Unit6: ProfitCenterPlanning AC610

YoucantransferplanningdatainrealtimefromCOobjects(suchascostcenters,

business processes, internal orders and projects/networks) to Profit Center

AccountingforeachactivityintheSAPsystem. Ifyoudonottransferplanning

dataforCOobjectstoProfitCenterAccountingonline,youcanpostthisdataen

bloc,forsingleobjectsorforasingleplanversionandfiscalyear.

Ifyouarenotworkingwithlineitems,youalwayshavetopostalltheobjectsof

theselectedtypewhenyourepeatthetransfer. Youcanpostthefollowingobjects:

costcenters,internalorders,projects,businessprocesses,networks,generalcost

objects,profitabilitysegments,SOPorders,MRPorders,realestateobjects.

Plannedoverhead(plannedprimarycosts,resultsanalysis,distribution,planned

secondary costs, assessment, and so on) is posted to profit centers via the

assignment of cost centers and internal orders. For make-to-order production

usingProjectSystem,youcantransfertheplanningdatafromWBSelementsor

from networks. Profitability analysis lets you transfer revenues from revenue

planning. It is possible to transfer planned values and quantities periodically

fromcosting-basedProfitabilityAnalysis(CO-PA)toProfitCenterAccounting.

(Previously it was only possible to post planning data subsequently from

account-based CO-PA.)

SOP orders and MRP orders are account assignment objects in sales and

productionplanning. Theirpurposeistoprovidearoughplanoftheproduction

activitiesrequiredtorealizetheplannedsales. Theproductionplanforproduct

groups is divided among the individual products, which are assigned to profit

centers.

234

©2005SAPAG.Allrightsreserved. 2005/Q2

第 245 页 / 共 355 页

AC610 Lesson: Integrated Planning

Exercise 12: Integrated Planning

221

Exercise Duration: 20 Minutes

Exercise Objectives

After completingthisexercise, youwillbeableto:

• transfer planning data from Cost Center Accounting online and post it

subsequently for a specific version

Business Example

Incostcenterplanningtherearetwoplanscenarioswhicharepostedindifferent

versions. Planninginversion0isveryadvancedsothatallchangestotheplanning

datashouldbeimmediatelyvisibleinProfitCenterAccounting.

Version610isstillintheroughplanningstage. Afterthisroughstageofplanning

hasbeencompleted, the planningdata should betransferredfrom Cost Center

Accounting to Profit Center Accounting.

Task 1:

Look at the results of tasks 1-1 and 1-2 from the “Planning Configuration”

exercise again.

1. Inwhich versionisplanningdatatransferredonlineandin whichversion

is it not transferred?

Version 0:

Version 610:

2. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variancewith the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 -12

Continued on next page

235

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 -12

第 246 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Field Name Values

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

____________________________________________________________

Task 2:

EnterplanningdatainthecostplanningofCostCenterAccountinginVersion0.

1. First set planner profile SAPALL.

2. EnterprimarycostsforcostcenterT91##. Uselayout1-101todoso.

Enter the followingdataontheinitial screen:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Cost center T91##

Cost Element From 410000

Cost Element To 430000

Enterthefollowing primary costsinthelayout.

Cost element Fixed Planned Costs

415000 36.000,-

430000 180.000,-

Continued on next page

236

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Cost center T91##
Cost Element From 410000
Cost Element To 430000
Cost element Fixed Planned Costs
415000 36.000,-
430000 180.000,-

第 247 页 / 共 355 页

AC610 Lesson: Integrated Planning

SavethedatabychoosingtheUpdateRun icon.

3. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variancewith the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

____________________________________________________________

____________________________________________________________

Task 3:

EnterplanningdatainthecostplanningofCostCenterAccountinginVersion610.

1. Enter primary costs for cost center T92##.

Forthis,uselayout1-101. Accesstheentryscreenwiththefollowingdata:

Field Name Values

Version 610

Period 1 - 12

Fiscal Year Current fiscal year

Cost center T92##

Cost Element From 410000

Cost Element To 430000

Enterthefollowing primarycostsin thelayout.

Continued on next page

237

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Version 610
Period 1 - 12
Fiscal Year Current fiscal year
Cost center T92##
Cost Element From 410000
Cost Element To 430000

第 248 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

____________________________________________________________

____________________________________________________________

2. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variance with the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

__________________________________________________________

238

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 249 页 / 共 355 页

AC610 Lesson: Integrated Planning

Solution 12: Integrated Planning

Task 1:

Look at the results of tasks 1-1 and 1-2 from the “Planning Configuration”

exercise again.

1. Inwhich versionisplanningdatatransferredonlineandin whichversion

is it not transferred?

Version 0:

Version 610:

Answer: Version 0: Online transfer

Version 610: No online transfer

2. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variancewith the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 -12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

____________________________________________________________

a) PCA:InformationSystem→ReportsforProfitCenterAccounting→

List-OrientatedReports→ProfitCenterGroup: Plan/Plan/Variance

Run the report.

What do you discover?

No planning data has been posted yet!

Continued on next page

239

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 -12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 250 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Task 2:

EnterplanningdatainthecostplanningofCostCenterAccountinginVersion0.

1. First set planner profile SAPALL.

Answer: Accounting → Controlling → Cost Center Accounting →

Planning→ Set Planner Profile

Enter planner profile SAPALL andconfirm.

2. EnterprimarycostsforcostcenterT91##. Uselayout1-101todoso.

Enter the followingdataontheinitial screen:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Cost center T91##

Cost Element From 410000

Cost Element To 430000

Enterthefollowing primary costsinthelayout.

Cost element Fixed Planned Costs

415000 36.000,-

430000 180.000,-

Continued on next page

240

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Cost center T91##
Cost Element From 410000
Cost Element To 430000
Cost element Fixed Planned Costs
415000 36.000,-
430000 180.000,-

第 251 页 / 共 355 页

AC610 Lesson: Integrated Planning

SavethedatabychoosingtheUpdateRun icon.

a) Accounting→Controlling→CostCenterAccounting→Planning→

Cost and Activity Inputs→ Change

Forthis,uselayout1-101. Accesstheentryscreenwiththefollowing

data:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Cost center T91##

Cost Element From 410000

Cost Element To 430000

Click the Overview screen icon.

Enterthefollowingprimarycostsinthelayout:

Cost element Fixed PlannedCosts

415000 36,000.00

430000 180,000.00

SavethedatabychoosingtheUpdateRunicon.

3. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variancewith the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

Continued on next page

241

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Cost center T91##
Cost Element From 410000
Cost Element To 430000
Cost element Fixed PlannedCosts
415000 36,000.00
430000 180,000.00
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 252 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

What do you discover?

____________________________________________________________

____________________________________________________________

a) PCA:InformationSystem→ReportsforProfitCenterAccounting→

List-OrientatedReports→ProfitCenterGroup: Plan/Plan/Variance

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

ThecostsofcostcenterT91##werepostedonlinetoprofitcenter91##

sincetheonlinetransferofplanningdataissetinversion0.

Task 3:

EnterplanningdatainthecostplanningofCostCenterAccountinginVersion610.

1. Enter primary costs for cost center T92##.

Forthis,uselayout1-101. Accesstheentryscreenwiththefollowingdata:

Field Name Values

Version 610

Period 1 - 12

Fiscal Year Current fiscal year

Cost center T92##

Cost Element From 410000

Cost Element To 430000

Enterthefollowing primary costsinthelayout.

Continued on next page

242

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Version 610
Period 1 - 12
Fiscal Year Current fiscal year
Cost center T92##
Cost Element From 410000
Cost Element To 430000

第 253 页 / 共 355 页

AC610 Lesson: Integrated Planning

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

____________________________________________________________

____________________________________________________________

a) Accounting→Controlling→CostCenterAccounting→Planning→

Cost and Activity Inputs → Change

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

Enterthefollowingprimarycostsinthelayout.

Cost element Fixed PlannedCosts

410000 12.000,-

430000 120.000,-

SavethedatabychoosingtheUpdateRunicon.

Continued on next page

243

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Cost element Fixed PlannedCosts
410000 12.000,-
430000 120.000,-

第 254 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

2. In the information system for Profit Center Accounting, call the

list-orientated report Profit Center Group: Plan/Plan/Variance with the

following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

__________________________________________________________

a) PCA:InformationSystem→ReportsforProfitCenterAccounting→

List-OrientatedReports→ProfitCenterGroup: Plan/Plan/Variance

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

What do you discover?

Theplannedcostsofversion610werenotpostedonlinetoprofitcenter

92##.

244

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 255 页 / 共 355 页

AC610 Lesson: Integrated Planning

Lesson Summary

You should now be able to:

• usetheintegrated function for transferring planningdata toProfit Center

Accounting

245

2005/Q2 © 2005 SAP AG. All rights reserved.

第 256 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Lesson: Planning Process

Lesson Duration: 75 Minutes

232

Lesson Overview

You plan data in Profit Center Accounting.

Lesson Objectives

After completingthislesson, you will beable to:

• modelaplanningprocessinProfitCenterAccountingusingmanualplanning

and formula planning

Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe

system.

Business Example

PlannedoverheadexpensesareallocatedwithinProfitCenterAccounting

Figure 84: Manual Planning - Planning Layouts

Youcanusespecialscreenlayouts-planninglayouts-toentercosts,revenues,

balancesheetvalues,andstatisticalkeyfiguresmanually. Youcanusethestandard

planninglayoutsintheSAPSystemordefineyourownlayouts.

246

©2005SAPAG.Allrightsreserved. 2005/Q2

第 257 页 / 共 355 页

AC610 Lesson: Planning Process

The use of planning layouts for defining planning screens has the following

advantages:

• Youcan definemorethan one lead column.

• Flexible value columns let you:

– Plan more than one column

– Plan quarters, half years, or years

– Centralizeor decentralizeyour planning

– Plan in different currencies

• Youcandefineformulasinindividual columns.

• YoudefineyourplanninglayoutsinCustomizing.

Figure 85: Integration of Microsoft Excel

Theintegrationof MicrosoftExcelintoprofitplanningmeansthatyoucanuse

Excelfunctionssuchasthoseforadditionalcalculations, graphicsandprinting,

while the SAP system ensures the consistency of the data centrally, providing

centralfunctionssuchasderivation andvaluation.

Toperformlocalplanning,youcansaveExcelsheetsthathavebeencreatedinan

SAP system locallyon aPCor laptopand thenwork on themin Excel outside

the SAP environment. The data can then be loaded back into the SAP system

afterwards using the upload function.

IntegratedExcelisbasedontheprinciplethatyoulinkcellsintheSAPplanning

layouts with the cells in the Excel sheet by defining an Excel template in

Customizing.

247

2005/Q2 © 2005 SAP AG. All rights reserved.

第 258 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Thisinvolvesanumber of specialfeatures, whichareexplainedintherelevant

notes in this documentation.

Figure 86: Formula Planning

Theformulaplanningsupportsthemanualplanning. Theformulaplanningallows

youtoutilizemathematicaldependenciestoplancosts/revenues, balancesheet

accounts, and statistical key figures for your profit centers. You can define

the mathematical relationships in the form of formulas in templates that are

independentoftheprofitcenters. Thiswayyoucanusethesameformulasover

and over for different profit centers.

Youcanplancosts/revenues,balancesheetaccounts,andstatisticalkeyfigures.

Youcanusewhateverplanoractualdataavailabletocalculatethese.

You create a templateand assign the required profit centers to it in the master

data maintenance.

Atemplateisevaluatedforaprofitcenter or aprofit center groupbycompany

code.

TheSAP systemappliestheformulasdefinedinthetemplateandusestheseto

calculate the required values. Each individual row in the created template is

calculated for the corresponding profit center. The system creates a planning

record for the cost element/revenue element, the balance sheet item, or the

statisticalkeyfiguresonthecorrespondingprofitcenter.

248

©2005SAPAG.Allrightsreserved. 2005/Q2

第 259 页 / 共 355 页

AC610 Lesson: Planning Process

Figure 87: Formula Planning – Template Definition

Youcancreatetemplatesfor theformulaplanning of profit centersinthePCA

environment.

In the application menu of Profit Center Accounting, chooseMaster Data →

ProfitCenter→IndividualProcessing→Change. Intheinitialscreen,selectthe

profitcentertowhichyouwanttoassignatemplate. Youcanalsousecollective

processingtoassigntemplatesintheprofitcentermasterrecord.

Enter the name of the template you want to use for the planning on the profit

centerintheTemplatefieldoftheIndicatorstabpage. Alltemplatescreatedinthe

PCA template environment can be used.

249

2005/Q2 © 2005 SAP AG. All rights reserved.

第 260 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Figure 88: Copy Plan Template

Thisfunctionletsyoucopyexistingtransactiondataasatemplateforanewplan.

Forexample,itmightbeusefultousetheactualvaluesofthecurrentfiscalyear

asabasisforplanningthecomingyear. Theonlythingsyouneedtospecifyare

the source and target data parameters.

Youcanrevaluatetheselectedsourcedata,bothintermsofamountsandquantities,

whenyoucopyit toyour plan. Todoso, enter revaluation factorsin thefields

provided. Iftheavailableentrypossibilitiesareinsufficient,youcandefineauser

exittorevaluatethedataaccordingtoyourneeds. Ifyouspecifyrevaluation,you

cancorrectthevaluesbyaddingorsubtractingacertainpercentage. Forexample,

youcancreateaplanfor1999bycopyingthe1998actualdataandadding5%. To

dothis,youneedtoenterarevaluationfactorwhichcallsfora5%increase.

Youalsoneedtospecifywhetherthesystemshouldoverwriteexistingdatainthe

targetplan,orwhetheritshouldbeaddedtothedatayoucopy.

Sourceplandata: Hereyouentertherecordtype,companycode,andfiscalyear

you want to plan. When copying planning data, remember to specify the plan

versionfromwhichyouwanttocopythedata. Withthisrecordtype,youspecify

whether youarecopyingplan or actual values.

Target data: Enter therecordtype, companycodeandfiscal year towhichyou

want to copythedata, and specify theplan version.

250

©2005SAPAG.Allrightsreserved. 2005/Q2

第 261 页 / 共 355 页

AC610 Lesson: Planning Process

Figure 89: Plan allocations

Theassessmentandthedistributionfunctionisthesameforactualandplanning

data.

Plan closingconsistsof the following functions:

• plan assessment

• plan distribution.

Youstartplanassessmentorplandistributionwhenyouhavefinishedplanning

completely. ThetransferofallplannedvaluesfromotherCOapplicationswhich

aretobetransferredtoProfitCenterAccountingmustbecomplete,asmustdirect

planning in Profit Center Accounting.

Theallocationfunctions“assessment”and“distribution”letyoutransferplanor

actualtransactions(revenues,costs,balancesheetitems)fromoneprofitcenter

to other profit centers.

In Profit Center Accounting, you can only allocate data within one company

code. Inaddition,eachassessmentordistributioncyclemustbeassignedtoone

company code only.

Transaction dataisalwaysassessed with oneassessment cost element. During

distribution, both credit and debit postingsaremadeto the sameaccount. You

can use other posted values, quantities or statistical key figures as a basis for

allocations in Profit Center Accounting.

251

2005/Q2 © 2005 SAP AG. All rights reserved.

第 262 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

252

©2005SAPAG.Allrightsreserved. 2005/Q2

第 263 页 / 共 355 页

AC610 Lesson: Planning Process

Exercise 13: Planning Process

239

Exercise Duration: 20 Minutes

Exercise Objectives

After completingthisexercise, youwillbeableto:

• enter revenues, costs, andstatistical key figures manually at profit center

level

• defineandexecuteformulaplanninginProfitCenterAccounting

Business Example

Inplanning, thenumber of team membersisentereddirectlyatthelevelofthe

profit center using statistical key figures.

Manuallyenteredplanningdataforthecostandrevenueplanningisalsoincluded

inProfitCenterAccountinginadditiontotheplanningdataalreadytransferred

from Cost Center Accounting.

Revenue planning is automated using formula planning. The revenue should

be posted as an approximate value as the planned revenue per team member

multiplied by the number of team members.

Theresultingplanscenarioshouldalsobeusedintheparallelplanscenario.

Task 1:

Enterthenumberofteammembersatprofitcenterlevel.

1. SettheplannerprofileAC610-##inprofitcenterplanning.

2. Enterthenumberofteammembersforprofitcenters91##and92##. Usethe

followingparametersforaccessinglayoutSTAT##:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Company Code 1000

Profit Center Group PLAN##

Statistical Key Fig. 9100

Enter thefollowingdata in layout STAT##.

Continued on next page

253

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Company Code 1000
Profit Center Group PLAN##
Statistical Key Fig. 9100

第 264 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Profit Center Quantity

91## 100

92## 25

Savethedatabychoosing theUpdateRun icon.

3. IntheinformationsystemforProfitCenterAccounting,callthelist-orientated

reportProfitCenter: StatisticalKeyFigureswiththefollowingparameters.

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit Center Value 91##

StatisticalKeyFigureValue 9100

Howmanyteammembersareassignedintheplantoprofitcenter91##?

____________________________________________________________

4. Repeatthereportcallforthereportfromtask3-1-3forprofitcenter92##.

Howmanyteammembersareassignedintheplantoprofitcenter92##?

Task 2:

Thecostsofgoodssoldareplanneddirectlymanuallyatthelevelofprofitcenter

sales 91##.

1. Enterthecostsofgoodssoldundercostelement893015manuallyincost

planning. Uselayout8A-101withthefollowingparameters.

Field Name Values

Version 0

Period 1 - 12

Continued on next page

254

©2005SAPAG.Allrightsreserved. 2005/Q2

Profit Center Quantity
91## 100
92## 25
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center Value 91##
StatisticalKeyFigureValue 9100
Field Name Values
Version 0
Period 1 - 12

第 265 页 / 共 355 页

AC610 Lesson: Planning Process

Field Name Values

Fiscal Year Current fiscal year

Company Code 1000

Profit Center 91##

Account number 893015

Enter the costs of goods sold

Profit Center InProfitCenterCurrency

91## 4.800.000,-

SavethedatabychoosingtheUpdateRun icon.

2. In the information system for Profit Center Accounting, call the report

Profit Center Group: Plan/Actual/Variance by Origin with the following

parameters.

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit CenterValue 91##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

Hint: Each posting in Profit Center Accountingis differentiated

by originobjects(e.g. ProfitCenter, Cost Center andsoon) both

intheactualandalsointheplanattotalsrecordlevel. Thismakes

it possible to display the costs and revenues by origin object in

the information system. The characteristic Origin Object is also

available in the definition of planning layouts. Hence it is also

possible,forexample,toenterplannedrevenuesaccordingtobilling

data (origin object 5).

Whichoriginobjectreturnstheplannedcostsforcostelement893015?

____________________________________________________________

____________________________________________________________

Continued on next page

255

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Fiscal Year Current fiscal year
Company Code 1000
Profit Center 91##
Account number 893015
Profit Center InProfitCenterCurrency
91## 4.800.000,-
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit CenterValue 91##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 266 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Which origin object returns the planned costs for cost elements 415000

and 430000?

____________________________________________________________

____________________________________________________________

Whywastheplanningdatapostedwhenthereweredifferentoriginobjects?

____________________________________________________________

____________________________________________________________

Task 3:

Revenueplanninginthecompanyisnotonlycarriedoutmanually,butistobe

automated using formula planning. The planning/organization manager wants

onlyanaveragerevenueperteammembertobeenteredmanuallyonareference

profit center, which is then updated to the individual profit centers with the

formula planning.

1. SetplannerprofileSAP801inProfitCenterAccounting.

2. Management expects a revenue of 120,000 per team member in order to

meetthebusinesstargets. Enterthisvalueonprofitcenter93##Planning.

Uselayout 8A-111withthefollowingparameters:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Company Code 1000

Profit Center 93## Planning

Account number 800000

Entertheplannedaveragerevenueperteammember.

Hint: Notethatrevenuesmustbeenteredwithanegativesign.

Continued on next page

256

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Company Code 1000
Profit Center 93## Planning
Account number 800000

第 267 页 / 共 355 页

AC610 Lesson: Planning Process

Account number InProfitCenterCurrency

800000 -120.000,-

Save the data

3. Define template SALES## in the PCA template environment in order to

calculatetheplannedrevenuesonprofitcenters91##and92##.

Hint: Thenumberofteammembersintheplanhasbeensavedwith

thestatisticalkeyfigure9100forprofitcenter91##and92##. The

plannedaveragerevenuecanbefoundonprofitcenter93##under

cost element 800000. The planned revenue for 91## or 92## is

calculated by multiplying the average revenue from 93## by the

number of team members for 91## or 92##. This relationship is

definedinatemplate,whichmustbedefinedinthemasterrecordof

theprofitcentertobeplannedbeforeformulaplanningisexecuted.

Afteryouhaveaccessedthetemplatedefinition,enter“RevenuePlanning”as

thenameofthetemplate. Enteraformulalinewiththefollowingparameters:

Field Name Values

Type P&L account

Object 800000

Gototheformulaeditorbydouble-clickingonthePlanAmountPerPeriod

field.

Hint: Intheformulaeditoryoucanentermathematicalrelationships

freely. TomakeaccessingSAPdatasimpler,youcanusefunctions

which map predefined accesses that only require parameters to

specify the access data.

To define the revenue formula, you need the two functions

“CostsRevenuesInventories”and“QtyStatKeyFigure”.

“CostsRevenuesInventories”deliverstheplanningdataofaprofit

center.

“QtyStatKeyFigure”deliversthequantityofastatisticalkeyfigure

of a profit center.

CallCostsRevenuesInventoriesfunctionandassignthefollowingparameters:

Continued on next page

257

2005/Q2 © 2005 SAP AG. All rights reserved.

Account number InProfitCenterCurrency
800000 -120.000,-
Field Name Values
Type P&L account
Object 800000

第 268 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Field Name Values

Company Code 1000

Plan_Actual_Indicator 1

Profit_Center 93##

Account number 800000

Version 0

Fiscal Year Current fiscal year

Check thefunctionandconfirm withEnter.

In the formula editor you can then see the expression for the

“CostsRevenuesInventories” function which returns the averagerevenue

of profit center 93##.

Thenaddthemultiplicationsign. Don'tforgettheblankcharacter.

Afterwards, insertthe„“QtySTATKeyFigure”functionwiththefollowing

parameters:

Field Name Values

Company Code 1000

1

1. PeriodicCalc. ofValues,

2. Total Fisc Year

0: Actual, 1: Planned 1

Profit Center Profit Center

Statistical key fig. 9100

Version 0

Fiscal Year Current fiscal year

Check thefunctionandconfirm withEnter.

Hint: Intheformulaeditoryoucannowseethecompleteformula

whichmultipliestwofunctionvalues. Thefirstfunctionreturnsthe

plannedrevenuesofprofitcenter93##,whereasthesecondfunction

returnsthequantityofthestatisticalkeyfigure9100. Thefunction

takesthequantityof thestatisticalkeyfigurefrom therespective

profitcenterinwhosemasterrecordthetemplateisdefined.

Confirm the formula in the editor.

Continued on next page

258

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Company Code 1000
Plan_Actual_Indicator 1
Profit_Center 93##
Account number 800000
Version 0
Fiscal Year Current fiscal year
Field Name Values
Company Code 1000
1. PeriodicCalc. ofValues, 2. Total Fisc Year 1
0: Actual, 1: Planned 1
Profit Center Profit Center
Statistical key fig. 9100
Version 0
Fiscal Year Current fiscal year

第 269 页 / 共 355 页

AC610 Lesson: Planning Process

Save the SALES## template.

4. AssigntemplateSALES##tothemasterrecordsofprofitcenter91##and

92##.

5. IntheinformationsystemforProfitCenterAccounting,callthereportProfit

CenterGroup: Plan/Actual/Variancewiththefollowingparameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit Center PLAN##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

Displaycostelement800000. Whichplanningdatahasbeenpostedtoprofit

center 91## and profit center 92##?

____________________________________________________________

____________________________________________________________

6. Executetheformulaplanningin companycode1000fortheprofit center

groupPLAN## inall theperiodsof thecurrentfiscal yearinversion 0in

update mode.

Continued on next page

259

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center PLAN##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 270 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

7. Call the report from task 3-3-5 again and check cost element 800000 for

profit centers 91## and 92##.

Which values were posted?

91##: _______________________________________________________

92##: _______________________________________________________

Explain howeachof thesevaluescomesabout.

Task 4:

Theplanningdataofprofitcenter91##shouldbeusedasatemplateforplanning

in version 610.

1. Firstcallthelist-orientatedreportProfitCenterGroup: Plan/Plan/Variance

with the following parameters:

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version (1) 0

Plan Version (2) 610

Profit Center Value 91##

ProfitandLossAccountsGroup 3000000.INT

BalanceSheetAccountGroup 1000000.INT

Howmuch is the plan total in version 0?

____________________________________________________________

Howmuch istheplantotal inversion610?

____________________________________________________________

2. Copytheplannedcostsandrevenuesofprofitcenter91##fromversion0to

version610. Restricttheselectiontoallperiodsofthecurrentfiscalyearin

companycode1000. Thecopieddatashouldreplaceexistingdataandbe

increasedby2%. Intheselectioncriteria,restricttheaccountstobecopied

to account group 3000000.INT.

Continued on next page

260

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version (1) 0
Plan Version (2) 610
Profit Center Value 91##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT

第 271 页 / 共 355 页

AC610 Lesson: Planning Process

3. Callthereportfromtask4-1againandchecktheplantotalforprofitcenter

91## in version 0 and version 610.

How much is the plan total in version 0?

Howmuch isthe plan total in version 610?

261

2005/Q2 © 2005 SAP AG. All rights reserved.

第 272 页 / 共 355 页

Unit6: ProfitCenterPlanning AC610

Solution 13: Planning Process

Task 1:

Enterthenumberofteammembersatprofitcenterlevel.

1. SettheplannerprofileAC610-##inprofitcenterplanning.

a) PCA: Planning→ Set Planner Profile

Enter AC610-## and confirm.

2. Enterthenumberofteammembersforprofitcenters91##and92##. Usethe

followingparametersforaccessinglayoutSTAT##:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Company Code 1000

Profit Center Group PLAN##

Statistical Key Fig. 9100

Enter the following data in layout STAT##.

Profit Center Quantity

91## 100

92## 25

Continued on next page

262

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Company Code 1000
Profit Center Group PLAN##
Statistical Key Fig. 9100
Profit Center Quantity
91## 100
92## 25

第 273 页 / 共 355 页

AC610 Lesson: Planning Process

SavethedatabychoosingtheUpdateRun icon.

a) PCA:Planning®StatisticalKeyFigures®Change

Enter the following data:

Field Name Values

Version 0

Period 1 - 12

Fiscal Year Current fiscal year

Company Code 1000

Profit CenterGroup PLAN##

Statistical Key Fig. 9100

Click the Overview screen icon.

Enter thefollowingdatain layout STAT##.

Profit Center Quantity

91## 100

92## 25

SavethedatabychoosingtheUpdateRunicon.

3. IntheinformationsystemforProfitCenterAccounting,callthelist-orientated

reportProfitCenter: StatisticalKeyFigureswiththefollowingparameters.

Field Name Values

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit CenterValue 91##

StatisticalKeyFigureValue 9100

Howmanyteammembersareassignedintheplantoprofitcenter91##?

Continued on next page

263

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Values
Version 0
Period 1 - 12
Fiscal Year Current fiscal year
Company Code 1000
Profit CenterGroup PLAN##
Statistical Key Fig. 9100
Profit Center Quantity
91## 100
92## 25
Field Name Values
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit CenterValue 91##
StatisticalKeyFigureValue 9100