AC410 Lesson: Cost Allocations
Task 5:
Check theresult of theassessment in thereport.
1. Callthecostcenters: actual/plan/variancereportforthecurrentperiodand
version0. Executethereportforthecostcentergroup(B20##).
Althougha100%credit(senderrule)wasdefinedforallthecostcentersin
theassessmentcycle, notallofthecost centersarecredited. Whichwere
not credited?
_________________________________________
_________________________________________
_________________________________________
2. Whywerethesecostcentersnotcompletelycredited?
(See the notes for exercise 4-3)
Task 6:
Nowexecutetheassessmentwithiterationofthesegments.
1. Reverse the assessment results of the A## cycle first from the previous
exercise. Executethereversal in anupdaterun.
2. NowchangetheA##cyclebyselectingtheIterativeindicatorintheheader
data. Save the cycle.
3. RuntheA##assessmentcycleagaininanupdaterun.
Continued on next page
237
2005/Q2 © 2005 SAP AG. All rights reserved.
第 248 页 / 共 443 页
Unit4: Period-endClosing AC410
4. Call up thesenderinformationandnotedownthesender amountsfor the
201##(Organization)and202##(ITServices)costcenters.
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Comparethenumberswiththosefromexercise3. Whatdoyounotice?
5. Callupthelineitems. Notedowntheentriesthatthe201##(Organization),
202##(ITServices)costcentersdebited,andviceversa.
201##(Organization)debits202##(ITService)with_______________
202##(ITServices)debits201##(Organization)with_______________
Comparethenumberswiththosefromexercise4-4.
What causes this difference?
Task 7: Optional
1. Optional
Usethefollowinggraphicandtablestotrack the iteration manually. The
graphic already containsthe receiver tracing factors for allocation of the
201##(Organization),and202##(ITServices)costcenters.
Complete the tables.
Hint: Theamountscanbedeterminedwithoutusingacalculator.
Any small variances that may arise in the result calculated by
the mySAP ERP system are not important for understanding the
exercise.
Continued on next page
238
©2005SAPAG.Allrightsreserved. 2005/Q2
第 249 页 / 共 443 页
AC410 Lesson: Cost Allocations
201##(Organization) 60%to301##(ConsultantFI/CO)
30%to302##(ConsultantLO)
10% to202## (IT service)
Actual Cost debit Tracing Allocation to
costs from 202## (IT factor 202##(ITService)
from the Service)
sender
1stRun 9,000 --- 10%
2ndRun --- 10%
3rdRun --- 10%
4thRun --- 10%
S 10%
202##(IT Service) 18→301##(ConsultantFI/CO)
tracing factor
12→302##(ConsultantLO)
6 →201##(Organization)
Actual Cost debit Tracing Allocation
costs from 201## factor to 201##
from the (Organization) (Organization)
sender
1stRun 36,000 --- 1/6
2ndRun --- 1/6
3rdRun --- 1/6
4thRun --- 1/6
S 1/6
Task 8:
Solve the following task:
1. ChecktheresultoftheassessmentintheCostCenters: actual/plan/variance
reportforthecurrentperiodandversion0. Executethereportforthecost
centergroup(B20##). Gotoeachindividualcostcenter.
What do you notice?
Continued on next page
239
2005/Q2 © 2005 SAP AG. All rights reserved.
| Actual costs from the sender | Cost debit from 202## (IT Service) | Tracing factor | Allocation to 202##(ITService) | |
|---|---|---|---|---|
| 1stRun | 9,000 | --- | 10% | |
| 2ndRun | --- | 10% | ||
| 3rdRun | --- | 10% | ||
| 4thRun | --- | 10% | ||
| S | 10% |
| Actual costs from the sender | Cost debit from 201## (Organization) | Tracing factor | Allocation to 201## (Organization) | |
|---|---|---|---|---|
| 1stRun | 36,000 | --- | 1/6 | |
| 2ndRun | --- | 1/6 | ||
| 3rdRun | --- | 1/6 | ||
| 4thRun | --- | 1/6 | ||
| S | 1/6 |
第 250 页 / 共 443 页
Unit4: Period-endClosing AC410
_____________________________________________
_____________________________________________
_____________________________________________
Task 9: Optional
Management Accounting employees that were not directly involved in the
definition of the cycles would like to have a brief overview of the allocation
relationships. DemonstratetheoptionsprovidedbythemySAP ERPsystemto
your colleagues.
1. CalluptheCycleoverview. Placethecursorinthecyclefor thestructure
planontheassessmentcycleA##,andcallupthecycleinformation.
2. Display previous processing.
You can call up the document list by double-clicking on the cycle in the
Executedorreversedcyclesdialogbox. Youcancallupthelineitemsby
double-clickingonthecorrespondingdocumentnumber.
240
©2005SAPAG.Allrightsreserved. 2005/Q2
第 251 页 / 共 443 页
AC410 Lesson: Cost Allocations
Solution 14: Cost Allocations
Task 1:
Solve the following task:
1. Explaintotheprojectteammemberswhyyoudidnotchoosedistributionto
creditthe“Telephone”costcenter. Distributionwouldalsohavetransferred
the primary costs.
Answer: Thesender cost center doesnot requireany information on the
amount of the original debit.
Sendersandreceiversdonotrequireanypartnerinformation.
Lower use of system resources.
Task 2:
Create an assessment cycle with more than one segment to credit the
“Organization”,“ITServices”,and“MotorPool”costcenters.
1. Create cycle A## in the actual data. This cycle is to begin on the first
day of thecurrentfiscalyear. NamethecycleAssessment Consulting
Department##. DeselecttheIterativeindicator. Defineasegmentforeach
of the different assessment relationships.
1st segment
• AddasegmentORGA##withthedescriptionAssessment201##by
percentages. Theallocationcostelementis6300##. 100%ofthe
postedactualcostsaretobeassessedusingfixedpercentages.
• Choose the Sender/Receiver tab page. The 201## cost center
(Organization)isthesenderfortheassessment. Thesystemallocates
all of the cost elements in the 4000000 to 650000 interval. The
A-ORGA##costcentergroupisthereceiverfortheassessment.
• Choose the Receiver tracing factortab page. The“Organization”
costcenteruses60%ofitstimeandresourcesforFI/COConsulting
(301##), 30%for LOConsulting(302##), andtheremaining10%
for the“IT Services” cost center (202##).
Continued on next page
241
2005/Q2 © 2005 SAP AG. All rights reserved.
第 252 页 / 共 443 页
Unit4: Period-endClosing AC410
2nd segment
• AddasegmentIT-SERV##withthedescriptionAssessment202##
byPC.Theallocationcostelementis6310##. 100%oftheposted
actualcostsaretobeassessedusingvariableportionsoftheactual
statistical key figure.
• Choose the Sender/Receiver tab page. The 202## cost center (IT
Services)isthesenderfortheassessment. Thesystemallocatesall
ofthecostelementsinthe4000000to650000interval. TheA-IT##
costcentergroupisthereceiveroftheallocation.
• ChoosetheReceivertracingfactortabpage. Enterthestatisticalkey
figurePC##asatracingfactorforyourallocations.
• Astheconsultantsareoftenoutoftheoffice,theirPCsrequirefewer
repairs than the PCs in the “Organization” cost center. You can
includethisontheRec. wghtfactorstabpage. For the201##cost
center(Organization),enterafactorof300,asrepairexpensesfor
thePCsonthatcostcenterarethreetimeshigher.
3rd segment
• Addasegment MOTO##withthedescriptionAssessment 203##
by mileage. The allocation cost element is6311##. 100% of the
posted actual costs are to beassessed using variable portionsof
the actual statistical key figure.
• ChoosetheSender/Receivertabpage. The203##costcenter(Motor
Pool)isthesenderfortheassessment. Thesystemallocatesallofthe
costelementsinthe4000000to650000interval. Theconsultingcost
centers(costcentergroupB30##)arethereceiversoftheallocation.
• Choose the Receiver tracing factortab page. Enter the statistical
key figure MI##asatracingfactor for your allocations. Goto the
segmentheader. Carryoutaformalcheck. Saveyourentries.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment →Extras →Cycle→ Create
b)
Fields Values
Cycle ASSE##
Start date 01.01 current fiscalyear
Execute or Enter icon.
Continued on next page
242
©2005SAPAG.Allrightsreserved. 2005/Q2
| Fields | Values |
|---|---|
| Cycle | ASSE## |
| Start date | 01.01 current fiscalyear |
第 253 页 / 共 443 页
AC410 Lesson: Cost Allocations
Text Assessmentconsultingdept##
Iterativeindicator Deselect
Version 0
c) 1st segment
Edit → Attach segment
Segmentnamefield1 Orga##
Segmentnamefield2 Assessment201##bypercentage
AssessmentCostElement 6300##
Sender Values
Rule Posted Amounts
Portion in % 100
Originofactualvalues Select
ReceiverTracingFactors
Receiver rule Fixed percentages
Switch to the Senders/receivers tab page.
Sender
Cost Center 201##
Cost Element From400000 to650000
Recipient
Cost Center Group A-ORGA##
SwitchtotheReceivertracingfactortabpage.
Recipient Percentage portion
202## 10
301## 60
302## 30
d) 2nd segment
Edit → Attach segment
Continued on next page
243
2005/Q2 © 2005 SAP AG. All rights reserved.
| Text | Assessmentconsultingdept## |
|---|---|
| Iterativeindicator | Deselect |
| Version | 0 |
| Segmentnamefield1 | Orga## |
|---|---|
| Segmentnamefield2 | Assessment201##bypercentage |
| AssessmentCostElement | 6300## |
| Sender Values | |
| Rule | Posted Amounts |
| Portion in % | 100 |
| Originofactualvalues | Select |
| ReceiverTracingFactors | |
| Receiver rule | Fixed percentages |
| Sender | |
|---|---|
| Cost Center | 201## |
| Cost Element | From400000 to650000 |
| Recipient | |
| Cost Center Group | A-ORGA## |
| Recipient | Percentage portion |
|---|---|
| 202## | 10 |
| 301## | 60 |
| 302## | 30 |
第 254 页 / 共 443 页
Unit4: Period-endClosing AC410
Segmentnamefield1 IT-Serv##
Segmentnamefield2 Assessment202##byPCnumber
AssessmentCostElement 6310##
Sender Values
Rule te Posted Amounts
Portion in % 100
Originofactualvalues Select
ReceiverTracingFactors
Receiver rule Variable portions
Variabletypeportions Statist. Actualstatisticalkeyfigures
Switch to the Senders/receivers tabpage.
Sender
Cost Center 202##
Cost Element From400000to650000
Recipient
Cost Center Group Group A-IT##
SwitchtotheReceivertracingfactortabpage.
Fields Values
Statistical key figure PC##
SwitchtotheReceiverweighingfactorstabpage.
Recipient Factor per 100
201## 300
e) 3rd segment
Edit → Attach segment
Segmentnamefield1 Mo.Pool##
Segmentnamefield2 Assessment203##bykmnumber.
AssessmentCostElement 6311##
Continued on next page
244
©2005SAPAG.Allrightsreserved. 2005/Q2
| Segmentnamefield1 | IT-Serv## |
|---|---|
| Segmentnamefield2 | Assessment202##byPCnumber |
| AssessmentCostElement | 6310## |
| Sender Values | |
| Rule te | Posted Amounts |
| Portion in % | 100 |
| Originofactualvalues | Select |
| ReceiverTracingFactors | |
| Receiver rule | Variable portions |
| Variabletypeportions | Statist. Actualstatisticalkeyfigures |
| Sender | |
|---|---|
| Cost Center | 202## |
| Cost Element | From400000to650000 |
| Recipient | |
| Cost Center Group | Group A-IT## |
| Fields | Values |
|---|---|
| Statistical key figure | PC## |
| Recipient | Factor per 100 |
|---|---|
| 201## | 300 |
| Segmentnamefield1 | Mo.Pool## |
|---|---|
| Segmentnamefield2 | Assessment203##bykmnumber. |
| AssessmentCostElement | 6311## |
第 255 页 / 共 443 页
AC410 Lesson: Cost Allocations
Sender Values
Rule Posted Amounts
Portion in % 100
Originofactualvalues Select
ReceiverTracingFactors
Receiver rule Variable portions
VariabletypePortions Statist. Actualstatisticalkeyfigures
Switch to the Sender/receiver tab page.
Sender
Cost Center 203##
Cost Element From400000to650000
Recipient
Cost CenterGroup B30##
SwitchtotheReceivertracingfactortabpage.
Fields Values
Statistical key figure MI##
Goto → Header Data
Formal check icon
Save your data!
Continued on next page
245
2005/Q2 © 2005 SAP AG. All rights reserved.
| Sender Values | |
|---|---|
| Rule | Posted Amounts |
| Portion in % | 100 |
| Originofactualvalues | Select |
| ReceiverTracingFactors | |
| Receiver rule | Variable portions |
| VariabletypePortions | Statist. Actualstatisticalkeyfigures |
| Sender | |
|---|---|
| Cost Center | 203## |
| Cost Element | From400000to650000 |
| Recipient | |
| Cost CenterGroup | B30## |
| Fields | Values |
|---|---|
| Statistical key figure | MI## |
第 256 页 / 共 443 页
Unit4: Period-endClosing AC410
2. Toenableallofthecyclescreatedinthecoursetoberunatthesametime,
youneedtoassignthecyclestodifferentflowgroups. Createaflowgroup
GR##,andnameitAGRP##. (Asthisisadifferentallocationcategorythan
inthepreviousexercise,thenameGR##canbeusedagain). Savethecycle.
a) IntheheaderdataoftheASSE## assessmentcycle.
Goto→CycleRunGroup→CreateGroupIcon
b)
Fields Values
Run group field 1 GR##
Run group field 2 ParallelizationassessmentGrp##
Confirm your entries.
Save the cycle.
Task 3:
Solve the following task:
1. Before you make the assessment, call up the Cost Centers:
actual/plan/variancereportforthecurrentperiodandversion0. Execute
the report for thecost center group (B20##).
Whichamountsareallocatedfromthe201##(Organization), 202##(IT
Services), and203##(MotorPool)costcenters?
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Continued on next page
246
©2005SAPAG.Allrightsreserved. 2005/Q2
| Fields | Values |
|---|---|
| Run group field 1 | GR## |
| Run group field 2 | ParallelizationassessmentGrp## |
第 257 页 / 共 443 页
AC410 Lesson: Cost Allocations
203## (Motor
Pool)__________________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparisons→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Navigatetoeachindividualcostcenterinthevariationmenu.
c) The following will be allocated:
Cost Center 201## 9,000
Cost Center 202## 36,000
Cost Center 203## 120,000
Continued on next page
247
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 258 页 / 共 443 页
Unit4: Period-endClosing AC410
Task 4:
Run the actual cycle for the assessment.
1. RuntheA##cycleforthecurrentperiod,withdetaillists. SelectTestRun.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Select
Detail lists Select
Cycle ASSE##
Assessment → Execute
2. Displaythesegments. WhatdoesthefigurethreesignifyincolumnE?
Answer: Goto → Segments
ColumnRdisplaysthereceiverrulestoredineachsegment. (F1Help)
3 signifiesfixedpercentagesasthetracingfactor.
3. Callupthereceiversforeachsegment. Notedowneachreceivercostcenter.
Receiver segment ORGA##:
1. 2. 3.
Receiver segment IT-SERV##
Continued on next page
248
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Select |
| Detail lists | Select |
| Cycle | ASSE## |
| Receiver segment ORGA##: | ||
|---|---|---|
| 1. | 2. | 3. |
| Receiver segment IT-SERV## |
第 259 页 / 共 443 页
AC410 Lesson: Cost Allocations
1. 2. 3.
Receiver segment MOTO##:
1. 2. 3.
a) Place your cursor on thegiven segment.
Goto → Recipient
Repeat for each segment.
ReceiversforsegmentORGA## 202## 301## 302##
ReceiversforsegmentIT-SERV## 201## 301## 302##
ReceiversforsegmentVEHIC## --- 301## 302##
4. Notedowntheentriesthatthe201##(Organization), 202##(ITServices)
cost centers debited, and vice versa.
201##(Organization)debits202##(ITServices)with_______________
202##(ITServices)debits201##(Organization)with_______________
Answer: From the basic list
Goto → Line items
202## debits 201## with 900,
202## debits 201## with 6,000
5. Thecost center202##(ITServices)allocatesitscostsonthebasisof the
numberofPCs. Althoughthecostcenter201##(Organization)onlyhas2
PCs,atracingfactorof6isdisplayed. Provideanexplanationforthis.
Answer: ReceivertracingfactorsthataredefinedusingtheVariableportions
rulecanbeassignedwithdifferentweightingfactors. Thisweightingfactor,
whenmultipliedwiththetracing factor, enablesyoutotakein toaccount
differencesincostscausedbytheindividualreceivers.
Costcenter 201##has2PCsthat incurmaintenanceexpensethat isthree
timeshigherthanforothercostcenters, sincetheyareusedfar morethan
othercostcenters'PCs. Duetotheweightingfactorof300,thetracingfactor
for assessment is increasedfrom two to six.
Continued on next page
249
2005/Q2 © 2005 SAP AG. All rights reserved.
| 1. | 2. | 3. |
|---|---|---|
| Receiver segment MOTO##: | ||
| 1. | 2. | 3. |
| ReceiversforsegmentORGA## | 202## | 301## | 302## |
|---|---|---|---|
| ReceiversforsegmentIT-SERV## | 201## | 301## | 302## |
| ReceiversforsegmentVEHIC## | --- | 301## | 302## |
第 260 页 / 共 443 页
Unit4: Period-endClosing AC410
6. Runthecycleinanupdateruntoposttheallocations.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
Task 5:
Check theresult of theassessment in the report.
1. Callthecostcenters: actual/plan/variancereportforthecurrentperiodand
version0. Executethereportforthecostcentergroup(B20##).
Althougha100%credit(senderrule)wasdefinedforallthecostcentersin
theassessmentcycle, notallofthecost centersarecredited. Which were
not credited?
_________________________________________
_________________________________________
Continued on next page
250
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 261 页 / 共 443 页
AC410 Lesson: Cost Allocations
_________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparison→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Cost center 201## Balance + 6,000
Cost center 202## Balance + 900
2. Whywerethesecostcentersnotcompletelycredited?
(See the notes for exercise 4-3)
Answer: Cost centers 201## and 202## make allocations to each other.
Sincetheassessmentcyclewasnotdefinediteratively,onlyoneallocation
runtakesplacetocreditthesendercostcenters. Debitsthatarisefromthe
assessment remainonthereceiver cost centers.
Continued on next page
251
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 262 页 / 共 443 页
Unit4: Period-endClosing AC410
Task 6:
Nowexecutetheassessmentwithiterationofthesegments.
1. Reverse the assessment results of the A## cycle first from the previous
exercise. Executethereversalinanupdaterun.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Reverse
Enter
2. NowchangetheA##cyclebyselectingtheIterativeindicatorintheheader
data. Save the cycle.
a) Extras → Cycle → Change
A## Enter cycle
SelecttheIterativeindicatorinthecycleheaderdata.
b) Save your data!
Continued on next page
252
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 263 页 / 共 443 页
AC410 Lesson: Cost Allocations
3. RuntheA##assessmentcycleagaininanupdaterun.
a) Switchtotheinitialscreenforassessment(Goto? Back.)
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
4. Call upthesenderinformation andnotedownthesender amountsfor the
201##(Organization)and202##(ITServices)costcenters.
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Comparethenumberswiththosefromexercise3. Whatdoyounotice?
Answer: Goto → Sender
The following was allocated:
Cost Center 201## 15,254,24
Cost Center 202## 37,525,42
Duetoiteration,thecreditamountsoneachsendercostcenterarehigher.
Goto → Basic list
Continued on next page
253
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 264 页 / 共 443 页
Unit4: Period-endClosing AC410
5. Callupthelineitems. Notedowntheentriesthatthe201##(Organization),
202##(ITServices)costcentersdebited,andviceversa.
201##(Organization)debits202##(ITService)with_______________
202##(ITServices)debits201##(Organization)with_______________
Comparethenumberswiththosefromexercise4-4.
What causes this difference?
Answer: Goto → Line items
202## debits 201## with 1,525,42
202## debits 201## with 6,254,24
Bothcostcentersarecredited100%. Thisisbecausetheinitialdebitoneach
cost center from the first iteration of the assessment cycle was allocated
again by the iterative cycle flow. During the first run, cost center 201##
(Organization)debitscostcenter202##(ITService)with900.00.
Task 7: Optional
1. Optional
Usethefollowinggraphicandtablestotrack the iteration manually. The
graphic already containsthe receiver tracing factors for allocation of the
201##(Organization),and202##(ITServices)costcenters.
Complete the tables.
Hint: Theamountscanbedeterminedwithoutusingacalculator.
Any small variances that may arise in the result calculated by
the mySAP ERP system are not important for understanding the
exercise.
201##(Organization) 60%to301##(ConsultantFI/CO)
30%to302##(ConsultantLO)
10% to202## (IT service)
Continued on next page
254
©2005SAPAG.Allrightsreserved. 2005/Q2
第 265 页 / 共 443 页
AC410 Lesson: Cost Allocations
Actual Cost debit Tracing Allocation to
costs from 202## (IT factor 202##(ITService)
from the Service)
sender
1stRun 9,000 --- 10%
2ndRun --- 10%
3rdRun --- 10%
4thRun --- 10%
S 10%
202##(IT Service) 18→301##(ConsultantFI/CO)
tracing factor
12→302##(ConsultantLO)
6 →201##(Organization)
Actual Cost debit Tracing Allocation
costs from 201## factor to 201##
from the (Organization) (Organization)
sender
1stRun 36,000 --- 1/6
2ndRun --- 1/6
3rdRun --- 1/6
4thRun --- 1/6
S 1/6
a) Of this amount, 6,150.00 is redebited to cost center 201##
(Organization). During the second run, cost center 201##
(Organization)allocates6150,ofwhich610isdebitedtocostcenter
202##(IT Service). Cost center 202##(IT Service)inturn, redebits
costcenter201##(Organization)with1/6ofthatamount.
b)
201##(Organization) 60%to301##(ConsultantFI/CO)
30%to302##(ConsultantLO)
10%to202##(ITServices)
Continued on next page
255
2005/Q2 © 2005 SAP AG. All rights reserved.
| Actual costs from the sender | Cost debit from 202## (IT Service) | Tracing factor | Allocation to 202##(ITService) | |
|---|---|---|---|---|
| 1stRun | 9,000 | --- | 10% | |
| 2ndRun | --- | 10% | ||
| 3rdRun | --- | 10% | ||
| 4thRun | --- | 10% | ||
| S | 10% |
| Actual costs from the sender | Cost debit from 201## (Organization) | Tracing factor | Allocation to 201## (Organization) | |
|---|---|---|---|---|
| 1stRun | 36,000 | --- | 1/6 | |
| 2ndRun | --- | 1/6 | ||
| 3rdRun | --- | 1/6 | ||
| 4thRun | --- | 1/6 | ||
| S | 1/6 |
第 266 页 / 共 443 页
Unit4: Period-endClosing AC410
Actual Cost debit Trac- Allocation
costs from 202## ingfac- to 202## (IT
fromthe (IT Service) tor Service)
sender
1stRun 9,000 --- 10% 900,
2nd --- 6,150 10% 615,
Run
3rd --- 102,50 10% 10,25
Run
4thRun --- 1,71 10% 0,17
--- 0,03 --- ---
S 6,254,24 10% 1,525,42
c)
202##(IT Service) 18→301##(ConsultantFI/CO)
tracing factor
12→302##(ConsultantLO)
6→201##(Organization)
Actual Cost debit Trac- Allocation
costs from 201## ingfac- to 201##
fromthe (Organization) tor (Organization)
sender
1stRun 36,000 900, 1/6 6,150
2nd --- 615, 1/6 102,50
Run
3rd --- 10,25 1/6 1,71
Run
4thRun --- 0,17 1/6 0,03
S 1,525,42 1/6 6,254,24
Task 8:
Solve the following task:
1. ChecktheresultoftheassessmentintheCostCenters: actual/plan/variance
reportforthecurrentperiodandversion0. Executethereportforthecost
centergroup(B20##). Gotoeachindividualcostcenter.
Continued on next page
256
©2005SAPAG.Allrightsreserved. 2005/Q2
| Actual costs fromthe sender | Cost debit from 202## (IT Service) | Trac- ingfac- tor | Allocation to 202## (IT Service) | |
|---|---|---|---|---|
| 1stRun | 9,000 | --- | 10% | 900, |
| 2nd Run | --- | 6,150 | 10% | 615, |
| 3rd Run | --- | 102,50 | 10% | 10,25 |
| 4thRun | --- | 1,71 | 10% | 0,17 |
| --- | 0,03 | --- | --- | |
| S | 6,254,24 | 10% | 1,525,42 |
| Actual costs fromthe sender | Cost debit from 201## (Organization) | Trac- ingfac- tor | Allocation to 201## (Organization) | |
|---|---|---|---|---|
| 1stRun | 36,000 | 900, | 1/6 | 6,150 |
| 2nd Run | --- | 615, | 1/6 | 102,50 |
| 3rd Run | --- | 10,25 | 1/6 | 1,71 |
| 4thRun | --- | 0,17 | 1/6 | 0,03 |
| S | 1,525,42 | 1/6 | 6,254,24 |
第 267 页 / 共 443 页
AC410 Lesson: Cost Allocations
What do you notice?
_____________________________________________
_____________________________________________
_____________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparison→CostcenterActual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Program → Execute
All cost centersare completely credited.
Task 9: Optional
Management Accounting employees that were not directly involved in the
definition of the cycles would like to have a brief overview of the allocation
relationships. DemonstratetheoptionsprovidedbythemySAP ERPsystemto
your colleagues.
1. Call uptheCycleoverview. Placethecursorinthecycleforthestructure
planontheassessmentcycleA##,andcallupthecycleinformation.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment→Extras→Cycle→DisplayOverview
b) ExpandtheASSE##node. DoubleclickASSE##.
Click on the Cycleinformation tabpage.
2. Display previous processing.
Continued on next page
257
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 268 页 / 共 443 页
Unit4: Period-endClosing AC410
You can call up the document list by double-clicking on the cycle in the
Executedorreversedcyclesdialogbox. Youcancallupthelineitemsby
double-clickingonthecorrespondingdocumentnumber.
a) Processed to date tab page
Double-clickontheselectedcycleintheExecutedorreversedcycles
dialog box. Double-click on the selected document to see the line
item view.
258
©2005SAPAG.Allrightsreserved. 2005/Q2
第 269 页 / 共 443 页
AC410 Lesson: Cost Allocations
Exercise 15: Cost Allocations
237
Exercise Duration: 20 Minutes
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create an allocation structure.
Business Example
Youfeel that theassessment of acost center that onlyhasoneassessment cost
element is not detailed enough. As the assessment receiver, you require more
detailed informationonthesourceof thecostelements, suchas, assessmentof
personnel and material costs. However, you would like to avoid defining ten
segmentsif,forexample,youwanttousetenassessmentcostelementstocredit
acost center. Youdefine an allocation structureso you can usemore thanone
assessment cost element in a segment.
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
2. In customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
3. Define the assignment number 01, with the text Motor Material Costs,
and the assignment number 02, with the text Personnel Costs. For each
assignment, specifywhich primary cost elementsareto beallocated with
which assessment cost element.
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Continued on next page
259
2005/Q2 © 2005 SAP AG. All rights reserved.
第 270 页 / 共 443 页
Unit4: Period-endClosing AC410
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
3. RuntheA##assessmentcycleagaininanupdaterun.
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Task 3:
Solve the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthecost
centers: Actual/Plan/Variancereportforthecurrentperiodandversion0.
Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
______________________________________________
260
©2005SAPAG.Allrightsreserved. 2005/Q2
第 271 页 / 共 443 页
AC410 Lesson: Cost Allocations
Solution 15: Cost Allocations
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
a) CCA: Master Data → Cost Element → Individual Processing →
Create secondary
b)
FieldNameorDataClass Values
Cost element 6316##
Valid from 01/01currentfiscalyear
To 12/31/9999
Name Assess. Vehic-mat##
Costelementcategory 42
Save your data!
Usethereferencetocreatecostelement6317##(Assess. Vehic-Pers##).
Change the name and description.
Continued on next page
261
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Cost element | 6316## |
| Valid from | 01/01currentfiscalyear |
| To | 12/31/9999 |
| Name | Assess. Vehic-mat## |
| Costelementcategory | 42 |
第 272 页 / 共 443 页
Unit4: Period-endClosing AC410
2. In customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
a) IMG→Controlling→CostCenterAccounting→ActualPostings→
Period-EndClosing→Assessment→DefineAllocationStructure→
Edit → New entries
b)
FieldNameorDataClass Cost Elements
Structure See exercise
Text Materialandpersonnelcosts
Save your data!
3. Define the assignment number01, with the text Motor Material Costs,
and the assignment number 02, with thetext Personnel Costs. For each
assignment, specifywhich primary costelementsaretobeallocatedwith
which assessment cost element.
a) SelectthestructureandswitchtotheDialogStructuretree.
Double-click Assignments.
Edit → New entries
b)
Assignments Text
01 Vehicle material costs
02 Personnel costs
Save your data!
Continued on next page
262
©2005SAPAG.Allrightsreserved. 2005/Q2
| FieldNameorDataClass | Cost Elements |
|---|---|
| Structure | See exercise |
| Text | Materialandpersonnelcosts |
| Assignments | Text |
|---|---|
| 01 | Vehicle material costs |
| 02 | Personnel costs |
第 273 页 / 共 443 页
AC410 Lesson: Cost Allocations
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
a) SelectAssignment01,andswitchtotheDialogStructuretree.
Double-click on Source.
b)
FieldNameorDataClass Cost Elements
Cost element from 475000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New entries
Assessmentcostelement 6316##
Save your data!
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
a) Return to assignments.
SelectAssignment02,andswitchtotheDialogStructuretree.
Double-click on Source.
FieldNameorDataClass Cost Elements
Cost element from 420000
Cost element to 431000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New entries
Assessmentcostelement 6317##
Save your data!
Continued on next page
263
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost element from | 475000 |
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost element from | 420000 |
| Cost element to | 431000 |
第 274 页 / 共 443 页
Unit4: Period-endClosing AC410
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Reverse
Enter
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
Continued on next page
264
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 275 页 / 共 443 页
AC410 Lesson: Cost Allocations
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment →Extras→Cycle →Change
b)
Fields Values
Cycle ASSE##
Start date 01/01currentfiscalyear
Execute icon
Goto → Overview Segments
Select the VEHIC## segment.
Copy Segment icon. Enter
Insert Segment icon
Name VEHIC##NEW
Select the new segment.
Double-clicktogotothesegmentmaintenance.
Placethecursorinthefieldfortheassessmentcostelement.
AssessmentCostElement Delete
AllocationStructure Enter chosen name
Save your data!
Goto → Segments Overview
Select the VEHIC## segment.
Choose icon
SettheLockindicator(row: Segment name).
Save your data!
Continued on next page
265
2005/Q2 © 2005 SAP AG. All rights reserved.
| Fields | Values |
|---|---|
| Cycle | ASSE## |
| Start date | 01/01currentfiscalyear |
| AssessmentCostElement | Delete |
|---|---|
| AllocationStructure | Enter chosen name |
第 276 页 / 共 443 页
Unit4: Period-endClosing AC410
3. RuntheA##assessmentcycleagaininanupdaterun.
a) Gototheinitialscreenfortheactualassessment.
Goto → Back (2x)
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Answer: Goto → Sender
The sender list differentiates by sender cost element. In the allocation
structure, twoassessmentcostelementsweredefinedtocreditcostcenter
203##. Thesecostelementsarelistedseparatelyinthesenderlist.
Task 3:
Solve the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthecost
centers: Actual/Plan/Variancereportforthecurrentperiodandversion0.
Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
Continued on next page
266
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 277 页 / 共 443 页
AC410 Lesson: Cost Allocations
______________________________________________
a) CCA:InformationSystem→Reports forcost center accounting→
Plan/ActualComparison→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center 302##
Program → Execute
c) The report containsinformation on thecontent of the debit for cost
center302##,withvehiclecoststhatareallocatedusingtwoassessment
cost elements, duetotheallocationstructure.
Costcenter 302##isdebitedbythevehiclescostcenter, mainlydue
to material costs.
267
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center | 302## |