AC040 Lesson: Using the Schedule Manager for Fast Close Options
Inthemonitor,youcandisplaydetailedinformationaboutallactiveorcompleted
jobsandflowsthatwerescheduledintheScheduleManager.
Allmessagesissuedbythesystemwhilethejobisbeingprocessedaredisplayedin
alist. Fromthislist,youcanbranchtothespoollist,joblog,detailedinformation,
orthebasiclist. TheStatusfieldshowsyouexactlywhereerrorsoccurred.
Whenyouchecktheresults,youcanchangethesystemstatusandspecifywhy
youchangedit. Thesystemthenlogsthechangesyoumademanually.
309
2009 © 2009 SAP AG. All rights reserved.
第 332 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Lesson Summary
You should now be able to:
• ExplainthepurposeandbasicfunctionsoftheScheduleManager
• Describe the typical sequence of period-end closing processes within
Management Accounting
310
©2009SAPAG.Allrightsreserved. 2009
第 333 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Lesson: Period-End Closing for Overhead Cost
Controlling
Lesson Overview
ThislessonpresentsthemostimportantperiodictransactionsinOverheadCost
Controlling.
Youwillseethatthereisadistinctionbetweentransactionsthatcloseoverhead
costobjectsattheexpenseofotheroverheadcostobjects(withinOverheadCost
Controlling) and transactions that transfer underabsorption or overabsorption
of the (main) cost centers to Cost Object Controlling or Profitability Analysis
(outside Overhead Cost Controlling).
Lesson Objectives
After completingthislesson, youwillbeable to:
• PoststatisticalkeyfigurestoaManagementAccountingobject
• Performacostassessmentfromonecostcentertoseveralothercostcenters
• Settlethecostsforaninternalordertoacostcenter
Business Example
Youwanttoreviewthenecessarystepsforperiod-endclosinginOverheadCost
Controlling. Attheendofeveryperiod,overheadcostsmustbeallocatedtothe
auxiliarycostcentersand,inturn,totheproductioncostcenters.
Thecostforrental,cleaningandfacilitymaintenanceisallocatedfromthefacility
managementcostcentertoothercostcenters(suchasITandproductionmachines).
Thisallocationisbasedonthesquaremetersoffloorspaceusedbytheindividual
costcenters(thisinformationwasenteredearlierasstatisticalkeyfigures).
ThecostsoftheITcostcenter arethenallocatedtotheindividual cost centers,
including the production machine cost center. This allocation is based on the
numberofpersonalcomputers(PCs)intheshopfloorarea.
Attheendoftheperiod,anycostsforinternalordersshouldalsobeallocatedto
therelevantrecipients. Thecostofmaintenancetasksthatwereperformedforthe
production machine cost center andrecordedin aninternalorder, for example,
should be allocated to this cost center.
Aftertheproductionmachinecostcenterhasreceivedalltheallocatedcosts,you
can calculate the actual costs of the various activity types (for example, setup
times, machinehours, andworking hours) and, therefore, alsotheactual price.
After all of the costs have been allocated to the business processes, you can
calculate the actual costs of these processes.
311
2009 © 2009 SAP AG. All rights reserved.
第 334 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Values Used in Overhead Management Accounting
Statisticalkeyfiguresareusedforcalculationsintheinformationsystemandform
thebasisforperiod-basedallocations. Forexample,youcanusetheEmployees
keyfiguretocreatereportswithpersonnelcostsforeachemployeeortodistribute
thecoststhatareincurredbytheCafeteriacostcentertoallcostcentersthatuse
the cafeteria.
Figure 127: Entering Statistical Key Figures
Youcreatestatisticalkeyfiguresasmasterdatarecords. Whenyoucreateamaster
record,youmustassignittooneoftwopossiblecategories: keyfiguresforfixed
valuesorkeyfiguresfortotalsvalues. Youuseastatisticalkeyfigureforfixed
values(category1)topostvaluesthatarevalidfromthepostingperiodthroughall
followingperiodsinthecurrentfiscalyear. Youmustpostthestatisticalkeyfigure
againonlywhenthevaluechanges. Akeyfigurefortotalsvalues(category2)is
requiredforpostingvaluesthatarevalidintherelevantpostingperiodonly. You
mustmakeanewpostingforthisineachnewpostingperiod.
Youcanalsoassignstatisticalkeyfigurestoacostcenteroractivitytype. Thisis
useful for cost splitting.
312
©2009SAPAG.Allrightsreserved. 2009
第 335 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure128: TransferringStatisticalKeyFiguresfromtheLIS
YoucanusethekeyfigurevaluesmaintainedintheLogisticsInformationSystem
(LIS)asstatisticalkeyfiguresinManagementAccounting. Bydoingso,youcan
use these values in your cost allocations.
The following prerequisites must be met:
• TheLogisticsInformationSystemmustbeactive.
• YoumustcreatestatisticalkeyfiguresinControllingandlinkthemtothe
corresponding key figure in the LIS.
• You must assign the key figures to the corresponding cost centers in
Customizing.
Statistical key figures can be transferred to Cost Center Accounting as
activity-dependent or activity-independent values.
Cost Allocation
YoucanuseseveralmethodstocarryoutperiodicallocationsinOverheadCost
Controlling.
Pure cost allocations are used to transfer costs from sender objects to receiver
objects. Thisisknownasavalueflow. Youcanalsoincludeaquantityflowin
the cost allocation. The cost element category (primary or secondary) used to
allocate the costsdependsontheallocationtype.
313
2009 © 2009 SAP AG. All rights reserved.
第 336 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Activityallocationscanalsobeusedinperiodicallocation. Whenyouallocate
activities, aquantityflowalwaystakesplace. Thisreferstothequantity of the
differentactivityunits. Anadditionalvaluefloweithertakesplaceimmediatelyor
canbecalculatedattheendoftheperiod. Activitiesarealwaysallocatedusingan
allocation cost element.
If Activity-Based Costing is activated, you can make periodic cost allocations
usingtemplates,alsobasedonquantitywithanadditionalvalueflow.
Figure129: PeriodicActivities inOverhead CostControlling
InSAPERP,existingtoolsarenormallyusedasoftenaspossiblesothatuserscan
leveragetheskillstheyhavealreadylearned, without havingtolearnnewones
eachtime. Similarly,onlytwomaintoolsareusedintheperiodictransactionsfor
OverheadCostControlling: thecostingsheetandthecycle/segmentmethod.
• Thecostingsheetalwaysstartswithbasicvaluestowhichoverheadcosts
are applied.
• The cycle/segment method representsrelationships between sendersand
receivers. Allocations are madebetween thesendersandreceiversusing
certain rules.
OperatingexpensesareoftenposteddifferentlyinFinancialAccountingthanin
ManagementAccounting. Forexample,aFinancialAccountingexpenseposting
inapostingperiodcanactuallyrefer toanentireyear.
314
©2009SAPAG.Allrightsreserved. 2009
第 337 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 130: Periodic Cost Allocation Methods
ToavoidperiodiccostfluctuationsinCostCenterAccountingthatarecausedby
paymentflowsfor specificperiods,thesecostscanbeattributedtotherelevant
periods of time. Costs that are created in this way are also known asaccrued
costs. Accrued costscan be posted in two ways:
• WitharecurringentrytransactioninFinancialAccountingandcosttransfer
to Management Accounting
• BycalculatingtheaccrualvalueinManagementAccountingusingthecosts
posted there
WhenyoucalculatetheaccrualvalueinManagementAccounting,youcanchoose
one of the following methods:
• Percentage method
• Target=actual method
315
2009 © 2009 SAP AG. All rights reserved.
第 338 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 131: Accrued Costs
Thepercentagemethodenablesyoutodetermineaccruedcostsusingapercentage
based on cost elements. The advantage of this method compared with accrual
calculation(whichusesarecurringentryinFinancialAccounting)isthataccrued
costsarecalculatedonthebasisofactualcosts. Thepercentagemethod,therefore,
isrecommendedforaccrualcalculationsofwagecosts,suchasvacationbonuses.
In an accrual calculation, the accrued costs are debited to the cost centers. At
the same time, one of the accrual objects that you defined (a cost center or
internalorder)iscredited. Theactualcostsarealsopostedtotheaccrualobjectto
calculate,analyze,andallocateallthebalancesbetweentheexpensesinFinancial
AccountingandtheaccruedcostsinManagementAccounting.
Theaccruedcostsusingthepercentagemethodarepostedwithanaccrualcost
element(costelementcategory3). Youmaintainanoverheadstructurethatdefines
the different components of the accrual calculation and identifies the accrual
objectthat iscreditedduring everyperiodicposting.
316
©2009SAPAG.Allrightsreserved. 2009
第 339 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 132: Accrual Calculation: Percentage Method
Periodic repostingsare used as a posting aid.
TransactionsrelevanttoManagementAccounting,suchastelephonecosts,postal
charges,insurance,andsoon,areenteredinFinancialAccountingandpostedtoa
specialallocationcostcenter,whichisusedexclusivelyforcostcollection. This
minimizesthenumberofdifferentcostcenterassignmentsyouhavetomakewhen
enteringdatainFinancialAccounting. Attheendoftheperiod,thecostsinthe
allocation cost center arerepostedto the cost centersthat actuallyincurred the
costsaccordingtorulesdefinedintheallocationcycle. Theoriginal,primarycost
elements are retained.
Periodicrepostingsshouldbeusedonlywhentheidentityofthesendercostcenter
isnotimportantforthereceiver costcenter. Inperiodicallocationtransactions,
lineitemsarerecordedforboththesenderandreceiversidesinordertodocument
theallocationinfull. However, thesendercost center isnot storedinthetotals
records. Youcandeterminetheoriginofthecostsonlyfromthelineitems. This
enhancessystemperformancewhenyouexecuteandsavethereposting.
Thereceiversofaperiodicrepostingcanbeothercostcenters,workbreakdown
structure(WBS)elements,internalorders,costobjects,orbusinessprocesses. You
canrestrictthenumberofreceiversallowedinCustomizing.
Periodicrepostingscanbereversedandrepeatedasoftenasrequired.
317
2009 © 2009 SAP AG. All rights reserved.
第 340 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 133: Periodic Reposting
Distributionisusedtotransferprimarycostsfromasendercostcentertoreceiver
controllingobjects. Onlycostcentersorbusinessprocessescanbesendersina
distribution allocation.
The receivers for allocation can be other cost centers, WBS elements, internal
orders, cost objects, or business processes. You can restrict the number of
receivers allowed in Customizing.
Example: Primary postings (such as energy costs) are collected by a service
cost center and allocated at period-end closing according to rules defined in
the distribution cycle. Theexample inthefigureuses fixed percentagesas the
allocationrule. Otherallocationrulesarealsoavailable.
Only primary costs can be distributed. The receivers retain the original cost
elements.
Line itemsare recorded onboththesender and receiver sides todocument the
allocationsindetail. Incomparisontoaperiodicreposting,adistributionupdates
the partner's (sender's) totals record so that it can beidentified at totals record
level in the information system reports.
Distributionscanbereversedandrepeatedasoftenasdesired.
318
©2009SAPAG.Allrightsreserved. 2009
第 341 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 134: Distribution
Assessmentsareusedtoallocateprimaryandsecondarycostsfromasendercost
center toreceivingcontrollingobjects. Onlycostcentersorbusinessprocesses
can be senders in an assessment.
Thereceiversofanassessmentcanbeothercostcenters,WBSelements,internal
orders, cost objects, or business processes. You can restrict the number of
receivers allowed in Customizing.
Primaryandsecondarycosts(suchasenergycosts)areallocatedatperiod-end
closingaccordingtorulesdefinedintheassessmentcycle. Theexampleinthe
figurebelowusesstatisticalkeyfigurestoallocatethecosts.
Each segment in an assessment cycle is assigned an assessment cost element
(secondarycostelementcategory42). Allthecostsallocatedinanassessmentare
identifiedbytheseassessmentcostelementsonthereceiverside. Alternatively,
you can use an allocation structure to define the cost elements that are to be
allocated under which assessment cost elements. You can assign individual
costelementstoanassessmentcostelement for thispurpose. Youcansavethe
allocationstructurewhenyoumaintain thesegment.
Line items are created on both the sender and receiver sides to document the
allocation. Thesystemdoesnotdisplaytheoriginalcostelementsonthereceiver
side. Allocatingcostsusinganassessmentisuseful,therefore,ifacostbreakdown
is not important for the receiver.
As with distributions, assessments update the partner's totals record. An
assessmentcanbereversedandrepeatedasoftenasdesired.
319
2009 © 2009 SAP AG. All rights reserved.
第 342 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 135: Assessment
Overheadcalculationsareanotherformofperiodiccostallocation. Overhead
rates can be applied to almost any account assignment object in Management
Accounting. The sender (credit object), however, can only be a cost center,
internal order, or business process.
An overhead rate can becalculated asa percentage of base costs or as a fixed
amount for each reference quantity. Let us assume that overhead has to be
calculatedforthewithdrawalofplasticpipesfromthewarehouse. Thisoverhead
canbecalculatedasapercentageofthecostofthewithdrawnpipesorasafixed
amount per meter of pipe length.
Thecalculationbase,theoverhead,thecreditcostelement,andthecreditobject
are all defined using a costing sheet. The cost element used is a secondary
allocationcostelementofcategory41. Thecostingsheetisassignedinthemaster
datafortheobjectsthatreceivetheoverheadpostings.
320
©2009SAPAG.Allrightsreserved. 2009
第 343 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 136: Overhead Rates
Internalordersusuallyactasinterimcostcollectorsandasanaidforplanning,
monitoring,andreportingtransactions. Afterthetaskiscomplete,thecostsmust
besettledtotheirfinaldestination(costcenter,fixedasset,profitabilitysegment,
andsoon). Thisprocessisknownassettlement. Settlementisanotherformof
periodic cost allocation.
Youcancarryoutsettlementsattheendoftheperiodortheendoftheorderlife
cycle,dependingonthetypeoforderanditsfunctioninyourenterprise.
Youcansettleorderstodifferenttypesofreceivers,providedthattheyaredefined
as valid in Customizing and there are no system restrictions (such as period
locks) that prevent the settlement. Examples of possible settlement receivers
includecost centers, otherorders, projects, profitabilitysegments, fixedassets,
and G/L accounts.
Asettlementrulemustbedefinedforeachorderintheordermasterrecord. This
rulecanspecify,forexample,thatallthecostsfortheorderaresettledtoasingle
receiver or split between several receivers.
You can control how the settlement is carried out with the many available
settlement options.
321
2009 © 2009 SAP AG. All rights reserved.
第 344 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 137: Order Settlement
Indirectactivityallocation canberegardedasadistribution of activitytypes.
For thisreason, it usesthecycle/segment method.
Thetarget=actualactivityallocationallocatesactivityquantitiesasplannedbut
according to the current actual operating rate.
A special type is template allocation:
• Whenanactivityisallocated,aresourcestructure(bundleofactivitytypes)
isstoredinatemplate,lateradapted(basedonquantity)toanoutputquantity,
and allocated to receivers.
• Whenyouallocateaprocess, youdefineacost driverfortheprocessand
laterallocateaprocessquantitythatisdependentonthiscostdriver. Youcan
useanyinformationprovidedinthesystemasacostdriver.
322
©2009SAPAG.Allrightsreserved. 2009
第 345 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 138: Methods forPeriodic Quantity Allocation
With indirect activity allocations, the system automatically allocates activity
quantities as actual and plan quantities. Unlike direct activity allocation, keys
(tracingfactors)aredefinedforallocatingtheactivitiestothereceivers.
Likeotherperiod-basedallocationmethods,indirectactivityallocationisbasedon
segmentsandcycles,whichareusedfordefiningthesender/receiverrelationships.
Youspecifytheprocessingmethodfor eachsegment.
During indirect activity allocation, costs are allocated using an internal cost
element for activity allocation (secondary cost element of category 43). Cost
elementsareassignedfromthemasterrecordinthecostcenter/activitytypeplan,
wheretheseassignmentscan also beoverwritten.
Costcentersareusedassendersinindirectactivityallocation. Thereceiversof
anindirectactivityallocationcanbeothercostcenters,WBSelements,internal
orders, cost objects, or business processes.
Dependingonthecategoryoftheactivitytypethatyouwanttoallocate,youcan
choose oneoftwodifferent allocation approaches.
• Manual entryof thesender'sactivity quantity
• RetroactivedeterminationintheSAPsystemofthesender'sactivityquantity
based on user-defined rules
323
2009 © 2009 SAP AG. All rights reserved.
第 346 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 139: Indirect Activity Allocation
You can generatetotal activityquantitiesfromthesendercostcentersformost
activitytypes. Thepostedactivityquantitiesaredistributedfromthesenderstothe
receiversusingindirectactivityallocation. Thisdistributiontakesplaceaccording
tohowtheindirectactivityallocationcyclewasdefinedinthesegments.
Youmustfirstcreateanactivitytypeforindirectallocation(activitytypecategory
3) for activitiesthat can bemeasuredandpostedforasenderobject. Thenyou
post theactivityquantityto thesender cost center.
Allocation to the receiver takes place during indirect activity allocation. The
allocationsegmentmustbebasedonthesenderrule,postedquantities. Youcan
useallreceiverruleswiththeexceptionoffixedquantities.
Ifyouwanttomeasurethetimethatyourtestersusefortestactivities,forexample,
do not measure the time taken to test partsthat are required for all production
cost centers. This provides you with the total activity quantity for the sender
butnottheindividualreceivervalues. Youcan,however,allocatethecalculated
activityvaluestothenumberoftestedpartsforeachproductioncostcenter. This
informationisavailable,forexample,asstatisticalkeyfiguresfromtheLogistics
InformationSystem. Youcanallocatethetotaltesteractivities(inhours)tothe
receivercostcentersusingindirectactivityallocation. Indoingso,youcanalso
takeintoaccounteachcostcenter'sshareofthetotalnumberoftestedparts.
324
©2009SAPAG.Allrightsreserved. 2009
第 347 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure 140: Enter Actual Activities for Sender
Activityquantitiesforwhichyoucannotdeterminetheproducedquantity(orthat
requiretoomuchtime)canbecalculatedusingindirectactivityallocation:
• Using a receiver tracing factor
• Using explicit entries in segment definition (fixed quantity for sender or
receiver)
325
2009 © 2009 SAP AG. All rights reserved.
第 348 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 141: Actual Activities forSenderNot Entered
Forthistypeofindirectactivityallocation,youcreateacategory2activitytype
(indirectcalculation,indirectallocation). Theappropriatesegmentmusteitherbe
basedonacombinationofthesenderrule,indirectlydeterminedquantities,and
anyreceiverrule,orthesamesenderandreceiverrule,fixedquantities. Ifyouuse
thesenderrule,indirectlydeterminedquantities,youcandefinetherelationship
betweenthequantityunitforthetracingfactorandthequantityunitfortheactivity
usingasender-specificweightingfactor(standardvalue=1).
Example: Because of the many different activities that your testers carry out,
it isdifficult tomeasurethe timetakenfor aspecifictest. You canrelatethese
activitiestostatisticalkeyfigures,whichstatethenumberoftestedpartsforeach
production cost center. Using sample measurements, you determine that each
testtakesonaverage15minutesperpart(0.25hours). Yousetthisvalueasthe
weighting factor for the sender. The system then uses this data to allocate the
testerhoursforeachproductioncostcenterandthetotaltesterhoursused.
You can also define a receiver weighting factor for all cases where the ratio
betweenactivitytypeandtracingfactorisnotconsistentforallreceivers. Inthe
example described in thepreviousparagraph, you would choosethis option if
thetimerequiredtotestpartsforproduction4260wasnotidenticaltothetime
required to test parts for production 4270.
326
©2009SAPAG.Allrightsreserved. 2009
第 349 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Figure142: Period-EndClosinginOverheadCostControlling
Whenyoucarryoutperiod-endclosinginOverheadCostControlling(CO-OM),
youmustfirstallocatethecostsfromauxiliarycostcenterstomaincostcenters.
Theoverhead costordersforthecost centersmustbesettledattheappropriate
time.
Period-end closing in Management Accounting should be embedded in an
integrated system inclosing for theentireSAPsystem. Tofindall thecostsin
CO-OM,itisusefultotransferthefollowingdatabeforeCO-OMclosing:
• Personnel costs (HR payroll)
• DepreciationsandaccruedinterestfromAssetAccounting
• MiscellaneousdatarelevanttoCO-OMfromothercomponents
Aftertheperiod-endclosingactivitiesarecompleted,alltheoverheadcostorders
andauxiliarycostcentersshouldhaveabalanceofzero.
Thefollowingfigureshowsapossiblesequenceofperiodictransactions. These
stepsusuallycannotbecarriedoutconsecutivelybecausesomestepshavetobe
repeatedforvariousobjectgroups. Thesequenceandcostassignmentshouldbe
appropriate for your business needs.
327
2009 © 2009 SAP AG. All rights reserved.
第 350 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure143: Period-EndClosinginOverheadCostControlling(2)
Inthesecondstep,youshouldclosethemaincostcenters.
Thevarianceanalysisisusedtoidentifythecauseofvariances. Withthistool,you
canseewhyacostcenterhasunderabsorptionoroverabsorptionattheendofa
period. Youcannot,however,useittochangethebalanceofthecostcenter.
Tobringthemaincostcenterbalancetozero(byallocatingtheunderabsorption
or overabsorption), you havethefollowing options:
• Assessment with Profitability Analysis
• Actualpricecalculationandrevaluationoftheactivityquantityflows. This
enablesyouto allocate the underabsorptionor overabsorption of thecost
centerstothecostobjects. Thisisrequiredtodisplaytheactualcostsfrom
theperiodonthecostobjects. Thisisparticularlyusefulifyouwanttouse
theactualcostsforasubsequentvaluationofyour warehousestockatthe
actualcostofgoodsmanufactured(function: actualcosting/MaterialLedger).
Alternatively,forotherreasons,youneedtouseactualcosts(forexample,
for expense-basedbilling of the cost object or if an analysisof theactual
successofsalesorder-relatedproductionorserviceprovisionisrequired).
With assessment in Profitability Analysis, you do not use the cost objects to
allocatetheunderabsorptionoroverabsorptionofthecostcenters. Themainissue
hereishowthecostcenterbalancesareassignedtothemarketsegments.
328
©2009SAPAG.Allrightsreserved. 2009
第 351 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Withactualpricecalculationandrevaluationoftheactivityquantityflows,you
can allocate the underabsorption or overabsorption of the cost centers to the
costobjects. Thisisrequiredfor displayingtheactualcostsfromtheperiodon
the cost objects.
Note: Thisisparticularlyusefulifyouwanttousetheactualcostsfora
subsequentvaluationofyourwarehousestockattheactualcostofgoods
manufactured(function: actualcostingwiththematerialledger).
It is also useful if, for other reasons, you need to use actual costs (for
example,forexpense-basedbillingofthecostobjectorifananalysisof
theactualsuccessofsalesorder-relatedproductionorserviceprovision
is required).
Becauserevaluationatactualpricescanleavesmallbalancesonthecostcenter
(roundingerrors),itis,inthiscase,alsousefultouseanassessmenttoallocatethe
remainingbalancestoProfitabilityAnalysistoimprovereconciliationbetween
CO-PA and Financial Accounting.
Figure 144: Variance Calculation forCost Centers
Youcanusethevariancecalculationtoanalyzethecausesofunderabsorptionor
overabsorptionforyourcostcentersorbusinessprocesses.
Thevariancecalculationisananalysistoolonly. Thevariancesarenotallocated
further. To credit the cost centers completely, you must usethe actual activity
prices for revaluation or use an assessment for distribution to the profitability
segments.
329
2009 © 2009 SAP AG. All rights reserved.
第 352 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
The systemcalculates the variance as follows:
• It calculates the target costs.
• Itsplitstheactualcostsamongtheactivitytypes.
• Itcalculatesthevariancesforeachcombinationofcostcenterandactivity
type.
Thevariancecalculationshowsthedifferencebetweenthetargetandactualcosts.
Thesystemusesawiderangeofvariancecategories,whichdifferentiatebetween
theinputandoutputsides. Theinputsidecontainsallthecostcenterdebitsand
credits,whiletheoutputsidecontainstheactivityallocationsofthecostcenter.
Variancecalculation iscumulative, thatis, thetotal of all variances isequal to
the total variance.
Figure 145: Revaluation at Actual Prices
Becausetheactualpriceforanactivitytypecanbecalculatedonlyatperiodclose,
theplannedpricesareusedtovaluatetheactivityquantitieswhenpostingactual
activities during the period.
330
©2009SAPAG.Allrightsreserved. 2009
第 353 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Aftercalculatingtheactualactivityprices,youcanrevaluatetheactivityquantity
flows. Thefollowingdifferencesshouldbetakenintoaccountduringthisprocess:
• To revaluate activity allocations to cost centers, business processes, and
profitability segments, you must specify the revaluation indicator in the
settingsforthefiscalyearoftheversion. Revaluationtakesplacewhenthe
actualactivitypriceiscalculated. Followthesesteps:
1. Postthedifferencesbetweentheallocationofplannedandactualprices
to a separate data record.
2. Updatethenewvaluationintheoriginaldatarecord. Youshouldselect
this optionif no planned prices exist, in other words, if the original
allocation was not valuated.
• To revaluate internal orders, production orders, maintenanceplanorders,
WBS elements, networks, and so on, you must execute a revaluation
transaction. This transaction can be found in the menus for the relevant
ManagementAccountingcomponents. Revaluationdataisalwayssavedina
separatedatarecordintheSAP systemdatabase.
• By calculating actual prices and then revaluating all existing activity
quantities,youcanfullycreditthesendercostcenter. Alternatively,youcan
assigntheunderabsorptionoroverabsorptionofyourcostcentersdirectlyto
Profitability Analysis.
Menu Paths for Period-End Closing for Overhead Management
Action Menu path
Carry out an actual cost Choose Accounting → Controlling →
settlement Internal Orders → Period-End Closing →
SingleFunctions→Settlement→Individual
Processing
Create an actual assessment Accounting → Controlling → Cost Center
cycle Accounting→Period-EndClosing→Single
Functions → Allocations → Assessment.
ChooseExtras→Cycle→Create
Run an assessment Accounting → Controlling → Cost Center
Accounting→Period-EndClosing→Single
Functions → Allocations → Assessment –
RuntheassessmentwithExecute
Run the cost flow report or Accounting → Controlling → Internal
Orders: Actual/Plan/Variance Orders→InformationSystem→Reportsfor
report InternalOrders→Plan/ActualComparisons
→Orders: Actual/Plan/Variance
331
2009 © 2009 SAP AG. All rights reserved.
| Action | Menu path |
|---|---|
| Carry out an actual cost settlement | Choose Accounting → Controlling → Internal Orders → Period-End Closing → SingleFunctions→Settlement→Individual Processing |
| Create an actual assessment cycle | Accounting → Controlling → Cost Center Accounting→Period-EndClosing→Single Functions → Allocations → Assessment. ChooseExtras→Cycle→Create |
| Run an assessment | Accounting → Controlling → Cost Center Accounting→Period-EndClosing→Single Functions → Allocations → Assessment – RuntheassessmentwithExecute |
| Run the cost flow report or Orders: Actual/Plan/Variance report | Accounting → Controlling → Internal Orders→InformationSystem→Reportsfor InternalOrders→Plan/ActualComparisons →Orders: Actual/Plan/Variance |
第 354 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
332
©2009SAPAG.Allrightsreserved. 2009
第 355 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Exercise 15: Managing Overhead Costs
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Carryoutperiod-endpostingsforyouroverheadcostobjects(costcenters
and overhead orders)
Business Example
Your company would like to run period-end closing. Before you can close
OverheadCostControllingfortheperiod,thebalancefortheoverheadcostobjects
must be zero. With overhead cost orders, this is accomplished by settlement,
whichcreditstheservicecostcentersbyallocatingthecoststheyincurredtothe
primarycostcentersthatreceivedtheactivitiesoftheservicecostcenters. The
primarycostcentersarecreditedaswell;theirbalanceisallocatedtoeitherCost
Object Controlling or Profitability Analysis.
Task 1:
Settleyour tradefair order to the servicecost center that isresponsiblefor the
costs incurred.
1. Carryoutanactualcostsettlementforyourtradefairorder. Usethecurrent
period for thesettlement and posting period.
Note: Use the trade fair order number you created in unit 2. To
searchfortheordernumber,useordertype0400asthematchcode.
Makesurethatcostswerepostedtoyourtradefairorderbylookingupthe
posteddatainthecost flowreport fortheorder.
Note: Toaccessthisreport,whichisintheinformationsystemunder
themenuforinternalorders,chooseAccounting→Controlling→
Internalorders→InformationSystem→ReportsforInternalOrders
→ Plan/Actual Comparisons → Orders: Actual/Plan/Variance.
Entercontrollingarea1000,theactualfiscalyearandperiod,plan
version 0, and your order number.
If no costs were posted, post EUR 2000 to your order. Choose
Accounting→FinancialAccounting→GeneralLedger→Posting
→EnterG/LAccountingDocument. Usecostelement403000and
account 113100.
Goto the detailed list. Display thesender andreceiver view. Which cost
element is used for the settlement?
Continued on next page
333
2009 © 2009 SAP AG. All rights reserved.
第 356 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
2. RuntheOrders: Actual/Plan/Variancereport for thecurrent periodand
planversion0. Runthereportforyourtradefairorder. Whatisthebalance
on your order?
3. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0toseehowthesettlementaffectsyourcostcenter. Run
thereportfor theservicecost center (SERV-##).
Task 2:
Createanassessmentcycleandsegmenttoallocatethecostsfromyourservice
costcentertotheproductioncostcentersthatitsupports.
1. Createanactualassessmentcycle,AAC-##,whichstartsonthefirstdayof
thecurrentfiscalyear. GivethecyclethedescriptionGroup##assessment.
Createacyclerun groupwith thenameGR##.
2. AttachsegmentAACS-##andenterthedescriptionService##assessment.
Enterassessmentcostelement631300forservicesofthecompany. Allocate
100%ofthepostedactualamountsfromyoursendercostcenter. Thetracing
factor,whichyouenteronthesamescreen,allocatesfixedpercentages.
3. Thesenderoftheallocationisyourservicecostcenter,SERV-##. Entercost
element group OAS for the allocation. The receiver of this allocation is
cost center group HAC040.
4. GototheReceiverTracingFactortabtodefineacostallocationof95%for
costcenterPROD-##andacostallocationof5%forcostcenterPROD-00.
Runaformalcheckonthecycleandsegmentyoucreated.
Save your entries.
5. Attachyourcycletoacyclerungroup. UseGR-##asthenameandchoose
Createcyclerungroup. Thenamewillappearascycleofgroup##. Choose
Entertwice. Savethecycleandleavethetransaction.
Task 3:
Carryouttheactualassessmentforyourservicecostcenter.
1. First executetheassessment asa test runfor your cycleAAC-## andthe
currentperiod. Specifythatdetaillistsaretobedisplayed.
2. Executetheassessmentasanupdateruntopostyourallocation.
Deselect Test Run.
3. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0toseehowtheassessmentaffectsyourservicecostcenter,
SERV-##. Whatisthebalanceonyourcostcenter?
334
©2009SAPAG.Allrightsreserved. 2009
第 357 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Solution 15: Managing Overhead Costs
Task 1:
Settleyour tradefair order to the servicecost center that isresponsiblefor the
costs incurred.
1. Carryoutanactualcostsettlementforyourtradefairorder. Usethecurrent
period for thesettlement and posting period.
Note: Use the trade fair order number you created in unit 2. To
searchfortheordernumber,useordertype0400asthematchcode.
Makesurethatcostswerepostedtoyourtradefairorderbylookingupthe
posteddatainthecost flowreport fortheorder.
Note: Toaccessthisreport,whichisintheinformationsystemunder
themenuforinternalorders,chooseAccounting→Controlling→
Internalorders→InformationSystem→ReportsforInternalOrders
→ Plan/Actual Comparisons → Orders: Actual/Plan/Variance.
Entercontrollingarea1000,theactualfiscalyearandperiod,plan
version 0, and your order number.
If no costs were posted, post EUR 2000 to your order. Choose
Accounting→FinancialAccounting→GeneralLedger→Posting
→EnterG/LAccountingDocument. Usecostelement403000and
account 113100.
Continued on next page
335
2009 © 2009 SAP AG. All rights reserved.
第 358 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Goto thedetailed list. Display thesender andreceiverview. Whichcost
element is used for the settlement?
a) ChooseAccounting→Controlling→InternalOrders→Period-End
Closing→SingleFunctions→Settlement→IndividualProcessing.
b) Enter the following data.
Field Value or Action
Order your tradefairnumber
Settlement Period current period
Posting Period current period
Fiscal Year current fiscal year
Processing type select automatic
Test Run makesurethisisnotselected
c) Choose Execute.
d) Gotothedetailedlist. Displaythesenderandreceiverview.
Dependingonthecustomizingofthesystem,thesettlementwascarried
outwiththeoriginalpostedcostelementorwithaspecialsettlement
costelement(forexample,651000)withcostelementcategory21.
Continued on next page
336
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Order | your tradefairnumber |
| Settlement Period | current period |
| Posting Period | current period |
| Fiscal Year | current fiscal year |
| Processing type | select automatic |
| Test Run | makesurethisisnotselected |
第 359 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
2. RuntheOrders: Actual/Plan/Variancereport for thecurrent periodand
planversion0. Runthereportforyourtradefairorder. Whatisthebalance
on your order?
a) ChooseAccounting→Controlling→InternalOrders→Information
System→ReportsforInternalOrders→Plan/ActualComparisons→
Orders: Actual/Plan/Variance.
b) Enter the following data.
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) your tradefair number
c) Choose Execute.
The balance should be zero.
Continued on next page
337
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | your tradefair number |
第 360 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
3. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0toseehowthesettlementaffectsyourcostcenter. Run
thereportfor theservicecost center (SERV-##).
a) Choose Accounting → Controlling → Cost Center Accounting →
Information System → Reports for Cost Center Accounting →
Plan/ActualComparisons→CostCenters: Actual/Plan/Variance.
b) Enter the following data.
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute.
The settlement amount was debited under the same settlement cost
elementthatwasusedtocredittheinternalorder.
Continued on next page
338
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 361 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Task 2:
Createanassessmentcycleandsegmenttoallocatethecostsfromyourservice
costcentertotheproductioncostcentersthatitsupports.
1. Createanactualassessmentcycle,AAC-##,whichstartsonthefirstdayof
thecurrentfiscalyear. GivethecyclethedescriptionGroup##assessment.
Createacycle run groupwith the nameGR##.
a) Choose Accounting → Controlling → Cost Center Accounting →
Period-EndClosing→SingleFunctions→Allocations→Assessment.
Choose Extras → Cycle → Create.
b) Enter the following data.
Field Value or Action
Cycle AAC-##
Start Date firstdayofcurrentfiscalyear
c) Choose Enter to go to the next screen.
d) IntheTextfield,enterGroup ## assessment.
e) ChooseGoto→CycleRunGroupandchooseCreateGroup.
f) Enter the following data.
Field Value or Action
Cycle Run Group GR##
Text Group ## cycle run
group
g) Choose Confirm (Enter).
Continued on next page
339
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Cycle | AAC-## |
| Start Date | firstdayofcurrentfiscalyear |
| Field | Value or Action |
|---|---|
| Cycle Run Group | GR## |
| Text | Group ## cycle run group |
第 362 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
2. AttachsegmentAACS-##andenterthedescriptionService##assessment.
Enterassessmentcostelement631300forservicesofthecompany. Allocate
100%ofthepostedactualamountsfromyoursendercostcenter. Thetracing
factor,whichyouenteronthesamescreen,allocatesfixedpercentages.
a) Choose Attach Segment.
b) Enter the following data.
Field Value or Action
Segment Name AACS-##
Description Service ## assessment
AssessmentCostElement 631300
c) Verify that thesender values are correct.
Field Value or Action
Sender Rule Posted amounts
Share in % 100
Actual Values should be selected
ReceiverTracingFactorgroup select Fixed Percentages for the
box receiver rule
3. Thesenderoftheallocationisyourservicecostcenter,SERV-##. Entercost
element group OAS for the allocation. The receiver of this allocation is
cost center group HAC040.
a) Go to the Sender/Receiver tab.
b) Enter the following data.
Field Value or Action
SenderCost Center SERV-##
SenderCostElementGroup OAS
ReceiverCostCenterGroup HAC040
4. GototheReceiverTracingFactortabtodefineacostallocationof95%for
costcenterPROD-##andacostallocationof5%forcostcenterPROD-00.
Runaformalcheckonthecycleandsegmentyoucreated.
Continued on next page
340
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Segment Name | AACS-## |
| Description | Service ## assessment |
| AssessmentCostElement | 631300 |
| Field | Value or Action |
|---|---|
| Sender Rule | Posted amounts |
| Share in % | 100 |
| Actual Values | should be selected |
| ReceiverTracingFactorgroup box | select Fixed Percentages for the receiver rule |
| Field | Value or Action |
|---|---|
| SenderCost Center | SERV-## |
| SenderCostElementGroup | OAS |
| ReceiverCostCenterGroup | HAC040 |
第 363 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
Save your entries.
a) Choose Goto→Receiver TracingFactor.
b) Enter the following data.
Field Value or Action
Portion/Percentforcostcenter 95
PROD-##
Sender Cost Element for cost 5
center PROD-00
c) Go to theSegment Headertab. Choose Cycle→ Check→ Formal
Check.
d) Save the cycle.
5. Attachyourcycletoacyclerungroup. UseGR-##asthenameandchoose
Createcyclerungroup. Thenamewillappearascycleofgroup##. Choose
Entertwice. Savethecycleandleavethetransaction.
a) SelectthecycleandchooseGoto→CycleRunGroup.
b) EnterGR-##asthenameandchooseCreatecyclerungroup.
Thenamewillappearascycleof group ##.
c) ChooseEntertwice. Savethecycleandleavethetransaction.
Continued on next page
341
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Portion/Percentforcostcenter PROD-## | 95 |
| Sender Cost Element for cost center PROD-00 | 5 |
第 364 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Task 3:
Carryouttheactualassessmentforyourservicecostcenter.
1. First executetheassessment asa test runfor your cycleAAC-## andthe
currentperiod. Specifythatdetaillistsaretobedisplayed.
a) Choose Accounting → Controlling → Cost Center Accounting →
Period-EndClosing→SingleFunctions→Allocations→Assessment.
b) Enter the following data.
Field Value or Action
From Period current period
To Period current period
Fiscal Year current fiscal year
Test Run select
Detail Lists select
Cycle AAC-##
c) Choose Enter.
The start dateis copiedfrom your cycle.
d) ChooseExecute. ChooseReceivertoseetheamountstobeassessed.
2. Executetheassessmentasanupdateruntopostyourallocation.
Deselect Test Run.
a) Gobacktotheinitialscreenfortheassessment.
b) DeselectTest Run. Choose Execute.
Continued on next page
342
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| From Period | current period |
| To Period | current period |
| Fiscal Year | current fiscal year |
| Test Run | select |
| Detail Lists | select |
| Cycle | AAC-## |
第 365 页 / 共 455 页
AC040 Lesson: Period-End Closing for Overhead Cost Controlling
3. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0toseehowtheassessmentaffectsyourservicecostcenter,
SERV-##. Whatisthebalanceonyour costcenter?
a) Choose Accounting → Controlling → Cost Center Accounting →
Information System → Reports for Cost Center Accounting →
Plan/ActualComparisons→CostCenters: Actual/Plan/Variance.
b) Enter the following data.
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Version 0
Cost Center SERV-##
c) Run the report.
The balance should be zero.
343
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Version | 0 |
| Cost Center | SERV-## |