Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Lesson Summary
You should now be able to:
• PoststatisticalkeyfigurestoaManagementAccountingobject
• Performacostassessmentfromonecostcentertoseveralothercostcenters
• Settlethecostsforaninternal order toacostcenter
344
©2009SAPAG.Allrightsreserved. 2009
第 367 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Lesson: Period-End Closing for Product Cost Controlling
Lesson Overview
Thislessondiscussesthetypicalperiodictransactionsforcostobjects. Because
our example deals with Product Cost by Order, the work in process (WIP) is
calculated based on the actual costs, that is, we have either WIP or variances,
depending on the status of the order.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Allocateoverheadcostsandprocesscoststoaproductionorder
• Deliver material to stock
• Calculateworkinprocess(WIP)andcalculateproductionvariances
• Settle the balancefor the production order
• Sellaservice(sales-order-relatedproductionofintangiblegoods)
Business Example
Youwanttofindoutwhatprocessingstepsarenecessaryattheendoftheperiod
for cost objects. These steps may include template allocation of processes,
activities, and overhead surcharges.
Afterapartialdeliverytostock,younoticethatthereisabalanceontheproduction
order. Youwanttocalculatetheseremainingcostsforunfinishedpartsaswork
inprocessforthecostobject. Afterthefinaldeliverytakesplaceforsomecost
objects, youwantto evaluatetheremainingcostsandcheckfor anyvariances.
Youalsoneedtolearnhowtosettlethecoststoapricedifferentaccountandto
a profit center and market segments.
Settlement and Other Period-End Tasks
Insettlement,thecostsaresettledtoapricedifferentaccountandtoaprofitcenter
andmarketsegments. Thecostobjectsaresettledattheendofaperiod.
345
2009 © 2009 SAP AG. All rights reserved.
第 368 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 146: ProcessFlow in Order-Related Manufacturing
Cost objects can be settled in two ways:
• Product Cost by Order
• Product Cost by Period
InProduct Cost byOrder, the following occurs:
• Workinprocess(WIP)iscalculatedatactualcost.
• As long as the cost object is not yet delivered, there will be WIP but no
variances.
• Whenthe cost object is delivered, theWIP is canceled and variancesare
calculated.
InProduct Cost by Period, the following occurs:
• Workinprocess(WIP)iscalculatedattarget cost.
• There are both WIP and variances.
Duringperiod-endclosing,theremainingcostsarefirstallocatedtothecostobject:
• Activitiesandprocessesareallocatedusingtemplateallocation.
• Activityquantitiesarerevaluatedatactualprices(providedtheactualprices
were calculated in CO-OM beforehand).
• Overheadratesallocateoverheadcoststothecostobject andcreditacost
center or internal order.
346
©2009SAPAG.Allrightsreserved. 2009
第 369 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Figure 147: TypicalSteps in Period-EndClosinginCO-PC
Nowthatallcostshavebeenassignedtothecostobject,youcanstartwithfinal
costing. Final costing includescalculating the workin processand calculating
variances and scrap.
• Calculating the work in process (WIP): WIP is calculated on the basis
of either the actual costs incurred or the target costs for the operations
confirmed todate. Thisdependson whichmethodyou use, ProductCost
by Order or Product Cost by Period. Most cost objects allow only one
method. WIPcalculationiscontrolledbytheresultsanalysiskeyspecifiedin
the cost object.
• Calculating variances and scrap: With Product Cost by Order, you can
calculatevariancesandscraponly ifthecost object hasDelivered(DLV)
orTechnicallycompleted(TECO)status. Variancecalculationiscontrolled
bythevariancekeyspecifiedinthecostobject. Variancecalculationisnot
possible for all cost objects.
Settlement settles the order values to Financial Accounting, Profit Center
Accounting,andProfitabilityAnalysis. IfthecostobjecthasnoWIP,thebalance
for the order after settlement is zero.
Settlement results in thefollowing postings:
• If the material has price control V, the balance on the order is settled to
inventory. WithpricecontrolS,thebalanceissettledtothepricedifference
account in Financial Accounting.
• The work in process isposted to Financial Accounting and Profit Center
Accounting.
• VariancesandscraparepostedtoProfitabilityAnalysis.
347
2009 © 2009 SAP AG. All rights reserved.
第 370 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 148: Template Allocation
Processcostscanbeallocatedtothecostobjectswithaperiodictransaction.
Usingcostdrivers,thetemplatecalculatestheprocessquantitiestobeallocated
tothematerialorcostobject. Thismeansthatproductionprocessespullprocess
quantitiesintothecostobjects using the template.
When processes provide their process quantities, they incur costs due to the
consumptionofresources(primarycosts,activities,andotherprocesses). Youcan
alsoallocatetheseresourcestotheprocessthroughatemplate.
By dividing the costs of the process by the allocated process quantity, an
actual price for the processcan also becalculated and then be used to remove
underabsorptionandoverabsorptionfromtheprocessbyrevaluatingtheprocess
quantityallocations. Alternatively,theprocessbalancecanbemadeavailableto
Profitability Analysis.
Processallocationalwayscontainsacombinedvalue/quantityflowwithaunique
origin;therefore,processallocationisanidealalternativetooverheadrates.
Process allocation thus contributes to better cost transparency and improved
analysis of the costs on the cost object.
348
©2009SAPAG.Allrightsreserved. 2009
第 371 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Figure 149: WIP Calculation Based on Actual Costs
Workinprocess(WIP)canbecalculatedusingeithertheactualcostsincurredfor
theorderorthetargetcostsforthecompletedoperations.
Withtheactualcostmethod,theWIPofanorderisthedifferencebetweenthe
debitedactualcostsandthetotalcreditsforanypartialdeliveries.
Withthetargetcostmethod,theWIPiscalculatedbymultiplyingthequantity
remaining after each operation by the planned costs for that operation. The
plannedcostsaredeterminedusingeitherthecurrentstandardcostestimateora
version-specific cost estimate. Version-specific cost estimates are commonly
used in repetitive manufacturing.
Withbothmethods,youcanspecifyinCustomizingwhatpercentageofthecosts
should be capitalized (for example, 100% of the material costs, 80% of the
materialoverhead,and0%oftheproductionoverhead). Youcanalsocapitalize
the entire WIP value.
By using different typesof productionorders, you can specify inCustomizing
whethertheworkinprocessiscalculatedonthebasisofactualcostsortargetcosts.
349
2009 © 2009 SAP AG. All rights reserved.
第 372 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 150: WIP Settlement
TheWIPcalculationcalculatesWIP.Theaccrualresultsareallocatedfurtherafter
thecostobjectissettled. ThesevaluescanthenbepostedtoFinancialAccounting
and Profit Center Accounting.
The WIP isnot broken down immediately at thebeginning of the next period.
Instead, it is updated during the next period-end closing run. This means that
during each period-end closing run, only the difference in WIP between the
currentandthelastperiod-endclosingrunissettled.
ThenumberoftheorderforwhichWIPispostedinFinancialAccountingissaved
intheassignmentfieldoftheaccountingdocument. Thisexplainsthepostingsin
Financial Accounting.
350
©2009SAPAG.Allrightsreserved. 2009
第 373 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Figure 151: Variance Calculation
The system assigns each variance to a variance category. These categories
reflectthecauseofthevariance(forexample,pricechangeorlotsizevariance).
VariancescanbeanalyzedintheinformationsystemandallocatedtoProfitability
Analysis according to the variance category.
Variancecategoriesexistonboththeinput andoutput:
• Variances that occur due to goods issues, internal activity allocations,
overheadcosts,andG/Laccountpostingsaredisplayedontheinputside.
Thesevariancesincludepricevariances,quantityvariances,resource-usage
variances, and input variances.
• Variancesthatoccurbecausethedeliveryoftheplannedorderquantitywas
eithertoohighortoolow,orthedeliveredquantitywasvaluateddifferently,
aredisplayedontheoutputside. Ifthedeliveryismadeatthestandardprice,
avariancemightoccuriftheorderlotsizediffersfromthecostinglotsize.
Thisvarianceisdisplayedasalotsizevariance.
351
2009 © 2009 SAP AG. All rights reserved.
第 374 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 152: Variance Settlement
Inorder-relatedproduction,variancesarecalculatedandallocatedasfollows:
• When a production order is created, the system automatically creates a
settlementrulethatassignstheordercoststothematerial(stockaccount).
Inthiscase, thematerialisthesettlementreceiver, thesettlement shareis
100%, and the settlement type is full.
• Whenyoudeliverthefinishedproductstothewarehouse,thesystemupdates
thematerialstockaccountforthematerialandcreditstheorderaccordingly.
• Whenvariancesarecalculatedattheendoftheperiod,thesystemsetsthe
statusfor theorder toVariances calculated.
• Whentheorderissettled, theorder iscreditedbythesameamountasthe
orderbalance. Atthesametime,thesystemmakesthefollowingoffsetting
entries:
– IfthepricecontrolindicatorissettoSinthematerialmasterrecord,
theactualcosts(variances)arewrittentoapricedifferenceaccount.
– IftheindicatorissettoV,theactualcosts(variances)arepostedtothe
material stock account for the material.
• ThesystemtransfersanyvariancestoProfitabilityAnalysis.
352
©2009SAPAG.Allrightsreserved. 2009
第 375 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Figure 153: Comparison of Methods
With Product Cost by Period, you calculate the WIP value using target costs.
For run schedule headers, you must enter the reporting point backflushes for
theoperation; forproductionorders, youmust enter confirmations. Confirmed
quantitiesthatarenotscraparevaluatedduringWIPcalculation(basedontarget
costs) and according to the valuation variant determined in Customizing for
Product Cost byPeriod. These quantities arevaluatedfor work in processand
scrap.
Variances are calculated periodically for Product Cost by Period. When the
variancesarecalculated,theconfirmedactualvaluesarecomparedwiththetarget
values. TheWIPvalueisalsodeductedfromthedifferencebetweentheactual
and target values.
Menu Paths for Period-End Closing for Product Cost Accounting
Action Menu path
Access the Individual Accounting→Controlling→Product Cost
Processingtransaction Controlling → Cost Object Controlling
→ Product Cost by Order → Period-End
Closing → Single Functions → Template
Allocation→IndividualProcessing
Calculateoverheadrates Accounting→Controlling→Product Cost
Controlling → Cost Object Controlling
→ Product Cost by Order → Period-End
Closing→SingleFunctions→Overhead→
Individual Processing
353
2009 © 2009 SAP AG. All rights reserved.
| Action | Menu path |
|---|---|
| Access the Individual Processingtransaction | Accounting→Controlling→Product Cost Controlling → Cost Object Controlling → Product Cost by Order → Period-End Closing → Single Functions → Template Allocation→IndividualProcessing |
| Calculateoverheadrates | Accounting→Controlling→Product Cost Controlling → Cost Object Controlling → Product Cost by Order → Period-End Closing→SingleFunctions→Overhead→ Individual Processing |
第 376 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Action Menu path
Checkactualcostsallocatedto Accounting→Controlling→ProductCost
aproduction order Controlling → Cost Object Controlling →
ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order →
DetailedReports→ForOrders
Determineworkinprocessfora Choose Accounting → Controlling →
production order Product Cost Controlling → Cost Object
Controlling → Product Cost by Order →
Period-EndClosing→SingleFunctions→
WorkinProcess→IndividualProcessing→
Calculate
Viewreportsonorders Accounting→Controlling→ProductCost
Controlling → Cost Object Controlling →
ProductCostbyOrder→InformationSystem
→ Reports for Product Cost by Order →
DetailedReports→ForOrders
Settleaproductionorder Accounting→Controlling→ProductCost
Controlling → Cost Object Controlling
→ Product Cost by Order → Period-End
Closing→SingleFunctions→Settlement→
Individual Processing
Execute a time ticket Logistics → Production → Shop Floor
confirmationforanoperation Control → Confirmation → Enter → For
Operation → Time Ticket
Calculatevariances Accounting→Controlling→ProductCost
Controlling → Cost Object Controlling
→ Product Cost by Order → Period-End
Closing→SingleFunctions→Variances→
Individual Processing
354
©2009SAPAG.Allrightsreserved. 2009
| Action | Menu path |
|---|---|
| Checkactualcostsallocatedto aproduction order | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → ProductCostbyOrder→InformationSystem → Reports for Product Cost by Order → DetailedReports→ForOrders |
| Determineworkinprocessfora production order | Choose Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Product Cost by Order → Period-EndClosing→SingleFunctions→ WorkinProcess→IndividualProcessing→ Calculate |
| Viewreportsonorders | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → ProductCostbyOrder→InformationSystem → Reports for Product Cost by Order → DetailedReports→ForOrders |
| Settleaproductionorder | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → Product Cost by Order → Period-End Closing→SingleFunctions→Settlement→ Individual Processing |
| Execute a time ticket confirmationforanoperation | Logistics → Production → Shop Floor Control → Confirmation → Enter → For Operation → Time Ticket |
| Calculatevariances | Accounting→Controlling→ProductCost Controlling → Cost Object Controlling → Product Cost by Order → Period-End Closing→SingleFunctions→Variances→ Individual Processing |
第 377 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Exercise 16: Period-End Closing for
Product Cost Controlling
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Executeperiod-endclosinginCostObjectControlling
• Includeprocesscostallocation,overheadcalculation,workinprocess(WIP)
calculation, variancecalculation,andordersettlement
Business Example
Acompanycreatedmanyproductionsordersduringtheperiods. Nowattheend
oftheperiodtheywanttocarryouttheperiodendclosingprocessincostobject
controlling.
Therefore they should consider:
Attheendoftheperiod,theprocesscostsandoverheadratesmustbeallocatedto
thecostobjects. Theycanthenanalyzethecostsforthecostobject. Becauseyour
order ismanufacturedbylot(orderview), twodifferentsituationsarepossible:
theorder hasordoesnot havefinaldeliverystatus.
Iftheorderdeliverystatusisnotfinal,youshouldfirstcalculatetheWIP.Thisis
necessarybecausethevalueoftheunfinishedproductsisnotyetreflectedinthe
balancesheetandprofitandlossstatement. Thereasonisthatthecostsforthese
products(suchasmaterialandactivityconsumption)alreadyaffectnetincome,
but the value of the products is not capitalized until the goods are received.
Closing the period without calculating and capitalizing WIP, therefore, would
resultinpoorfiguresintheP&Lstatement,thebalancesheet,andeveninProfit
Center Accounting. TheWIPcalculationonlycalculatesthevalues; thevalues
arenottransferredtoFinancialAccountingand Profit Center Accounting until
the order is settled.
Iftheorderdeliverystatusisfinal,noproductsremainintheproductionprocess.
ThismeansthattheWIPmustbezero. TheWIPmuststillbecalculated,however,
sothatthecancellationamountfortheWIPcapitalizedinthepreviousmonthcan
bedetermined. Thebalanceremainingontheorderafterfinaldeliveryisthetotal
variance,whichyoucanexaminewithvariancecalculation. Variancecalculation
showsthereasonsforthevarianceswithrespecttothetargetvaluesforthedebits
and credits of the order by classifying the variances into variance categories.
Thesevariancecategoriesaresavedfortheorderasstatisticalinformationsothat
theyareavailablelaterforevaluationsandsummarizations.
355
2009 © 2009 SAP AG. All rights reserved.
第 378 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Whentheorderissettled,thebalanceispostedtothestockaccountsortotheprice
differenceaccount in accordancewiththepostingrule. The WIP(cancellation
amount)istransferredtoFinancialAccountingandProfitCenterAccounting,and
thevariancescanbetransferredtoCO-PAbrokendownintovariancecategories.
After settlement, the balanceontheorder iszero.
Task 1:
Carry out period-end closing tasks.
1. Allocate process quantities. Use the template allocation, individual
processing transaction to allocate the process costs for your production
order for the current period and version 0.
Hint: UsetheControllingmenutoaccesstheIndividualProcessing
transaction. You can also access this transaction by choosing
Logistics → Production → Shop Floor Control → Period-End
Closing→TemplateAllocation→IndividualProcessing.
2. Calculate the overhead rates.
Hint: Omitrevaluationwithactualpricesbecausenoactualprices
have been calculated.
Useindividualprocessingforoverheadcoststocalculatetheoverheadrates
for your production order.
3. Checktheactualcostsallocatedtotheproductionorderbytheprocesscost
allocationandoverheadapplicationfunctions. Fromthereportstructurefor
ManagementAccounting,chooseProductCostbyOrder. Runthedetailed
reportforyourproductionorderwithyourlayoutGR##.
4. Determinetheworkinprocess(WIP)foryourproductionorderinthecurrent
period. Useresultsanalysisversion0,chooseLogInformationMessagesand
calculate the WIP in an update run.
5. UsingtheWIPreport,takealookattheWIPvaluethatwascalculatedfor
the production order.
Hint: This report is available in Cost Object Controlling under
Product Cost by Order.
6. Settletheproductionorderinanupdateruntotransfertheworkinprocess
to Financial Accounting andProfit Center Accounting. Theperiod isthe
currentperiodandtheprocessingtypeisautomatic.
Continued on next page
356
©2009SAPAG.Allrightsreserved. 2009
第 379 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Whentheorderhasbeensettled,thesystemdisplaysadetailedlist. Check
thesender andreceiver information. DrilldownontheitemsinFinancial
Accounting and Profit Center Accounting.
Task 2:
Whenproductioniscompleted, performthefollowingtasks.
1. Executeatimeticketconfirmation/finalconfirmationforoperation70forthe
remaining60pieces. Todothis,confirmatotalquantityof60piecesinthe
Shop Floor Control menu.
Note: Thisisamilestoneoperation. Theprecedingoperationsare
automaticallyconfirmedwiththeplannedexecutiontimesadjusted
totheconfirmedquantities(target/actualconfirmation). Thegoods
receiptforthe60piecesispostedautomatically(automaticgoods
receipt).
2. Reviewtheactualcostspostedtotheproductionorderfromtheconfirmation.
Additionaldebitsfortheproductionactivitiesandacreditforthedelivered
quantityof60piecesmusthavebeenassignedtotheorder. Runthedetailed
reportagainforyourproductionorderwithyourlayoutGR##.
3. The order now has final delivery status. Calculate the WIP again to
determine the cancellation amount.
Hint: Since the period has not changed during our course since
the last period-end close, the result of WIP calculation is not the
cancellationamountbutthecurrentWIPvalueof0.
CalculatetheWIPasanupdaterun. Choosethecurrentperiodandresults
analysis version 0. Choose Log Information Messages and execute the
calculation as an update run.
4. Calculate the variances for your production order for the current period.
Executethe calculation for target cost version0 and chooseDetail Lists.
From the variance calculation list, go to the cost element report and the
variance analysis report.
Note: Assoonastheorderhasbeencompleted,thevariancescan
be calculated. The variance calculation function calculates the
difference between the actual cost and the target cost (such as a
standard cost estimate).
5. Settleyourordertoallocatetheorderbalance,theWIPcancellationamount,
andthevariancestoFinancialAccounting, ProfitCenterAccounting, and
CO-PA.
Continued on next page
357
2009 © 2009 SAP AG. All rights reserved.
第 380 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Settle your production order for the current period with processing type
Automatic in an update run.
Whentheorderhasbeensettled,thesystemdisplaysadetailedlist. Check
the sender and receiver information in thislist. Expand thestructure and
displaytheaccountingdocument,theprofitcenteraccountingdocument,and
the profitability analysis document.
Task 3:
Optional: Deliver items to a customer.
1. Deliver 60 pieces of material R-F1## from your warehouse, shipping
location 1000, to your customer.
Note: Go back to the SAP menu for order creation by choosing
Back twice.
Entertheselectiondateastwoweeksfromtoday. Enter0002asthestorage
location and choose Enter.
Goto thepickingsection,entera pickingquantityof60 andchoosePost
goods issue.
Confirm that you want to save your data by choosing Yes. Make a note
of the delivery document number.
Note: If you cannot enter a pick quantity, you have to create a
transfer order.
1. SelecttheitemandchooseSubsequentFunctions→Create
Transfer Order.
2. Onthenextscreen,intheControlsectionselectActivateItem,
Backgroundprocessing,andAdoptPickQuantity2. Choose
Enterto save. Exit the transaction.
358
©2009SAPAG.Allrightsreserved. 2009
第 381 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Solution 16: Period-End Closing for
Product Cost Controlling
Task 1:
Carry out period-end closing tasks.
1. Allocate process quantities. Use the template allocation, individual
processing transaction to allocate the process costs for your production
order for the current period and version 0.
Hint: UsetheControllingmenutoaccesstheIndividualProcessing
transaction. You can also access this transaction by choosing
Logistics → Production → Shop Floor Control → Period-End
Closing→TemplateAllocation→IndividualProcessing.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→TemplateAllocation→IndividualProcessing.
b) Entertheordernumber, theactualperiod,unmarktestrunandmark
detail lists
. Choose Execute
2. Calculate the overhead rates.
Hint: Omitrevaluationwithactualpricesbecausenoactualprices
have been calculated.
Continued on next page
359
2009 © 2009 SAP AG. All rights reserved.
第 382 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Useindividualprocessingforoverheadcoststocalculatetheoverheadrates
for your production order.
a) Choose Accounting→ Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost by Order → Period-End
Closing→SingleFunctions→Overhead→IndividualProcessing.
b) Enter the following data.
Field Value or Action
Production order numberoftheproductionorder
Period current period
Fiscal Year current fiscal year
Test Run deselect
c) ChooseDialog Display. ChooseExecute.
3. Checktheactualcostsallocatedtotheproductionorderbytheprocesscost
allocationandoverheadapplicationfunctions. Fromthereportstructurefor
ManagementAccounting,chooseProductCostbyOrder. Runthedetailed
reportforyourproductionorderwithyourlayoutGR##.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Enter the production order number. Under Time Frame, choose
Cumulated.
c) Choose Execute.
Theactualvaluesshouldbelistedforthecostelementsoftheprocess
and overhead rates.
Continued on next page
360
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Production order | numberoftheproductionorder |
| Period | current period |
| Fiscal Year | current fiscal year |
| Test Run | deselect |
第 383 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
4. Determinetheworkinprocess(WIP)foryourproductionorderinthecurrent
period. Useresultsanalysisversion0,chooseLogInformationMessagesand
calculate the WIP in an update run.
a) Choose Accounting → Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost by Order → Period-End
Closing → Single Functions → Work in Process → Individual
Processing → Calculate.
b) Enter the following data.
Field Value or Action
Production order numberfromdatasheet
WIP to Period current period
Fiscal Year current fiscal year
RA Version 0
Test Run deselect
c) ChooseLogInformationMessages. ChooseExecute.
5. UsingtheWIPreport,takealookattheWIPvaluethatwascalculatedfor
the production order.
Hint: This report is available in Cost Object Controlling under
Product Cost by Order.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Entertheproductionordernumber,selectCumulatedasthetimeframe,
and choose Execute.
c) Switchtothe“WorkinProcess”layout(1SAP03).
6. Settletheproductionorderinanupdateruntotransfertheworkinprocess
toFinancial Accounting and ProfitCenter Accounting. The period isthe
currentperiodandtheprocessingtypeisautomatic.
Continued on next page
361
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Production order | numberfromdatasheet |
| WIP to Period | current period |
| Fiscal Year | current fiscal year |
| RA Version | 0 |
| Test Run | deselect |
第 384 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Whentheorderhasbeensettled,thesystemdisplaysadetailedlist. Check
thesender andreceiverinformation. DrilldownontheitemsinFinancial
Accounting and Profit Center Accounting.
a) Choose Accounting→ Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost by Order → Period-End
Closing→SingleFunctions→Settlement→IndividualProcessing.
b) Enter the following data.
Field Value or Action
Production order numberfromdatasheet
Settlement Period current period
Fiscal Year current fiscal year
Processing Type select Automatic
Test Run deselect
c) Choose Execute.
d) Todisplaythesettlement, chooseDetail lists.
e) To display the Financial Accounting documents and profit center
documentsonthereceiverscreen,selecttheordernumberandchoose
Accounting Documents. Double-click the accounting document to
selectit. Gobacktothelistofaccountingdocumentsanddouble-click
the profit center document.
Continued on next page
362
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Production order | numberfromdatasheet |
| Settlement Period | current period |
| Fiscal Year | current fiscal year |
| Processing Type | select Automatic |
| Test Run | deselect |
第 385 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Task 2:
Whenproductioniscompleted, performthefollowingtasks.
1. Executeatimeticketconfirmation/finalconfirmationforoperation70forthe
remaining60pieces. Todothis,confirmatotalquantityof60piecesinthe
Shop Floor Control menu.
Note: Thisisamilestoneoperation. Theprecedingoperationsare
automaticallyconfirmedwiththeplannedexecutiontimesadjusted
totheconfirmedquantities(target/actualconfirmation). Thegoods
receiptforthe60piecesispostedautomatically(automaticgoods
receipt).
a) Choose Logistics → Production → Shop Floor Control →
Confirmation→Enter→ForOperation→TimeTicket.
b) Entertheordernumber. Enteroperation70andchooseEnter.
c) Choose Final Confirmation. Verify the yield to be confirmed is 60
pieces. Save the confirmation.
2. Reviewtheactualcostspostedtotheproductionorderfromtheconfirmation.
Additionaldebitsfortheproductionactivitiesandacreditforthedelivered
quantityof60piecesmusthavebeenassignedtotheorder. Runthedetailed
reportagainforyourproductionorderwithyourlayoutGR##.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→InformationSystem→
ReportsforProductCostbyOrder→DetailedReports→ForOrders.
b) Entertheproductionordernumber,selectCumulatedasthetimeframe,
and thenchoose Execute(layout GR##).
Additional debits for the production activities and a credit for the
deliveredquantityof60piecesmusthavebeenassignedtotheorder.
3. The order now has final delivery status. Calculate the WIP again to
determine the cancellation amount.
Hint: Since the period has not changed during our course since
the last period-end close, the result of WIP calculation is not the
cancellationamountbutthecurrentWIPvalueof0.
Continued on next page
363
2009 © 2009 SAP AG. All rights reserved.
第 386 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
CalculatetheWIPasanupdaterun. Choosethecurrentperiodandresults
analysis version 0. Choose Log Information Messages and execute the
calculation as an update run.
a) ChooseAccounting→Controlling→ProductCostControlling→Cost
ObjectControlling→ProductCostbyOrder→Period-EndClosing
→SingleFunctions→WorkinProcess→IndividualProcessing→
Calculate. Entertheproductionordernumber.
b) IntheWIPtoPeriodfield,enterthecurrentperiod. IntheFiscalYear
field, enter the current fiscal year.
c) Select RA Version and enter 0.
d) Deselect Test Run. Choose Log Information Messages. Choose
Execute.
The WIP value must be 0.
4. Calculate the variances for your production order for the current period.
Executethe calculation for target cost version0 and chooseDetail Lists.
From the variance calculation list, go to the cost element report and the
variance analysis report.
Note: Assoonastheorderhasbeencompleted,thevariancescan
be calculated. The variance calculation function calculates the
difference between the actual cost and the target cost (such as a
standard cost estimate).
a) Choose Accounting→ Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost by Order → Period-End
Closing→SingleFunctions→Variances →IndividualProcessing.
Enter the production order number.
b) InthePeriodfield, enterthecurrentperiod. IntheFiscalYearfield,
enter thecurrent fiscal year. Select 000 for theSelectedTargetCost
Versions.
c) DeselectTestRun. ChooseDetailList. ChooseExecute.
d) Inthevariancecalculationlist,selecttheordernumberandchooseCost
Elementstodisplaythevariancesbycostelement.
If you want to display the variance by category, double-click the
variance amount.
5. Settleyourordertoallocatetheorderbalance,theWIPcancellationamount,
andthevariancestoFinancial Accounting, ProfitCenter Accounting, and
CO-PA.
Continued on next page
364
©2009SAPAG.Allrightsreserved. 2009
第 387 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Settle your production order for the current period with processing type
Automatic in an update run.
Whentheorderhasbeensettled,thesystemdisplaysadetailedlist. Check
the sender and receiver informationin thislist. Expand thestructure and
displaytheaccountingdocument,theprofitcenteraccountingdocument,and
the profitability analysis document.
a) Choose Accounting → Controlling → Product Cost Controlling →
Cost Object Controlling → Product Cost by Order → Period-End
Closing→SingleFunctions→Settlement→IndividualProcessing.
Enter the production order number.
b) IntheSettlementPeriodfield, enterthecurrentperiod. IntheFiscal
Year field, enter the current fiscal year. Select Automatic in the
Processing Type field.
c) Deselect Test Run. Choose Execute.
d) Todisplaythesettlement, chooseDetailList.
e) To display the settlement data sent to Financial Accounting and to
Profitability Analysis, chooseDetail Lists.
f) Toseetheresultsanalysisdata(WIPcancellation),chooseDetailList
of Accrual Data for FI.
g) To display the Financial Accounting documents and profit center
documents on the receiver screen, position your cursor on the
order number and choose Accounting Documents. Then choosethe
accountingdocumentbydouble-clickingit. Displaytheprofitcenter
documentandtheprofitabilityanalysisdocumentinthesameway.
Task 3:
Optional: Deliver items to a customer.
1. Deliver 60 pieces of material R-F1## from your warehouse, shipping
location 1000, to your customer.
Note: Go back to the SAP menu for order creation by choosing
Back twice.
Entertheselectiondateastwoweeksfromtoday. Enter0002asthestorage
location and choose Enter.
Goto the pickingsection, enter apickingquantityof60 andchoosePost
goods issue.
Continued on next page
365
2009 © 2009 SAP AG. All rights reserved.
第 388 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Confirm that you want to save your data by choosing Yes. Make a note
of the delivery document number.
Note: If you cannot enter a pick quantity, you have to create a
transfer order.
1. SelecttheitemandchooseSubsequentFunctions→Create
Transfer Order.
2. Onthenextscreen,intheControlsectionselectActivateItem,
Backgroundprocessing,andAdoptPickQuantity2. Choose
Enterto save. Exit the transaction.
a) OntheOrderCreation: InitialScreen, chooseOrder →Subsequent
Functions → Outbound Delivery.
b) Enter the following data.
Field Value or Action
Shipping Point 1000
Selection Date twoweeksfromtoday
Order make sure your sales order
number appearshere
c) Enter0002asthestoragelocationandchooseEnter.
d) Enterapickquantityof60piecesandchoosePostgoodsissue. Make
a note of the delivery document number.
366
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Shipping Point | 1000 |
| Selection Date | twoweeksfromtoday |
| Order | make sure your sales order number appearshere |
第 389 页 / 共 455 页
AC040 Lesson: Period-End Closing for Product Cost Controlling
Lesson Summary
You should now be able to:
• Allocateoverheadcostsandprocesscoststoaproductionorder
• Deliver material to stock
• Calculateworkinprocess(WIP)andcalculateproductionvariances
• Settle the balancefor the production order
• Sellaservice(sales-order-relatedproductionofintangiblegoods)
367
2009 © 2009 SAP AG. All rights reserved.
第 390 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Lesson: Profit Analysis in Management Accounting
Lesson Overview
Thislessonfocusesontheclosingprocessesrequired todisplayaperiodicand
completeresultinProfitabilityAnalysisandProfitCenterAccounting. Thelesson
discussesaccount-basedandcosting-basedprofitabilityanalysis.
Lesson Objectives
After completingthislesson, you will beable to:
• Listthemasterdatausedinprofitabilityandsalesaccountingandexplain
its purpose
• Listthesourcesofdataforprofitabilityandsalesaccounting
• DescribetheflowofdatatoProfitabilityAnalysis
• DescribetheflowofdatatoProfitCenterAccounting
Business Example
At theend of the period, you need to generate the reportsrequired to evaluate
profitandloss. Youwanttousethesereportstoanalyzethemarketsegmentsin
ProfitabilityAnalysisandtheinternal areasof responsibilityforprofitandloss
in Profit Center Accounting.
Master Data Used in Profitability and Sales Accounting
ProfitabilityandSalesAccountingusesthefollowingmasterdata:
• Characteristic
• Characteristic value
• Value field
• Profitability segment
• Profit center
368
©2009SAPAG.Allrightsreserved. 2009
第 391 页 / 共 455 页
AC040 Lesson: Profit Analysis in Management Accounting
Figure154: MasterDatainProfitabilityandSalesAccounting
Characteristic, characteristic value, and value field play an important role in
Profitability Analysis.
• Characteristicisusedtospecifywhatyouwanttoreporton. Examplesof
characteristicsaredivisions,regions,products,andcustomers.
• ExamplesofcharacteristicvaluesincluderegionSouthorNorth.
• A value field is used to specify the key figures you want to track and
analyze. Examples of valuefields aregross sales, surcharges, discounts,
and cost of sales
Aprofitabilitysegmentdefinesaspecificvaluecombinationofallcharacteristics,
which corresponds to a market segment. A profitability segment is generated
automatically as soon as it is addressed.
369
2009 © 2009 SAP AG. All rights reserved.
第 392 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 155: Basic Terms Used in Profitability Analysis
Types of Profitability Analysis
ProfitabilityAnalysisisanapplicationinManagementAccounting. Twoversions
areavailableforprofitabilityreporting: costing-basedandaccount-based.
Costing-based Profitability Analysis
• Has reports that display values by value field (flexibly defined key
figures)
• Canbeexpandedwithotheranticipatedvalues,suchasaccruedfreight
costs
• Uses special database tables
• Producesrevenuesandcostofsalessimultaneouslywhenthebilling
document is calculated
Account-based Profitability Analysis
• Hasreportsthatdisplayvaluesbycostelementandrevenueelement
• ReconcilesdirectlywithFinancialAccountingataccountlevel
• Sharesdatatableswithother ManagementAccountingapplications,
such as Cost Center Accounting
• Postsrevenueswhenthebillingdocumentiscreated,butupdatescost
of sales at the point of goods issue
370
©2009SAPAG.Allrightsreserved. 2009
第 393 页 / 共 455 页
AC040 Lesson: Profit Analysis in Management Accounting
Figure 156: Types of Profitability Analysis
Data Flow in Profitability Analysis
Thedatafromsalesordermanagementisoneofthekeysourcesofinformationfor
ProfitabilityAnalysis. Incosting-basedProfitabilityAnalysis,informationcan
betakenattwopointsinthesalesordercycle: whenanorderiscreatedorchanged
(optional), and when an invoice is generated for an order. In account-based
ProfitabilityAnalysis,informationcanbetakenattwopointsinthesalesorder
cycle: when a goods issue is posted and when an invoice is generated for the
goods issue.
371
2009 © 2009 SAP AG. All rights reserved.
第 394 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure 157: Data Flow in Profitability Analysis
CostsfromotherareasofManagementAccountingcanbetransferredperiodically
toProfitabilityAnalysisusingactivityandtemplateallocations,settlements,and
assessments.
Direct assignments can also be made manually from Financial Accounting to
Profitability Analysis.
TodisplayalloverheadcostsinProfitabilityAnalysis,youallocatetheoverhead
coststhatwerenotallocatedtoProductCostControllingtoProfitabilityAnalysis.
You have various options for doing this:
• Allocation of internal activities
• Assessment
• Order settlement
• Project settlement
372
©2009SAPAG.Allrightsreserved. 2009
第 395 页 / 共 455 页
AC040 Lesson: Profit Analysis in Management Accounting
Figure 158: Assigning Overhead Costs: Overview
Forexample,youcanallocateinternalactivitiesfromcostcenterstoProfitability
Analysiseitherdirectlyorindirectly. Inadditiontothesender(costcenter)and
receiver(profitabilitysegment), youenterthequantityoftheactivityprovided.
The system then valuates this quantity using the price of the activity type in
question. The calculated value is credited to the sender and debited to the
profitabilitysegmentthatreceivestheactivityquantity. Thismeans,forexample,
thatyoucanpostatransportactivitydirectlytoaspecificcustomerwithouthaving
to post it to a cost center or an order first.
Youcanusetheassessmentmethodtotransferthevariancesinproductioncost
centersand the costs incurred on cost centersfor salesand administration, for
example, to Profitability Analysis.
373
2009 © 2009 SAP AG. All rights reserved.
第 396 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
Figure159: AssessmentofCostCenterandProcessCosts
Thecostcentersandprocessesarecreditedwiththeallocatedamount. Thismeans
thatallcostscanbeallocatedonlyonce. Costcentercostsandprocesscostsare
assessedinthesamewayasinOverheadCostControlling,wherebyyoudefine
cycles and execute them on a periodic basis. These cycles contain the control
informationrequiredforassessmentandaremaintainedinCustomizing.
IntheSAPsystem,youcansettleinternalorders(ManagementAccounting),sales
orders(salesordermanagement),projects(ProjectSystem),andproductionorders
andrunscheduleheaderswithproductcostcollectors(production planning) to
profitability segments. Orders and projects can be used for various functions
relevant to Profitability Analysis.
374
©2009SAPAG.Allrightsreserved. 2009
第 397 页 / 共 455 页
AC040 Lesson: Profit Analysis in Management Accounting
Figure 160: OrderSettlement to Profitability Analysis
You can use internal orders or internal projects to monitor the costs of an
internalactivity, such asanadvertisingcampaign. Thecostsof theactivityare
assignedtotheorder,collected,andsettledtotherelevantprofitabilitysegments
(for example, the corresponding product group and sales area) after the job is
completed.
The make-to-order manufacturer can also use an order or project. If the order
or project isasalesorder fromsalesordermanagement, acustomerproject, or
aManagement Accountingorder for which revenuepostingscanbemade, the
manufacturercanpostcosts(costofgoodsmanufactured,salesandadministration
costs, for example) and revenues and sales deductions to the order or project
inquestion. After theproduct is finished, the costsand revenues are settledto
ProfitabilityAnalysis. Youcanalsotransferaccruedvalues(particularlyimportant
formilestonebilling),suchascostofsalesandreservesforimminentlosses,to
Profitability Analysis.
Profit Center Accounting
ProfitCenterAccountingispartofManagementAccountingandshowstheresults
ofprofitcentersinoverabsorptionandunderabsorptionreports(likecostcenter
reports). Accordingtonewertheories,theresultsofprofitcenterscanbeshownas
profitandlossstatementsandbalancesheets. Nevertheless, youmaychooseto
havedifferentvaluationsonprofitcentersthanyouhaveinFI(forexample,based
on accrualsand differentabbreviationsfor assets).
375
2009 © 2009 SAP AG. All rights reserved.
第 398 页 / 共 455 页
Unit8: Period-EndClosingAspectsofManagementAccounting AC040
With General Ledger Accounting (new) in SAP ERP you now have a choice:
you can either run Profit Center Accounting in Financial Accounting or you
runProfitCenterAccountinginManagementAccounting(classicProfitCenter
Accounting). Your choice depends on your primary analysis goals in Profit
CenterAccounting. Hint: ForsometimeafterthemigrationtoGeneralLedger
Accounting(new),youmaychoosetorunProfitCenterAccountinginFIandCO
in parallel, but this is not recommended.
Note: For more information, please refer to SAP Notes 1280060 and
826357.
YoumaydecidetorunProfitCenterAccountinginFinancialAccountingif,for
example:
• You want to use a profit center simply as characteristic to split your FI
documents,asyouwouldwithbusinessareasandsegments.
• You want to easily report reconciled P&L statements and balance sheets
for profit centers.
YoumaydecidetorunProfitCenterAccountinginManagementAccountingif,
for example:
• Youwanttousecosting-basedvaluesonyourprofitcenters(accruals,special
costingbasedabbreviationsforassets,orspecialvaluesforactivitytypes).
• Youwanttoflexiblyanalyzeprofitcenterswiththeoriginalsecondarycost
elementsposted inManagement Accounting.
Profit Analysis in Profit Center Accounting
The header of the profit center master record contains the profit center ID,
controllingarea,validitydaterange,andtextfieldsforthenameanddescription
of the profit center.
376
©2009SAPAG.Allrightsreserved. 2009