Unit4: PlanninginManagementAccounting AC040
Task 6:
Calculate plan activity price automatically.
Note: If a cost center plans an activity type, you must also plan the
costs the cost center expects to incur when producing the planned
number of units of the activity. You must code costs that have been
plannedindependentlyof theactivitysoyoucancalculatetheunitcost
of producing the activity. Automatic plan price calculation is used to
calculatethisunitcost(pricealwaysreferstoaunitoftheactivitytype
to be produced).
Ifacostcenterproducesmorethanoneactivitytype,youmustdistribute
theactivity-independentplancostsamongtheactivitytypesofthecost
centertocalculatethepriceofeachsingleactivitytype. Inthisexample,
theequivalencenumbers,whichwereenteredintheexerciseonactivity
typeplanning,areusedasabasisforcostsplitting.
1. Runtheautomaticplanpricecalculationforyourserviceandproductioncost
centers. Useyourcostcenter groupCENTERS-##for periods1 to12in
thecurrentfiscalyear. SelectNoBusinessProcesses,TestRun,andDetail
Lists from the processing options.
Compare your resultswith the prices that were planned manually (in the
exerciseforactivitytypeplanning). Makeanoteoftheplanactivityprices
determinedmanuallyandautomatically. Ifyourautomaticallyplannedprices
are acceptable, post the new prices.
Continued on next page
138
©2009SAPAG.Allrightsreserved. 2009
第 153 页 / 共 455 页
AC040 Lesson: PlanningOptions inOverheadManagementAccounting
Activity Type/Cost Manual Price AutomaticPrice
Center
CHK-##/SERV-##
REP-##/SERV-##
1421/PROD-##
a) Choose Accounting → Controlling → Cost Center Accounting →
Planning→Allocations→PriceCalculation.
b) Choose Cost Center Group. In the Cost Center Group field, enter
CENTERS-##.
Choose No Business Processes.
c) Enter the following data.
Field Value or Action
Version 0
Period 1
To 12
Fiscal Year current fiscal year
d) Select Test Run and Detail Lists.
e) Choose Execute.
Ifyouractivitytypepriceshavebeencalculatedcorrectly,choosePost.
ChooseContinuetodeletethemessageandexitthetransaction.
139
2009 © 2009 SAP AG. All rights reserved.
| Activity Type/Cost Center | Manual Price | AutomaticPrice |
|---|---|---|
| CHK-##/SERV-## | ||
| REP-##/SERV-## | ||
| 1421/PROD-## |
| Field | Value or Action |
|---|---|
| Version | 0 |
| Period | 1 |
| To | 12 |
| Fiscal Year | current fiscal year |
第 154 页 / 共 455 页
Unit4: PlanninginManagementAccounting AC040
Lesson Summary
You should now be able to:
• Explainthepurposeofstatisticalkeyfiguresandthemethodsusedtoplan
them
• Describethecostallocationmethodsusedinplanning
• Describetheobjectivesofactivitytypeplanning
• Namethetypicalsequenceofstepsinvolvedincostcenterplanning
• Describeafewsimpleandcomplexplanningoptions
• DescribethepurposeanduseofEasyCostPlanningfunctions
140
©2009SAPAG.Allrightsreserved. 2009
第 155 页 / 共 455 页
AC040 Unit Summary
Unit Summary
You should now be able to:
• DescribehowplanningfeaturesinSAPsystemcouldbeusedforplanning
activities within your organization
• Explain howdifferent planversionscan beused
• ListthethreecostaccountingmethodsusedinManagementAccounting
• Explainthepurposeofstatisticalkeyfiguresandthemethodsusedtoplan
them
• Describethecostallocationmethodsusedinplanning
• Describetheobjectivesof activitytypeplanning
• Namethetypicalsequenceofstepsinvolvedincostcenterplanning
• Describeafewsimpleandcomplexplanningoptions
• DescribethepurposeanduseofEasyCostPlanningfunctions
141
2009 © 2009 SAP AG. All rights reserved.
第 156 页 / 共 455 页
第 157 页 / 共 455 页
第 158 页 / 共 455 页
Unit4: PlanninginManagementAccounting AC040
142
©2009SAPAG.Allrightsreserved. 2009
第 159 页 / 共 455 页
Unit 5
Integrated Planning Process in
Management Accounting
Unit Overview
Thisunitdiscussestheintegrationaspectsofplanning. Plandatacanbecreated
byautomaticplanningfunctionsandcanbetransferredtoothermodulestoserve
thereas basefor subsequentplans. Thisprovides morereconciliationbetween
differentplansandsavesmucheffortincomparisontomanualplanningactivities.
Unit Objectives
After completing thisunit, you will beableto:
• Listtheapplicationcomponentsintheintegratedplanningcycle
• Describe the effects of the individual application components in the
integrated planning cycle
• ListthemasterdatausedinProductCostControllingandexplainitspurpose
• Explain how the integrated planning cycle is used in the manufacturing
and service industries
• List the additional characteristics and functions that are available in the
integratedplanningcyclewhenActivity-BasedCostingused
• Carryoutsomeofthebasicplanningfunctionswithbusinessprocesses
Unit Contents
Lesson: Integrated Planning Cycle...........................................144
Exercise 7: Integrated Planning Cycle...................................163
Lesson: Integration of Activity-Based Costing ..............................173
Exercise 8: Planning with Activity-Based Costing......................179
143
2009 © 2009 SAP AG. All rights reserved.
第 160 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Lesson: Integrated Planning Cycle
Lesson Overview
ThislessondescribesintegratedplanningfromthepointofviewofManagement
Accounting. Webeginwithasalesplananduseittodevelopacomprehensive
business plan. Much of the plan data does not necessarily have to be entered
by controllers; rather, it can be transferred from other components, such as
Profitability Analysis, Profit Center Accounting, and product costing, via
integration.
Lesson Objectives
After completingthislesson, you will beable to:
• Listtheapplicationcomponentsintheintegratedplanningcycle
• Describe the effects of the individual application components in the
integrated planning cycle
• ListthemasterdatausedinProductCostControllingandexplainitspurpose
• Explain how the integrated planning cycle is used in the manufacturing
and service industries
Business Example
Having reviewed planning in Management Accounting (with various costing
and allocation methods), you want to take a closer look at the integrated
planningcycle. ThisincludesplanninginManagementAccountingtogetherwith
planninginmanufacturing, SAPERPHumanCapitalManagement, fixedasset
management,andinventorymanagement. Exactlyhowtheseintegratedplanning
toolsare used dependson theindustry sector.
Introducing the Integrated Planning Cycle
Theintegratedplanningcyclebeginswithasalesplan. IntheSalesInformation
System(SIS),acomponentoftheLogisticsInformationSystem(LIS),youcan
plan sales quantities for the followingyear at product or product group level.
Similarly, salesquantityplanningcanbeaccomplishedinProfitabilityAnalysis
(CO-PA).
ThesalesplansfromtheSISandProfitabilityAnalysiscanbecomparedwithone
anothersothatasingleforecastcanbetransferredtoSales&OperationsPlanning
(SOP).Acapacity-basedcomparisonofplanquantitieswithproductionresources
thentakesplaceinSOP.Iftheplancannotbemet,additionalresourcesmustbe
obtained or the salesplan must be changed.
144
©2009SAPAG.Allrightsreserved. 2009
第 161 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Figure 66: Integrated Business Planning
The activity requirements are created, either in SOP or by using long-term
requirementsplanning, and are then transferred asscheduled activities to cost
center planning.
In cost center planning, the plan activity quantities are created on the basis of
scheduled quantities from SOP. Cost planning is performed for cost centers
and internal orders, as well as additional activity planning for Overhead Cost
Controlling. Planned costs from SAP ERP Human Capital Management and
AssetAccountingcanbetransferredtocostcenterplanning. Planactivityprices
are then calculated.
ThecalculatedplanactivitypricesgotoProductCostPlanning,whichestimates
theproductioncostsoftheplannedproductsbyusingbillsofmaterialandroutings
(quantity structures).
The cost of goods manufactured that were calculated on the basis of the sales
planaretransferredtoProfitabilityAnalysis. Thesecostsareusedalongsidethe
forecasted revenuestocreateaprofit plan. You canusetheresultsof thisplan
tomakeadjustmentstotheoriginalsalesplan,whichtheninitiatestheintegrated
planningcycleagain. Thiscyclecanberepeateduntilallaspectsoftheintegration
plan are completed.
145
2009 © 2009 SAP AG. All rights reserved.
第 162 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Figure 67: Integrated Planning - Sales Planning
Using Application Components in the Planning Cycle
ProfitabilityAnalysisplanningenablesyoutoplansales,revenueandprofitability
data for any profitability segments. The complete planning process for an
enterprisecan,therefore,bemappedinaccordancewiththebusinessrequirements.
Sales and profit planning isusually an integratedprocesscomprising different
rolesinManagementAccounting,suchassalesmanager,regionalmanagerand
salesexecutive. Salesandprofitplanningalsousesvariousapproaches,including
top-down,centralizedplanningorbottom-up,decentralizedplanning.
The planningtoolsfor Profitability Analysisprovideeveryoneinvolved in the
planningprocesswithastandardizedplanninginterface. Thisinterfaceenables
poweruserstocooperateeasilywitheachother,forexample,thecentralplanner
whomonitorsandmodulatestheplanningprocessandoccasionaluserswhoonly
confirm planned values from time to time.
Figure 68: Profitability Analysis: Planning
146
©2009SAPAG.Allrightsreserved. 2009
第 163 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Becausethecontentsandlevelofdetailofindividualplanscanvaryaccordingto
roleandareaofresponsibility,theplanningframeworkenablesyoutostructure
yourplanbyplanninglevelandcontent,whichyoucanallocatetotheindividual
responsible. The planning hierarchy is displayed in a tree structure. You can
execute nearly all planning functions directly from the planning framework,
from modelingtheplanningprocesstomonitoring planningtasksand entering
plan data manually.
To support the individual steps of the planning process, the planning toolsfor
ProfitabilityAnalysisprovidenumerousplanningfunctionsandplanningaidsthat
you can use to create and change any plan data. Included are both automatic
functionsthat createandchangedataforthewholeplan, andmanualfunctions
forenteringplandatamanually. Alternatively,youcanenterplandatalocallyin
MicrosoftExcelandthenreloadit totheSAPsystem.
Figure 69: Top-Down Distribution Concept
Withtop-downdistribution,dataplannedatonelevelinProfitabilityAnalysisis
distributedtootherlevels. Distributiontakesplaceonthebasisofreferencedata,
whichcanbeplanningdataoractualdatafromProfitabilityAnalysis.
Oneexample of top-down distribution is planning valuesat theproduct group
levelandthendistributingthesevaluestotheindividualproductsinthatgroup.
Another examplemightbeplanningvaluesattheindividualproductlevelsand
thendistributingthosevaluestotheplantswheretheproductsaresold.
Planvaluescanbedistributedonthebasisofreferencedatabyperiodoracross
periods. Ifperiod-independentreferencedataisusedasthebasisfordistribution,
thedistributionpercentagesarealignedacrosstheperiodsforthereceivers.
147
2009 © 2009 SAP AG. All rights reserved.
第 164 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Whenperformingtop-downdistribution, youhavetospecifythefield(s)inthe
referencedatawhosevaluesaretobeusedasthedistributionbasis.
In the example shown in the figure above, revenue for the product group is
distributedtotheindividualproductsbelongingtothisgroup. Thevaluesinthe
SalesQuantityfieldserveasreferencedata. Value100isusedasthedistribution
baseforproduct P1, and200isusedforproduct P2.
Figure 70: Planning in Manufacturing
You cantransfera salesquantityplan created inProfitabilityAnalysisto Sales
andOperationsPlanning. Youcantransferthesalesquantityeitherforindividual
productsorcumulativelyattheproductgrouplevel. Youcanselectanymarket
segment(forexample,allproductsfromonedivision)andtimeframe(reporting
period) for transfer.
You can transfer data for one plant or for several plants. If you do not plan at
plantlevelinProfitabilityAnalysis,theplannedquantitiesaredistributedtothe
plants. If necessary, translation takesplacebetween different units of measure
and period types during the transfer.
Usethefollowing master datafor planintegration:
• Material masters
• Bills of material
• Work centers
• Routings
MasterdataenablescostobjectstobecreatedquicklyandefficientlyintheSAP
system. Thedatashowninthefigurebelow–materialmaster,BOM,workcenter,
androuting–iscopiedtothequantitystructureofaproductionorder.
148
©2009SAPAG.Allrightsreserved. 2009
第 165 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Figure 71: Master Data in Product Cost Accounting
Thematerialmasterisusedtorepresentrawmaterials,assemblies,andproducts.
A bill of material (BOM) is a list of the components used in an assembly or
product.
Aworkcenterisaphysicallocationwhereoperationsareperformed. Whenthe
masterrecordforaworkcenteriscreatedinproductionplanning,itislinkedtothe
costcenterandtothevariousactivitytypesofthecostcenter. Thislinkenablesthe
priceoftheactivitytypetobeaccessed. Theactivitypriceisusedtovaluatethe
laborormachinetimethatismadeavailablebythecostcenterduringproduction.
A routing describes a sequence of work steps and determines the activity
quantities used by Cost Center Accounting.
Using this master data, especially the routing information, as a basis, you can
determinewhichactivityquantitiesofcostcentersyouneedtobeabletoproduce
the materials required by the sales plan.
Intheworkcenters,theactivityquantitiesarecalculatedusingtheactivitytypes
and theassociated formulas. The activityrequirement quantities calculated in
long-term planning are taken into account when the activity requirement is
reconciledwith the cost centers' range of services.
149
2009 © 2009 SAP AG. All rights reserved.
第 166 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Figure72: TransferringActivityRequirementstoCostCenterAccounting
Youcantransferthevaluescalculatedfortheactivityrequirementduringlong-term
planning to Cost Center Accounting. The cost center records the transferred
activityrequirementsasscheduledactivityquantitiesfortheproductionsector(for
example,substitutedbyreconciliationobjectsfromSales&OperationsPlanning).
Figure 73: Integrated Planning - CostCenter Planning
Usingthescheduledactivityquantity, theoutputquantitiesofactivitytypesfor
costcenterscanbeplanned. Thiscanbedoneautomaticallyusingareconciliation
run or manually by the cost center manager.
150
©2009SAPAG.Allrightsreserved. 2009
第 167 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
After output quantities are planned, the costs are planned. The cost center
managerdoesnotplanallthecostsmanually. Manycostscanbetakenfromthe
plansinothercomponents. Planningdatamaybeintegratedfromthefollowing
components:
• SAP ERP Human Capital Management
• Fixed asset management
• Plan-integrated orders
• Plan-integratedWBSelements(intheProjectSystem)
Afterallthisdatahasbeentransferred,thecostcentermanagerplanstheremaining
costs manually. Planprices are calculated last.
Figure 74: Transferring Planned Values to Cost Centers
In integrated planning, data canbe transferred from upstream systemsof Cost
Center Accounting to cost center planning. If you planned this data in the
upstreamsystemsandnowwanttotransferitunchangedtocostcenterplanning,it
isnotnecessarytoreplanthedatainCostCenterAccounting.
To use integrated planning, several requirements must be met in Cost Center
Accounting and intheupstreamsystems. For example, if youwant totransfer
plannedvaluesforstatisticalkeyfigures,youmustfirstcreatemasterrecordsfor
thesekeyfiguresandthenlinkthemtotheLogisticsInformationSystem.
151
2009 © 2009 SAP AG. All rights reserved.
第 168 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
ThepersonnelcostsplannedinPersonnelAdministrationcanbetransferredtothe
affectedcostcenters. IntegratedplanningbetweenCostCenterAccountingand
personnelplanningenablesyoutoplanpersonnelcostsfortargetwages,payroll
results,orbasicpay,andthentransferthesecoststoCostCenterAccounting.
IntegratedplanningbetweenCostCenterAccountingandfixedassetaccounting
enablesyou totransfer periodicdepreciationchargesandinterest (onthefixed
capital)toprimarycostplanninginCostCenterAccounting.
Figure 75: Planning Internal Orders
Costsarenormallyplannedforordersthathavealonglifecycle. Orderswitha
shortlifecycle,suchasforunexpectedsmallrepairs,areusuallynotplanned.
Therearethreedifferentcostplanninglevelsavailableforplanninginternalorders:
• Overallplanningisthesimplestlevelforplanningordercosts. Youcanplan
overallvaluesandannualvaluesirrespectiveofthecostelements.
• Primary/secondarycost andrevenueplanningcanbeusedifyouhave
detailedinformationaboutaninternalorder. Formanualplanningpurposes,
primary/secondary cost and revenue planning comprises the planning of
primarycosts,activityinputs,andrevenues. Iftheorderisplan-integrated,
youcan,forexample,creditplanvalueswithsettlementtoacostcenter.
• Unitcostingcanbeusedtocarryoutmoredetailedplanningthanispossible
on cost elements.
Inintegratedplanningforinternalorders, youincludecostelementandactivity
inputplanningforaninternalorderincostcenterorbusinessprocessplanning.
You activate integrated planning in the plan version. When you plan activity
152
©2009SAPAG.Allrightsreserved. 2009
第 169 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
inputs for integrated internal orders, the scheduled activity is posted to the
sendercostcenter/senderprocess. Inaddition,plannedsettlementsandperiodic
repostingsofintegratedorderstocost centers/processesareallowed. Thisalso
appliestoplanallocationsofindirectactivities,assessments,anddistributionof
cost centers/processes to plan-integrated orders.
BeforetransferringtheplannedquantitiesinProfitabilityAnalysistoanSOPplan,
youshouldconsiderthemaster dataforlogistics. Theinformationprovidedby
thismasterdataisusedinlogisticsandinManagementAccountingtocreatecost
estimatesandcostobjectsquicklyandeasily. Thismasterdataisimportant for
integrationbetweenmaterialsmanagement,SalesandDistribution,Management
Accounting, and other applications.
Figure 76: Integrated Planning - Product CostPlanning
Forcosting,productcostplanningusesmasterdatafromotherSAPapplications,
forexample,billsofmaterial,routingsandworkcentersfromproductionplanning,
as well as cost centers, activity types, and business processes from Overhead
Cost Controlling.
You can use various tools for product cost planning whether or not data is
available from manufacturing:
• Product costing with quantity structures
• Product costing without quantity structures
• Reference and simulation costings
153
2009 © 2009 SAP AG. All rights reserved.
第 170 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Inproductcostingwithquantitystructures,costsarecalculatedforamaterial
via automatic derivation of the quantity structure from bills of material and
routingsorthemasterrecipe,orfromnetworkresources. Ifcertainprerequisites
exist,theresultscanbeupdatedinthestandardpricefieldorinanotherpricefield
of the material master record.
In product costing without quantity structures, costs are calculated for a
material without a quantity structure being derived automatically. When you
executethecostestimate,youmusteitherenterthequantitystructuremanuallyor
copyitfromatemplate. Ifcertainprerequisitesexist,theresultscanbeupdatedin
thestandardpricefieldorinanotherpricefieldofthematerialmasterrecord.
With reference and simulation costings, costs are calculated for an abstract
objectknownasabaseplanningobject. Whenyouexecutethecostestimate,you
eitherenterthequantitystructuremanuallyorcopyitfromatemplate. Theresult
isaplannedquantitystructure,whichyou canuseinsubsequentcostingsunder
thenameofthebaseplanningobject. Youcanusetheplannedquantitystructure
asadditivecostsforproductcostingwithaquantitystructure.
Figure 77: Product Cost Planning: Overview
When you create a cost estimate with a quantity structure, you must enter the
costingvariant,thematerial,theplant,andthelotsize. Thedatesproposedfrom
the costing variant specify the following:
• Theperiodofvalidityofthecostestimate(costingdatefrom/to)
• Theselectiondateforthebillofmaterialandrouting(quantitystructuredate)
• Thepricingdateforthematerialcomponentsandactivities(valuationdate)
154
©2009SAPAG.Allrightsreserved. 2009
第 171 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Youuse thetransfer control indicator to specify that you either want to use an
existingcostestimateformaterialcomponentsorcreateanewcostestimate. You
cananalyzetheresultsofthecostestimatedirectlyintheinformationsystem.
Thesystemselectsandvaluesthequantitystructureautomatically.
The costing results can be saved and displayed as itemizations, cost element
itemizations,orcostcomponentsplits. Theitemizationshowsdetailedinformation
abouttheoriginofthecosts,suchasthequantitiesandpricesofthematerialsand
internal activities used.
The cost element itemization groups the individual costing items into cost
elements. Thecostelementsgroupthecostsinorderofappearance. Costelements
aredeterminedforactivitiesviaaccountdeterminationformaterials,theactivity
type master record, or activity type planning; for processes, cost elements are
determined via the process master record.
Thecostcomponentsplitgroupsthecostelementsintocostcomponents. When
amultilevelstructureiscosted, thecostcomponentsplitisrolledupsothatthe
original identityof thecostsisretainedfor analysis.
Figure 78: Overhead Rate
Overheadcosts(forexample,energycostsorwarehousecosts)canbeassignedto
the product.
You can use a costing sheet to calculate your own overhead costs. If you use
thetraditionalmethod,youapplytheoverheadcoststothereferenceobjectasa
percentageorquantityrate. Inthecostingsheet,youdeterminehowtheoverhead
costsarecalculatedforthecostofgoodsmanufacturedandthecostofgoodssold.
155
2009 © 2009 SAP AG. All rights reserved.
第 172 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Thecostingsheetisassignedtoavaluationvariant, whichisthenassignedtoa
costingvariant. Whenyoucreateamaterialcostingthatusesthiscostingvariant,
theassignedcostingsheetisusedfortheoverheadcostcalculation.
Whenyoucalculateoverheadcosts,thesystemchoosesthecostingitemcategory
G.Theoverheadcostsareupdatedaccordingtothecostelementsthatyoucreated
in the costing sheet.
The standard system contains predefined costing sheets. In addition, you can
create your own costing sheets as required.
Figure 79: Cost Rollup in Product Cost Planning
Costrollupisusedtoensurethatthecostofgoodsmanufactured(materialand
production costs) of all materials in a multilevel bill of material (BOM) are
included in the cost estimate of the higher-level material. Thisis achieved by
assigningthecostsinacostestimatetocostcomponents.
When acost estimate for a multilevel BOM is created, the costs are rolled up.
Thatis,thecostcomponentsofthecostcomponentsplitarepassedupwardinthe
hierarchytothecostestimateofthehigher-levelmaterial.
156
©2009SAPAG.Allrightsreserved. 2009
第 173 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Figure 80: Price Update
Markingandreleasinga standardcostestimateupdatesthestandardpricefor
the material in the material master record. This results in the inventory being
revaluated(important for Financial Accounting).
Thefollowingprerequisitesmustbemetbeforeastandardcostestimatecanbe
marked or released:
• Standard cost estimate must be free of errors (status KA, costed without
errors).
• Marking and release must be allowed. The company code and period in
whichthestandardcostestimatecanbemarkedwithasetvaluationvariant
areenteredintheauthorizationforamarking. Theauthorizationshouldbe
setuponceperperiodbytheemployeeresponsible. Ifyoumarkastandard
costestimate, theresultsareupdatedinthematerialmasterrecordsasthe
future standard price.
Whenyoureleasethestandardcostestimate,thesefuturepricesareupdatedasthe
current standard price.
Youcanreleaseastandardcostestimateonlyonceperperiod,unlessyoudelete
the previously released standard cost estimate (using a special program) from
thedatabase. Youshouldalsoalwayscheckthestandardcostestimatetoensure
that it is correct before you release it for a product. Specialized reports in the
InformationSystemofproductcostplanningallowyoutodothis.
157
2009 © 2009 SAP AG. All rights reserved.
第 174 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Figure 81: Updating SalesPlan andProfitability Analysis
To transform sales planning (used in the planning cycle) from Profitability
Analysistoprofitplanning,youhavetomatchtheplannedrevenuesandthecost
of goods manufactured that were generated on the basis of the plan. You can
use the valuation function to do this.
Valuation in Profitability Analysis can use the results of product costing to
calculatethecostofgoodsmanufacturedandthecostofgoodssold. Thequantities
oftheplannedproductsaremultipliedbythestandardcostofgoodsmanufactured
andtransferredtoProfitabilityAnalysisaccordingtocostcomponent. Thisallows
detailed fixed and variable costs to be included in the individual contribution
margins.
158
©2009SAPAG.Allrightsreserved. 2009
第 175 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Figure82: TransferringtheCostingResultstoProfitabilityAnalysis
ThecostcomponentsfrommaterialcostingcanbeusedinProfitabilityAnalysis
tovaluatetheplanor actual dataofbillingdocuments. Thisenablesyoutosee
detailed information on the origin of your product costs and to analyze your
contribution margins.
To transfer thematerial costs, you assign thecost componentswith thecost of
goodsmanufacturedandthesalesandadministrationcoststothecorresponding
value fields of an operating concern.
Thecalculatedcostofgoodssoldisthencomparedwiththeplannedrevenuesso
thattheplannedinvoiceamountscanbecalculated.
InCustomizingforProfitabilityAnalysis,youcanmaketherequiredsettingsfor
transferringthedatafrommaterialcostingtoProfitabilityAnalysis.
Using the Integrated Planning Cycle in Service
Industries
Servicesthatdonotdependonproductionplansarerealizedusingatemplatein
the integrated planning cycle.
159
2009 © 2009 SAP AG. All rights reserved.
第 176 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Figure 83: Integration of Services in Planning
You should plan the resources necessary for your planned services so you can
transfertheresourceand/orprocessquantitiestocostcentersorprocesses. These
quantitiesbecomethescheduledactivityand/orprocessquantities. Youcanusea
plan-integrated order to plan resources.
Afterprimarycostplanninghasbeencompleted,thepricesforactivitytypesand
processesaregeneratedusingpricedetermination. Thesepricesarethenusedto
valuatetheplannedquantitystructure,wherebytheprocesscostsaretransferred
to Profitability Analysis, for example.
Integrated Planning in Profit Center Accounting
Toenableinternalareasofresponsibilitytobecontrolledandvaluatedeffectively,
youshouldrestrictprofitcenterplanningtothosefactorsthataremeasurableand
thatcanbeinfluenceddirectly. Theresponsibleprofitcenteremployeescanuse
theplanningdataonlyiftheyareinapositiontoinfluencethecosts, revenues,
andstocks in their area. Becausetheorganizational structure and scope of the
responsibilityareasinyourcompanydependmainlyonindividualfactors,theplan
shouldbeasflexibleandmultidimensional aspossible.
160
©2009SAPAG.Allrightsreserved. 2009
第 177 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Figure 84: IntegratedPlanning in ProfitCenterAccounting
Profitcenterplanningis,therefore,anintegralpartofoverallbusinessplanning.
Profitcentersnicelyillustratetheintegratednatureofbusinessplanningbecause
theplanningdataisessentiallygeneratedbyotherapplicationsandsupplemented
or modified in the profit centers. Profit center planning is part of short-term
businessplanning that covers one fiscal year.
Profitcenterplanninginvolvestwosteps. First,theplanningdataistransferred
totheprofitcentersfromCostCenterAccounting,internalorders, Profitability
Analysis, and Product Cost Planning. Theplanning datacan then be modified
directly in the profit centers.
Duringtheplanningprocess,theindividualplanningareasarecombinedintoan
integratedplanningnetwork. Youcanusedifferentplanversionstoaccountfor
changesduringtheplanningprocessortoenabledifferentplanningscenariostobe
used for a given time frame.
161
2009 © 2009 SAP AG. All rights reserved.
第 178 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Menu Paths for Integrated Planning
Action Menu path
Reviewactivityprices Accounting → Controlling → Cost Center
Accounting→InformationSystem→Reports
for Cost Center Accounting → Prices →
CostCenters: ActivityPrices
Create cost estimate with Accounting→Controlling→ProductCost
quantity structure Controlling → Product Cost Planning →
Material Costing → Cost Estimate with
QuantityStructure→Create
Usecostingresulttoupdatethe Accounting→Controlling→ProductCost
standard price Controlling → Product Cost Planning →
MaterialCosting→PriceUpdate
162
©2009SAPAG.Allrightsreserved. 2009
| Action | Menu path |
|---|---|
| Reviewactivityprices | Accounting → Controlling → Cost Center Accounting→InformationSystem→Reports for Cost Center Accounting → Prices → CostCenters: ActivityPrices |
| Create cost estimate with quantity structure | Accounting→Controlling→ProductCost Controlling → Product Cost Planning → Material Costing → Cost Estimate with QuantityStructure→Create |
| Usecostingresulttoupdatethe standard price | Accounting→Controlling→ProductCost Controlling → Product Cost Planning → MaterialCosting→PriceUpdate |
第 179 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Exercise 7: Integrated Planning Cycle
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Createandrelease astandard cost estimate
• Use the integrated planing cycle to help clarify the flow of the planning
results
Business Example
Because your company plans tomanufacture products and toprovide services
based on market demand, a decision was made to start the planning cycle in
ProfitabilityAnalysis. Theresultingsalesplan(businessplan)wastransferredto
Sales & Operations Planning (SOP), and the required material quantities and
production resources were calculated. Upon completion of the SOP planning
process, cost center figures wereplanned and the planned activity prices were
calculated. Based on these results, it is now possible to create a standard cost
estimate for the material for the next period.
Task 1:
Check fixed and variableprices for activities.
1. Beforea standard cost estimate iscreated, you must check thecalculated
priceforoneoftheproductionactivitiesinpumpassemblyroutingR-F1##.
Review the planned activity price for activity type1421 and cost center
4230. Makeanoteofthefixedandvariableplanpricesfortheactivity.
Note: ThefirstproductionoperationforassemblingpumpR-F1##
willoccuratworkcenterR-M##,whichisassignedtocostcenter
4230. Theplannedlaborforthisoperationis10minutesperpiece.
Activitytype1421isassignedtothisoperation. Theplanpricecan
be duly fixed and fully variable.
Task 2:
Following cost center planning, you have to recalculate the cost of goods
manufactured for R-F1##. Toaccomplish this, create astandard cost estimate
taking into account theplanned activity prices.
1. Createa standard cost estimate for material R-F1## with costing variant
PPC1andalotsizeof500pieces. ChangethedefaultfortheCostingFrom
Datetotoday. Leavetheotherdefault dataforCostingDateTo, Quantity
Structure and Valuation as is.
Continued on next page
163
2009 © 2009 SAP AG. All rights reserved.
第 180 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
2. OntheCreateMaterialCostEstimatewithQuantityStructurescreen,check
the cost calculation results.
Expandthepanelontheleftsideofthescreen. Selectthepumpandexpand
thesubtreetodisplayallthematerialcomponentsinahierarchy.
Note: Checkwhetherthecostingstructureisdisplayedontheleft
sideofthescreen. Ifnot,chooseCostingStructureOntodisplayit.
Youcanselectanymaterialcomponentfromthecostingstructure.
Thecostingdataforthecomponent isdisplayedin thesectionon
theright. Thesectionatthelowerrightdisplaysthecorresponding
detailed costs.
Double-click the different material components in the costing
structuretodisplaythecostingdataforeachcomponentontheright
of the screen.
To have the system calculate the costs for the selected component,
double-click the calculator icon.
3. Displayallthedetails(resources)usedforeachofthesematerials,including
productionactivities,components,processesandoverheadrates.
Todothis,selectthepumpandchooseDisplay→OnlyMaterials/AllItems.
Locate activity type 1421 and cost center 4230 and verify that the price
listedmatchesthepricethatyoureviewedinthefirsttask,Checkfixedand
variable prices for activities.
Reducethesizeof the panel on theleft again.
4. Analyzetheitemizationdisplayedinthelowersectionofthescreen. Youcan
expandtheupperedgeofthescreenbydraggingitupwardwiththemouse.
Changethecostingallocationbaseto1piecebychoosingSettings→Cost
Display.
WhatisthecostofpumpR-F1##? _____________________
Select other layouts to obtain a cost display with a different layout (for
example,layout1SAP09foralistsortedbycostelements).
5. Save the costing with itemization and log.
Task 3:
Release the cost estimate.
1. Tousetheresultofthiscostingasthefuturestandardprice,youmustmark
thecostestimatebychoosingPriceUpdatefromthemenu.
Continued on next page
164
©2009SAPAG.Allrightsreserved. 2009
第 181 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Afteryouhavemarkedthecosting,displaytheCosting2viewofthematerial
masterrecordforR-F1##andreviewthefuturepricethatisenteredinthe
material master record.
2. ReleasethecostestimateformaterialR-F1##sothatitbecomesthecurrent
standardprice. CheckthisintheCosting2viewinthematerialmasterrecord.
165
2009 © 2009 SAP AG. All rights reserved.
第 182 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Solution 7: Integrated Planning Cycle
Task 1:
Check fixed and variablepricesfor activities.
1. Beforeastandardcost estimate iscreated, you must checkthecalculated
priceforoneoftheproductionactivitiesinpumpassemblyroutingR-F1##.
Review the planned activity price for activity type 1421 and cost center
4230. Makeanoteofthefixedandvariableplanpricesfortheactivity.
Note: ThefirstproductionoperationforassemblingpumpR-F1##
willoccuratworkcenterR-M##,whichisassignedtocostcenter
4230. Theplannedlaborforthisoperationis10minutesperpiece.
Activitytype1421isassignedtothisoperation. Theplanpricecan
be duly fixed and fully variable.
a) Choose Accounting → Controlling → Cost Center Accounting →
InformationSystem→ReportsforCostCenterAccounting→Prices
→ Cost Centers: Activity Prices.
b) Enter the following data.
Field Value or Action
Cost Center 4230
Activity Type 1421
Version 0
Fiscal Year current fiscal year
From Period 1
To 12
c) Choose Execute.
The Activity fixed plan price is _____. The Activity variable plan
price is _____.
Continued on next page
166
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Cost Center | 4230 |
| Activity Type | 1421 |
| Version | 0 |
| Fiscal Year | current fiscal year |
| From Period | 1 |
| To | 12 |
第 183 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Task 2:
Following cost center planning, you have to recalculate the cost of goods
manufactured for R-F1##. Toaccomplish this, create astandard cost estimate
taking into account theplanned activity prices.
1. Createa standard cost estimate for material R-F1## with costing variant
PPC1andalotsizeof500pieces. ChangethedefaultfortheCostingFrom
Datetotoday. Leavetheotherdefault dataforCostingDateTo, Quantity
Structure and Valuation as is.
a) Choose Accounting → Controlling → Product Cost Controlling →
Product Cost Planning → Material Costing → Cost Estimate with
Quantity Structure → Create.
b) OntheCreateMaterialCostEstimatewithQuantityStructurescreen,
enter the following data.
Field Value or Action
Material R-F1##
Plant 1000
Costing Variant PPC1
Costing Version 1
Costing Lot Size 500
c) Choose Enter.
d) ChangethedateintheCostingDateFromfieldtotodayandleaveall
the other fieldsunchanged. Choose Enter.
2. OntheCreateMaterialCostEstimatewithQuantityStructurescreen,check
the cost calculation results.
Expandthepanelontheleftsideofthescreen. Selectthepumpandexpand
thesubtreetodisplayallthematerialcomponentsinahierarchy.
Note: Checkwhetherthecostingstructureisdisplayedontheleft
sideofthescreen. Ifnot,chooseCostingStructureOntodisplayit.
Youcanselectanymaterialcomponentfromthecostingstructure.
Thecostingdataforthecomponent isdisplayedinthesectionon
theright. Thesectionatthelowerrightdisplaysthecorresponding
detailed costs.
Double-click the different material components in the costing
structuretodisplaythecostingdataforeachcomponentontheright
of the screen.
Continued on next page
167
2009 © 2009 SAP AG. All rights reserved.
| Field | Value or Action |
|---|---|
| Material | R-F1## |
| Plant | 1000 |
| Costing Variant | PPC1 |
| Costing Version | 1 |
| Costing Lot Size | 500 |
第 184 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
To have the system calculate the costs for the selected component,
double-click the calculator icon.
a) OntheCreateMaterialCostEstimatewithQuantityStructurescreen,
check the cost calculation results.
b) Select the highest level of the costing structure (pump) and choose
ExpandSubtree(directlyabovethecostingstructure).
Theexpandedlistdisplaysallthecomponentsthatareused. Thecosts
formaterials,productionactivities,processes,andoverheadratesare
displayedindetailinthesectioninthelowerrightofthescreen.
c) To have the system calculate the costs for the selected component,
double-clickthecalculatoricon(inthecostingstructuretotheleftof
the material component).
Thesystemcalculatesthecostsfortheselectedcomponentanddisplays
them.
3. Displayallthedetails(resources)usedforeachofthesematerials,including
productionactivities,components,processesandoverheadrates.
Todothis,selectthepumpandchooseDisplay→OnlyMaterials/AllItems.
Locate activity type 1421 and cost center 4230 and verify that the price
listedmatchesthepricethatyoureviewedinthefirsttask,Checkfixedand
variable prices for activities.
Reducethesizeof the panel on theleft again.
a) Todisplayallthedetails,selectthepumpandchooseDisplay→Only
Materials/All Items.
b) For activity type 1421 and cost center 4230, consumption of this
resource has been valuated with the price you looked up in task 1,
Checkfixed andvariablepricesforactivities.
c) Reducethesizeof thepanel ontheleft again.
4. Analyzetheitemizationdisplayedinthelowersectionofthescreen. Youcan
expandtheupperedgeofthescreenbydraggingitupwardwiththemouse.
Changethecostingallocationbaseto1piecebychoosingSettings→Cost
Display.
WhatisthecostofpumpR-F1##? _____________________
Continued on next page
168
©2009SAPAG.Allrightsreserved. 2009
第 185 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
Select other layouts to obtain a cost display with a different layout (for
example,layout1SAP09foralistsortedbycostelements).
a) Choose Settings→ Cost Display and change thecosting allocation
base to 1 piece.
The system displays the costs for one pump R-F1##. Thisvalue is,
however,stillbasedonthecostinglotsizeof500pieces.
b) Selectlayout1SAP09foralistsortedbythecostelements. Tryother
layouts for a cost display.
5. Savethe costing with itemization and log.
a) Choose Save to save your costing. When the system displays the
UpdateParametersdialogbox, selectItemization, Log, thenchoose
Continue.
Task 3:
Release the cost estimate.
1. Tousetheresultofthiscostingasthefuturestandardprice,youmustmark
thecostestimatebychoosingPriceUpdatefromthemenu.
Continued on next page
169
2009 © 2009 SAP AG. All rights reserved.
第 186 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Afteryouhavemarkedthecosting,displaytheCosting2viewofthematerial
masterrecordforR-F1##andreviewthefuturepricethatisenteredinthe
material master record.
a) Choose Accounting→ Controlling → Product Cost Controlling →
ProductCostPlanning→MaterialCosting→PriceUpdate.
b) Enter the following data.
Field Value or Action
Posting Period current period
Fiscal Year current fiscal year
Company Code 1000
Plant 1000
Material R-F1##
c) ChooseMarkingAllowance. Forcompanycode1000,LegalValuation,
enter costing version 1.
Thesymbolinthefirstcolumnisgreen. Thismeansthatthemarking
allowanceforcostingversion1hasalreadybeengiven.
d) Gobacktotheinitialscreenusingthegreenarrow. DeselecttheTest
RunindicatorandchooseExecute. Thesystemdisplaysanoverview.
e) Tochecktheeffectsonthematerialmaster,clickthenameofmaterial
R-F1##.
ThisdisplaystheDisplayMaterialMastertransaction.
f) Choose the Costing 2 view.
The value of the standard cost estimateisdisplayedin the“Future”
column of the standard cost estimate.
g) Go back to the initial screen for price updates. Do not exit the
transaction.
Continued on next page
170
©2009SAPAG.Allrightsreserved. 2009
| Field | Value or Action |
|---|---|
| Posting Period | current period |
| Fiscal Year | current fiscal year |
| Company Code | 1000 |
| Plant | 1000 |
| Material | R-F1## |
第 187 页 / 共 455 页
AC040 Lesson: Integrated Planning Cycle
2. ReleasethecostestimateformaterialR-F1##sothatitbecomesthecurrent
standardprice. CheckthisintheCosting2viewinthematerialmasterrecord.
a) ChooseRelease. DeselecttheTestRunindicatorandchooseExecute.
The systemdisplays an overviewagain.
b) Tochecktheeffectsonthematerialmaster,clickthenameofmaterial
R-F1##.
This displays the Display Material Master transaction. Choose the
Costing2view. Thevalueofthestandardcostestimateisdisplayedin
the“Current”columnofthestandardcostestimate.
c) Gobacktotheinitialscreeninthepriceupdateandexitthetransaction.
171
2009 © 2009 SAP AG. All rights reserved.
第 188 页 / 共 455 页
Unit5: IntegratedPlanningProcessinManagementAccounting AC040
Lesson Summary
You should now be able to:
• Listtheapplicationcomponentsintheintegratedplanningcycle
• Describe the effects of the individual application components in the
integrated planning cycle
• ListthemasterdatausedinProductCostControllingandexplainitspurpose
• Explain how the integrated planning cycle is used in the manufacturing
and service industries
172