AC610_EN_Col52_FV_Inst_A4 (第5页)

第 157 页 / 共 355 页

AC610 Lesson: Transfer from Sales and Distribution

Solution 8: Transfer from Sales and

Distribution

Task 1:

CreateastandardsalesorderintheSalesandDistributioncomponentandseehow

thesalescostsareupdatedinProfitCenterAccounting.

1. Enterasalesorder withthefollowingparameters:

Field Name Value

Order Type TA

Sales organization 1000

distribution channel 10

Division 00

Sold-to Party T-CO05A##

Ship-to Party T-CO05A##

PO Number PUMP ##

Material P -100

Order Quantity 50

Checktheaccountassignmentofthisorderitemintheitemdetails. Which

profit center is assigned?

Give reasons to support your answer.

___________________________________________

___________________________________________

SincethesalesorderitemsaretobeassignedtotheSalesandDistribution

profitcenter91##,enterthisastheprofitcenteraccountassignmentinthe

item.

Postthedocumentandmakeanoteofthedocumentnumber.

___________________________________________

a) Logistics→SalesandDistribution→Sales→Order→Create

Enter the following data.

Continued on next page

147

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Order Type TA
Sales organization 1000
distribution channel 10
Division 00
Sold-to Party T-CO05A##
Ship-to Party T-CO05A##
PO Number PUMP ##
Material P -100
Order Quantity 50

第 158 页 / 共 355 页

Unit3: ActualData AC610

Field Name Value

Order Type TA

SalesOrganization 1000

DistributionChannel 10

Division 00

Confirm by pressing Enter.

Field Name Value

Sold-to Party T-CO05A##

Ship-to Party T-CO05A##

PO Number PUMP ##

Material P -100

Order Quantity 50

Confirm by pressing Enter.

Check the account assignmentof thisorder itemin theitemdetails.

Whichprofitcenterisassigned? Givereasonstosupportyouranswer.

ChooseGoto→Item→AccountAssignment.

Profit center 1010 was automatically determined by the system

becauseitisenteredinthemasterrecordofmaterialP-100.

Since the sales order items are to be assigned to the Sales and

Distributionprofitcenter91##,enterthisastheprofitcenteraccount

assignment in the item.

Postthedocumentandmakeanoteofthedocumentnumber.

YouareintheAccountAssignmenttabpageoftheitemdataforthe

standard order.

Deleteprofitcenter1010fromtheProfitCenterfieldandenterprofit

center 91## instead.

Confirm by pressing Enter.

Savetheorder. Makeanoteofthenumberofthesalesanddistribution

document.

___________________________________________

2. Createanoutbound deliveryfor thesalesorder.

Continued on next page

148

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Value
Order Type TA
SalesOrganization 1000
DistributionChannel 10
Division 00
Field Name Value
Sold-to Party T-CO05A##
Ship-to Party T-CO05A##
PO Number PUMP ##
Material P -100
Order Quantity 50

第 159 页 / 共 355 页

AC610 Lesson: Transfer from Sales and Distribution

Use the following parameters:

Field Name Value

Shipping Point 1000

Selection Date Current date + 1 month

Order Order number from task

1-1

Savethedocumentandmakeanoteofthedocumentnumber.

___________________________________________

Changetheoutbounddeliveryyouhavejustsavedandcreateatransferorder

usingthesubsequentfunctionsinordertocarryoutthelogisticalfunctions

fortransportationplanningandshipmentcompletion(inparticularpicking).

Use the following parameters:

Field Name Value

Warehouse Number 010

Delivery Document number of

delivery

Activate Item Set indicator

Foreground/Backgrnd System-Guided

Post the transfer order. No entries are necessary since picking is carried

out automatically.

Changetheoutbounddeliveryagainandcarryoutthegoodsissueposting.

a) Logistics→SalesandDistribution→Sales→Order→Subsequent

Functions → Outbound Delivery

Use the parametersfrom the tableabove.

Savethedocumentandmakeanoteofthedocumentnumber.

___________________________________________

Changetheoutbounddeliveryyouhavejustsavedandcreateatransfer

orderusingthesubsequentfunctionsinordertocarryoutthelogistical

functions for transportation planning and shipment completion (in

particular picking).

UsethefollowingparametersLogistics→SalesandDistribution→

Sales→Order→SubsequentFunctions→OutboundDelivery

Continued on next page

149

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Shipping Point 1000
Selection Date Current date + 1 month
Order Order number from task 1-1
Field Name Value
Warehouse Number 010
Delivery Document number of delivery
Activate Item Set indicator
Foreground/Backgrnd System-Guided

第 160 页 / 共 355 页

Unit3: ActualData AC610

Choose Outbound Delivery → Change.

Enterthedocumentnumberoftheoutbounddelivery.

ChooseSubsequentFunctions→CreateTransferOrder.

Enter the following data.

Field Name Value

WarehouseNumber 010

Delivery Document number of

delivery

Activate Item Set indicator

Foreground/Backgrnd System-Guided

Confirm by pressing Enter.

Post the transfer order.

Noentriesarenecessarysincepickingiscarriedoutautomatically.

Post the transfer order.

Change the outbound delivery again and carry out the goods issue

posting.

Logistics→SalesandDistribution→Sales→Order→Subsequent

Functions → Outbound Delivery

Choose Outbound Delivery → Change.

Enterthedocumentnumberoftheoutbounddelivery.

Confirm by pressing Enter.

Click thePost Goods Issue pushbutton.

Thelogisticaloutbounddeliveryisnowcompletedandtheassociated

documents have been created.

Continued on next page

150

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Value
WarehouseNumber 010
Delivery Document number of delivery
Activate Item Set indicator
Foreground/Backgrnd System-Guided

第 161 页 / 共 355 页

AC610 Lesson: Transfer from Sales and Distribution

Task 2:

Displaythesalesorderinordertocheckthesubsequentdocumentsofthisorder.

1. Displaythesalesorderandcheckthesubsequentdocumentsfromwithinthis

screen. Howmanysubsequentdocumentsweregenerated?

Answer: Logistics→SalesandDistribution→Sales→Order→Display

Entertheordernumberoffromtask1-1andconfirmwithEnter.

ChooseEnvironment/ Displaydocument flow.

Four documents were generated:

• Standard order

• Delivery

• WM transfer order

• Outbound delivery

2. Display the document for goods issue delivery. From there, analyze the

postedFIdocument. Whichpostingwasgenerated?

Answer: Selectthedocumentforgoodsissuedelivery.

Click the Display Document pushbutton.

Thesystemdisplaysthematerialdocumentforgoodsissuedelivery.

Click theAccounting Documentspushbutton.

Choose Accounting document.

Posting: 893015Costsofgoodsmanufacturedforsalesto792000finished

products

Exit the FI document.

3. AlsocheckthecorrespondingPCAdocumentpostedinparallel. Whichline

item was posted to which profit center?

Answer: Choose Profit Center Document.

893015costofgoodsmanufactured for saleswaspostedtoprofit center

91## .

792000finishedproductswaspostedtoprofitcenter1010.

Continued on next page

151

2005/Q2 © 2005 SAP AG. All rights reserved.

第 162 页 / 共 355 页

Unit3: ActualData AC610

Task 3:

The last step is to create a billing document.

1. To create the billing document for the sales order in task 1-1 enter the

documentnumberoftheoutbounddeliveryfromtask1-2. Makeanoteof

the number of the billing document.

Answer: Logistics → Sales and Distribution → Sales → Order →

Subsequent Functions→ Billing Document

Ifnecessary,enterthedocumentnumberfortheoutbounddeliveryfromtask

1-2intheDocumentcolumn. Savethebillingdocument.

Make a note of the document number.

2. Displaythesalesorderandcheckthesubsequentdocumentsfromwithinthis

screen. Howmanysubsequentdocumentsweregenerated?

Answer: Logistics→SalesandDistribution→Sales→Order→Display

Entertheordernumberoffromtask1-1andconfirmwithEnter.

ChooseEnvironment →DisplayDocumentFlow.

Sixdocumentshavebeenpostedinthemeantime.

• Standard order

• Delivery

• WM transfer order

• Outbound delivery

• Invoice

• Accounting document

3. Gofromtheaccountingdocumenttotheprofitcenterdocument. Whichline

item was posted to which profit center?

Answer: Click Accounting Document.

Click the Display Doc. pushbutton.

CustomerreceivableT-CO05A##to800000revenues

4. Gofromtheaccountingdocumenttotheprofitcenterdocument.

Whichlineitemwaspostedtowhichprofit center?

Answer: You arein the accounting document.

ChooseEnvironment→DocumentEnvironment→AccountingDocuments

Choose Profit Center Document.

Account800000ispostedtoprofitcenter 91##.

5. WhywerethereceivablesnottransferredtoProfitCenterAccounting?

Answer: ReceivablescanonlybetransferredperiodicallytoProfitCenter

Accounting.

152

©2005SAPAG.Allrightsreserved. 2005/Q2

第 163 页 / 共 355 页

AC610 Lesson: Transfer from Sales and Distribution

Lesson Summary

You should now be able to:

• understandhowprofitcentersarederivedintheex-stocksaleprocessand

identify when the posting is made

153

2005/Q2 © 2005 SAP AG. All rights reserved.

第 164 页 / 共 355 页

Unit3: ActualData AC610

Lesson: Functional Areas in Profit Center Accounting

Lesson Duration: 20 Minutes

146

Lesson Overview

Theprofitandlossstatement inFinancial Accountingisbasedoncost of sales

accounting. The functional areas required for this purpose can be analyzed in

Profit Center Accounting.

Lesson Objectives

After completingthislesson, you will beable to:

• knowthatthefunctionalareaiscopiedfromFinancialAccountingtoProfit

Center Accounting

Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe

system.

Business Example

[Use a business example to explain the practical benefits of this lesson for a

company.]

Figure52: AssignmentofFunctionalAreasintheP&LStatement

When you use the period accounting approach, the system breaks down the

operatingresultsbyrevenueandcostelement. Thismakesitpossibletorecognize

whichfactorsofproductioncausethecostswhichareincurred. Thetotalcosts

154

©2005SAPAG.Allrightsreserved. 2005/Q2

第 165 页 / 共 355 页

AC610 Lesson: Functional Areas in Profit Center Accounting

for the period can then be compared to the total revenues earned during the

same period. These costs include the costs of all the goods and services that

wereproducedintheperiodbuthavenotyetbeensold(increasesinstock)plus

the goods and services produced in previous periods and sold in this period

(reductionsinstock). Thissum, together withthecapitalizedinternalactivities

andthechangestoworkinprocess,yieldsthetotalresultfortheperiod.

The more sales-oriented cost of sales approach compares the costs to the

correspondingquantitystructureoftherevenues. Revenuesareonlycompared

tothecostsincurredforthequantityofgoodsorservicessold. Whenproducts

are sold from stock, it may be that the costs were incurred during a previous

period. Inthisapproach,nodistinctionismadebetweendifferentcostelements.

Instead,resourceusageisdividedaccordingtothefunctionsR&D,production,

sales and administration.

Tocalculateprofitsaccordingtothecostofsalesapproach,youneedtoaccessthe

functionalareacharacteristic,whichisderivedinFIorCO.Sinceyoucandefine

thesefunctional areasandtherulesbywhichthey areused, youneedtodefine

yourownreportsifyouwanttousethecostofsalesapproach.

Figure 53: Cost-of-Sales Accounting Overview

InadditiontotheFI-GLgeneralledger, anotherledgerismanagedinFI-SL.In

thisledgeryoucanupdatealltheFI-relevantbusinesstransactions.

Incontrasttothegeneralledger,thetransactionfiguresaredividedbyfunctional

area.

155

2005/Q2 © 2005 SAP AG. All rights reserved.

第 166 页 / 共 355 页

Unit3: ActualData AC610

Thisslideshowsyouthefollowingexamplepostings:

• Sales revenues from SD (1)

• Cost of goodssold fromMM goodsissue (2)

• Productionvariancesfromthesettlementoftheproductionorder(3)

• All debits and credits of all the production cost centers

(overabsorption/underabsorption) (3a)

• All postings to cost centers affecting the functional areas Sales,

AdministrationandResearch&Development(3b)

• AdjustmentpostingsfromthereconciliationledgerbacktoFI-SLinthecase

of secondary cross-functionalareapostings(3c)

• Postings to profitability segments (4)

• Other expenses (5)

Figure 54: Functional Area Derivation Options

Ifcost-of-salesaccountingisactivatedfor acompanycode, afunctionalareais

determined when P&L postings are made.

No functional area is determined when postings are made to balance sheet

accountsorwhenstatisticalkeyfiguresareenteredinControlling.

The derived functional area is transferred to the line items of Profit Center

Accounting.

156

©2005SAPAG.Allrightsreserved. 2005/Q2

第 167 页 / 共 355 页

AC610 Lesson: Functional Areas in Profit Center Accounting

Exercise 9: Functional Areas in Profit

149

Center Accounting

Exercise Duration: 20 Minutes

Exercise Objectives

After completingthisexercise, youwillbeableto:

• identifythefunctionalareathatwastransferredtoPCA

Business Example

InFinancial Accounting, theindividual companycodesusefunctionalareasin

ordertodisplaytheprofitandlossstatementinaccordancewiththecostofsales

accounting. Thisoption shouldalsobemadeavailabletothoseresponsiblefor

theprofitcenter. CheckwhichfunctionalareasweretransferredtoProfitCenter

Accounting.

Task 1:

Check profit centerdocumentsfor functional areas.

1. ExecutethelineitemreportofProfitCenterAccountingwiththefollowing

parameters:

Field Name Value

Record Type 0

Version 0

Controlling Area 1000

Company Code 1000

Posting Period Current Period

Fiscal Year Current fiscal year

Profit Center 91## Sales

ShowtheFunctionalAreafieldinthecurrentdisplayvariant.

Then sort the lines by account number.

Which functional area was determined when posting with cost element

430000?

___________________________________________

___________________________________________

Continued on next page

157

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Record Type 0
Version 0
Controlling Area 1000
Company Code 1000
Posting Period Current Period
Fiscal Year Current fiscal year
Profit Center 91## Sales

第 168 页 / 共 355 页

Unit3: ActualData AC610

Whichfunctionalareawasdeterminedwhenpostingwithrevenueelement

800000?

2. Callthelineitemreportforprofitcenter92## Administration.

Whichfunctionalareawasdeterminedwhenpostingcostelement430000?

Task 2:

1. HowdoyouderiveafunctionalareaintheR/3System?

158

©2005SAPAG.Allrightsreserved. 2005/Q2

第 169 页 / 共 355 页

AC610 Lesson: Functional Areas in Profit Center Accounting

Solution 9: Functional Areas in Profit

Center Accounting

Task 1:

Check profit centerdocumentsfor functional areas.

1. ExecutethelineitemreportofProfitCenterAccountingwiththefollowing

parameters:

Field Name Value

Record Type 0

Version 0

Controlling Area 1000

Company Code 1000

Posting Period Current Period

Fiscal Year Current fiscal year

Profit Center 91## Sales

ShowtheFunctionalAreafieldinthecurrentdisplayvariant.

Then sort the lines by account number.

Which functional area was determined when posting with cost element

430000?

___________________________________________

___________________________________________

Continued on next page

159

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Record Type 0
Version 0
Controlling Area 1000
Company Code 1000
Posting Period Current Period
Fiscal Year Current fiscal year
Profit Center 91## Sales

第 170 页 / 共 355 页

Unit3: ActualData AC610

Whichfunctionalareawasdeterminedwhenpostingwithrevenueelement

800000?

a) PCA:InformationSystem→ReportsforProfitCenterAccounting→

LineItemReports→ProfitCenter: ActualLineItems

Enterthefollowing dataandrun thereport.

Field Name Value

Record Type 0

Version 0

Controlling Area 1000

Company Code 1000

Posting Period Current Period

Fiscal Year Current fiscal year

Profit Center 91## Sales

ShowtheFunctionalAreafieldinthecurrentdisplayvariant.

YouareintheABAPListViewerdisplayoftheprofitcenterlineitems.

Choose Settings→ Layout → Current...

SelecttheFunctionalAreacolumninthelistofavailablecolumns.

Click Show selected fields.

Confirm by pressing Enter.

Then sort thelines by account number.

Whichfunctionalareawasdeterminedwhenpostingwithcostelement

430000?

YouareintheABAPListViewerdisplayoftheprofitcenterlineitems.

Select the Account Number column.

Choose Edit → Sort Ascending.

Functionalarea0300 Saleswasdetermined.

Which functional area was determined when posting with revenue

element 800000?

Functionalarea0050 Saleswasdetermined.

2. Callthelineitemreportforprofitcenter92## Administration.

Continued on next page

160

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Value
Record Type 0
Version 0
Controlling Area 1000
Company Code 1000
Posting Period Current Period
Fiscal Year Current fiscal year
Profit Center 91## Sales

第 171 页 / 共 355 页

AC610 Lesson: Functional Areas in Profit Center Accounting

Whichfunctionalareawasdeterminedwhenpostingcostelement430000?

a) PCA:InformationSystem→ReportsforProfitCenterAccounting→

LineItemReports→ProfitCenter: ActualLineItems

Enterthefollowingdataand run thereport.

Field Name Value

Record Type 0

Version 0

Controlling Area 1000

Company Code 1000

Posting Period Current Period

Fiscal Year Current fiscal year

Profit Center 92## Sales

Which functional area was determined when posting cost element

430000?

Functionalarea0400Administrationwasdetermined.

Task 2:

1. HowdoyouderiveafunctionalareaintheR/3System?

Answer: Manual Posting

Substitution during cost of salesapproach

In the master record for the P&L account

In the master record for the CO object

161

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Record Type 0
Version 0
Controlling Area 1000
Company Code 1000
Posting Period Current Period
Fiscal Year Current fiscal year
Profit Center 92## Sales

第 172 页 / 共 355 页

Unit3: ActualData AC610

Lesson Summary

You should now be able to:

• knowthatthefunctionalareaiscopiedfromFinancialAccountingtoProfit

Center Accounting

162

©2005SAPAG.Allrightsreserved. 2005/Q2

第 173 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Lesson: Period-End Closing in Profit Center Accounting

Lesson Duration: 75 Minutes

155

Lesson Overview

Youcarryoutperiod-endpostingsinProfitCenterAccounting.

Lesson Objectives

After completingthislesson, youwillbeable to:

• enterorcopystatisticalkeyfigurestoprofitcenters

• transferpayablesandreceivablestoProfitCenterAccounting

• define a profit center allocation

• explain the document entry, balance carryforward, and average balance

ledger concepts

Explainthecontentfromabusinessperspectiveusingthetechnicalsettingsinthe

system.

Business Example

DemonstratedirectpostingsandallocationswithinProfitCenterAccounting.

Figure 55: Transfer of Statistical Key Figures

163

2005/Q2 © 2005 SAP AG. All rights reserved.

第 174 页 / 共 355 页

Unit3: ActualData AC610

Inadditiontothemonetarydatainaccounting, youcanalsotransfer Statistical

KeyFiguresfromtheaccountassignmentobjectsinControllingtoProfitCenter

Accounting. Statisticalkeyfigurescanbetransferredfromthefollowingobjects:

• Cost Centers

• Cost centers/activity types

• Orders

• Cost objects

• Networks/network activities

• WBS elements

• Sales document (sales order items)

ACustomizingtabledetermineswhichkeyfigurescanbetransferredfromwhich

objects to Profit Center Accounting. This means that you can choose not to

transfercertainkeyfigureswhichareunnecessaryinECPCA,suchasthoseused

solelyinCostCenterAccountingastracingfactorsforperiodicallocations.

Demonstration: Entry of Statistical Key Figures

Purpose

Entry of statisticalkey figuresatprofitcenter level

System Data

System:

Client:

UserID:

Password:

Setupinstructions:

1. Accounting→EnterpriseControlling→ProfitCenterAccounting→Actual

Postings→Statistical keyfigures →Change

Use layout 8A-701, document Type PC

Period 1 –12, XXXX

Profit Center 10B00

Stat Key Figure: 9100

Thisstatisticalkeyfiguresrepresentsemployees.

ShowhowstatisticalkeyfiguresaretakenfromassignedCostcenters(refer

to IMG)

164

©2005SAPAG.Allrightsreserved. 2005/Q2

第 175 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Figure 56: Transfer of Payables/Receivables

Beforeyoucantransferpayablesandreceivables,youfirstneedtocalculatethe

payables and receivables to be split in Financial Accounting. In this step, the

payablesandreceivablesarebrokendownaccordingtoprofitcenterandbusiness

areabasedon salesorder lineitemassignments.

WithinPCAyoucantransferthedatatoProfitCenterAccounting. Youreceivea

listofallthecompanycodesinthecurrentcontrollingarea. Selecttherequired

company codes and choose the periods you want to transfer. The system then

posts the payables and receivables to Profit Center Accounting using the

reconciliationaccountsofthegeneralledger. NoFIdocumentsarecreatedin

the process.

Ifyouselectlineitems,thesystemwritesalineitemforeachcustomerandeach

supplier.

Aftertheprogramhasrunyoureceiveanerrorlog. Youcananalyzetheposted

datausingstandardreportsinProfitCenterAccounting.

Hint: The program first transfers the closing balance of payablesand

receivables. Italsodeterminesthefinalbalanceofthepreviousperiodand

updatesthiswithaminus("-")sign. Asaresult,thesummaryrecordsin

eachperiodcontainthemovementsin thepayablesandreceivables, as

shown exactly in Financial Accounting.

165

2005/Q2 © 2005 SAP AG. All rights reserved.

第 176 页 / 共 355 页

Unit3: ActualData AC610

Demonstration: Transfer of AP/AR

Purpose

Trigger balance sheet adjustment in FI and periodic transfer of payables and

receivables.

System Data

System:

Client:

UserID:

Password:

Setupinstructions:

1. ShowARfromtheSalesProcessexecuted before

Logistics →SD →Sales →Order→Display

Environment → Display document flow

Click Accounting document

Button Display Document

ShowthatARarenotyetdistributedtoaprofitcenter

Environment/Balance Sheet adjustment

ShowthatonlyrevenuesaretransferredtoPCA

Environment/Accounting documents

Choose Profit center doc

2. CalculateDistributionof AR toprofit center

Note: dependent on the number of documents, which will be

distributed, thiswilltakeacoupleofminutes

Accounting → Financial accounting → General Ledger → Periodic

processing → Closing → Reclassify → Balance Sheet adjustment →

Calculate

Company Code: 1000

Show that AR from above are now distributed to profit center 1406 as

seen in point1.

3. Execute transfer of AP/AR to PCA

Accounting→EnterpriseControlling→ProfitCenterAccounting→Actual

Postings→PeriodEndClosing→TransferringPayables/receivables

166

©2005SAPAG.Allrightsreserved. 2005/Q2

第 177 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Company Code: 1000 for actual period

Mark ‘Line items’

4. Showactual lineitemsfrominvolvedprofit center

Accounting→EnterpriseControlling→ProfitcenterAccounting→Info

System→ReportsforProfitCenterAccounting→ListorientedReports→

Profit CenterGroup: Plan/Actual/Variance

Controlling Area: 1000

Fiscal year: actual year

From period: 1

To period: 12

plan version: 0

Profit Center Group: H1421

Balancesheetaccountgroup: 1000000.INT

Revenueand cost elements: 3000000.INT

Figure 57: Distribution/Assessment

Allocation(assessmentanddistribution)ofoverheadcostsisusuallyperformed

atperiodclosing. ThisisusuallydonedirectlyinManagementAccountingand

reflected inthedata inProfit Center Accounting.

167

2005/Q2 © 2005 SAP AG. All rights reserved.

第 178 页 / 共 355 页

Unit3: ActualData AC610

If you have a service profit center or allocation center in your profit center

hierarchy, you may need to assess or distribute costs again in Profit Center

Accounting.

Under certaincircumstancesit may also benecessary toallocaterevenuesand

salesdeductions. YoucandothisaswellinProfitCenterAccounting.

Oftenyouhavetoallocatecertainbalancesheetitems(rawmaterials,realestate

andsoon), whichyou firstpostedto asingleprofit center, to severalreceiving

profit centers.

AssessingordistributingdatainProfitCenterAccountingonlymakessenseafter

you have completed all the period closing activities in the applications which

supply EC-PCA with data (FI, CO, SD, MM, etc.). You should also post any

additional profit center data manually, such as PCA Statistical Key Figures,

before allocating.

Distribution and assessment work the same way asin Overhead Management,

but affect PCA postings only.

Figure 58: Create Distribution/Assessment

Whenyoudefineadistributionorassessment,youcollectallthesender-receiver

relationships in segments. You then store these segments in different cycles,

which are stored with a time reference.

AsofRelease4.6allocationcyclescanbedefinedatthecontrollingarealevel.

168

©2005SAPAG.Allrightsreserved. 2005/Q2

第 179 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

The allocation can be processed interactively in a cycle. If no percentage

remainingvaluesaredefined,andallaccountsareinvolvedintheallocation,the

sender profit centers are all completely emptied.

Figure 59: Enter Profit Center Documents

Youcanalsouseittocreatetheopeningbalancefortransferringadditionalbalance

sheet items to Profit Center Accounting.

YoucancreateyourowndocumententrylayoutinCustomizingoruseoneofthe

standard layouts.

Enterthecompanycodeandthedocumenttype. Ifyouwish,youcanalsoentera

differentdatetobeusedforcurrencytranslation. Thesystemassignsadocument

numberinternally. Ifyouwish, youcanalso enteratransactioncurrency anda

basicunitofmeasure. Enterthecurrenciesandquantitiesaswellasanaccount

assignmentforeachdocumentline. Forcreditpostings,youmustenteraminus

sign (-) after the amount.

ThedocumentsyoucreatehereareonlyupdatedinProfitCenterAccounting. No

postingsaremadeinFIorintheSpecialPurposeLedgers.

169

2005/Q2 © 2005 SAP AG. All rights reserved.

第 180 页 / 共 355 页

Unit3: ActualData AC610

Figure 60: Balance carry forward

Ifyouwanttopostmaterialstocks,assets,workinprocessoradditionalbalance

sheetitemstoProfitCenterAccountingbytransaction,youneedtocarrybalances

forwardduringthecourseofyearendclosing. Otherwisethisstepisoptional.

Whenyoucarrybalancesforward,theprofitandlossaccountsarecarriedforward

to the carry-forward account defined in Customizing for each P&L statement

accounttype,whilethebalancesheetaccountsarecarriedforwardtobalancesheet

accounts. Postingsaredividedaccordingtocontrollingarea,profitcenter,origin

objecttypeandtransaction. Balancesheetaccountsarecarriedforwardunderthe

same account and divided according to controlling area, profit center, partner

profitcenter,partnercompany,functionalarea,transaction,depreciationarea(for

assets)andresultsanalysisversion(forworkinprocess).

Once you have activated the function for carrying balances forward in Profit

Center Accounting,

the system performs itautomatically for all postingsthat are transferred from

FinancialAccountingorenteredmanuallyinProfitCenterAccounting.

170

©2005SAPAG.Allrightsreserved. 2005/Q2

第 181 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Figure 61: Average Balance Ledger

All transactionscarried out duringaperiod arestoredwith adateweightingin

theaveragebalanceledger. Thismeansthatatransactionthattakesplaceonthe

firstdayoftheperiodisupdatedwithafullweighting,whereaslatertransactions

areweightedaccordingtowhenintheperiodtheyoccurred(daysremainingin

period, divided by days in period).

Theaveragebalanceledger(8Z)onlycontainsweightedtransactionsbyperiod.

Tocalculatetheaveragebalanceforaperiod,thesystemneedstotaketheopening

balanceintoaccountaswell. Thisopeningbalanceistakenfromtheprofitcenter

ledger "8A".

Example:

Atthebeginningofperiod2, accountbalance=10,000.00-

Number of days in period 2: 28

Inward movement on 2/15: 10,000.00-

→weightedmovement: 10,000.00-*14days/28days=5,000.00-

Inward movement on 2/22: 10,000.00-

→weightedmovement: 10,000.00-*7days/28days=2,500.00-

Average balance for period 2: 17,500.00-

You can only update the average balance ledger if you update accounts in

realtime. Ifyoutransfertheseperiodically,youcanonlyseethebalancesasofthe

endoftheperiod. Itisnolongerpossibletodeterminewhenduringtheperiodthe

transactions were carried out.

171

2005/Q2 © 2005 SAP AG. All rights reserved.

第 182 页 / 共 355 页

Unit3: ActualData AC610

172

©2005SAPAG.Allrightsreserved. 2005/Q2

第 183 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Exercise 10: Period-End Closing in Profit

163

Center Accounting

Exercise Duration: 20 Minutes

Exercise Objectives

After completingthisexercise, youwillbeableto:

• create a cycle for distribution in EC-PCA

Business Example

Therevenuesarecollectedonthesalesprofitcenter. Managementperiodically

submitsfixedamountswhicharepostedtothenon-salesprofitcentersmonthly.

Distributionistobeusedtokeeptherevenueelementvisible.

Task 1:

Analyzethecurrent statusof the profit andlossstatement on theprofit centers

of group GR##.

1. In the information system of Profit Center Accounting, start the

list-orientated report Profit CenterGroup: Plan/Actual/Variancewith the

following parameters:

Field Name Value

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT Profit and

Loss Statement

BalanceSheetAccountGroup 1000000.INT Assets

Continued on next page

173

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT Profit and Loss Statement
BalanceSheetAccountGroup 1000000.INT Assets

第 184 页 / 共 355 页

Unit3: ActualData AC610

2. Whatisyourassessmentofthe“performance”ofprofitcenter91##?

Whatisyourassessmentofthe“performance”ofprofitcenter92##?

Task 2:

DefineadistributioninEC-PCAinordertoallocaterevenues.

1. Createadistributionintheperiod-endclosingofEC-PCA.Usethefollowing

parameters:

Field Name Value

Cycle PCA##

Start Date 01.01.current fiscal

year

Enterthefollowingdataintheheaderdataofthecycle:

Field Name Value

Text Revenue Distribution

PCA##

Controlling Area 1000

Company Code 1000

Attachasegmentandenterthefollowingsegmentdata.

Field Name Value

Segment Name PCA##SEG

Revenue Distribution

Group ##

Enterpostedamountsof100%intheactualasthesendervaluesandfixed

amounts as the receiver tracing factor.

Go to the Senders/Receivers tab page and enter the following allocation

relationship:

Thepostedamountsonaccount800000should bestatisticallydistributed

fromprofitcenter91##to92##. Youareworkinginversion9.

Continued on next page

174

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Value
Cycle PCA##
Start Date 01.01.current fiscal year
Field Name Value
Text Revenue Distribution PCA##
Controlling Area 1000
Company Code 1000
Field Name Value
Segment Name PCA##SEG
Revenue Distribution Group ##

第 185 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

GototheReceiverTracingFactortabpagesothatyoucanenterthefixed

valuetobeallocated. EnterEURasthetransactioncurrencyand–30,000as

the revenue amount.

Save the cycle.

2. Execute cycle PCA## in the current period of the current fiscal year in

update mode. Use document type V0.

Who is the sender of the allocation?

____________________________________________________________

____________________________________________________________

Who is the receiver of the allocation?

____________________________________________________________

____________________________________________________________

Task 3:

Analyzetheeffectsof thedistribution in reporting.

1. In the information system of Profit Center Accounting, start the

list-orientated report Profit CenterGroup: Plan/Actual/Variancewith the

following parameters:

Field Name Value

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT Profit and

Loss Statement

BalanceSheetAccountGroup 1000000.INT Assets

Whatisyourassessmentofthe“performance”ofprofitcenter91##?

____________________________________________________________

____________________________________________________________

Whatisyourassessmentofthe“performance”ofprofitcenter92##?

____________________________________________________________

____________________________________________________________

Continued on next page

175

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT Profit and Loss Statement
BalanceSheetAccountGroup 1000000.INT Assets

第 186 页 / 共 355 页

Unit3: ActualData AC610

2. Whichactualaccountassignmentobjectshadtherevenuespostedtothem?

Check the corresponding generated accounting documents of the profit

center line item of the distribution.

176

©2005SAPAG.Allrightsreserved. 2005/Q2

第 187 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Solution 10: Period-End Closing in Profit

Center Accounting

Task 1:

Analyzethecurrent statusof the profit andlossstatement on theprofit centers

of group GR##.

1. In the information system of Profit Center Accounting, start the

list-orientated report Profit CenterGroup: Plan/Actual/Variancewith the

following parameters:

Field Name Value

Controlling Area 1000

Fiscal Year Current fiscal year

Period 1 - 12

Plan Version 0

Profit Center GR##

ProfitandLossAccountsGroup 3000000.INT Profit and

Loss Statement

BalanceSheetAccountGroup 1000000.INT Assets

a) PCA:InformationSystem→ReportsforProfitCenterAccounting

→ List-Orientated Reports → Profit Center Group: Plan/Actual

Variance

b) YoucanseethereportlayoutfortheprofitcentergroupGR##.

2. Whatisyourassessmentofthe“performance”ofprofitcenter91##?

Whatisyourassessmentofthe“performance”ofprofitcenter92##?

Answer: In the Variation window, select profit center 91##. If all the

postingshavebeenmadeinaccordancewiththeexercises,profitcenter91##

obtainsaprofitinaccordancewithaccountgroup3000000.INT.

IntheVariationwindow,selectprofitcenter92##. Profitcenter92##does

not obtain a profit since no revenues were posted online from the actual

transactions.

Continued on next page

177

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1 - 12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT Profit and Loss Statement
BalanceSheetAccountGroup 1000000.INT Assets

第 188 页 / 共 355 页

Unit3: ActualData AC610

Task 2:

DefineadistributioninEC-PCAinordertoallocaterevenues.

1. Createadistributionintheperiod-endclosingofEC-PCA.Usethefollowing

parameters:

Field Name Value

Cycle PCA##

Start Date 01.01.current fiscal

year

Enterthefollowingdataintheheaderdataofthecycle:

Field Name Value

Text Revenue Distribution

PCA##

Controlling Area 1000

Company Code 1000

Attachasegmentandenterthefollowingsegmentdata.

Field Name Value

Segment Name PCA##SEG

Revenue Distribution

Group ##

Enterpostedamountsof100%intheactualasthesendervaluesandfixed

amounts as the receiver tracing factor.

Go to the Senders/Receivers tab page and enter the following allocation

relationship:

Thepostedamountsonaccount800000should bestatisticallydistributed

fromprofitcenter91##to92##. Youareworkinginversion9.

GototheReceiverTracingFactortabpagesothatyoucanenterthefixed

valuetobeallocated. EnterEURasthetransactioncurrencyand–30,000as

the revenue amount.

Save the cycle.

a) PCA:ActualPostings→Period-EndClosing→Distribution

Continued on next page

178

©2005SAPAG.Allrightsreserved. 2005/Q2

Field Name Value
Cycle PCA##
Start Date 01.01.current fiscal year
Field Name Value
Text Revenue Distribution PCA##
Controlling Area 1000
Company Code 1000
Field Name Value
Segment Name PCA##SEG
Revenue Distribution Group ##

第 189 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

Field Name Value

Cycle PCA##

Start Date 01.01.current fiscal

year

Confirm by pressing Enter.

Enterthefollowingdataintheheaderdataofthecycle:

Field Name Value

Text Revenue Distribution

PCA##

Controlling Area 1000

Company Code 1000

Attachasegmentandenterthefollowingsegmentdata.

Choose theAttach Segmentpushbutton.

Field Name Value

Segment Name PCA##SEG

Revenue Distribution

Group ##

Enterpostedamountsof100%intheactualasthesendervaluesand

fixedamountsasthereceiver tracingfactor.

Choose Extras → Cycle → Create.

Field Name Value

Sender rule Posted Amounts

Share in % 100 %

Actual button Act. vals

Receiver rule Fixed amounts

GototheSenders/Receiverstabpageandenterthefollowingallocation

relationship:

The posted amounts on account 800000 should be statistically

distributed from profit center 91## to 92##. You are working in

version 9.

Continued on next page

179

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Cycle PCA##
Start Date 01.01.current fiscal year
Field Name Value
Text Revenue Distribution PCA##
Controlling Area 1000
Company Code 1000
Field Name Value
Segment Name PCA##SEG
Revenue Distribution Group ##
Field Name Value
Sender rule Posted Amounts
Share in % 100 %
Actual button Act. vals
Receiver rule Fixed amounts

第 190 页 / 共 355 页

Unit3: ActualData AC610

b) Click theSenders/Receivers tab page.

Enterthedataspecifiedintheparagraphabove.

GototheReceiverTracingFactortabpagesothatyoucanenterthe

fixedvaluetobeallocated. EnterEURasthetransactioncurrencyand

–30,000 as the revenue amount.

c) ChoosetheReceiverTracingFactortabpage.

Enter the currency key EUR.

Enter –30,000 as a fixed amount.

Notethattheamountmustbeentered withanegativesignsince

revenuesarepostedtoProfitCenterAccountingwithanegative

sign.

Save the cycle.

2. Execute cycle PCA## in the current period of the current fiscal year in

update mode. Use document type V0.

Who is the sender of the allocation?

____________________________________________________________

____________________________________________________________

Who is the receiver of the allocation?

Continued on next page

180

©2005SAPAG.Allrightsreserved. 2005/Q2

第 191 页 / 共 355 页

AC610 Lesson: Period-End Closing in Profit Center Accounting

____________________________________________________________

____________________________________________________________

a) PCA:ActualPostings→Period-EndClosing→Distribution

Enter the following data:

Field Name Value

Period Current Period

Fiscal Year Current fiscal year

Document type V0

TestRunnotactivated

Detail Lists Activate

Cycle PCA##

Choose Execute

Who is the sender of the allocation?

Click the Sender pushbutton.

Thesenderoftheallocationisaccount800000withprofitcenter

91##sincedistributionsallocatespecifictothecostelement.

ChoosetheBasicListpushbuttontoreturntothebasiclist.

Who isthe receiver of the allocation?

Youareinthebasiclistof thedistribution.

Choose the Receiver pushbutton.

Thereceiveroftheallocationisaccount800000withprofitcenter

92##sincedistributionsallocatespecifictothecostelement.

Task 3:

Analyzetheeffectsof thedistribution in reporting.

1. In the information system of Profit Center Accounting, start the

list-orientated report Profit CenterGroup: Plan/Actual/Variancewith the

following parameters:

Field Name Value

Controlling Area 1000

Fiscal Year Current fiscal year

Continued on next page

181

2005/Q2 © 2005 SAP AG. All rights reserved.

Field Name Value
Period Current Period
Fiscal Year Current fiscal year
Document type V0
TestRunnotactivated
Detail Lists Activate
Cycle PCA##
Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
返回FICO参考资料列表