第 260 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 2:
Process an activity allocation using the following information and see how it
affects your service cost center.
Note: Yourservicecostcenterspent50hoursinspectingtheassetsofyour
productioncostcenter. Thedetecteddamagetosomeassetswasrepaired
with90hoursofrepairactivity. Anactivityreport(paper document)is
nowpassedtotheinternalaccountingdepartment.
1. Create a direct activity allocation to allocate 50 hours of activity type
CHK-##and90hoursofactivitytypeREP-##fromcostcenterSERV-##
tocostcenterPROD-##. Usetheentryvariantscostcenter andlistentry.
Post your document.
a) Choose Accounting → Controlling → Cost Center Accounting →
ActualPostings→ActivityAllocation→Enter.
b) Enter the following data.
Field Value or Action
Document Date today
Version 0
Screen Variant cost center
c) Choose List Entry.
d) Enterthefollowingdatainthefirstandsecondrows.
Column Row 1 Row 2
SenderCostCenter SERV-## SERV-##
SenderActivityType CHK-## REP-##
ReceiverCostCenter PROD-## PROD-##
Total Quantity 50 90
e) Choose Post.
Continued on next page
240
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Document Date | today |
| Version | 0 |
| Screen Variant | cost center |
| Column | Row 1 | Row 2 |
|---|---|---|
| SenderCostCenter | SERV-## | SERV-## |
| SenderActivityType | CHK-## | REP-## |
| ReceiverCostCenter | PROD-## | PROD-## |
| Total Quantity | 50 | 90 |
第 261 页 / 共 455 页
AC040 Lesson: Actual Postings in OverheadManagement Accounting
2. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0. Executethereportfortheservicecostcenter,SERV-##.
Check the quantity and cost flows from the service cost center to the
production cost center.
Note: Ifyouscrolltotheendofthereport,youcanseethequantities
of the activity type allocation.
a) Choose Accounting → Controlling → Cost Center Accounting →
Information System → Reports for Cost Center Accounting →
Plan/ActualComparisons→CostCenters: Actual/Plan/Variance.
b) Enter the following data.
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute.
d) Scrolltotheendofthereporttoseethequantitiesoftheactivitytype
allocation.
Continued on next page
241
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 262 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
3. Putthecursorontheitemoftheinternalactivityallocationcreditanddrill
downtotheactual lineitemreport. Calluptheaccountingdocument and
check with layout “/AC990”, if a real-time reconciliation posting in FI
took place.
Note: If layout /AC990 is not available, use your own layout,
Group-## .
a) Double-click on the credit lineof your cost element report anddrill
down to the actual line item report.
b) ChooseEnvironment→AccountingDocumentsanddouble-clickon
theAccountingDocument Number. YouseetheEntry Viewof your
FI document.
Choose layout “/AC990”. You see the used cost centers and profit
centers.
c) Choose General Ledger View. The system shows that a clearing
accounthasbeenusedtodothereal-timereconciliationandthat the
documentisbalancedfor eachprofitcenter.
Task 3:
Create an entry using the Cross-Application Time Sheet and transfer the
information to Management Accounting. Check the result on the service cost
center.
1. UsetheCross-ApplicationTimeSheet(CATS)withthedataentryprofile
CO2torecordtherepair activityREP-##, whichyouremployeewiththe
personnelnumber10##providedfortheproductioncostcenterPROD-##.
Note: If a messageappearstelling youthat you haveto assign a
plant, skip it by choosing Continue.
Use today as the key date. The sender cost center is SERV-## and the
employeehasprovidedarepairservicetodaythatlasted8hours.
Continued on next page
242
©2009SAPAG.Allrightsreserved. 2009
第 263 页 / 共 455 页
AC040 Lesson: Actual Postings in OverheadManagement Accounting
Switch to the release view, select your entered row, and chooseRelease.
Save the time entry.
a) Choose Accounting → Controlling → Cost Center Accounting →
Actual Postings→TimeSheet→CATSClassic→RecordWorking
Times.
b) Enter the following data.
Field Value or Action
Data Entry Profile CO2
Personnel Number 10##
c) ChooseEnterTimes. Ifamessageappearstellingyouthatyouhaveto
assign aplant, skipitbychoosingContinue.
d) Enter the following data.
Field or Column Value or Action
SenderCost Center SERV-##
Activity Type REP-##
ReceiverCostCenter PROD-##
e) Inthecolumncontainingtoday'sdate,enter8. ChooseReleaseView
(lower part of the screen).
f) SelectyourentryrowandchooseRelease(inthefunctionbaratthetop
ofthescreen). ChooseSave. Gobacktothemainmenu.
2. Update the time sheet data directly.
Note: Youcandothisbecauseyourenteredactivitydoesnotrequire
approvalaccordingtothesettingsintheentryprofile.
Continued on next page
243
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Data Entry Profile | CO2 |
| Personnel Number | 10## |
| Field or Column | Value or Action |
|---|---|
| SenderCost Center | SERV-## |
| Activity Type | REP-## |
| ReceiverCostCenter | PROD-## |
第 264 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Foryourentrydate,transferthetimesheetdataaccordinglytoManagement
Accountingonly. Use10##,thepersonnelnumberofyouremployee,forthe
selection. MakeanoteoftheManagementAccountingdocumentnumber.
a) Choose Accounting → Controlling → Cost Center Accounting →
ActualPostings→TimeSheet→Transfer→Accounting.
b) Enter the following data.
Field Value or Action
Personnel Number 10##
Date today
Posting Date today
c) Choose Execute.
The system displays a log with a message informing you that a
document was posted.
3. RuntheCostCenters: Actual/Plan/Variancereportforthecurrentperiod
andplanversion0. ExecutethereportfortheservicecostcenterSERV-##.
OpentheCostCenters: Actual LineItemsreport for theallocationcost
element615000anddrilldowntothesourcedocument.
a) Choose Accounting → Controlling → Cost Center Accounting →
Information System → Reports for Cost Center Accounting →
Plan/ActualComparisons→CostCenters: Actual/Plan/Variance.
b) Enter the following data.
Field Value or Action
Controlling Area 1000
Fiscal Year current fiscal year
From Period current period
To Period current period
Plan Version 0
Or Value(s) SERV-##
c) Choose Execute.
d) Double-clickthereportlineforcostelement615000. Double-clickthe
Cost Centers: Actual Line Itemsreport. Double-click the lineitem
with a quantity of 8.
Continued on next page
244
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Personnel Number | 10## |
| Date | today |
| Posting Date | today |
| Field | Value or Action |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | current fiscal year |
| From Period | current period |
| To Period | current period |
| Plan Version | 0 |
| Or Value(s) | SERV-## |
第 265 页 / 共 455 页
AC040 Lesson: Actual Postings in OverheadManagement Accounting
Task 4:
Post entries against a budget.
1. Enteranoriginalbudgetforthecurrentfiscalyearforyourtradefairorder
(seethedatasheetfortheordernumber). Specifyabudgetof10000.
a) Choose Accounting→Controlling→InternalOrders→Budgeting
→ Original Budget → Change.
b) IntheOrderfield,enterthenumberofyourtradefairorder. Choose
Enter.
c) Enter 10000 for your order budget for the current fiscal year and
the overall value. Choose Save.
2. Make surethe trade fair order is released.
Note: Beforeyoucanpostactualcoststoyourtradefairorder,you
must makesurethat the order isreleased.
a) ChooseAccounting→Controlling→InternalOrders→MasterData
→SpecialFunctions → Order→Change.
b) EnteryourordernumberandchooseMasterData.
c) Go to the Control Data tab.
Iftheorderhasnotbeenreleased,chooseRelease(locatedtotherightof
theSystemStatusfield). ThestatuschangesandisnowRELorreleased.
d) Save the order.
3. EnteraG/Laccountposting,withtodayasthedate,forthepurchaseofraw
materialsforcompanycode1000incurrencyEUR.Enteradebitamountof
9800forG/Laccount400000(inputtaxcodeV0)andassignthepostingto
your trade fair order.
Continued on next page
245
2009 © 2009 SAP AG. All rights reserved.
第 266 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
SpecifythattheoffsettingcreditistobemadetoG/Laccount113100. Post
thedocumentandnotethebudgetwarningmessage.
a) ChooseAccounting →FinancialAccounting→GeneralLedger →
Posting →EnterG/L Account Document.
b) Enter the following data.
Field Value or Action
Document Date today
Company Code 1000(ifaskedbysystem)
Currency EUR
G/L Account 400000 infirst row
D/C Debit
AmountinDocumentCurrency 9800
Tax Code V0
Order your tradefair order
G/L Account 113100
D/C Credit
AmountinDocumentCurrency 9800
c) Choose Enter. Choose Post.
d) Note the budget warning message.
ChooseEntertoclearthewarningmessage.
e) RemainintheG/LAccountPostingscreenforthenextexercisestep.
The warning message indicates that your order budget is almost
exhausted.
4. Enter one more G/L account postings, with today as the date, for the
purchaseofrawmaterialsforcompanycode1000incurrencyEUR.Enter
adebitamountof1000for G/Laccount400000andassignthepostingto
yourtradefairorder. SpecifythattheoffsettingcreditistobemadetoG/L
account113100. Postthedocumentandnotethebudgetwarningmessage.
Continued on next page
246
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Document Date | today |
| Company Code | 1000(ifaskedbysystem) |
| Currency | EUR |
| G/L Account | 400000 infirst row |
| D/C | Debit |
| AmountinDocumentCurrency | 9800 |
| Tax Code | V0 |
| Order | your tradefair order |
| G/L Account | 113100 |
| D/C | Credit |
| AmountinDocumentCurrency | 9800 |
第 267 页 / 共 455 页
AC040 Lesson: Actual Postings in OverheadManagement Accounting
Postanother1000EURtoyourorder. Howdoesthesystemreact?
a) Choose Accounting→FinancialAccounting→GeneralLedger →
Posting →EnterG/L AccountDocument.
b) Enter the following data.
Field Value or Action
Document Date today
G/L Account 400000 infirstrow
D/C Debit
AmountinDocumentCurrency 1000
Tax Code V0
Order your trade fair order
G/L Account 113100
D/C Credit
AmountinDocumentCurrency 1000
c) Choose Enter. Choose Post.
d) Note the budget warning message.
ChooseEnterto clearthewarning message.
The warning message indicates that your order budget has been
exceededforthecurrentfiscalyear. Ifyoutrytopostanotheramount
of 1000, thesystemdisplaysanerrormessage.
5. Review the e-mail messages.
Note: Youreceivemessagesonlyif youhaveentered yourself as
thebudgetmanagerinCustomizing. Theinstructorwilldisplaythe
e-mailmessagesthatwereautomaticallyissuedbytheavailability
control settings.
a) Toviewthee-mailmessages,chooseOffice→Workplace→Inbox.
b) Choose Unread Documents.
247
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Document Date | today |
| G/L Account | 400000 infirstrow |
| D/C | Debit |
| AmountinDocumentCurrency | 1000 |
| Tax Code | V0 |
| Order | your trade fair order |
| G/L Account | 113100 |
| D/C | Credit |
| AmountinDocumentCurrency | 1000 |
第 268 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Lesson Summary
You should now be able to:
• Post ManagementAccountingrepostingdocuments
• Explainthepurposeof adirectactivityallocation
• Post a direct activity allocation
• Explain thepurpose of entering time sheets
• Describethesteps for processing time sheets
• Set up a budget for an internal order
• Postdocumentstoaninternalordertodemonstratetheeffectsofavailability
control
• DescribehowExecutionServicesisusedtopostdocuments
248
©2009SAPAG.Allrightsreserved. 2009
第 269 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Lesson: Postings for Make-to-Stock Production
Lesson Overview
This lesson introduces typical postings using lot-size-based, make-to-stock
production as anexample. You will learn howto createaproduction order for
manufacturingapumptostockandhowtoposttransactionstotheorder.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Create a production order
• Postthedocumentsnecessaryforenteringtheconsumptionofmaterialand
activities
• Postthedocumentsnecessaryforenteringallotherproductioncosts
Business Example
Becauseyourcompanymanufacturesmaterialsorproductstostock,youneedto
learnhowtoenterandmanageproductioncosts. Youwanttolearnthedifferent
waystoanalyzethecosts: bylotsize,byperiod,orbysalesorder.
Analyzing Production Costs
Productionordersareusedtoenterproductioncostsformaterialsorproducts.
Youcan analyze production costs inthree ways:
• By lot size using Product Cost by Order
• By period using Product Cost by Period
• BysalesorderusingProductCostbySalesOrder
249
2009 © 2009 SAP AG. All rights reserved.
第 270 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 107: Product Cost Accounting
Product Cost by Order relates to the lot-oriented production of goods and
services, whichmeansthattheviewisalwayssetonafixedquantity(lotsize).
Youcanalsodisplaycostsinreportingforaspecificperiod.
Figure 108: Product Cost by Order
250
©2009SAPAG.Allrightsreserved. 2009
第 271 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
An example of this production is order-related production using a production
order for a specific quantity, which is manufactured and then delivered to the
warehouse. Sales orders are also lot-size-related because they are created for
specific quantities.
For each production order, you can:
• Calculate planned and actual costs.
• TransferactualcoststootherobjectsintheSAPsystem.
• Analyze planned and actual costs.
When using Product Cost by Order, you can:
• Determinewhichcostshavenotyetbeensettledtoproductionorders, and
transfertheperiod'sworkinprogressforeachordertoFinancialAccounting
and Profitability Analysis.
• Determineanyproductionvariancesthatoccurredforeachorderandtransfer
thesevaluesascostsfortheperiodtoProfitabilityAnalysis.
• Determine scrap costs and transfer them periodically to Profitability
Analysis.
In contrast to Product Cost by Order where costs are analyzed according to
lots,ProductCost byPeriodallowsyoutoanalyzecostsbyperiod. Costsare
collectedandanalyzedoveraspecifictimeperiodusingaproductcostcollector.
By using a product cost collector, you can collect product costs regardless of
theproductiontype. Productioncostscanbecollectedinthesameproductcost
collectorforeachperiodregardlessoftheproductionenvironment(order-related
production, processmanufacturingormassproduction).
Product Cost by Periodrelates to the time-oriented production of goods and
services. Theviewisalwayssetonafixedamountoftime(period).
251
2009 © 2009 SAP AG. All rights reserved.
第 272 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 109: Product Cost by Period
Anexampleoftime-orientedproductionisperiodicproductionusingaproduct
costcollector(forexample,massproduction),whereitisnotpossibletoentera
productionquantity. Aninternalorderorprojectcanalsobeperiodicbecauseit
doesnotgenerallyrelatetoafixedquantityofgoodsorservices.
The following apply for mass production:
• The planned requirements for mass production are normally generated
automatically by material requirements planning (MRP); however, the
requirementscanalsobecreatedmanually. Productionplanningandcontrol
usesplannedordersforcapacityrequirementsplanningandleveling.
• Incontrasttoorder-relatedproduction,plannedordersarenotconvertedand
productiontakesplaceusingtheplannedorders,whichadoptalllogistical
functions. A cost object is opened to record cost postings; it does not,
however, containalotsize. Thecostobject isvalidforafixedamountof
time(setbytheuser)andisperiodicallyclosedforcostcontrollingpurposes.
You can use the same cost object in the following period, and, in certain
cases, throughoutthecompleteproduct lifecycle.
ProductCostbySalesOrderrelatestotheproductionofgoodsandservicesfor
a specificcustomer requirementknownatthetimeof production. Salesorders
alwaysrefertoaspecificquantity. Youcan,however, choosewhetherthesales
ordershouldalsobeacostobject(sales-order-relatedproductionwithsalesorder
controlling) or whether it transfers the requirement to Logistics only and is
notrelevantfor Controlling(sales-order-relatedproductionwithoutsalesorder
controlling).
252
©2009SAPAG.Allrightsreserved. 2009
第 273 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Figure 110: Product Cost by Sales Order
The following are examplesof sales-order-related production with sales order
controlling:
• Manufacturingaproductwherethecostsandrevenuesaretobeanalyzedat
sales order level
• Providing a service whose costs are credited to a sales order and whose
revenuesarepostedusingabillingdocumentoraresourcerelatedbilling
document
Product Cost by Sales Order is especially suited to complex make-to-order
environments. A sales order can be combined with a project for particularly
complexmake-to-ordersituations(customerprojectproduction).
Using Product Cost by Sales Order, you can:
• Calculateandanalyzeplannedandactualcostsandrevenuespersalesorder
item.
• Calculatethevalueofyourstockforsemifinishedandfinishedproducts.
• Transfer data to Financial Accounting
• Transfer datatoProfitabilityAnalysis(CO-PA).
• TransferdatatoProfitCenterAccounting(EC-PCA).
Monitoring Production Costs
InProductCostControllingatorderlevel,productionordersarethecostobjects.
The costs debited to the orders are normally analyzed and settled in lots. This
meansthatvariancescanbeanalyzedonlyafterthewholeproductionquantityhas
been delivered to the inventory.
253
2009 © 2009 SAP AG. All rights reserved.
第 274 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 111: Controlling at Order Level
ProductCost Controllingatorderlevelenablesyouto:
• Calculateandanalyzetheplan,targetandactualcostsforproductionorders
and process orders
• Calculatetheworkinprocess(WIP)usingactualcosts
• Calculate and analyze variances
• TransferdatatoFinancialAccounting,ProfitabilityAnalysis,ProfitCenter
Accounting, andActualCosting/MaterialLedger.
When you create a production order, preliminary costing can be carried out
automaticallytocalculatetheplannedcostsoftheorder.
Actual costsareincurred whenrawmaterialsfrom thewarehouseand activity
typesfromcostcentersareconsumed. Youcanalsopostprimarycostsdirectlyto
theproductionorder. Theordercanalsobedebitedwithincurredoverheads. You
canpostprocesscostsbyusingatemplatetoallocateprocessquantities.
Because the different types of actual cost are posted to the production order
simultaneouslywiththeconsumptionofmaterialsorservices,youcandisplayand
analyzethecostsfortheproductionorderatanytime.
Whenfinishedgoodsaredeliveredtothewarehouse,theinventoryvalueofthe
warehouse isdebited and theorder is credited.
254
©2009SAPAG.Allrightsreserved. 2009
第 275 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Figure 112: Controlling at Product Level
To track costsat theproductlevel, youcreateaproduct cost collectorfor each
product. A product cost collector is a cost object in Product Cost by Period
thatcollectstheactualcostsincurredduringtheproductionofamaterialineach
period. Whenyouuseaproductcostcollector,theproductisthemaincostobject.
Productcostcollectorscanbeusedinanyproductionenvironment. Thismeans
that actual costs can be collected on product cost collectors in order-related
production,processmanufacturing,orrepetitivemanufacturing.
Actualcostscanbeallocatedtoandfromproductcostcollectorsasfollows:
• DirectlythroughG/LaccountpostingsinFinancialAccounting
• ThroughtransactionsinLogistics(suchasgoodsissuesorconfirmations)for
manufacturingorders(productionordersorprocessorders)
Example: Goods issues for a production order or reporting point
confirmationsinrepetitivemanufacturingdebittheproductcostcollector
withactualcosts. Goodsreceivedfromproductioncredittheproductcost
collector.
Youcanseetheactualcostsonproductcostcollectorsintheinformationsystem
at any time.
255
2009 © 2009 SAP AG. All rights reserved.
第 276 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
During period-end closing, you can:
• Allocateprocesscoststoproductcostcollectorsusingtemplates
• Revaluate activities with actual prices
• Determineoverheadcostsforproductcostcollectors
• Calculatethevalueoftheunfinishedgoods(workinprocess)fortheperiod
using target costs
• Calculate the variances for the period
• Allocatetheworkinprocessandvariancestootherapplicationcomponents
Typical Activities in Cost Object Accounting
Although the activity output processes differ from enterprise to enterprise or
amongdifferent industrieswithregardstologistics, they areall similar for the
purposes of controlling. Regardless of the activity output (product or service,
for example), preliminary costing, simultaneous costing, and final costing are
alwayspartoftheprocess. ProductCostControllingcan,therefore,beregarded
asatoolboxcontaining many cost objectsandfunctions. You choose themost
appropriatecostobjectandfunctionsaccordingtoyourcostaccountinggoalsand
thedata(quantitystructures)thatyoucanprovide. Theresultisyourcostobject
accounting for the analyzedactivityoutput. You might chooseadifferent cost
objectforanotheractivityoutput(productgrouporservice,forexample),inwhich
case the scenario would be different.
Figure 113: Typical Activities in CostObjectAccounting
256
©2009SAPAG.Allrightsreserved. 2009
第 277 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Regardlessofthescenario that you want tohave, thebasicstepsare alwaysas
follows:
1. Selectthecostobjectsthataremostappropriateasfarastheirfunctionsor
integration are concerned.
Note: Youcanusemanyofthesecostobjectsincombination,for
example,productionorderwithsalesorderorcustomerprojectwith
assigned networksandproductionorders.
2. Calculatethecostsandsavethesecostsasplanvaluesonthecostobject.
Note: If the cost object has Created (CRTD) status, it must be
releasedbeforeyoucanmakeactualpostingstoit.
3. Withdrawtherequiredmaterials(possiblywithreferencetoabillofmaterial)
from the warehouse.
Note: Thesequenceoftheactualpostingsisnotpredefined;instead,
itisderivedfromthebusinesstransactions.
4. Purchasedexternalactivityorexternallyprocuredgoodscanresultingoods
andinvoicereceiptsthatareassignedonthecostobject.
5. Theactivityoutputconsumesinternalactivitiesfromcostcenters. Youcan
postthisactivityoutputmanuallywiththetimesheetorconfirmations.
6. Allocateoverheadratesandprocessesasperiodictransactions.
7. If products are completed, they can be delivered to the warehouse. This
credits the cost object accordingly.
8. Attheendoftheperiod,determineWIP,calculateaccrualonthecostobjects,
and/orcalculatevariance(finalcosting),dependingonthecostobjecttype.
9. At the endof the period, settle thecost object.
These basic steps are always carried out in a similar way for each cost object,
and can be seen as the core process.
Using Production Orders
Forthemanufactureofmaterialsorproducts,productionordersareusedtoenter
productioncosts. Dependingontheproductionprocess,variousproductionorder
types can be used.
You will use order-related production as the production process. Becauseyou
wanttoderivethequantitystructurefrombillsofmaterial(BOMs)androutings,
youdecidetouseManufacturingproductionordersasthecostobjects.
257
2009 © 2009 SAP AG. All rights reserved.
第 278 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Figure 114: Process Flow: Order-Related Manufacturing
Thisfigureshowsthetypicalprocessflowfororder-relatedproduction. Afewof
the steps are described here:
• Order request: The order request can come from Sales & Operations
Planning(SOP)orbebasedonanexternalrequest. YoucantransfertheSOP
datatotheproductionplan. Theplanningruncangenerateaplannedorder
thatcanthenbeconvertedtoaproductionorder.
• Availability check: During theplanning run, the system also checksthe
availabilityoftherequiredrawmaterialsandsemifinishedproducts. Ifnot
enough materialsare available, the system can createadditional planned
ordersthatcanthenbeconvertedtoproductionorders,purchaserequisitions,
or purchase orders.
• Ordercreation: Whentheorderiscreated, apreliminarycostestimateis
generated(althoughnotalways,suchasinrepetitivemanufacturing),which
isusedtocalculatetheplannedcostsfortheorder. Theplannedcostscan
be updated if the order is changed.
• Order release, material withdrawal, confirmation, and shop paper
printing: Actual costs can be assigned to the order after it is released.
Actualcostsareincurredwhenmaterialiswithdrawnfortheorderandwhen
confirmationsaregeneratedtodocumenttheconsumptionofactivitytypes.
Youcanalsopostprimarycostsdirectlytotheproductionorder. Whenthe
orderisreleased,shoppapersareprintedfortheshopfloor.
• Delivery to stock: After the production process is complete, the work
inprocessisdeliveredtostock. Partialdeliveriesarepossibleatanytime
during production.
258
©2009SAPAG.Allrightsreserved. 2009
第 279 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Figure 115: Delivery to Stock
Afterfinaldelivery,allcostsremainingontheorderareallocatedtoinventoryor
toapricedifferenceaccount. Theorderisthenfullycredited.
Ifthepricecontrolindicatorinthematerial'smasterrecordissettoSforstandard
price,thedifferencebetweentheactualcostsandthecreditpostingsforinventory
receiptsischargedto a pricedifferenceaccount. Thisrecalculates the moving
averagepriceand updatesit forstatisticalpurposes.
Ifthepricecontrolindicatorinthematerial'smasterrecordissettoVformoving
averageprice,thedifferencebetweentheactualcostsandthecreditpostingsfor
inventoryreceiptsischargedtothematerialstockaccount. Thisrecalculatesthe
totalwarehousestockvalueandthemovingaverageprice.
If, at thetimeofsettlement, thewarehousestockislessthantheorder quantity
becausegoodswereissuedinthemeantime,thefollowingeventstakeplace:
• Thecostsfortheremainingwarehousequantityarepostedtothematerial's
stock account.
• Theremainingcostsareautomaticallypostedtoapricedifferenceaccount.
Ifthematerialledgerisactive, thedeliveryisalsopostedtothematerialledger
andcanthenbeusedtocalculateanactualmaterialpriceattheendoftheperiod.
259
2009 © 2009 SAP AG. All rights reserved.
第 280 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Menu Paths for Make-to-Stock Production
Action Menu path
Analyzeproductionorder Accounting→Controlling→ProductCost
Controlling → Cost Object Controlling →
ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order →
DetailedReports→ForOrders
Confirm completion of an Logistics → Production → Shop Floor
activity Control → Confirmation → Enter → For
Operation → Time Ticket
Createproductionorder Logistics → Production → Shop Floor
Control→Order→Create→WithMaterial
EnterapostingtoaG/Laccount Accounting → Financial Accounting →
GeneralLedger→DocumentEntry→Enter
G/L Account Document
Post a goods issue Logistics → Materials Management →
InventoryManagement→GoodsMovement
→ Goods Issue
Postagoodsreceipt Logistics → Materials Management →
InventoryManagement→Goodsmovement
→ GoodsReceipt→Other
Reviewactualcostsposted Accounting→Controlling→ProductCost
Controlling → Cost Object Controlling →
ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order →
DetailedReports→ForOrders
260
©2009SAPAG.Allrightsreserved. 2009
| Action | Menu path |
|---|---|
| Analyzeproductionorder | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → ProductCostbyOrder→InformationSystem → Reports for Product Cost by Order → DetailedReports→ForOrders |
| Confirm completion of an activity | Logistics → Production → Shop Floor Control → Confirmation → Enter → For Operation → Time Ticket |
| Createproductionorder | Logistics → Production → Shop Floor Control→Order→Create→WithMaterial |
| EnterapostingtoaG/Laccount | Accounting → Financial Accounting → GeneralLedger→DocumentEntry→Enter G/L Account Document |
| Post a goods issue | Logistics → Materials Management → InventoryManagement→GoodsMovement → Goods Issue |
| Postagoodsreceipt | Logistics → Materials Management → InventoryManagement→Goodsmovement → GoodsReceipt→Other |
| Reviewactualcostsposted | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → ProductCostbyOrder→InformationSystem → Reports for Product Cost by Order → DetailedReports→ForOrders |
第 281 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Exercise 12: Postings in a Make-to-Stock
Environment
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Createaproductionorderandanalyzethepreliminarycosting
• Performtypical postingsto aproductionorder
Business Example
Your company produces a particular material. The logistics process involves
make-to-stock manufacturing using BOMs, routings, and production orders.
Becauseyourcompanywantstobaseproductiononlotsizes,youdecidetouse
ProductCostbyOrderinManagement Accounting.
Task 1:
Ensurethatyouhaveenoughwarehousestockforyourconsumptionmaterials.
Note: Youuseseveralmaterialsfromthewarehousetomanufactureyour
product. Normally,whenpurchasingthesematerials,youdecidebetween
in-houseproductionorexternal procurement.
Toshortentheprocurementtransaction,usemovementtype561toposta
goodsreceiptwithoutreferencetoapurchaseorder.
1. Createagoodsreceiptininventorymanagement. Entermovementtype561,
plant 1000 and storage location 0001.
On the following screen, enter materials R-B1##, R-B2##, R-B3##, and
R-B4##. Enterreceiptof300piecesforeachmaterial.
Hint: Tolimittheworkyouhavetodo, onthelistscreenchoose
OtherGoodsReceipts→ Createwith Reference →To BOM and
entermaterialR-F1##andthequantity300.
Post the goods receipt.
Continued on next page
261
2009 © 2009 SAP AG. All rights reserved.
第 282 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 2:
Create a production order. Make sure that the data appears automatically as
default data in the order.
1. Fromthelogisticsmenuforproductioncontrol, createaproductionorder
formaterialR-F1##inplant1000. TheproductionordertypeisPP01. The
productionlotsizeis100pieces. Usethelastworkingdayofthismonthas
the finish date.
Hint: YoucouldalsouseCurrentDateastheschedulingtype.
2. MakesurethatthecomponentswerecopiedfromtheBOMtotheproduction
order. Makesurethattheoperationswerecopiedfromtherouting.
Hint: Gotothecomponentoverviewtocheckthecomponents. Go
totheoperationoverviewtochecktheoperations.
3. From theproduction order header, review the control information. What
are the relevant fields for costing?
4. Checkthesettlementrule. Whatwasdefinedasthereceiver?
5. Releasetheproductionorderandthensaveit. Makeanoteoftheproduction
order number on your data sheet.
Toreleasetheorder,chooseReleaseOrder. Tosavetheorder,chooseSave.
Task 3:
Analyze a production order.
1. FromtheinformationsystemofProductCostbyOrder,displaythedetailed
reportfororders. Analyzeyourproductionorder(createdinthefirsttask,
Createaproductionorder)withtheCostTrendlayout(1SAP02).
ChangethelayoutbyinsertingtheCostElementfieldaftertheOrigin(Text)
field. Save this layout as GR## and user-specific as your future default
setting.
Note: Entercontrollingarea1000indialogbox.
Continued on next page
262
©2009SAPAG.Allrightsreserved. 2009
第 283 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Task 4:
Post a goods issue.
1. From inventory management, post the goods issue for the material
componentsreservedfortheorder. Usemovementtype261,plant1000and
storagelocation0001. Referencethereservationlist. Enterthenumberof
theproductionorderyoucreatedinthefirsttask. Transferallthereserved
materialsandchangethequantityofthegoodsissuefortheseconditemfrom
100 to 101 pieces. Post the goodsissue.
Note: ChooseEntertoclearanywarningmessagesthatmightbe
displayed.
Task 5:
Analyze a production order.
1. Fromtheinformationsystemof Product CostbyOrder, openthedetailed
reportforordersandanalyzeyourproductionorderfromtask1withyour
layout, GR##.
Note: Thereportshouldshowdifferentresultsnow.
Task 6:
Confirm completion of an activity.
1. Go to the Production Control menu. Confirm the progress or partial
completion, based on the time ticket, for the last operation (70) of the
production order.
Continued on next page
263
2009 © 2009 SAP AG. All rights reserved.
第 284 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Confirm only 40 finished products without any scrap, but increase the
proposedactivityquantities(executiontimes)byapproximately10%(you
arechangingtheactivityquantitiesintentionallytocreateavariance).
Note: After each operation, shop floor control can confirm
completion torecord the output quantitiesand theactual activity
quantities consumed by theoperation.
Because this is a milestone operation, the previously executed
operationsareconfirmedautomaticallyusingtheplannedexecution
times adjusted for the actual confirmed quantity (target = actual
confirmation).
Whenaconfirmationisentered,thesystemcanexecuteautomatic
goodsmovementtransactions. TheroutingformaterialR-F1##was
maintained so that thesystem automaticallyprocessesthe goods
receiptforthefinishedproductwhenthelastoperationisconfirmed.
Thesematerialmovementtransactionscreateacreditpostingonthe
production order.
Task 7:
Review actual costs posted.
1. Review the actual costs posted to the production order because of the
confirmation. Additional actual costs should have been incurred by the
production activities and a creditposting should have been made for the
deliveredquantityof40pieces. Fromthemenu,displaythedetailedreport
with your layout, GR##.
Task 8:
Post primary costs.
1. EnteraG/Laccountpostingforthepurchaseandimmediateconsumptionof
materialforcompanycode1000intheEURcurrency. Enteradebitamount
of500forG/Laccount410000(taxcodeV0)andassignthepostingtoyour
productionorderfromtask1. Specifythattheoffsettingcreditistobemade
to G/L account113100. Post thedocument.
Note: Additional costs were incurred for the production order
in addition to the costs for the normal production activities and
goods issue transactions. The additional costs were incurred by
anunexpectedexternalservice, whichwasnecessarytocomplete
production. You must post primary costs directly to the order in
Financial Accounting.
Continued on next page
264
©2009SAPAG.Allrightsreserved. 2009
第 285 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Task 9:
Review actual costs posted.
1. Check the actual costs that were posted to the production order by the
FinancialAccountingposting. Fromthemenu, displaythedetailedreport
with your layout, GR##.
265
2009 © 2009 SAP AG. All rights reserved.
第 286 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Solution 12: Postings in a Make-to-Stock
Environment
Task 1:
Ensurethatyouhaveenoughwarehousestockforyourconsumptionmaterials.
Note: Youuseseveralmaterialsfromthewarehousetomanufactureyour
product. Normally,whenpurchasingthesematerials,youdecidebetween
in-house production or externalprocurement.
Toshortentheprocurementtransaction,usemovementtype561toposta
goodsreceiptwithoutreferencetoapurchaseorder.
1. Createagoodsreceiptininventorymanagement. Entermovementtype561,
plant 1000 and storage location 0001.
On thefollowing screen, enter materialsR-B1##, R-B2##, R-B3##, and
R-B4##. Enterreceiptof300piecesforeachmaterial.
Hint: Tolimittheworkyouhavetodo, onthelistscreenchoose
OtherGoodsReceipts→ Createwith Reference→ To BOM and
entermaterialR-F1##andthequantity300.
Post the goods receipt.
a) ChooseLogistics→MaterialsManagement→InventoryManagement
→Goodsmovement→GoodsReceipt→Other(NOTMIGO).
b) Enter the following data.
Field Value or Action
Movement type 561
Plant 1000
Storage location 0001
Choose Enter.
c) On the entry screen, choose Other Goods Receipts → Create with
Reference → To BOM.
d) EntermaterialR-F1##andthequantity300.
e) Post the goods receipt.
Continued on next page
266
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Movement type | 561 |
| Plant | 1000 |
| Storage location | 0001 |
第 287 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Task 2:
Create a production order. Make sure that the data appears automatically as
default data in the order.
1. Fromthelogisticsmenufor productioncontrol, createaproductionorder
formaterialR-F1##inplant1000. TheproductionordertypeisPP01. The
productionlotsizeis100pieces. Usethelastworkingdayofthismonthas
the finish date.
Hint: YoucouldalsouseCurrentDateastheschedulingtype.
a) Choose Logistics→Production→ShopFloorControl→Order→
Create → With Material.
b) Enter the following data.
Field Value or Action
Material R-F1##
Production Plant 1000
Order Type PP01
c) Choose Enter.
d) IntheTotal Quantityfield,enter100pieces. Enterthelastworking
day of this month as the finish date.
e) Choose Enter.
2. MakesurethatthecomponentswerecopiedfromtheBOMtotheproduction
order. Makesurethattheoperationswerecopiedfromtherouting.
Hint: Gotothecomponentoverviewtocheckthecomponents. Go
totheoperationoverviewtochecktheoperations.
a) Choose Component Overview.
b) Choose Operation Overview.
Continued on next page
267
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Material | R-F1## |
| Production Plant | 1000 |
| Order Type | PP01 |
第 288 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
3. From theproduction order header, review the control information. What
are the relevant fields for costing?
a) ChooseOrderHeader. Ontheheaderscreen,gototheControlData
tab.
ThefieldsthatarerelevantforthecostingareintheCostinggroupbox.
ThesefieldsareCostingVariantPlan,CostingVariantActual,Costing
Sheet,OverheadKey,ResultsAnalysisKey,andVarianceKey.
4. Checkthesettlementrule. Whatwasdefinedasthereceiver?
a) Choose Header → Settlement Rule.
MaterialR-F1##wasdefinedasthesettlementreceiver.
b) Go back to previous screen.
5. Releasetheproductionorderandthensaveit. Makeanoteoftheproduction
order number on your data sheet.
Toreleasetheorder,chooseReleaseOrder. Tosavetheorder,chooseSave.
a) Choose Release Order and choose Save.
Task 3:
Analyze a production order.
1. FromtheinformationsystemofProductCostbyOrder,displaythedetailed
reportfororders. Analyzeyourproductionorder(createdinthefirsttask,
Createaproductionorder)withtheCostTrendlayout(1SAP02).
ChangethelayoutbyinsertingtheCostElementfieldaftertheOrigin(Text)
field. Save this layout as GR## and user-specific as your future default
setting.
Note: Entercontrollingarea1000indialogbox.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Entercontrollingarea1000 inthedialogbox.
c) Enter the production order number from the first task, choose
Cumulatedasthetimeframe,andthenexecutethereport.
d) Choose the Cost Trend layout (1SAP02).
e) ChangethelayoutbyinsertingtheCostElementfieldaftertheOrigin
(Text)field. SavethislayoutasGR##anduser-specificasyourfuture
default setting.
Continued on next page
268
©2009SAPAG.Allrightsreserved. 2009
第 289 页 / 共 455 页
AC040 Lesson: Postings for Make-to-Stock Production
Task 4:
Post a goods issue.
1. From inventory management, post the goods issue for the material
componentsreservedfortheorder. Usemovementtype261,plant1000and
storagelocation0001. Referencethereservationlist. Enterthenumberof
theproductionorderyoucreatedinthefirsttask. Transferallthereserved
materialsandchangethequantityofthegoodsissuefortheseconditemfrom
100 to 101 pieces. Post the goodsissue.
Note: ChooseEntertoclearanywarningmessagesthatmightbe
displayed.
a) ChooseLogistics→MaterialsManagement→InventoryManagement
→ Goods Movement → Goods Issue.
b) Enter the following data.
Field Value or Action
Movement Type 261
Plant 1000
Storage Location 0001
c) ChooseToReservationandenterthenumberoftheproductionorder
intheOrderfield. (Youcanalsoenterthereservationnumberinthe
Reservationfieldif youhavealready lookedit up intheproduction
order).
d) ChooseContinue. ChooseSelectAllandadopttheitems.
e) Change the quantity of the second item from 100 to 101. Post the
goods issue.
f) ChooseEntertoclearanywarningmessagesthatmightbedisplayed.
Continued on next page
269
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Movement Type | 261 |
| Plant | 1000 |
| Storage Location | 0001 |
第 290 页 / 共 455 页
Unit7: DailyPostingsinManagementAccounting AC040
Task 5:
Analyze a production order.
1. Fromtheinformationsystemof ProductCostbyOrder, openthedetailed
reportforordersandanalyzeyourproductionorderfromtask1withyour
layout, GR##.
Note: Thereportshouldshowdifferentresultsnow.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Enter your production order number (created in task 1). Choose
Cumulatedasthetimeframeandexecutethereport.
c) If required, choose your layout, GR##.
Actualvaluesshouldbelistedforthecostelementsforthecomponents.
Task 6:
Confirm completion of an activity.
1. Go to the Production Control menu. Confirm the progress or partial
completion, based on the time ticket, for the last operation (70) of the
production order.
Continued on next page