第 192 页 / 共 355 页
Unit3: ActualData AC610
Field Name Value
Period 1 - 12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT Profit and
Loss Statement
BalanceSheetAccountGroup 1000000.INT Assets
Whatisyourassessmentofthe“performance”ofprofitcenter91##?
____________________________________________________________
____________________________________________________________
Whatisyourassessmentofthe“performance”ofprofitcenter92##?
____________________________________________________________
____________________________________________________________
a) PCA:InformationSystem→ReportsforProfitCenterAccounting
→ List-Orientated Reports → Profit Center Group: Plan/Actual
Variance
Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT Profit
and Loss Statement
BalanceSheetAccountGroup 1000000.INT Assets
Choose Execute.
Whatisyourassessmentofthe“performance”ofprofitcenter91##?
Profitcenter91##hassubmittedrevenuestoprofitcenter92##.
Whatisyourassessmentofthe“performance”ofprofitcenter92##?
Profitcenter92##hasreceivedrevenuesfromprofitcenter91##.
Continued on next page
182
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Value |
|---|---|
| Period | 1 - 12 |
| Plan Version | 0 |
| Profit Center | GR## |
| ProfitandLossAccountsGroup | 3000000.INT Profit and Loss Statement |
| BalanceSheetAccountGroup | 1000000.INT Assets |
| Field Name | Value |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current fiscal year |
| Period | 1 - 12 |
| Plan Version | 0 |
| Profit Center | GR## |
| ProfitandLossAccountsGroup | 3000000.INT Profit and Loss Statement |
| BalanceSheetAccountGroup | 1000000.INT Assets |
第 193 页 / 共 355 页
AC610 Lesson: Period-End Closing in Profit Center Accounting
2. Whichactualaccountassignmentobjectshadtherevenuespostedtothem?
Check the corresponding generated accounting documents of the profit
center line item of the distribution.
Answer: You are in the report view of report Profit Center Group:
Plan/Actual/Variance.
IntheVariationwindow,navigatetoprofitcenter92##.
Double-clickonthereportrowofaccount800000.
Youwillseetheprofitcenterlineitemofthedistribution.
Select Profit Center: Actual Line Items
Thesystemdisplaystheerrormessage“Documentdisplaydoesnotexist
for object type L()"”.
This means that there are no documents in accounting. Therefore,
no actual objects were posted to. The distribution in Profit Center
AccountingonlypostsstatisticallywithinProfitCenterAccounting.
183
2005/Q2 © 2005 SAP AG. All rights reserved.
第 194 页 / 共 355 页
Unit3: ActualData AC610
Lesson Summary
You should now be able to:
• enterorcopystatisticalkeyfigurestoprofitcenters
• transferpayablesandreceivablestoProfitCenterAccounting
• define a profit center allocation
• explain the document entry, balance carryforward, and average balance
ledger concepts
184
©2005SAPAG.Allrightsreserved. 2005/Q2
第 195 页 / 共 355 页
AC610 Unit Summary
Unit Summary
You should now be able to:
• understand and configure the characteristic-orientated profit center
determination
• understandthedocument-orientatedprofitcenterdeterminationindifferent
business processes
• understandandcustomizetheprocessfortransferringdatafromFinancial
Accounting
• understandandcustomizetheprocessfortransferringdatafromMaterials
Management
• understand how primary and secondary costs are posted to the assigned
profit centers
• understandhowprofitcentersarederivedintheex-stocksaleprocessand
identify when the posting is made
• knowthatthefunctionalareaiscopiedfromFinancialAccountingtoProfit
Center Accounting
• enterorcopystatisticalkeyfigurestoprofitcenters
• transferpayablesandreceivablestoProfitCenterAccounting
• define a profit center allocation
• explain the document entry, balance carryforward, and average balance
ledger concepts
185
2005/Q2 © 2005 SAP AG. All rights reserved.
第 196 页 / 共 355 页
UnitSummary AC610
186
©2005SAPAG.Allrightsreserved. 2005/Q2
第 197 页 / 共 355 页
AC610 Test Your Knowledge
Test Your Knowledge
177
1. AssetbalancesinAssetAccountingcanonlybetransferredperiodically.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
2. MaterialstocksaretransferredtoProfitCenterAccountingatplantlevel.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
3. By default, the profit center assignment for cost objects is made on a
sales-related basis.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
4. Costs and revenues are posted to the profit center of the salesorder item
during settlement.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
5. Allocationswithin profit centersare reflected in the assigned cost center
(parallel accounting system).
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
187
2005/Q2 © 2005 SAP AG. All rights reserved.
第 198 页 / 共 355 页
TestYourKnowledge AC610
Answers
178
1. AssetbalancesinAssetAccountingcanonlybetransferredperiodically.
Answer: False
Assetbalancescanbetransferredbothperiodicallyandonlineiftheopening
balancehasalready beentransferred andthefixedassetaccount hasbeen
entered in the table for additional balance sheet and P&L accounts. The
indicatorforonlinetransferofactualdatamustalsobeset.
2. MaterialstocksaretransferredtoProfitCenterAccountingatplantlevel.
Answer: True
Theprofitcenterisassignedtothematerialatplantlevel.
3. By default, the profit center assignment for cost objects is made on a
sales-related basis.
Answer: False
Theprofitcenterassignmentismadeonaproduct-relatedbasis. Bydefault,
theproductionordercontainstheprofitcenteroftheproductionmaterial.
4. Costsand revenuesare posted to theprofit center of thesales order item
during settlement.
Answer: False
Costsarepostedwhenthegoodsissueforthedeliveryismade,andrevenues
arepostedwhenthebillingdocumentisissued.
5. Allocationswithin profit centersarereflected in theassigned cost center
(parallel accounting system).
Answer: False
Thesystempostsallocationswithinprofitcentersonlystatisticallyandonly
attheleveloftherelevantsenderandreceiverprofitcenters.
188
©2005SAPAG.Allrightsreserved. 2005/Q2
第 199 页 / 共 355 页
Unit 4
The New General Ledger (New GL)
179
AsofmySAPERP2004,thenewgeneralledgerallowsyoutomanageyourProfit
CenterAccountingrequirementsintheformofadditionalaccountassignments.
Explainboththetechnicalandbusinessaspectsofthissolution.
Unit Overview
WithmySAPERPCentralComponent,theSAPcomponentoffersaninteresting
alternative Financial Accounting:
The New General Ledger (New GL)
Unit Objectives
After completing thisunit, you will beableto:
• describehowthenewgeneralledgerworksinconjunctionwithProfitCenter
Accounting
Unit Contents
Lesson: New General Ledger and Profit Center Accounting..............190
189
2005/Q2 © 2005 SAP AG. All rights reserved.
第 200 页 / 共 355 页
Unit4: TheNewGeneralLedger(NewGL) AC610
Lesson: New General Ledger and Profit Center Accounting
Lesson Duration: 30 Minutes
180
Lesson Overview
With mySAP ERP Central Component, the SAP system offers an interesting
alternative in Financial Accounting:
The new general ledger (new GL)
Lesson Objectives
After completingthislesson, you will beable to:
• describehowthenewgeneralledgerworksinconjunctionwithProfitCenter
Accounting
AsofmySAPERP2004,thenewgeneralledgerallowsyoutomanageyourProfit
CenterAccountingrequirementsintheformofadditionalaccountassignments.
Explainboththetechnicalandbusinessaspectsofthissolution.
Business Example
Management is considering using the new general ledger when the company
upgrades to mySAP ERP 2004.
It would like to know what advantages this has in terms of Profit Center
Accounting.
190
©2005SAPAG.Allrightsreserved. 2005/Q2
第 201 页 / 共 355 页
AC610 Lesson: New General Ledger and Profit Center Accounting
Figure 62: The New General Ledger (New GL)
Benefits of the New GL - Overview
The new general ledger in mySAP ERP offers the following benefits over the
traditional general ledger in R/3 Enterprise:
• Thenewgeneral ledgerusesanextended datastructureasstandard. You
canalsoaddyourownfieldstothegeneralledger.
• Bysplittingdocumentsinrealtime(=>onlinesplit),youcanpreparebalance
sheets for entities, such as “segments”.
• ReconciliationbetweenCOandFIcanbecarriedoutinrealtime–“realtime
integrationbetweenCOandFI”–time-consumingreconciliationactivities
are a thing of the past.
• The“newGL”allowsyoutomanageseveral“ledgers”(=>ledger)within
thegeneralledger. Thisisonewayofimplementingparallelaccountingin
the SAP system.
191
2005/Q2 © 2005 SAP AG. All rights reserved.
第 202 页 / 共 355 页
Unit4: TheNewGeneralLedger(NewGL) AC610
Figure 63: Benefits in Detail– Extended Data Structure
Figure64: BenefitsinDetail–DocumentSplitting(OnlineSplit)I
192
©2005SAPAG.Allrightsreserved. 2005/Q2
第 203 页 / 共 355 页
AC610 Lesson: New General Ledger and Profit Center Accounting
Figure65: BenefitsinDetail–DocumentSplitting(OnlineSplit)II
Figure 66: Benefits in Detail – Realtime Integration CO
193
2005/Q2 © 2005 SAP AG. All rights reserved.
第 204 页 / 共 355 页
Unit4: TheNewGeneralLedger(NewGL) AC610
Figure 67: Benefits in Detail – Parallel Accounting
194
©2005SAPAG.Allrightsreserved. 2005/Q2
第 205 页 / 共 355 页
AC610 Lesson: New General Ledger and Profit Center Accounting
Facilitated Discussion
Discussion Questions
Usethefollowingquestionstoengagetheparticipantsinthediscussion. Feelfree
to use your own additional questions.
Discussthepracticalaspectsofthenewgeneralledgerwiththecourseparticipants.
195
2005/Q2 © 2005 SAP AG. All rights reserved.
第 206 页 / 共 355 页
Unit4: TheNewGeneralLedger(NewGL) AC610
Lesson Summary
You should now be able to:
• describehowthenewgeneralledgerworksinconjunctionwithProfitCenter
Accounting
196
©2005SAPAG.Allrightsreserved. 2005/Q2
第 207 页 / 共 355 页
AC610 Unit Summary
Unit Summary
You should now be able to:
• describehowthenewgeneralledgerworksinconjunctionwithProfitCenter
Accounting
197
2005/Q2 © 2005 SAP AG. All rights reserved.
第 208 页 / 共 355 页
UnitSummary AC610
198
©2005SAPAG.Allrightsreserved. 2005/Q2
第 209 页 / 共 355 页
Unit 5
Transfer Prices
187
Thisunitexplainsthebusinessbackgroundbehindtransferprices.
Unit Overview
This unit explains the purpose of the transfer prices solution in Profit Center
Accounting from a business perspective.
Unit Objectives
After completing thisunit, you will beableto:
• understandtheconceptoftransferpricesintheSAPsystem
• outline the significance that transfer prices have within Profit Center
Accounting
• describemultiplevaluationapproachesintheSAPsystem
Unit Contents
Lesson: Transfer Prices........................................................200
199
2005/Q2 © 2005 SAP AG. All rights reserved.
第 210 页 / 共 355 页
Unit5: TransferPrices AC610
Lesson: Transfer Prices
Lesson Duration: 30 Minutes
188
Lesson Overview
Thislessonexplainsthepurposeof thetransfer pricessolutioninProfitCenter
Accounting from a business perspective.
Lesson Objectives
After completingthislesson, you will beable to:
• understandtheconceptoftransferpricesintheSAPsystem
• outline the significance that transfer prices have within Profit Center
Accounting
• describemultiplevaluationapproachesintheSAPsystem
Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe
system.
Business Example
Profit centermanagersareinterested intrackinginternalrevenuesbetweenthe
entities(profit centers) withinthe corporation.
Thedeliveryofgoodsfromoneprofitcentertoanothershouldbeconductedata
set transfer price (for example, market price).
200
©2005SAPAG.Allrightsreserved. 2005/Q2
第 211 页 / 共 355 页
AC610 Lesson: Transfer Prices
Figure 68: Strategic Enterprise Management
Theprofitabilityofacompanycanvaryconsiderablydependingontheperspective
that has been chosen.
Groupcontrollingfocusesprimarilyontheorganizationasawhole,thatis,rather
thanseeingtheindividualcompaniesofthewholegroup,itseesthegroup(inthis
contextidenticaltothecontrollingarea)asasinglecompany. (Fictionoftheunit)
For the individual affiliated companies, prominence is given to the profit
performance from a legal point of view (commercial and tax trading report in
accordance with local GAAP).
Thoseresponsiblefortheprofitcentersareprimarilyinterestedintheprofitability
of their own profit center. (Profit center view). You manage the profit center
practicallylikeanindependentcompany(“companywithinthecompany”).
201
2005/Q2 © 2005 SAP AG. All rights reserved.
第 212 页 / 共 355 页
Unit5: TransferPrices AC610
Figure 69: Parallel Valuation Views
Theviewoftheindividualcompanyandthevaluation of businesstransactions
accordingtolegalreportingrequirementsonlyrepresentsoneofseveralpossible
perspectives. Commercialandtaxconsiderationsplayadominantroleinthelegal
reportingrequirementsoftheindividual companies.
Inadditiontothislegalview,though,successfulcorporateandgroupmanagement
alsoneedsaccountinginformationthatshowsbusinessactivitiesfromthepointof
viewofthewholegrouporofindividualprofitcenters.
It is essential for group controlling for the entire group that you valuate these
businesstransactionsusinggroupproductioncosts(group view). Moreover, in
many groups the management structures do not necessarily coincide with the
independentaccountingunits. Aninternalmovingaveragepricesystemguides
the activities of the individual profit centers according to market principles.
Consequently,valueflowsrepresentedfromthepointofviewofprofitcentersare
vitalforthepurposesofprofitcentermanagementandprofitability.
202
©2005SAPAG.Allrightsreserved. 2005/Q2
第 213 页 / 共 355 页
AC610 Lesson: Transfer Prices
Figure 70: Definition of a Transfer Price
There are transfer prices in each of these views, calculated on the basis of a
different valuation approach.
(CurrentlytransferpricinghasonlybeenrealizedinSAPforgoodsmovements
andalsoforfixedpricingwithinthescopeofprojects.)
Figure 71: Transfer Prices in the SAP System
203
2005/Q2 © 2005 SAP AG. All rights reserved.
第 214 页 / 共 355 页
Unit5: TransferPrices AC610
For thepurposeof parallelvaluationintheSAPsystem, thecorporategroupis
representedbythecontrollingarea. Thetransferpricesfromthegroupviewresult
from a group cost estimate.
Intheprofitcenterview,transferpricesarethepricesnegotiatedbythemanagers
or other criteria.
The legal view isthe viewpoint of theindividual company, represented by the
companycode. Thetransferpricesforthisviewarethesalesandpurchaseprices.
Figure 72: Parallel Valuation Approaches– Example (I)
Wewill useamultistageproductionprocesstodemonstratehowparallelvalue
flows are updated throughout the system.
204
©2005SAPAG.Allrightsreserved. 2005/Q2
第 215 页 / 共 355 页
AC610 Lesson: Transfer Prices
Figure 73: Parallel Valuation Approaches -Example (II)
Theexamplecorporatestructureshownabovewilldemonstratetheuseofparallel
valuationapproachesforamultistageproductionprocess.
Fromtheviewpointoftheprofitcentersinvolved,thegoodstransferfromprofit
center 1to profit center 2 appears as an “internal” sale valuated witha special
price 75 defined in PCA (75.00)
Thegoodswithdrawalfromprofitcenter2foranorderinprofitcenter3isasale
from both the profit center viewpoint and the legal viewpoint, and is valuated
separatelyusingtheappropriatePCApriceandlegalprice. Thesameistruefor
the stock transfer from thefinished goods warehouseto theoutbound delivery
warehouse.
Forcross-companycodetransfersbetweenprofitcenters,youcurrentlyneedto
definethepricesforboththelegalandtheprofitcenterviewpointsinSD.
205
2005/Q2 © 2005 SAP AG. All rights reserved.
第 216 页 / 共 355 页
Unit5: TransferPrices AC610
Figure 74: TransferPricesinProfitCenterAccounting (1)
IfyouchoosetousethePCAvaluationapproachinProfitCenterAccounting,you
candefinetransferpricesforgoodsmovementsbetweenprofitcenters.
Figure 75: Flexible Transfer Pricing
Ifyourorganizationdecidestousetransferpricesintheprofitcenterviewpoint,
youcancalculatespecialmovingaveragepricesforallgoodsmovementsbetween
profit centers.
Thistransferpriceisanegotiatedpricebetweenprofitcenters. Itmaybebased,
forexample,ontheexternalmarketprice,oritmaybedeterminedasamarkupon
thecostofgoodsmanufacturedasseenfromthegroupvieworlegalview. These
markupscandependonanumberoffactors,suchastheprofitcentersinvolved,
the product, plant, date, and so on.
But it would most likely be too much work to store a transfer price for
each individual material. To save time, you can group materials under one
representativematerial,andonlymaintainthetransferpriceforthismaterial. This
206
©2005SAPAG.Allrightsreserved. 2005/Q2
第 217 页 / 共 355 页
AC610 Lesson: Transfer Prices
techniquemakesit possibletomaintaintransfer priceson thebasisofanABC
analysis,assigningtheApartsanexplicitmarketpriceormarkupandallocating
allCpartsusingacrosstheboardmarkupsatproductgrouplevel.
YoudefinetransferpricesforProfitCenterAccountingusingconditions.
Figure 76: TransferPrices in Profit CenterAccounting (2)
Basedonatransferpricesetat150.00,thesenderprofitcenterrecordsaninternal
revenue in this amount. This is set off against the “cost of sales”, which is
calculated based on the internal change in stock. The receiver profit center
recordsanexpenseofthesameamount. Thecorrespondingaccountshavetobe
maintainedinCustomizingforProfitCenterAccounting.
207
2005/Q2 © 2005 SAP AG. All rights reserved.
第 218 页 / 共 355 页
Unit5: TransferPrices AC610
Facilitated Discussion
Discussion Questions
Usethefollowingquestionstoengagetheparticipantsinthediscussion. Feelfree
to use your own additional questions.
208
©2005SAPAG.Allrightsreserved. 2005/Q2
第 219 页 / 共 355 页
AC610 Lesson: Transfer Prices
Lesson Summary
You should now be able to:
• understandtheconceptoftransferpricesintheSAPsystem
• outline the significance that transfer prices have within Profit Center
Accounting
• describemultiplevaluationapproachesintheSAPsystem
209
2005/Q2 © 2005 SAP AG. All rights reserved.
第 220 页 / 共 355 页
UnitSummary AC610
Unit Summary
You should now be able to:
• understandtheconceptoftransferpricesintheSAPsystem
• outline the significance that transfer prices have within Profit Center
Accounting
• describemultiplevaluationapproachesintheSAPsystem
210
©2005SAPAG.Allrightsreserved. 2005/Q2
第 221 页 / 共 355 页
AC610 Test Your Knowledge
Test Your Knowledge
197
1. WhichvaluationapproachisappliedinProfitCenterAccountingiftransfer
prices are used?
Choosethecorrectanswer(s).
□ A Group cost of goods manufactured
□ B Profit center transfer price
□ C Sales and purchase price
□ D Standard price of the material
211
2005/Q2 © 2005 SAP AG. All rights reserved.
第 222 页 / 共 355 页
TestYourKnowledge AC610
Answers
198
1. WhichvaluationapproachisappliedinProfitCenterAccountingiftransfer
prices are used?
Answer: B
Sales and purchase prices are posted in the legal view and group cost of
goods manufactured in the group view.
212
©2005SAPAG.Allrightsreserved. 2005/Q2
第 223 页 / 共 355 页
Unit 6
Profit Center Planning
199
ThisunitexplainshowProfitCenterAccountingintegratesplandataintheSAP
systemandhowplandatacanbepostedinProfitCenterAccounting.
Unit Overview
Plan data can be transferred to Profit Center Accounting or entered directly in
ProfitCenterAccounting. FormulaplanningandExcelintegrationroundoffthe
topic of plan data entry.
Unit Objectives
After completing thisunit, you will beableto:
• set up profit center planning and carry out both manual and automatic
planning
• explain how profit center planning is integrated with overall business
planning in SAP
• set up profit center planning
• usetheintegrated function for transferring planningdata toProfit Center
Accounting
• modelaplanningprocessinProfitCenterAccountingusingmanualplanning
and formula planning
Unit Contents
Lesson: Planning Overview ...................................................214
Lesson: Planning Configuration...............................................219
Exercise 11: Planning Configuration.....................................223
Lesson: Integrated Planning ..................................................232
Exercise 12: Integrated Planning.........................................235
Lesson: Planning Process.....................................................246
Exercise 13: Planning Process...........................................253
213
2005/Q2 © 2005 SAP AG. All rights reserved.
第 224 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Lesson: Planning Overview
Lesson Duration: 15 Minutes
200
Lesson Overview
ProfitCenterAccountingisintegratedwithoverallbusinessplanning.
Lesson Objectives
After completingthislesson, you will beable to:
• set up profit center planning and carry out both manual and automatic
planning
• explain how profit center planning is integrated with overall business
planning in SAP
Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe
system.
Business Example
Profit center planning is to be implemented as an integral part of your overall
company planning.
Figure 77: Planning in Profit Center Accounting
214
©2005SAPAG.Allrightsreserved. 2005/Q2
第 225 页 / 共 355 页
AC610 Lesson: Planning Overview
To make it possible to control and analyze internal areas of responsibility
effectively, you should limit profit center planning to those values which can
be influenced directly by the profit centers. Since the concrete organizational
structure and scope of your company's responsibility areas depends largely
on individual factors, it is necessary to create a plan that is as flexible and
multi-dimensional as possible.
Profitcenterplanningisanintegralpartofyouroverallcompanyplanning. The
integralcharacterofbusinessplanningisparticularlyapparentwithinthecontext
ofProfitCenterAccounting,astheplanningdatausedhereislargelycreatedin
otherapplications(suchasCostCenterAccounting)andcanbesupplementedor
changedinProfitCenterAccounting. Profitcenterplanningispartofshort-term
businessplanning and thus encompasses a span of onefiscal year. Short-term
businessplanninggenerallyconsistsofthefollowingpartialplans:
• Sales plan
• Revenue plan
• Production plan:
• Cost plan
During the profit center planning process, these individual planning areas are
combinedintoanintegratedplanningnetwork. Youcanusevariousplanversions
in order to depict various planning scenarios.
Figure 78: Planning in Profit Center Accounting
215
2005/Q2 © 2005 SAP AG. All rights reserved.
第 226 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Profit center planning is a process that is handled differently in almost every
company. Industry-specificcharacteristics,uniqueorganizationalstructuresand
responsibilities mean that you haveto individually tailor the planning process
for your particular company.
Theplanning process isnot aone-timeactivity, but rather aniterativeprocess,
whichisusuallyperformedinseveralsteps. Youneedtopayspecialattentionto
thesequenceinwhichtheplanningactivitiesarecarriedout,andwhichplanning
areasneed to be coordinated with one another.
The overall planning process is therefore supported by a number of different
planning methods. Profit center planning offers you thefollowing methodsof
planning:
• copyingexisting planor actual datato aplan
• posting plan data by period or simultaneously by transaction from other
applications
• manual planning of profit centers
• distributionandassessmentofdatabetweenprofitcenters
• variousplanreportsforcomparisonofdifferentplanversions
216
©2005SAPAG.Allrightsreserved. 2005/Q2
第 227 页 / 共 355 页
AC610 Lesson: Planning Overview
Facilitated Discussion
Discussion Questions
Usethefollowingquestionstoengagetheparticipantsinthediscussion. Feelfree
to use your own additional questions.
217
2005/Q2 © 2005 SAP AG. All rights reserved.
第 228 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Lesson Summary
You should now be able to:
• set up profit center planning and carry out both manual and automatic
planning
• explain how profit center planning is integrated with overall business
planning in SAP
218
©2005SAPAG.Allrightsreserved. 2005/Q2
第 229 页 / 共 355 页
AC610 Lesson: Planning Configuration
Lesson: Planning Configuration
Lesson Duration: 60 Minutes
204
Lesson Overview
YoudefinetheversionandplannerprofileforProfitCenterAccounting.
Lesson Objectives
After completingthislesson, youwillbeable to:
• set up profit center planning
Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe
system.
Business Example
Revenueandselectedbalancesheetitemsareplannedatprofitcenterlevel
Figure 79: Plan Versions
The plan data in Profit Center Accounting isstored in different plan versions.
This makesit possibleto storevarious plandata inparallel for thesame profit
center. Forexample,youcanmakeadistinctionbetweenanoperationalplanand
astrategic plan, or between anoptimisticplanandapessimisticplan. Youcan
219
2005/Q2 © 2005 SAP AG. All rights reserved.
第 230 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
displaydifferentplanversionsaswellasactualversionintheplanningtransaction,
andusethisdatatocalculatenewplandata. Youcanalsoanalyzeandcompare
yourplanversionsintheinformationsystem(Reporting).
IfyouwanttotransferplandatafromothercomponentsoftheSAPSystem,such
asCostCenterAccounting, youneedtomaintainthepropercontrolparameters
for Profit Center Accounting.
AplanversionisalwaysvalidforalloftheCOcomponent. Whenyoudefinea
planversion,youalsohavetomaintainspecificparametersfortheapplications
inwhichyouwanttouseit. Ifthe“versionlocked”indicatorisactive, theplan
version is locked and cannot be changed. In this case, you cannot make any
changestotheplanvalues. Thismakesitpossibleforyoutoprotectaplanagainst
changes when you have finished maintaining it. The “Online Data Transfer”
indicator controlswhether theplandatashould betransferredautomaticallyby
activity. Iftheindicatorisnotactive,youneedtotransferthepostingsbyfiscal
year. The“LineItems”indicatorcontrolswhetherplanlineitemsareupdatedin
ProfitCenterAccounting. Thelineitemdocumentsrecordeverychangemadetoa
plan. Youalsoneedtospecifyanexchangeratetypetodeterminewhichratethe
systemshouldusetotranslatetheplandatamanuallyenteredinthatversion.
Theexchangeratetypeisonlyrelevantforplandata,whichismanuallyentered.
Figure 80: Definition of Planning Layouts
Youhavetwobasicoptionsfordefiningtheleadcolumn(s):
Youcandefineeachrowseparately. Youchoose,forexample,thecharacteristic
accountandenter*tochooseallofitsvaluesorXYZforaspecificvalue. You
canalsochooseavaluefieldtoplacethevaluefieldsinrows.
220
©2005SAPAG.Allrightsreserved. 2005/Q2
第 231 页 / 共 355 页
AC610 Lesson: Planning Configuration
Youcandefinethewholeleadcolumnbynotselectinganycharacteristicvalue(*).
Theuserwillbepresentedwithablankrowandcanenterspecificcharacteristic
values. Thisoptionalsomakesitpossibleforyoutodefinemorethanonelead
column.
Valuecolumnsaredefinedusingkeyfigure,suchasprofitcentercurrencyorlocal
currency. Youdecidewhetheryouwantthevaluefieldstoappearintherowsor
inthecolumnswhenyoudefinethefirstelementofthelayout. Oncemade,this
settingcannotbereversed. Whenyoudefineavaluefieldinaroworcolumn,you
canalsospecifycharacteristicstolimitthevaluefield.
Youcanchoosefromamongthefollowingattributes:
• Distributionkeyfordistributingtheaggregatedvaluestoperiods
• Unitsforthevaluefield(eitheracurrencyoraunit)
Inadditionto the planningcolumns, youcan also defineformulacolumnsand
formularows. Forexample, youcanhavethesystemcalculatethecontribution
margin in a formula row or column.
Generaldataselection: Hereyouspecifysettingswhicharevalidfortheentire
planning layout. In a layout for cost and revenue planning, you choose the
characteristicssuchas“version”,“period”,“fiscalyear”,and“profitcenter”inthe
general data selections.
Figure 81: Planner Profile
Planner profiles are used to control the planning process. They are structured
hierarchically. Inaplannerprofile,youspecifywhichplanninglayoutwillbeused
foreachplanningarea(balancesheetaccounts, costs/revenuesorstatisticalkey
221
2005/Q2 © 2005 SAP AG. All rights reserved.
第 232 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
figures). You can only plan using planning layoutsif youwork with aplanner
profile. Aplannerprofilecontainsanumberofdefaults(parameters)formanual
planning. These structures are:
• Planning layout(s)
• Default values for the distribution key
• Planning document type
• Defaultsforthevariablesintheplanninglayouts
Whenyouenterplanningdata,thesystemasksyoutospecifyvaluesforallthe
variablesdefinedintheselectedplanninglayout. Whenyouenterplanningdata,
thesystemasksyoutospecifyvaluesforallthevariablesdefinedintheselected
planninglayout. Ofcourse,youcanalsooverwritethesedefaults,providedthat
they have not been locked.
Byassigning anauthorization groupto aplannerprofile, youcan control what
objects your users are authorized to process. This is particularly important in
thecaseofdecentralizedplanningscenarios. Ifnecessary, defineanindividual
plannerprofileforeachplanner,andassigntheprofiletoanauthorizationgroup.
Thisallowsyoutoassurethateach planner canonlyplanintheareaforwhich
he/she is authorized to do so.
222
©2005SAPAG.Allrightsreserved. 2005/Q2
第 233 页 / 共 355 页
AC610 Lesson: Planning Configuration
Exercise 11: Planning Configuration
209
Exercise Duration: 20 Minutes
Exercise Objectives
After completingthisexercise, youwillbeableto:
• analyzetheversionsettingsfortheProfitCenterAccountingcomponent
• define planning layoutsandplanner profiles
Business Example
The overall business planning of the SAP System isto betransferred to Profit
CenterAccountinginordertokeepthetimeandeffortrequiredtoenterplanning
datatoaminimum. Youwanttoinformtheplanning/organizationmanagerof
howeasilyplanningcanbehandledintheversionconcept. Inaddition,youwill
demonstrate the organizational structure of planning using the tools planning
layout and planner profile.
223
2005/Q2 © 2005 SAP AG. All rights reserved.
第 234 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Task 1:
ChecktheversionsettingsforplanninginProfitCenterAccounting.
1. Check version 0 toseewhether onlinetransfer issetin theProfit Center
Accountingsettings. Alsofindoutwhetherplanlineitemsarewritten.
2. Checkversion610toseewhetheronlinetransferissetintheProfitCenter
Accountingsettings. Alsofindoutwhetherplanlineitemsarewritten.
Task 2:
Thenumberofteammembersisenteredusingastatisticalkeyfiguredirectlyon
the profit centersto be planned. In the following tasks, define theappropriate
data entry layout and planner profile.
1. ThedataentrylayoutSTAT##forthenumberofteammembersshouldlook
as follows.
The header data showsthe following values
Field Name Values
Fiscal Year Variable entry
Period Variable entry From To
Company Code Variable entry
Version Variable entry
Statistical Key Fig. Variable entry
Theheadersofthedataentrycolumnsaretobearrangedinthissequence.
ProfitCenter Profit Center Quantity Unit
Description
###### ######################## ##
Continued on next page
224
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Fiscal Year | Variable entry |
| Period | Variable entry From To |
| Company Code | Variable entry |
| Version | Variable entry |
| Statistical Key Fig. | Variable entry |
| ProfitCenter | Profit Center Description | Quantity | Unit |
|---|---|---|---|
| ###### | ############## | ########## | ## |
第 235 页 / 共 355 页
AC610 Lesson: Planning Configuration
DefineplanninglayoutSTAT##forstatisticalkeyfigures. Thecharacteristic
ProfitCenterdefinestheleadcolumn. Whenaccessingtheplanninglayout,
youshouldbeabletoselectbothindividualprofitcentersandprofitcenter
groups. The display should show both the key and the characteristic
description. The Unit column shows the unit of measure of each of the
statistical key figures have been entered.
Thecharacteristicsfortheheaderdataareenteredinthegeneralselections.
The user shouldbe ableto enter all variables of the characteristicsof the
header data. Save the planning layout.
2. CreateaplannerprofileAC610-##PlannerprofileAC610Group##. This
plannerprofileallowstheentryofcosts/revenuesandstatisticalkeyfigures
withdocumenttypeP0. Thestandardlayout8A-101shouldbeusedforcost
and revenue planning. To enter the statistical key figures, use the layout
created in task 2-1. Savetheplanner profile.
3. Totestyourdefinitions,setplannerprofileAC610-##andthencalllayout
STAT##forenteringstatisticalkeyfiguresintheplanningofProfitCenter
Accounting. Do not enter any data yet.
225
2005/Q2 © 2005 SAP AG. All rights reserved.
第 236 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Solution 11: Planning Configuration
Task 1:
ChecktheversionsettingsforplanninginProfitCenterAccounting.
1. Check version 0 toseewhether onlinetransfer issetin theProfit Center
Accountingsettings. Alsofindoutwhetherplanlineitemsarewritten.
Answer: ORK2: ProfitCenterAccounting→Planning→BasicSettings
forPlanning→PlanVersions→MaintainPlanVersions
Select version 0.
Inthedialogstructure,double-clickSettingsforProfitCenterAccounting.
Boththeonlinetransferandalsothewritingofplanlineitemsareactivated
in the current fiscal year.
2. Checkversion610toseewhetheronlinetransferissetintheProfitCenter
Accountingsettings. Alsofindoutwhetherplanlineitemsarewritten.
Answer: ORK2: ProfitCenterAccounting→Planning→BasicSettings
forPlanning→PlanVersions→MaintainPlanVersions
Select version 610.
Inthedialogstructure,double-clickSettingsforProfitCenterAccounting.
Theonlinetransferisnotactivatedinthecurrentfiscalyear.
Writingplanlineitems,ontheotherhand,isactivated.
Task 2:
Thenumberofteammembersisenteredusingastatisticalkeyfiguredirectlyon
the profit centersto be planned. In the following tasks, define theappropriate
data entry layout and planner profile.
1. ThedataentrylayoutSTAT##forthenumberofteammembersshouldlook
as follows.
The header data showsthe following values
Field Name Values
Fiscal Year Variable entry
Period Variable entry From To
Company Code Variable entry
Version Variable entry
Statistical Key Fig. Variable entry
Continued on next page
226
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Fiscal Year | Variable entry |
| Period | Variable entry From To |
| Company Code | Variable entry |
| Version | Variable entry |
| Statistical Key Fig. | Variable entry |
第 237 页 / 共 355 页
AC610 Lesson: Planning Configuration
Theheadersofthedataentrycolumnsaretobearrangedinthissequence.
ProfitCenter Profit Center Quantity Unit
Description
###### ######################## ##
DefineplanninglayoutSTAT##forstatisticalkeyfigures. Thecharacteristic
ProfitCenterdefinestheleadcolumn. Whenaccessingtheplanninglayout,
youshouldbeabletoselectbothindividualprofitcentersandprofitcenter
groups. The display should show both the key and the characteristic
description. The Unit column shows the unit of measure of each of the
statistical key figures have been entered.
Thecharacteristicsfortheheaderdataareenteredinthegeneralselections.
The user shouldbe ableto enter all variables of the characteristicsof the
header data. Save the planning layout.
a) ORK2: ProfitCenterAccounting→Planning→ Manual Planning
→PlanningLayout→MaintainPlanningLayoutforStatisticalKey
Figures
ChooseCreatePlanningLayoutforStatisticalKeyFigures.
Enter STAT## Number of employees
Choose the Create pushbutton.
YouarenowintheReportPainterviewfordefiningplanninglayouts.
ChooseEdit→Gen. DataSelection→Gen. DataSelection
Select the following characteristics and copy them to theSelected
Characteristics.
Field Name Values
Fiscal Year Variable entry
Period Variable entry From To
Company Code Variable entry
Version Variable entry
Statistical Key Fig. Variable entry
Setthevariableon/offindicatorforeachcharacteristic.
WiththePeriodcharacteristic,makesurethattheindicatorisalsoset
for the To column.
Click the Confirm pushbutton.
Continued on next page
227
2005/Q2 © 2005 SAP AG. All rights reserved.
| ProfitCenter | Profit Center Description | Quantity | Unit |
|---|---|---|---|
| ###### | ############## | ########## | ## |
| Field Name | Values |
|---|---|
| Fiscal Year | Variable entry |
| Period | Variable entry From To |
| Company Code | Variable entry |
| Version | Variable entry |
| Statistical Key Fig. | Variable entry |
第 238 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
The headers of the data entry columns are to be arranged in this
sequence.
ProfitCenter Profit Center Quantity Unit
Description
###### ######################## ##
Define planning layout STAT## for statistical key figures. The
characteristicProfitCenterdefinestheleadcolumn. Whenaccessing
theplanninglayout,youshouldbeabletoselectbothindividualprofit
centersandprofitcentergroups. Thedisplayshouldshowboththekey
andthecharacteristicdescription. TheUnitcolumnshowstheunitof
measureofeachofthestatisticalkeyfigureshavebeenentered.
The characteristics for the header data are entered in the general
selections. The user should be able to enter all variables of the
characteristicsoftheheaderdata. Savetheplanninglayout.
Double-clickonthe LeadColumncolumnheader.
TransfertheProfitCentercharacteristictotheselectedcharacteristics.
Set the SET on/off indicator andtheVariable on/offindicator . This
allowsthevariableentryofprofitcenter groupswhenaccessingthe
layout.
Click the Lead column pushbutton.
ChooseCharacteristicValueandNameandconfirmbypressingEnter.
ClicktheConfirmpushbuttontoexitthedefinitionoftheleadcolumn.
Double-clicktheColumn 1column header.
Choose the Quantity key figure.
ClicktheChangeshort,middleandlongtextsicon.
Enter Quantity as the short text.
ClicktheCopyshorttextpushbuttonandconfirm.
ClicktheConfirmpushbuttontoexitthecolumndefinition.
PositionyourcursoraftertheQuantitycolumn.
ChooseEdit →Element→Insert Element.
Choose Attribute.
Choose Unit.
ClicktheConfirmpushbuttontocompletethecolumndefinition.
Continued on next page
228
©2005SAPAG.Allrightsreserved. 2005/Q2
| ProfitCenter | Profit Center Description | Quantity | Unit |
|---|---|---|---|
| ###### | ############# | ########### | ## |
第 239 页 / 共 355 页
AC610 Lesson: Planning Configuration
Save the planning layout.
2. CreateaplannerprofileAC610-##PlannerprofileAC610Group##. This
plannerprofileallowstheentryofcosts/revenuesandstatisticalkeyfigures
withdocumenttypeP0. Thestandardlayout8A-101shouldbeusedforcost
and revenue planning. To enter the statistical key figures, use the layout
created in task 2-1. Savetheplanner profile.
a) ORK2: ProfitCenterAccounting→Planning→ManualPlanning→
Maintain Planner Profiles
ChooseEC-PCA Maintain PlannerProfiles
Click the New Entries pushbutton.
Profile: AC610-##
Description: PlannerProfileAC610Group##
Select AC610-##.
Inthedialogstructure,double-clickProfitCenterAccounting.
Click the New Entries pushbutton.
ChooseCosts/RevenuesinthePlanningAreacolumn.
Choose P0in theDocument Typecolumn.
ChooseStatisticalKeyFiguresinthePlanningAreacolumn.
Choose P0in theDocument Typecolumn.
Select theCosts/Revenues planning area.
In the dialog structure, double-click Layouts for Profit Center
Accounting.
Click the New Entries pushbutton.
Choose Layout 8A-101.
Inthedialogstructure,double-clickProfitCenterAccounting.
SelecttheStatistical KeyFiguresplanningarea.
In the dialog structure, double-click Layouts for Profit Center
Accounting.
Click the New Entries pushbutton.
Choose Layout STAT##.
Save the planner profile AC610-##.
Continued on next page
229
2005/Q2 © 2005 SAP AG. All rights reserved.
第 240 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
3. Totestyourdefinitions,setplannerprofileAC610-##andthencalllayout
STAT##forenteringstatisticalkeyfiguresintheplanningofProfitCenter
Accounting. Do not enter any data yet.
a) PCA: Planning→ Set Planner Profile
Enter AC610-## and confirm.
This sets the planner profile.
PCA:Planning→StatisticalKeyFigures→Change
Enter the following data:
• Version 0
• Period 1 – 12
• Current fiscal year
• Company code 1000
• Profit center group PLAN##
• Statistical key figure 9100
• Form-based
230
©2005SAPAG.Allrightsreserved. 2005/Q2
第 241 页 / 共 355 页
AC610 Lesson: Planning Configuration
Lesson Summary
You should now be able to:
• set up profit center planning
231
2005/Q2 © 2005 SAP AG. All rights reserved.
第 242 页 / 共 355 页
Unit6: ProfitCenterPlanning AC610
Lesson: Integrated Planning
Lesson Duration: 30 Minutes
217
Lesson Overview
YoutransferplanningdatafromOverheadCostControlling.
Lesson Objectives
After completingthislesson, you will beable to:
• use the integrated function fortransferring planningdata toProfit Center
Accounting
Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe
system.
Business Example
SalesandcostplansaretransferredfromProfitabilityAnalysisandCostCenter
Accounting to Profit Center Accounting
Figure 82: IntegratedPlanning in Profit CenterAccounting
232
©2005SAPAG.Allrightsreserved. 2005/Q2
第 243 页 / 共 355 页
AC610 Lesson: Integrated Planning
Profit center planning is a part of short-term business planning and thus
encompassesaspanofonefiscalyear. Short-termbusinessplanninggenerally
consists of the following partial plans:
• Sales plan
• Master production schedule
• Cost plan
• Revenue plan
SalesPlan:Thestartingpointforshort-termplanningisthesalesplan,inwhich
youdeterminethequantitiesyouexpecttosellduringtheplanningperiod. The
salesplanisusuallycreatedbythesalesdepartment. Theplannedsalesquantities
are then passed on to production planning so that the planned capacities and
activitiescanbecoordinated. MasterProductionPlan:Themasterproduction
planiselaboratedinclosecoordinationwiththesalesplan. Itdeterminesboththe
capacitiesandthequantityrequirementsforrawmaterialsandoperatingsupplies.
Theplannedactivitiesestablishedhereareforwardedtothecostcenters, which
mustsupplythesecapacitiesintheformofactivityunits. Furthermore,thecost
centermanagersmustplanthecoststobeincurredandtheactivityquantitiestobe
takenfromothercostcentersbasedontheplannedcapacitiesandactivities. Cost
Plan(CostCenterPlan): Oncetheactivityunitshavebeenplanned,itisnecessary
toplanthecostsexpectedfortheseactivities. SalesandProfitPlan:Theplanned
costs and sales quantities can then be used to derived planned contribution
margins. Thecosts from cost center planning and the planned sales quantities
(valuatedbasedontheexpectedrevenue)areusedinsalesrevenueplanning.
Figure 83: Transfer of Planning Data
233
2005/Q2 © 2005 SAP AG. All rights reserved.