AC040 Lesson: Postings for Make-to-Stock Production
Confirm only 40 finished products without any scrap, but increase the
proposedactivityquantities(executiontimes)byapproximately10%(you
arechangingtheactivityquantitiesintentionallytocreateavariance).
Note: After each operation, shop floor control can confirm
completion torecord the output quantitiesandtheactual activity
quantities consumed by theoperation.
Because this is a milestone operation, the previously executed
operationsareconfirmedautomaticallyusingtheplannedexecution
times adjusted for the actual confirmed quantity (target = actual
confirmation).
Whenaconfirmationisentered,thesystemcanexecuteautomatic
goodsmovementtransactions. TheroutingformaterialR-F1##was
maintained so that the system automatically processesthe goods
receiptforthefinishedproductwhenthelastoperationisconfirmed.
Thesematerialmovementtransactionscreateacreditpostingonthe
production order.
a) Choose Logistics → Production → Shop Floor Control →
Confirmation→Enter→ForOperation→TimeTicket.
b) Entertheordernumber. PressF4(valuehelp)intheOperationfield
and select 70. Choose Enter.
c) Choose Partial Confirmation. Enter40 astheyield toconfirm and
chooseEnter. Changethedefaultlabortimetobeapproximately10%
higher thanthetimeproposedbythesystem.
d) Save the confirmation.
Continued on next page
271
2009 © 2009 SAP AG. All rights reserved.
第 292 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 7:
Review actual costs posted.
1. Review the actual costs posted to the production order because of the
confirmation. Additional actual costs should have been incurred by the
production activities and a creditposting should have been made for the
deliveredquantityof40pieces. Fromthemenu,displaythedetailedreport
with your layout, GR##.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Entertheproductionordernumberfromtask1,chooseCumulatedas
the time frame, and execute the report.
c) If required, choose your layout, GR##.
Actualvaluesshouldbedisplayedforthecostelementsoftheactivity
typesandcomponents,aswellasforthedeliverytothewarehouse.
Continued on next page
272
©2009SAPAG.Allrightsreserved. 2009
第 293 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Task 8:
Post primary costs.
1. EnteraG/Laccountpostingforthepurchaseandimmediateconsumptionof
materialforcompanycode1000intheEURcurrency. Enteradebitamount
of500forG/Laccount410000(taxcodeV0)andassignthepostingtoyour
productionorderfromtask1. Specifythattheoffsettingcreditistobemade
toG/L account113100. Post the document.
Note: Additional costs were incurred for the production order
in addition to the costs for the normal production activities and
goods issue transactions. The additional costs were incurred by
anunexpectedexternalservice, whichwasnecessarytocomplete
production. You must post primary costs directly to the order in
Financial Accounting.
a) Choose Accounting→FinancialAccounting→GeneralLedger →
Posting →EnterG/L AccountDocument.
b) Enter the following data.
Field Value or Action
Document Date today
Currency EUR
G/L Account 410000
D/C Debit
AmountinDocumentCurrency 500
Tax Code V0
Order yourproductionordernumber
G/L Account 113100
D/C Credit
AmountinDocumentCurrency 500
c) Choose Enter. Choose Post.
Continued on next page
273
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Document Date | today |
| Currency | EUR |
| G/L Account | 410000 |
| D/C | Debit |
| AmountinDocumentCurrency | 500 |
| Tax Code | V0 |
| Order | yourproductionordernumber |
| G/L Account | 113100 |
| D/C | Credit |
| AmountinDocumentCurrency | 500 |
第 294 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 9:
Review actual costs posted.
1. Check the actual costs that were posted to the production order by the
FinancialAccountingposting. Fromthemenu,displaythedetailedreport
with your layout, GR##.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) EntertheordernumberfromtaskandchooseCumulatedasthetime
frame. Execute the report.
c) If required, choose your layout, GR##.
Actual values should be displayed for the cost elements of the
components,activitytypesandconsultantactivity, aswell asfor the
delivery to the warehouse.
274
©2009SAPAG.Allrightsreserved. 2009
第 295 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Lesson Summary
You should now be able to:
• Create a production order
• Postthedocumentsnecessaryforenteringtheconsumptionofmaterialand
activities
• Postthedocumentsnecessaryforenteringallotherproductioncosts
275
2009 © 2009 SAP AG. All rights reserved.
第 296 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Lesson: Posting Sales of Make-to-Stock Goods
Lesson Overview
Thislessonlooksathowsalesofmake-to-stockgoodsareenteredinthesystem
andwhathappenstoasalesorderasitisprocessedthroughbillingandposting
revenuestoProfitabilityAnalysisandProfitCenterAccounting.
Lesson Objectives
After completingthislesson, you will beable to:
• Createa salesorder for manufactured goods
• Postthedocumentsnecessaryforenteringthegoodsissue
• Use the billing function to post revenue for manufactured goods to
Profitability Analysis
Business Example
After selling goodsto acustomer, you want toseehowasalesorder isused to
deliver and bill the sold goods. You also want to use Profitability Analysis to
comparetherevenueswiththecostsformanufacturingandsellingtheproduct.
Selling Goods
A sales order is used to sell your manufactured pumps from the warehouse.
Becausethesale(showninthefigurebelow)doesnotrepresentanactivityoutput,
it iscompletedusingasalesorderlineitemthatisnot acostobject (controlled
using Customizing settings). This means that costs and revenues cannot be
assignedtothissalesorderitem(item10isnotacostobject).
Figure 116: Selling Goods and Services
276
©2009SAPAG.Allrightsreserved. 2009
第 297 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
Steps in Sales Order Processing
InanefficientorderprocessingsystemsuchassalesordermanagementinSAP,
allactivitiesrelatedtothecustomer areintegrated. Insalesordermanagement,
documentsareintroducedthroughaworkflowandareinterlinkedwitheachother.
Theworkflowstartswiththeprocessesbeforetheactualsale,andendswhenthe
customer'spayment for the goodsis processed.
Figure 117: Steps in Sales Order Processing
Theseprocessesarebasedonelectronicdocuments,andeachdocumentislinked
to the document that precedes or follows it in the workflow. The documents
helpyouandyourcustomersmanagesalesordersmoreeasily. Todisplaythese
documentsdirectlyfromthesalesorder,chooseDisplaydocumentflow.
Tostarttheorderprocessingworkflow,youcreateasalesdocument. Thesales
ordercanbeprecededbyacustomerinquiryandquotation. Whenthecustomer
pays, youpostthepayment inFinancial Accounting.
277
2009 © 2009 SAP AG. All rights reserved.
第 298 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 118: TransferringSales OrderReceipts to CO-PA
Youcanvaluateincomingsalesorders(asexpectedrevenues)andtransferthem
fromsalesordermanagementtoProfitabilityAnalysis(CO-PA)toenablepossible
profitstobeanalyzedatanearlystage. Thisenablesyoutocreatereportsthatin
turnenableyoutoanalyzecontributionmarginsbasedonthesalesordersreceived.
Figure 119: Delivery and Billing
278
©2009SAPAG.Allrightsreserved. 2009
第 299 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
WhendataispostedtoFinancialAccounting, itistransferredtoaccount-based
CO-PAatthesametime. Thismeansthatwhenaccountingdocumentsforgoods
issuesandbillingarecreated, thesystemgeneratescorrespondinglineitemsin
CO-PA.AlineitemiscreatedforeachcostandrevenueelementinCO-PA.The
numberofthesereceivinglineitemsisthesameasthenumberpostedinFinancial
Accounting. No line items are created for incoming orders here because such
ordersdonottriggerpostingsinFinancialAccounting.
Thevaluesin account-basedCO-PAareassigned to profitabilitysegmentsand
saved inthecostor revenueelement specifiedinmaterialsmanagement(MM)
for goodsissuesorinsalesordermanagement for billingdocuments. Thedata
canbetransferredtoaccount-basedCO-PAonlyiftheG/LaccountinFinancial
Accounting is defined as a cost element or revenue element in Management
Accounting.
Revenuesandcostofgoodssoldarecalculatedwhenproductsaredeliveredand
when billing takes place.
• Whentheproductsaredeliveredtothecustomer, thestockisreducedby
the cost of goods sold. Adelivery document iscreatedwhentheproduct
is delivered.
• Whenthedeliveredproductsarebilled,thecompanycanseetherevenues
generated. A billing document iscreated when thecustomer is invoiced.
From the point of view of Management Accounting, billing takes place
when the revenue is settled.
A billing document usually completes a business transaction in sales order
management. The billing data is sent to Financial Accounting automatically,
wheretherevenueandreceivablespostingsaremadeatthesametime.
When the billing document is created, sales order management uses pricing
procedures to calculate all revenues, sales deductions, and other data (such as
standard costs), and stores this data in condition types. What happens next
dependsonwhetherthesalesorderisorisnotacostobject.
• Ifthesalesorderonwhichbillingisbasedisnotacostobject,thesecondition
typesareassignedtothevaluefieldsincosting-basedProfitabilityAnalysis
and are posted to CO-PA automatically.
• Ifthesalesorderonwhichbillingisbasedisacostobject,therevenuesare
assigned to the sales order.
Selling Goods with Sales Order Management
In the figure below, item 10 relates to a product that was produced in a
make-to-stockenvironment. Theproductionprocessiscontrolledbyaproduction
order,whichdeliversthefinishedgoodstounrestrictedwarehousestockforsaleat
a later time.
279
2009 © 2009 SAP AG. All rights reserved.
第 300 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure120: SellingGoodsfromStockwithSalesOrderManagement
Because the sales order item is not acost object in this scenario, the revenues
will be transferred directly to Profitability Analysis (CO-PA) when thebilling
document is created.
Thecostofgoodssoldcanbecalculatedusingvaluation. Valuationcanaccessa
costestimatethathasalreadybeencreatedinProductCostPlanningandcopythe
calculatedcostofgoodsmanufacturedforthegoodssold.
Variancesbetween thecostof goodsmanufactured and the actual costsfor the
productionordercanbetransferredtoCO-PAduringproductionordersettlement.
Therevenuesgeneratedby thebillingprocesswill bepostedto thesalesorder
item. CostsandrevenuesaretransferredtoProfitabilityAnalysiswhenthecost
object is settled.
Note: Itispossibletoexecuteperiodicresultsanalysisforthecostobject.
Inthiscase,theresultsanalysisdata,notthepostedcostsandrevenues,is
transferred to CO-PA.
280
©2009SAPAG.Allrightsreserved. 2009
第 301 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
Menu Paths for Posting Sales of Make-to-Stock Goods
Action Menu path
Create sales order Logistics→Sales&Distribution→Sales→
Order → Create
Createbillingdocument Logistics→Sales&Distribution→Sales→
Order → Subsequent Functions → Billing
Document
Makeanactivityallocationfrom Accounting→Controlling→Product Cost
a cost center Controlling → Cost Object Controlling
→ Product Cost by Sales Order → Actual
postings → Activity and business process
allocation
Accesstheactual/planreportfor Accounting→Controlling→Product Cost
sales orders Controlling → Cost Object Controlling →
ProductCostbySalesOrder→Information
system→Reportsforproduct cost bysales
order→Detailedreports→forsalesorder
281
2009 © 2009 SAP AG. All rights reserved.
| Action | Menu path |
|---|---|
| Create sales order | Logistics→Sales&Distribution→Sales→ Order → Create |
| Createbillingdocument | Logistics→Sales&Distribution→Sales→ Order → Subsequent Functions → Billing Document |
| Makeanactivityallocationfrom a cost center | Accounting→Controlling→Product Cost Controlling → Cost Object Controlling → Product Cost by Sales Order → Actual postings → Activity and business process allocation |
| Accesstheactual/planreportfor sales orders | Accounting→Controlling→Product Cost Controlling → Cost Object Controlling → ProductCostbySalesOrder→Information system→Reportsforproduct cost bysales order→Detailedreports→forsalesorder |
第 302 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
282
©2009SAPAG.Allrightsreserved. 2009
第 303 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
Exercise 13: Processing Sales of
Make-to-Stock Goods
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Describetheprocessofsellinggoodsfromthewarehouseusingasalesorder
Business Example
Yourcompanyreceivesanorderfromacustomertodeliverpumps.
Task 1:
CreateasalesorderforthecustomerusingmaterialR-F1##asthefirstsalesorder
item.
1. Createastandardorder(OR)forsalesorganization1000(Frankfurt). Enter
10 asthesales channel and00asthedivision.
Thesold-topartyandship-topartyistheBeckerCompanyinBerlin(1000).
Thepurchaseordernumberis1000##. Thecustomerhasordered100pieces
ofmaterialR-F1##(pumps). ChooseEnter. Acceptthedefaultvalueforthe
schedulelineand transferthedeliveryproposal.
Note: Ifthesystemdoesnotautomaticallyperformanavailability
checkandgenerateadeliveryproposal,youcandoitmanuallyby
choosingDeliveryProposal(neartheMaterialfield).
2. Check thepricing conditions for the pumps.
Note: Tocheckthepricingconditions,selecttheitemandchoose
DisplayItemDetails(inlowerpartofthescreen).
3. Checktheaccountassignmentforthepumpstodisplaythesettlementrule
for settlement to Profitability Analysis. Save the sales order and make a
note of the document number.
Task 2:
Execute a delivery.
1. Executea delivery toship thepumps(from the salesorder created inthe
firsttask)tothecustomer. Deliverthegoodsfromshippinglocation1000
(Hamburg). Entertheselectiondateastwoweeksfromtoday. Enter0002as
the storage location and chooseEnter.
Continued on next page
283
2009 © 2009 SAP AG. All rights reserved.
第 304 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Thedeliveryquantityis40pumps. Enterapickquantityof40piecesand
choose Post goods issue.
Note: Ifyoucannotenterapickquantity,youmustcreateatransfer
order:
1. SelecttheitemandchooseSubsequentFunctions→Create
Transfer Order.
2. On the next screen, enter 010 as the warehouse number,
selectActivateItem,Backgroundprocessing,andAdoptPick
Quantity 2.
3. ChooseEntertosavethetransferorder. Exitthetransaction.
Confirm that you want to save your data by choosing Yes. Make a note
of the delivery document number.
Task 3:
Bill the customer for the pumps and check the accounting documents that are
created.
1. After the goods are delivered, create the billing document for the sales
document item.
Note: Thedeliverydocumentnumberisadefaultvalueproposed
bythesystem. Ifthenumberisnotdisplayed, enteryourdelivery
document number (from previous task).
Makeanoteofthebillingdocumentnumberandthebillingdate.
2. Checkthedocumentscreatedforthebillingdocument.
Display the billing document. Go to the overview of the accounting
documentsandanalyzetheaccountingdocument,theprofitcenterdocument,
andtheprofitabilityanalysisdocument. Notethetransferredcharacteristics
andtheusedvaluefieldsfortheprofitabilityanalysisdocument.
284
©2009SAPAG.Allrightsreserved. 2009
第 305 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
Solution 13: Processing Sales of
Make-to-Stock Goods
Task 1:
CreateasalesorderforthecustomerusingmaterialR-F1##asthefirstsalesorder
item.
1. Createastandardorder(OR)forsalesorganization1000(Frankfurt). Enter
10 asthesales channel and00asthedivision.
Continued on next page
285
2009 © 2009 SAP AG. All rights reserved.
第 306 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Thesold-topartyandship-topartyistheBeckerCompanyinBerlin(1000).
Thepurchaseordernumberis1000##. Thecustomerhasordered100pieces
ofmaterialR-F1##(pumps). ChooseEnter. Acceptthedefaultvalueforthe
schedulelineand transfer thedeliveryproposal.
Note: Ifthesystemdoesnotautomaticallyperformanavailability
checkandgenerateadeliveryproposal,youcandoitmanuallyby
choosingDeliveryProposal(neartheMaterialfield).
a) ChooseLogistics→Sales&Distribution→Sales→Order→Create.
b) Enter the following data.
Field Value or Action
Order Type OR
SalesOrganization 1000
DistributionChannel 10
Division 00
Choose Item Overview.
c) Enter the following data.
Field Value or Action
Sold-to Party 1000
Ship-to Party 1000
PurchaseOrderNumber 1000##
Material R-F1##
Order Quantity 100
d) Choose Enter.
The system creates a schedule line.
e) Choose Delivery Proposal to transfer the delivery proposal of the
system.
Continued on next page
286
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Order Type | OR |
| SalesOrganization | 1000 |
| DistributionChannel | 10 |
| Division | 00 |
| Field | Value or Action |
|---|---|
| Sold-to Party | 1000 |
| Ship-to Party | 1000 |
| PurchaseOrderNumber | 1000## |
| Material | R-F1## |
| Order Quantity | 100 |
第 307 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
2. Check thepricing conditions for the pumps.
Note: Tocheckthepricingconditions,selecttheitemandchoose
DisplayItemDetails(inlowerpartofthescreen).
a) Select the item row and chooseDisplay Item Details(in lower part
of the screen).
b) Go to the Conditions tab.
3. Checktheaccountassignmentforthepumpstodisplaythesettlementrule
for settlement to Profitability Analysis. Save the sales order and make a
note of the document number.
a) Choose Account Assignment.
b) Choose Save.
Task 2:
Execute a delivery.
1. Executea delivery toship thepumps(from the salesorder created inthe
firsttask)tothecustomer. Deliverthegoodsfromshippinglocation1000
(Hamburg). Entertheselectiondateastwoweeksfromtoday. Enter0002as
the storage location and chooseEnter.
Thedeliveryquantityis40pumps. Enterapickquantityof40piecesand
choose Post goods issue.
Note: Ifyoucannotenterapickquantity,youmustcreateatransfer
order:
1. SelecttheitemandchooseSubsequentFunctions→Create
Transfer Order.
2. On the next screen, enter 010 as the warehouse number,
selectActivateItem,Backgroundprocessing,andAdoptPick
Quantity 2.
3. ChooseEntertosavethetransferorder. Exitthetransaction.
Continued on next page
287
2009 © 2009 SAP AG. All rights reserved.
第 308 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Confirm that you want to save your data by choosing Yes. Make a note
of the delivery document number.
a) OntheOrderCreation: InitialScreen, chooseOrder →Subsequent
Functions → Outbound Delivery.
b) Enter the following data.
Field Value or Action
Shipping Point 1000
Selection Date fourweeksfromtoday
Order Make sure your sales order
number appearshere
c) Choose Enter.
d) Enter0002asthestoragelocationandchooseEnter.
The delivery quantity is 40 pumps.
e) Enter40asthepickquantity. ChoosePostgoodsissue. Makeanoteof
the delivery document number.
Task 3:
Bill the customer for the pumps and check the accounting documents that are
created.
1. After the goods are delivered, create the billing document for the sales
document item.
Note: Thedeliverydocumentnumberisadefaultvalueproposed
bythesystem. Ifthenumberisnotdisplayed, enteryourdelivery
document number (from previous task).
Makeanoteofthebillingdocumentnumberandthebillingdate.
a) Choose Logistics → Sales & Distribution → Sales → Order →
SubsequentFunctions→BillingDocument.
b) Enteryourdeliverydocumentnumberifitisnotproposedasadefault
value. Choose Save.
c) Makeanoteofthebillingdocumentnumberandthebillingdate.
2. Checkthedocumentscreatedforthebillingdocument.
Continued on next page
288
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Shipping Point | 1000 |
| Selection Date | fourweeksfromtoday |
| Order | Make sure your sales order number appearshere |
第 309 页 / 共 455 页
AC040 Lesson: Posting Sales of Make-to-Stock Goods
Display the billing document. Go to the overview of the accounting
documentsandanalyzetheaccountingdocument,theprofitcenterdocument,
andtheprofitabilityanalysisdocument. Notethetransferredcharacteristics
andtheusedvaluefieldsfortheprofitabilityanalysisdocument.
a) Choose Billing Document → Display.
b) Enterthebillingdocumentnumber. ChooseAccountingOverview.
c) Go to the accounting document, profit center document, and
profitabilityanalysisdocumentbyclickingeachentry.
Intheprofitabilityanalysisdocument,youcanseethecharacteristics
and value fields. On the Characteristics tab page, you see the
transferred characteristics values.
OntheValueFieldstabpage,youseethelistofvaluefields. Choose
Next Page and Previous Page to display the data transferred to
profitability analysis for this sale.
d) Go back to the billing document.
289
2009 © 2009 SAP AG. All rights reserved.
第 310 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Lesson Summary
You should now be able to:
• Createa salesorder for manufactured goods
• Postthedocumentsnecessaryforenteringthegoodsissue
• Use the billing function to post revenue for manufactured goods to
Profitability Analysis
290
©2009SAPAG.Allrightsreserved. 2009
第 311 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Lesson: Postings for Processing Make-to-Order
Services
Lesson Overview
Thislessonlooksathowsalesofmake-to-orderservicesareenteredinthesystem
andwhathappenstoasalesorderasitisprocessed,includingbillingandposting
revenuestoProfitabilityAnalysisandProfitCenterAccounting.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Create a sales order for a service
• Postthedocumentsnecessarytoenteraninternalactivityallocation
• Use thebilling function in sales order management to post revenue for a
service to Profitability Analysis
Business Example
Aftersellingaservicetoacustomer,youwanttoseehowasalesorderisusedto
request,record,andbilltheservice. YoualsowanttouseProfitabilityAnalysisto
comparetherevenueswiththecostsofperformingtheservice.
Selling Services
Completingaservice,suchasacustomer-siteinstallation,isanactivityoutputthat
isassigneddirectlytothesalesorder. TouseManagement Accounting for this
salesorderitem, theitemmustbeopenedasacostobjectinCustomizing. This
meansthatthecostsandrevenuescanbeposteddirectlytothissalesorderitem
(item20isacostobject). Insteadofaddinganewitemtothesalesorder,youcan
createanewsalesorder. Theitemisthen10insteadof20.
291
2009 © 2009 SAP AG. All rights reserved.
第 312 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 121: Selling Services
Selling Services with Sales Order Management
Inthefigureabove,item20referstoaservicethatisprovidedatthecustomersite.
Thisserviceentailsinstallingthepumpsthatweresoldinsalesorderitem10.
292
©2009SAPAG.Allrightsreserved. 2009
第 313 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Figure 122: Selling ServiceswithSalesOrderManagement
Inthiscase,thesalesorderitemisacostobject. Anorder-specificcostestimate
canexistforthecostobject. Inthiscase, itisasalesordercostestimatewhose
resultsaresavedasplannedvaluesforthesalesorder.
Costsincurredbyprovidingtheservicewillbeassigneddirectlytotheorderitem.
Examples of costsincurredincludecost center activitiesused, consumption of
materialsfromthewarehouse,orexternallyprocuredgoodsandservices.
Therevenuesgeneratedbythebillingprocesswillalsobepostedtothesalesorder
item. CostsandrevenuesaretransferredtoProfitabilityAnalysiswhenthecost
object is settled.
Note: Itispossibletoexecuteperiodicresultsanalysisforthecostobject.
Inthiscase,theresultsanalysisdata,notthepostedcostsandrevenues,is
transferred to CO-PA.
293
2009 © 2009 SAP AG. All rights reserved.
第 314 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Menu Paths for Posting Sales of Make-to-Order Services
Action Menu path
Create salesorder Logistics→Sales&Distribution→Sales→
Order → Create
Createbillingdocument Logistics→Sales&Distribution→Sales→
Order → Subsequent Functions → Billing
Document
Makeanactivityallocationfrom Accounting→Controlling→ProductCost
a cost center Controlling → Cost Object Controlling
→ Product Cost by Sales Order → Actual
postings → Activity and business process
allocation
Accesstheactual/planreportfor Accounting→Controlling→ProductCost
sales orders Controlling → Cost Object Controlling →
ProductCostbySalesOrder→Information
system→Reportsforproduct cost bysales
order→Detailedreports→forsalesorder
294
©2009SAPAG.Allrightsreserved. 2009
| Action | Menu path |
|---|---|
| Create salesorder | Logistics→Sales&Distribution→Sales→ Order → Create |
| Createbillingdocument | Logistics→Sales&Distribution→Sales→ Order → Subsequent Functions → Billing Document |
| Makeanactivityallocationfrom a cost center | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → Product Cost by Sales Order → Actual postings → Activity and business process allocation |
| Accesstheactual/planreportfor sales orders | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → ProductCostbySalesOrder→Information system→Reportsforproduct cost bysales order→Detailedreports→forsalesorder |
第 315 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Exercise 14: Postings for a Make-to-Order
Service
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Describethestepstoprocessthesaleofaservicebasedonasalesorder
Business Example
Your customer would like to have pumps installed at their site and submits a
requestforthisservice. Youneedtoentertheservicerequestinasalesorder.
Task 1:
Createasalesorderforthecustomer,usingR-SERVICEasthefirstsalesorder
item.
1. Createastandardorder(OR)forsalesorganization1000(Frankfurt). Enter
10 as the sales channel and 00 as the division. The Becker Company in
Berlin (1000) is the sold-to party and ship-to party. The purchase order
numberis1001##. Thecustomerorders50hoursofserviceR-SERVICE
(installation of pumps). ChooseEnter.
2. Atorderitemlevel,checktheaccountassignmentfortheservice. Display
therulefor settlement toProfitabilityAnalysis.
Note: Double-clicktheorder item numberto drilldownto order
item level.
3. Check thepricing conditions for the service.
Note: CostingvariantPC04shoulddisplayasthedefaultvalue. Use
R-SERVICE-99 as the base object.
Changethedefaultvaluesforcostingby10%. Savethecostingandreview
the conditions again.
Continued on next page
295
2009 © 2009 SAP AG. All rights reserved.
第 316 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 2:
Completeadirectactivityallocationtothesalesorderforthecompletedservice.
Note: Aftertheyreturnfromthecustomersite,youremployeesnormally
report the completed activities directly in the Cross-Application Time
Sheet(CATS).Iftheyrecordtheactivitiesonlyonasheetofpaper,you
havetoenteradirectactivityallocationtothesalesorder.
1. Enteradirectactivityallocationfromcostcenter4230toyoursalesorder
item.
Allocate56hoursofactivitytype1421and12hoursofactivitytype1420to
your sales order item. Post theallocation.
2. Checkthevaluesandthelineitemsofthesalesorderusingtheplan/actual
report for sales orders.
Hint: Toaccesstheplan/actualreportforsalesorders,chooseCost
ObjectControlling→ProductCostbySalesOrderandaccessthe
report in the information system.
Task 3:
Bill the customer for the service.
1. Createthebillingdocumentforthesalesdocumentitem.
Note: Thesalesorder number isadefault valueproposedby the
system. If the number is not displayed, enter your sales order
number (from previous task).
Makeanoteofthebillingdocumentnumberandthebillingdate.
2. Checkthedocumentscreatedforthebillingdocument.
Display the billing document. Go to the overview of the accounting
documents and analyze the accounting document and the profit center
document.
3. Checkthevaluesandthelineitemsofthesalesorderusingtheplan/actual
report for sales orders.
Hint: Toaccesstheplan/actualreportforsalesorders,chooseCost
Object Controlling → Product Cost by Sales Order and access
thereport intheinformation system. Thisisthesamereport you
accessed earlier.
296
©2009SAPAG.Allrightsreserved. 2009
第 317 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Solution 14: Postings for a Make-to-Order
Service
Task 1:
Createasalesorderforthecustomer,usingR-SERVICEasthefirstsalesorder
item.
1. Createastandardorder(OR)forsalesorganization1000(Frankfurt). Enter
10 as the sales channel and 00 as the division. The Becker Company in
Berlin (1000) is the sold-to party and ship-to party. The purchase order
numberis1001##. Thecustomerorders50hoursofserviceR-SERVICE
(installation of pumps). ChooseEnter.
a) ChooseLogistics→Sales&Distribution→Sales→Order→Create.
b) Enter the following data.
Field Value or Action
Order Type OR
SalesOrganization 1000
DistributionChannel 10
Division 00
Choose Item Overview.
c) Enter the following data.
Field Value or Action
Sold-to Party 1000
Ship-to Party 1000
PurchaseOrderNumber 1001##
Material R-SERVICE
Order Quantity 50
d) Choose Enter.
Thesystemcreatesalineitemfor theorder.
Continued on next page
297
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Order Type | OR |
| SalesOrganization | 1000 |
| DistributionChannel | 10 |
| Division | 00 |
| Field | Value or Action |
|---|---|
| Sold-to Party | 1000 |
| Ship-to Party | 1000 |
| PurchaseOrderNumber | 1001## |
| Material | R-SERVICE |
| Order Quantity | 50 |
第 318 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
2. Atorderitemlevel,checktheaccountassignmentfortheservice. Display
theruleforsettlement toProfitabilityAnalysis.
Note: Double-clicktheorder itemnumber to drill downto order
item level.
a) Choose Account Assignment.
b) Choose Settlement Rule.
c) Double-click the item.
d) ChooseProfitabilitySegmenttoseethecharacteristicsofProfitability
Analysis.
e) Go back to order item level.
3. Check thepricing conditions for theservice.
Note: CostingvariantPC04shoulddisplayasthedefaultvalue. Use
R-SERVICE-99 as the base object.
Changethedefaultvaluesforcostingby10%. Savethecostingandreview
the conditions again.
a) Select the service and choose Conditions.
b) Click the Costing icon.
CostingvariantPC04shoulddisplayasthedefaultvalue.
c) EnterR-SERVICE-99asthebaseobjectandchooseEnter. Increase
the default values by 10%.
d) Save the costing and review the conditions again on the order line
item level.
TheresultofthecostingwasincurredusingconditiontypeEK02.
e) Savethesalesorderandmakeanoteofthedocumentnumber.
Task 2:
Completeadirectactivityallocationtothesalesorderforthecompletedservice.
Note: Aftertheyreturnfromthecustomersite,youremployeesnormally
report the completed activities directly in the Cross-Application Time
Sheet(CATS).Iftheyrecordtheactivitiesonlyonasheetofpaper,you
havetoenteradirectactivityallocationtothesalesorder.
1. Enteradirectactivityallocationfromcostcenter4230toyoursalesorder
item.
Continued on next page
298
©2009SAPAG.Allrightsreserved. 2009
第 319 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Allocate56hoursofactivitytype1421and12hoursofactivitytype1420to
your sales order item. Post the allocation.
a) Choose Accounting → Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost bySales Order →Actual
Postings→Activityandbusinessprocessallocation→Enter.
b) Choosescreenvariant“salesorder/costobject”oranotherappropriate
screen variant.
c) Enter the following data.
Field Value or Action
From Cost Center 4230
Activity Type 1421
Quantity 56
Activity Type 1420
Quantity 12
d) Choose Save to post the allocation.
2. Checkthevaluesandthelineitemsofthesalesorderusingtheplan/actual
report for sales orders.
Hint: Toaccesstheplan/actualreportforsalesorders,chooseCost
ObjectControlling→ProductCostbySalesOrderandaccessthe
report in the information system.
a) Choose Accounting → Controlling → Product Cost Controlling →
CostObjectControlling→ProductCostbySalesOrder→Information
system→Reportsforproductcostbysalesorder→Detailedreports
→ for sales order.
b) Enter yoursalesorder number (fromprevioustask)and execute the
report.
c) Drilldowntothelineitemsandlookuptheaccountingdocuments. A
reconciliationpostinginFinancialAccountingwascarriedout.
Continued on next page
299
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| From Cost Center | 4230 |
| Activity Type | 1421 |
| Quantity | 56 |
| Activity Type | 1420 |
| Quantity | 12 |
第 320 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 3:
Bill the customer for the service.
1. Createthebillingdocumentforthesalesdocumentitem.
Note: Thesalesorder number isadefault valueproposedby the
system. If the number is not displayed, enter your sales order
number (from previous task).
Makeanoteofthebillingdocumentnumberandthebillingdate.
a) Choose Logistics → Sales & Distribution → Sales → Order →
SubsequentFunctions→BillingDocument.
b) Enteryoursalesordernumberifitisnotproposedasadefaultvalue.
Choose Save.
c) Makeanoteofthebillingdocumentnumberandthebillingdate.
2. Checkthedocumentscreatedforthebillingdocument.
Display the billing document. Go to the overview of the accounting
documents and analyze the accounting document and the profit center
document.
a) Choose Billing Document → Display.
b) Enterthebillingdocumentnumber. ChooseAccountingOverview.
c) Go to the accounting document and the profit center document by
clicking each entry.
d) Go back to the billing document.
3. Checkthevaluesandthelineitemsofthesalesorderusingtheplan/actual
report for sales orders.
Hint: Toaccesstheplan/actualreportforsalesorders,chooseCost
Object Controlling → Product Cost by Sales Order and access
thereport intheinformation system. Thisisthesamereport you
accessed earlier.
a) Choose Accounting→ Controlling → Product Cost Controlling →
CostObjectControlling→ProductCostbySalesOrder→Information
system→Reportsforproductcostbysalesorder→Detailedreports
→ for sales order.
b) Enteryoursalesordernumberandexecutethereport.
c) Drilldowntothelineitemsandlookuptheaccountingdocuments. An
FinancialAccountingdocumenthasbeencreated.
300
©2009SAPAG.Allrightsreserved. 2009
第 321 页 / 共 455 页
AC040 Lesson: Postings for Processing Make-to-Order Services
Lesson Summary
You should now be able to:
• Create a sales order for a service
• Postthedocumentsnecessarytoenteraninternalactivityallocation
• Use thebilling function in sales order management to post revenue for a
service to Profitability Analysis
301
2009 © 2009 SAP AG. All rights reserved.
第 322 页 / 共 455 页
UnitSummary AC040
Unit Summary
You should now be able to:
• Post ManagementAccountingrepostingdocuments
• Explainthepurposeof adirectactivityallocation
• Post a direct activity allocation
• Explain thepurpose of entering time sheets
• Describethesteps for processing time sheets
• Set up a budget for an internal order
• Postdocumentstoaninternalordertodemonstratetheeffectsofavailability
control
• DescribehowExecutionServicesisusedtopostdocuments
• Create a production order
• Postthedocumentsnecessaryforenteringtheconsumptionofmaterialand
activities
• Postthedocumentsnecessaryforenteringallotherproductioncosts
• Createa salesorder for manufactured goods
• Postthedocumentsnecessaryforenteringthegoodsissue
• Use the billing function to post revenue for manufactured goods to
Profitability Analysis
• Create a sales order for a service
• Postthedocumentsnecessarytoenteraninternalactivityallocation
• Use thebilling function in sales order management to post revenuefor a
service to Profitability Analysis
302
©2009SAPAG.Allrightsreserved. 2009
第 323 页 / 共 455 页
第 324 页 / 共 455 页
第 325 页 / 共 455 页
Unit 8
Period-End Closing Aspects of
Management Accounting
Unit Overview
Variousperiodictransactionsareavailableforperiod-endclosinginManagement
Accounting. Youcanusemost thesetransactionsnot only onceat theend ofa
period, butasmanytimesasyou needwithinaperiod, andincorrectordouble
postings will not occur.
Thisunitalsointroducesthereconciliation ledger, whichyou can usetocheck
reconciliation of Management Accounting with Financial Accounting and, if
necessary, to actually executereconciliation.
Unit Objectives
After completing thisunit, you will beableto:
• ExplainthepurposeandbasicfunctionsoftheScheduleManager
• Describe the typical sequence of period-end closing processes within
Management Accounting
• PoststatisticalkeyfigurestoaManagementAccountingobject
• Performacostassessmentfromonecostcentertoseveralothercostcenters
• Settlethecostsforaninternalordertoacostcenter
• Allocateoverheadcostsandprocesscoststoaproductionorder
• Deliver material to stock
• Calculateworkinprocess(WIP)andcalculateproductionvariances
• Settle the balancefor the production order
• Sellaservice(sales-order-relatedproductionofintangiblegoods)
• Listthemasterdatausedinprofitabilityandsalesaccountingandexplain
its purpose
• Listthesourcesofdataforprofitabilityandsalesaccounting
• DescribetheflowofdatatoProfitabilityAnalysis
• DescribetheflowofdatatoProfitCenterAccounting
• Explaintheconceptofpreliminaryvaluationprice
303
2009 © 2009 SAP AG. All rights reserved.
第 326 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
• Explain the concept of periodic unit price
• Explain the concept of transfer price
Unit Contents
Lesson: Using the Schedule Manager for Fast Close Options ...........305
Lesson: Period-End Closing for Overhead Cost Controlling..............311
Exercise 15: Managing Overhead Costs................................333
Lesson: Period-End Closing for Product Cost Controlling.................345
Exercise 16: Period-End Closing for Product Cost Controlling.......355
Lesson: Profit Analysis in Management Accounting .......................368
Exercise 17: Profitability and Sales Accounting........................383
Lesson: Profit Analysis with Actual Costing or Transfer Prices...........388
304
©2009SAPAG.Allrightsreserved. 2009
第 327 页 / 共 455 页
AC040 Lesson: Using the Schedule Manager for Fast Close Options
Lesson: Using the Schedule Manager for Fast Close
Options
Lesson Overview
TheScheduleManagerenablesyoutoeffectivelymanageandmonitorperiodic
transactions. Youcanuseittomanagetasksinperiod-endclosing.
Lesson Objectives
After completingthislesson, youwillbeable to:
• ExplainthepurposeandbasicfunctionsoftheScheduleManager
• Describe the typical sequence of period-end closing processes within
Management Accounting
Business Example
Insteadofusingaseriesoflocalchecklists, youwanttomanagetheperiod-end
closingprocesscentrally. Inaddition,youwantacentralreferencepointforallthe
tasksthatmustbecarriedoutregularlyinyourcompany.
Schedule Manager Features
TheScheduleManagerhelpsyoucarryoutyourperiod-endclosingactivitiesby
combiningalltherelatedtransactionsinonecentral application. TheSchedule
Manager containsall theessential functions, fromdefining the structureof the
period-endclosingprocesstoschedulingjobsandmonitoringtheresults.
305
2009 © 2009 SAP AG. All rights reserved.
第 328 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 123: Schedule Manager Benefits
TheScheduleManager also providesallthedata thatis requiredfor executing
period-endclosingtasks. Allemployeeswhohavetherelevantauthorizationscan
use the Schedule Manager to find information about outstanding tasks. They
can also displayobjectsthataretobeprocessed andschedule additional tasks.
Youcanclearlysee, forexample, whenmonth-endclosingneedstobefinished
and when the preceding period needs to be closed. You can use the Schedule
Managertocheck, atanytime, whichtasksmustbecarriedoutwhenandwhat
the results should be.
The ScheduleManager also supportsyouin other areasof the SAP system. It
helps you to define, schedule, run, and control individual periodic tasks and
complexprocessesthatmustbecarriedoutatregularintervals. Italsoprovides
youwithanup-to-dateoverviewoftheprocessesinvolved.
306
©2009SAPAG.Allrightsreserved. 2009
第 329 页 / 共 455 页
AC040 Lesson: Using the Schedule Manager for Fast Close Options
Figure 124: Schedule Manager: Time Scheduling
Using the Schedule Manager
Youstart thetransactionsusingtheScheduleManagerintheSAPsystem. The
initialscreenshowsuserinformationthatyoucandeactivateatanytime.
YoucanusetheScheduleManagertocarryoutthefollowingtasks:
• Createastructuredtasklist. Thetaskscanbecarriedoutperiodicallyandby
more than one user.
• Runflowsandindividual jobsinthebackground.
• Runprogramsortransactionsindividuallyandonline.
• Store detailed information for each task.
The task list containsthe following task types:
• Flows
• Individual jobs
• Programs or transactions
• NotesthatdescribetasksthatareprocessedoutsidetheSAPsystem(phone
call, for example)
Thedailyoverviewlistsallthetasksthatwerecarriedoutonorarescheduledfora
particularday. Thesystemlogseachtaskasitiscarriedoutandprovidesyouwith
informationabouttheplannedandcurrentstarttime,aswellasthecurrentstatus
ofeachtask. Fromthedailyoverview,youcangotothemonitoringfunctionto
displaymoreinformation about jobsand flows.
307
2009 © 2009 SAP AG. All rights reserved.
第 330 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure125: ScheduleManager: TaskListandFlowDefinition
Youusethetasklisttogroupindividualtaskstogether. Toensurethatthejobflow
isadheredto,youcancreateaflowdefinitionthatcontainsallthedependentwork
items. Intheflowdefinition,youcangrouptasksforprocessinginthebackground
inaparticularsequence. Youcontroltheseflowdefinitionsusingtheworkflow.
Youcanalsoinsertuser decisionsfortestingpurposes.
Worklistsenableyoutoreducethetotalprocessingtimerequired.
Figure 126: Schedule Manager: Monitor
308
©2009SAPAG.Allrightsreserved. 2009