,andcostingversion1. Enteracosting
lot sizeof 100pieces. Choosetoday'sdateforthecostingfromdate. The
costestimateshouldbevaliduntil31.12.2010. Acceptthedefaultquantity
structure date and valuation date.
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCost Planning→MaterialCosting→CostEstimatewith
Quantity Structure →Create(CK11N)
Enter the following:
Material: R-F1##
Plant: 1000
Costing variant: PPC1
Costing version: 1
Costing lot size: 100
GototheDatestab. ChoosetheDefaultDatesandthenchangethe
default dates as follows:
Costing date from: Today's date
Costing date to: December 31, 2010
Quantitystructuredate: 1stdayoffollowingmonth
Valuation date: 1stdayoffollowingmonth
ChooseEnter. Thesystemexecutesthecostestimateautomatically.
2. What isthe error statusof your cost estimate?
a) GototheCostingdatatab. Thestatusofthecostestimateshould
be Costed without errors.
Continued on next page
201
2009 © 2009 SAP AG. All rights reserved.
第 218 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
3. Gotothematerialoverview. Whichproductswerecostedinthistransaction?
a) GototheoverviewbychoosingGoto→MaterialOverview.
The following materials appear in the list: R-F1##, R-B1##,
R-B2##, R-B3##, R-B4##, R-T1##, R-T2##, R-T3##, R-T0##,
R-T4##, R-T5##.
AllshouldhavethestatusKA(costedwithouterrors).
Go back to thecosting result overview.
4. GotoCustomizingusingtheexplanationfacilities,andverifythatyoucan
updatethestandardpriceforassemblyR-B1##withthisresult.
a) ChooseCostingVariantandthenchoosetheCostingType. Yousee
thatcostingtype01Standardcostest. (mat.) allowsthestandard
pricetobeupdatedin thematerial master.
5. Save the cost estimate, including the log.
a) 4. Gobacktotheinitialscreenandsavethecostestimatewithcost
component split, itemization and log.
Task 3:
Gotothemenu option for thepriceupdatetoverifythat markingforcompany
code1000isallowedfor thecurrentposting period.
1. For which costing variant and version was marking and release allowed
for the current period?
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCostPlanning→MaterialCosting→PriceUpdate(CK24)
Posting period: Current month
Fiscal year: Current fiscal year
Choose Marking allowance.
Select company code 1000.
Allowedcostingvariantforstandardcostestimate: PPC1
Costing version: 1
Exit the display.
Continued on next page
202
©2009SAPAG.Allrightsreserved. 2009
第 219 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Task 4:
MarkthecostestimateofassemblyR-B1##,plant1000,forthecurrentperiodin
the current fiscal year.
1. Turnofftheindicatorforthetestrunintheprocessingoptions. Donotleave
theresultlistuntil answeringquestions5 and6.
a) Menu Accounting → Controlling → Product Cost Controlling→
ProductCostPlanning→MaterialCosting→PriceUpdate(CK24)
Make the following entries:
Posting period: Current month
Fiscal year: Current fiscal year
Company code: 1000
Plant: 1000
Material: R-B1##
DeselecttheTestrunindicatorandchooseExecute.
Note: Make sure that the cost estimate has the status VO
Marked without errors
DonotexittheresultlistuntilansweringthequestionsinTask5.
Task 5:
DisplaythematerialmasterrecordofyourcomponentR-B1##:
1. Fromtheresultlist,displaythematerialmasterrecordofyourcomponent
R-B1##inplant1000byselectingthematerialfromtheresultlist. Selectthe
costing 2 view.
Enter the prices in the table below.
What is the period?
Continued on next page
203
2009 © 2009 SAP AG. All rights reserved.
第 220 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
Field PriceforR-B1## Period
Futurestandardcostestimateprice
Current standard cost estimate
price
Previous standard cost estimate
price
a) PlaceyourcursorontheresultlineandclickthematerialR-B1##.
Select the Costing 2 view.
The pricesare in the Costing 2 view.
Theperiodisthecurrentperiodofthecurrentfiscalyear.
Field PriceforR-B1## Period
Futurestandardcostestimate Result from cost Current
price estimate period
Currentstandardcostestimate
price
Previous standard cost
estimate price
Theentriesforthecurrentandpreviousperiodareunchanged.
2. Whatisthecurrent stockbalanceofR-B1##? Go totheaccounting view
1 to determine this.
a) Go to Accounting 1.
The total stock is 10 pieces, the total stock valueR-B1## isalso
listed.
Continued on next page
204
©2009SAPAG.Allrightsreserved. 2009
| Field | PriceforR-B1## | Period |
|---|---|---|
| Futurestandardcostestimateprice | ||
| Current standard cost estimate price | ||
| Previous standard cost estimate price |
| Field | PriceforR-B1## | Period |
|---|---|---|
| Futurestandardcostestimate price | Result from cost estimate | Current period |
| Currentstandardcostestimate price | ||
| Previous standard cost estimate price |
第 221 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Task 6:
Release cost estimate R-B1##, plant 1000.
1. Gotothelogintheresultlist,andnavigatefromthepricechangedocument
tothedisplayoftheaccountingdocuments. Donotleavetheresultlistuntil
answering the questions in Task 7.
a) Menu→Accounting→Controlling→ProductCostControlling→
ProductCostPlanning→MaterialCosting→PriceUpdate(CK24)
Choose the Release button.
Enter the following:
Posting period: Current month
Fiscal year: Current fiscal year
Company code: 1000
Plant: 1000
Material: R-B1##
DeselecttheTestrunindicatorandchooseExecute.
The cost estimate should have the status FR (Released without
errors).
Tofindthepricechangedocument,scrolltotherightoftheresult
list. Displaythepricechangedocumentbyplacingthecursoron
thedocumentnumberforthepricechangedocument.
Thepricechangedocumentis displayed.
Choose Accounting documents.
ChooseAccountingdocument.Gobacktotheresultlist
Task 7:
Display the material master record of R-B1##:
1. Fromtheresultlist, displaythematerialmasterrecordofR-B1##inplant
1000. Go to costing view 2.
a) Placeyourcursoronthematerial(casingmaterialR-B1##)inthe
pricechangedocument. GototheCosting2viewofthematerial
mastertoseetheaffect ofthepricechange.
2. What are the prices?
a) The prices are in theCosting 2 view.
Continued on next page
205
2009 © 2009 SAP AG. All rights reserved.
第 222 页 / 共 537 页
Unit5: MaterialCostingwithQuantityStructure AC505
3. What is the period?
a) Thepricecomesfromthecurrentperiodinthecurrentfiscalyear.
Field Price for Period
R-B1##
Future standard cost estimate
price
Current standard cost estimate Resultfromcost Current
price estimate period
Previous standard cost estimate
price
Task 8:
1. Go to the material master of the finished product R-F1## and select the
Costing 2 view.
a) Menu→Logistics→MaterialsManagement→MaterialMaster→
Material→Display→DisplayCurrent(MM03)
Material: R-F1##
Viewselection: Costing2, Accounting 2
Choose Enter
Enter plant 1000.
2. Hasthepricefieldthatyouenteredearlierchanged?
a) No price field was changed.
3. Give reasons for your answer.
a) 2. MarkingandreleasewasperformedonlyforassemblyR-B1##.
Theremainingassembliesandthefinalresultarenotaffectedby
this.
IfthecostingresultformaterialR-F1##shouldbewrittentothe
standard price field, marking and release must be carried out
specifically for this material.
206
©2009SAPAG.Allrightsreserved. 2009
| Field | Price for R-B1## | Period |
|---|---|---|
| Future standard cost estimate price | ||
| Current standard cost estimate price | Resultfromcost estimate | Current period |
| Previous standard cost estimate price |
第 223 页 / 共 537 页
AC505 Lesson: Prices in Material Master
Lesson Summary
You should now be able to:
• Update prices in the material master
• Usepricecontrol techniquesinmaterialvaluation
• Usethefunctionsofmaterialcostingwithquantitystructureefficiently
207
2009 © 2009 SAP AG. All rights reserved.
第 224 页 / 共 537 页
UnitSummary AC505
Unit Summary
You should now be able to:
• Analyzetheresultsofamaterialcostestimatewithquantitystructure
• Use the BOM to determine the material costs
• UseRoutingandworkcenterstodetermineproductioncosts
• Linkworkcenterstocostcenterstovaluateproductioncosts
• DescribetherequiredentriesintheLogisticsmasterdata
• Createamaterialcostestimatewithquantitystructure
• Analyzetheresultsofamaterialcostestimatewithquantitystructure
• Update prices in the material master
• Usepricecontrol techniquesinmaterialvaluation
• Usethefunctionsofmaterialcostingwithquantitystructureefficiently
208
©2009SAPAG.Allrightsreserved. 2009
第 225 页 / 共 537 页
AC505 Test Your Knowledge
Test Your Knowledge
1.
can determine the product structure and production plans as entered in
Logistics, and convert them into the structures of the itemization and
cost component split.
Fillintheblankstocompletethesentence.
2. Where can you use BOMs?
3. What does the control key specify?
4. How do you use formula parameters?
5. What is quantity structure control?
6. Select the standard costing values
Choosethecorrectanswer(s).
□ A Lot size
□ B Dates
□ C Quantity structure
□ D All of the above
209
2009 © 2009 SAP AG. All rights reserved.
第 226 页 / 共 537 页
TestYourKnowledge AC505
7. Whatistheuseoftheexplanationfacilitiesvis-a-viscostplanning?
8. Whatisthesignificanceoftax-basedandcommercialprices?
9. Whatisthepurposeofundertakingtheprofitabilityanalysis?
10. Howcanyouchangethestandardpricewithoutreleasingacostestimate?
210
©2009SAPAG.Allrightsreserved. 2009
第 227 页 / 共 537 页
AC505 Test Your Knowledge
Answers
1. Materialcostingwithquantitystructurecandeterminetheproductstructure
and production plans as entered in Logistics, and convert them into the
structuresoftheitemizationandcostcomponentsplit.
Answer: Materialcostingwithquantitystructure
2. Where can you use BOMs?
Answer: BOMs are used:
• InMaterialRequirementsPlanningforprocuringparts.
• In Production for staging parts.
• In costingfor calculating material costs.
3. What does the control key specify?
Answer: The control key specifies the business functions you want to
execute with an operation:
• Scheduling
• Capacity planning
• Costing
• Confirmation
• External processing
4. How do you use formula parameters?
Answer: You can use formula parameters to which you have assigned
values. You can thenlinktheseparameterswithmathematicaloperations
suchasaddition,subtraction,multiplication,ordivision. Theformulasare
maintainedinCustomizingfor theworkcenter.
5. What is quantity structure control?
Answer: Quantity structure control is a process by which the system
searchesfor alternatives, shouldmultipleBOMsand/or routingsexistfor
a material.
211
2009 © 2009 SAP AG. All rights reserved.
第 228 页 / 共 537 页
TestYourKnowledge AC505
6. Select the standard costing values
Answer: D
Thestandardcostingvaluesarelotsize,dates,andquantitystructure.
7. Whatistheuseoftheexplanationfacilitiesvis-a-viscostplanning?
Answer: Theexplanationfacilitiesenablethecostplannertoquicklyaccess
dataandinformationinthecostingenvironment. Theyremaininthecost
estimateortheanalysisthereofwhileaccessingtheabovedata.
8. Whatisthesignificanceoftax-basedandcommercialprices?
Answer: Tax-basedandcommercialpricesareenteredforpurchasedparts
ininventorycostingforvaluessuchasthedeterminationoflowestvalue. An
inventorycostestimatecanusethesepricesforvaluation,andthenupdate
thecostingresultsforfinishedandsemifinishedproductsinthesefields.
9. Whatisthepurposeofundertakingtheprofitabilityanalysis?
Answer: InProfitabilityAnalysis,youcanusestandardcostestimates(or
othermaterialcostestimates)tocomparetherevenuesofthebilledquantity
withthe cost component split of theproduct.
10. Howcanyouchangethestandardpricewithoutreleasingacostestimate?
Answer: Youcanchangethestandardpricewithoutreleasingacostestimate:
Delete the cost estimate. Use the menu option Delete Test Data for this.
When you delete the current standard cost estimate, the cost component
splitanditemizationareremovedfromthedatabase. Similarly,thelinkto
thematerialmasterisdeleted,andthecurrentplannedpriceissetto_. The
standard price is unaffected.
212
©2009SAPAG.Allrightsreserved. 2009
第 229 页 / 共 537 页
第 230 页 / 共 537 页
第 231 页 / 共 537 页
Unit 6
Costing Run
Unit Overview
Thisunitexplainshowtocreateacostingrun. Theunitalsoexplainshowtocreate
aselectionlistusingflexiblematerialselectionforacostingrun. Itexplainshow
toexecuteacostingrun. Theunitanalyzestheresultsofacostingrunandusing
thisanalysis,theunitexplainshowtoefficientlyusethecostingrun.
Unit Objectives
After completing thisunit, you will beableto:
• Create a costing run
• Createaselectionlistusingflexiblematerialselectionforacostingrun
• Execute a costing run
• Analyze the result of a costing run
• Usethecostingrunefficientlythrougheffectiveerrorhandling
Unit Contents
Lesson: Costing Run in Product Cost Planning.............................214
Exercise 10: Costing Run.................................................227
213
2009 © 2009 SAP AG. All rights reserved.
第 232 页 / 共 537 页
Unit6: CostingRun AC505
Lesson: Costing Run in Product Cost Planning
Lesson Overview
Thislessonexplainshowtocreateacostingrun. Italsoexplainshowtocreatea
selectionlistusingflexiblematerialselectionforacostingrun.
Lesson Objectives
After completingthislesson, you will beable to:
• Create a costing run
• Createaselectionlistusingflexiblematerialselectionforacostingrun
• Execute a costing run
• Analyze the result of a costing run
• Usethecostingrunefficientlythrougheffectiveerrorhandling
Business Example
Youregularlyprovideallcost estimates, suchasstandard, modified, andother
costestimates,fortheproductsandmaterialsinyourcompany.
Youusethecostingrunasatoolfor productcostplanningtoprocessthismass
data.
You also need tomonitor cost changes, both positive andnegative, by making
regular comparisons.
Anothertaskistoanalyzeandaccountforcostingvariancesandcorrecterrorsin
the master data and/or price maintenance.
214
©2009SAPAG.Allrightsreserved. 2009
第 233 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Overview and Process Flow
Figure 92: Overview: Costing Run
ThecostingrunisatoolusedformassprocessinginProductCostPlanning.
Thefollowingsituationsareexamplesofusingthecostingrun:
• Standardcostestimateofallthematerialsinoneplant.
• Standardcostestimateofallthematerialsinallplants.
• Monthlymodifiedstandardcostestimateofallmaterials.
• Currentcostestimateofallmaterialsofaproductgroup.
• Currentcostestimateofahighlycomplexproductstructure.
The costing run organizes the processing steps and checks the material cost
estimatesgenerated. Afteracostingrunanditsprocessingstepsaresuccessfully
completed, it canbedeleted. Theadministrativedatain the costingrunisalso
deleted,butthematerialcostestimatesgeneratedbyacostingrunremainandcan
be reorganized and/or archived, if required.
215
2009 © 2009 SAP AG. All rights reserved.
第 234 页 / 共 537 页
Unit6: CostingRun AC505
Figure 93: Costing Run: Process Flow
Aftereachprocessingactivity,youcanstudytheactivityinthemessagelog,and,
ifrequired,repeattheactivityuntilcostingisfreeoferrors.
• Example: Ifafewmaterialsarecostedwitherrors,onlythecostingactivity
is repeated beforeprice updateis performed.
Inthecaseofpartialselectionofassemblies,thestructuremustbeexplodedagain
after the selection.
Ifyourepeattheselectionactivity,thesubsequentactivitymustalsoberepeated.
216
©2009SAPAG.Allrightsreserved. 2009
第 235 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Flexible Material Selection
Figure 94: Flexible Material Selection
Business Value
• Flexibleselectionofmaterialsforcostingenablesmorepreciseselectionof
materialsinsupportofthecostestimator’srequirements.
Realization
• Thereisaseparatetransactiontomaintaintheparameterstoselectmaterials
andgeneratetheselectionlist(transactionCKMATSEL).
• The selection of materials can be restricted through the following
characteristics:
– Material number, plant
– BOM usage
– Additionalmaterialmasterfieldsfoundintheaccountingandcosting
views
– Criteria for existing cost estimates
– Referencingmaterialsfromanexistingcostingrun
• After the initial material list iscreated, it ispossibleto manually edit the
selection list (transaction CKMATCON) by adding or deleting materials
from the selection list.
• Theselectionlistcanbeusedtoselectmaterialsforacostingrun(transaction
CK40N)byassigningtheselectionlisttotheSelectionstep.
217
2009 © 2009 SAP AG. All rights reserved.
第 236 页 / 共 537 页
Unit6: CostingRun AC505
Figure 95: Maintenance and Use of Selection List
The selection list is created using the transaction CKMATSEL. Materials can
beselectedusingmaterialmasterfieldsfromtheaccountingandcostingviews
such as:
• Profit Center
• Valuation Class
• Special Procurement Type
Materials can also be selected based on the characteristics of previous cost
estimates, such as:
• Costing Variant
• Costing Dates
• Costing Status
Ifrequired, thematerialsselectedcanbemanuallyedited usingthetransaction
CKMATCON.
Theselectionlistcanbeusedinfuturecostingruns,asrequired.
218
©2009SAPAG.Allrightsreserved. 2009
第 237 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Working with Costing Run
Figure 96: Creating a Costing Run
Acostingrunisidentifiedbyitsnameandthecostingrundate.
• Recommendation: Usethelongtexttoexplainthepurposeofcosting(such
as “Plan 04/2000, plant 0001”).
Createwithreference: Asarule,youshouldexecutecostingrunsforthesame
plants on a monthly, quarterly, or yearly basis. If you usethisfunction, all the
necessary data and parameters are copied. All you need to do is execute the
process and alter the names and long text.
General data
• Thecostingvariantspecifiestheexplosionandvaluationstrategies.
• Youneedtoenteronlythecompanycodeifthecostingrunshouldbelimited
toonecompanycodeandcross-companycostinghasnotbeenenabledin
Customizing.
• Similarly, you need to enter only a server group if you use parallel
processing. Thisisrequiredonlyforextremelylargequantitiesofdata.
Beforeyoucaninitiatethecostingrun,youneedtosavetheGeneralData.
219
2009 © 2009 SAP AG. All rights reserved.
第 238 页 / 共 537 页
Unit6: CostingRun AC505
Figure 97: Executing a Costing Run
Theprocessingactivitiesareofferedaccordingtocontext. Theyarearrangedand
the flow is from left to right and top to bottom. You can executethe activities
eitherbyclickingicons(hotspots) or contextmenus.
Processing activities are categorized as Change parametersand Execute. The
functionsoftheParameterscolumn(Changeparameters) enableyoutocheck
or maintain the options of the activity (for example, the material numbers for
selection). BychoosingExecute,theprocessingactivityisinitiatedorscheduled.
OthercolumnsthatareusedtoexecuteafunctionareAuthorizationandLog. The
symbolintheAuthorizationcolumnindicatesifmarking/releaseispermitted(open
or closedpadlock)orif issuingauthorizationisnotpossible(redcross). If you
choosethepadlock,youaretakentothescreenthatisusedtoissueauthorization.
TheAuthorizationcolumnisdisplayedonlyforstandardcostestimates. If you
choose the Log column, youaretakento thelog.
TheBackgroundprocessingoptionenablesyoutospecifyif processingshould
takeplaceonlineor in the background. Whenyou chooseExecute, thesystem
eitherstartstheactivityorschedulesitinthebackground.
Statistics are generated for each activity.
220
©2009SAPAG.Allrightsreserved. 2009
第 239 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Costing Results and Analysis
Figure 98: Costing Results
TheCostingresultsareaenablesyoutoanalyzetheresultsofaprocessingactivity.
You can obtain an overview of the material selected or check the results of
individual cost estimates.
Three reports are available:
• Costinglevels: Providesanoverviewofthenumberofmaterialsselectedand
costinglevelscreated. Thelowestlevelcontainsthematerialcomponents,
purchasedpartsandrawmaterials. Ifyouselectspecificcostinglevelsand
gotothemateriallist,thesystemdisplaysthematerialsofonlytheselected
levels.
• Materiallist: Containstheselectedmaterials. Youcanalsocheckthestatus
ofthecostestimateforthematerial. Thereareseveralnavigationoptions,
suchasthecontextmenu,double-click,andthetoolbarmenu,whichcanbe
usedtoaccessmorecostestimatescreensandreports.
• Analysis: Thisreportisgeneratedbytheidenticalprocessingactivityinthe
Analysis area. It enables you to compare costing results with the results
ofothercostingrunsor withthepricesinthematerialmaster. Navigation
options similar to the material list are available. You can also access
comparison reports.
Recommendation: SAPrecommendstheuseoftheAnalysisoptiontocompare
newstandardcostestimateswiththestandardprice. Also,whentherearelarge
amountsofdata,youcanquicklydisplayanalysisreportsthatwerecreatedinthe
background.
221
2009 © 2009 SAP AG. All rights reserved.
第 240 页 / 共 537 页
Unit6: CostingRun AC505
Figure 99: Analyzing the Costing Run
Thestandardsystemprovidesseveralvariantsofthisreportforvariousanalysis
purposes. Youcanaccessthesereportseitherinthecostingrunbychoosingthe
menuoptionSettingsorthroughtheInformationSystem(outsideofthecosting
run).
• ResultsofCostingRun: Displaystheresultsofacostingrun.
• PriceversusCostEstimate: Youcancomparetheselectedcostestimates
withoneofthepricesinthematerialmaster. Youcansimulatetherevaluation
ofinventoriesthatwouldresultiftheselectedcostestimateswerereleased.
• VariancesBetweenCostingRuns: Enables youto compare twocosting
runs.
Foranoverviewofallreportoptions,usetheAllselectionsoption.
Exceptions: Checks the value against which the threshold values should be
calculated. Ifthecomparisonvalueisamaterialmasterprice,youneedtoenter
the price to be checked under Output.
Youcangofromtheobjectlisttothedetailedreports. Forexample:
Displaycostestimate,multi-levelBOM,itemization,costcomponentsplit.
Formoreinformationonanalyzingcostingruns,seetheSAPLibrary.
222
©2009SAPAG.Allrightsreserved. 2009
第 241 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Figure100: InformationSystem–AnalyzingtheCostingRun
The Analysis option in the costing run enables only one mass report. When
analysisisperformedagain, theoldresultisoverwritten.
The Analyze Costing Run report in the Information System does not have this
restriction. Also, time-consuming retrieval and formatting of mass data is
performedinthebackgroundandanextractisgenerated. Theextractisinteractive
andcanbequicklydisplayed. Theimportantfeaturehereistheinterplaybetween
selectionvariants, display variants, andextracts.
Recommended procedure:
• Defineanduseappropriatedisplayvariants(includingtotals, sorting, and
filters).
• Defineanduseappropriateselectionvariantsthatareassignedtothedisplay
variants.
• Specifytheextractsinwhichthecontentshouldbesaved.
• Startbackgroundprocessingwithdefinedselectionvariants.
• To call the report, you need to specify the extract to be read. In the
displayedextract,youcanusethesorting,filtering,andtotallingfunctions
and go to the detailed reports.
Formoreinformationaboutanalyzingcostingruns,seetheSAPLibrary.
223
2009 © 2009 SAP AG. All rights reserved.
第 242 页 / 共 537 页
Unit6: CostingRun AC505
Error handling in the Costing Run
Figure 101: Error Handling in the Costing Run
Costing by costing level: When you cost mass data for the first time and
you anticipate numerous errors or the quality of the master data is poor, it is
recommendedthatyouexecutecostingbycostinglevel.
• IntheparametersfortheCostingactivity,selecttherelevantcostinglevels
and proceed with costing. Process the errors and remove their causes.
Performcostingagainuntiltheresultsaresatisfactory.
• Intheparametersofthesamecostingrun, selectthehighercostinglevels.
Thematerialcostestimatesofthelowerlevelsareautomaticallyincluded.
Cost estimates with errors only: This procedure is recommended when few
errorsareanticipatedorfortheabovesituationsforoneormoreselectedcosting
levels.
• Theexampleshownaboveontherightillustratesacasewhereallthecosting
levelsarecosted. Insuchcases,theerrorseverityofmessageCK318should
besettoErrorintheuser-definederrormessage,sothatallcostestimates
containingcostestimateswitherrorsareflaggedaccordingly.
• For repeatedcost estimates, settheindicator Cost estswitherrorsonlyin
the Costing parameter.
224
©2009SAPAG.Allrightsreserved. 2009
第 243 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Figure 102: Costing Run – Managing Logs
Inmassprocessing,loggedmessagesanderrorsaretheruleandnottheexception.
Message numbers (and consequently message causes) generally account for a
small proportion of the logs.
Ifextremelylargecostingrunsareexecuted,youcancreatealogforeachcosting
level to assist the analysis process.
The standard system contains displayvariantsfor error logs thatenableyou to
summarizeandgroupthedata. Youshoulddefineyourowndisplayvariantsfor
filtersandsorting,sothatyoucanquicklyaccesstherequireddata.
Youcanprintthelogateachstageofthecostingrun. Thisisnotrecommendedfor
largecostingrunsbecauseitincreasestheprocessingtimeandusesaconsiderable
amount of the system's resources (spools).
Itisagood ideatosavethelogandanalyzeitlater.
225
2009 © 2009 SAP AG. All rights reserved.
第 244 页 / 共 537 页
Unit6: CostingRun AC505
226
©2009SAPAG.Allrightsreserved. 2009
第 245 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Exercise 10: Costing Run
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Perform the activities of a costing run
• Define the uses of the costing run
• Choosematerialsforacostingrunusingflexibleselection
• Createa costing run, select materialsfor editing, explode a structureand
execute costing
• Mark and release the cost estimates
Business Example
The objective is to cost materials efficiently. You will use the costing run
to simultaneously cost multiple materials with their assemblies and material
components. Youwillexecutethevariousactivitiesofthecostingrunandusethe
analysis options.
Task 1:
Create a flexible selection list:
1. Createaflexibleselection list toselectionmaterialsfor your costingrun.
SelectthematerialsR-F1##andR-F2##forplant1000.
Caution: Ensurethat you select only theproductsofyour group
through multipleselection of materials.
2. Assign thenameSelect##to yourselection list. Enterashort description
of your choice.
Task 2:
CreateacostingrunwiththenameGR##usingcurrentdateasthecostingrundate.
1. EnterthedescriptionGroup##mid-yearcostestimate. Usecostingvariant
PPC1andcostingversion01. Executethecostingrunforcontrollingarea
1000 and company code 1000.
2. The cost estimate is to bemarked and released today. Make the relevant
date settings.
3. Save the costing run.
Continued on next page
227
2009 © 2009 SAP AG. All rights reserved.
第 246 页 / 共 537 页
Unit6: CostingRun AC505
Task 3:
1. Display theprocessactivitiesforthecosting run andassign yourflexible
selectionlistSelect##formaterialselection. Intheprocessingoptions,turn
offtheindicatorforbackgroundprocessingandsaveyourentries.
2. Executetheselectionstep. Thepre-selectionofmaterialsshoulddisplaytwo
materialswith thestatusSE (Selectedwithout Errors). Checkthecosting
result in the list of costing levels.
Task 4:
1. Maintaintheparametersforthenextcostingrunstep,thestructureexplosion.
Turn off theBackground processing indicator, so that the activity can be
executed online.
2. Nowthatyouhavemaintainedtheparameters,youcanexecutethestructure
explosion step.
3. Howmanycostinglevelswereselected? Whatisthereasonforthis?
4. Whichnewmaterialsappearinthematerialoverviewofthecostingrun?
5. ViewtheselectionstatusSEfromthematerialsoverviewlist,bychanging
to the list layout 1SAP01.
Task 5:
Proceed with the costing step.
1. Go into the parameter maintenance for the costing step and turn off the
Backgroundprocessingindicator. Makesurethatthelogissetforcosting
levels.
2. After saving the settings, execute costing.
3. Fromthematerialsoverview,makesurethatallthematerialsthathavebeen
costed have ayellow or green trafficlight.
Task 6:
Younowwanttoanalyzethecostingresultsusingspecialreports.
1. In the analysis parameters, select display variant SAP&11. Using the
parameters, select your costing run GR## with the relevant costing date
and save it.
2. Executetheanalysisandselectalayoutthatcomparesthecostingresultwith
the standard price for every material, in order to see the impact that will
occuriftheseresultsarereleasedasthenewstandardcost.
3. Fromthereport,displaytheMulitlevelBOMreport.
Continued on next page
228
©2009SAPAG.Allrightsreserved. 2009
第 247 页 / 共 537 页
AC505 Lesson: Costing Run in Product Cost Planning
Task 7:
1. Markthecostingresults. First,checkwhethermarkinghasbeenallowedin
the current period for your costing variant.
2. TurnofftheBackgroundprocessingandtestrunindicatorsintheparameter
settings. Execute the update run.
3. Fromthematerialsoverview,checkthecostingresultforagivenmaterialby
double-clicking on the material number.
4. Gotothematerialmaster(Costingview2)forthesematerials. Placeyour
cursoronthematerialnumber,clickontherightmousebuttonandgotothe
material master. Make sure that the Future standard cost estimate price
field has been updated.
Task 8:
1. Finally,releasethecostingresults. Makesurethatreleasewillbecarriedout
onlineandthenexecutetherelease. Donotexecuteatestrun.
2. From the Price Update: Release Standard Price list, make sure that all
materials have the status FR (Released without Errors). Navigate to the
materialmasterdirectlyfromthePriceUpdate: ReleaseStandardPricelist
byselectingthematerial. ChecktheresultsofthereleaseintheAccounting
1 and Costing 2 views.
3. FromthePriceUpdate: ReleaseStandardPricelist,displaythefinancial
accounting document for the revaluation of inventory. Which materials
caused the inventorybalanceto berevalued?
4. In the Edit Costing Run screen, go to the overview of the costing run in
theScheduleManager todisplaytheactivitiesthatwereperformed inthe
costing run.
229
2009 © 2009 SAP AG. All rights reserved.
第 248 页 / 共 537 页
Unit6: CostingRun AC505
Solution 10: Costing Run
Task 1:
Create a flexible selection list:
1. Createaflexibleselection list toselection materialsforyour costing run.
SelectthematerialsR-F1##andR-F2##forplant1000.
Caution: Ensurethat you select only the productsof your group
through multipleselection of materials.
a) Menu →Accounting →Controlling→ Product Cost Controlling
→Product CostPlanning→MaterialCosting→CostingRun→
Selection List→Create (CKMATSEL)
Go to the Multiple selectionfunction for the material and enter
the following:
Material number: R-F1##
R-F2##
Copy the values.
Enter plant 1000.
2. AssignthenameSelect##toyour selection list. Enter ashort description
of your choice.
a) Executetheselectionofthematerials. Savetheresult.
Save the selection list.
Continued on next page
230
©2009SAPAG.Allrightsreserved. 2009