第 237 页 / 共 543 页
AC405 Lesson: Cost Allocations
Segmentnamefield1 IT-Serv##
SegmentNamefield2 Assessment202##byPCnumber
Assessment CEle 6310##
Sender Values
Rule te Posted amounts
Share in % 100
Actualvalueorigin Select
ReceiverTracingFactor
Receiver rule Variable portions
TypeofVariablePortions Statist. Actualstatisticalkeyfigures
Switch to the Senders/receivers tab page.
Sender
Cost Center 202##
Cost Element From400000to650000
Receivers
Cost center group Group ASSE-IT##
SwitchtotheReceivertracingfactortabpage.
Fields Values
Statistical key figure PC##
SwitchtotheReceiverweighingfactorstabpage.
Receivers Factor per 100
201## 300
e) 3rd segment
Edit → Attach segment
Segmentnamefield1 MOTO##
SegmentNamefield2 Assessment203##bykmnumber.
Assessment CEle 6311##
Continued on next page
221
2009 © 2009 SAP AG. All rights reserved.
| Segmentnamefield1 | IT-Serv## |
|---|---|
| SegmentNamefield2 | Assessment202##byPCnumber |
| Assessment CEle | 6310## |
| Sender Values | |
| Rule te | Posted amounts |
| Share in % | 100 |
| Actualvalueorigin | Select |
| ReceiverTracingFactor | |
| Receiver rule | Variable portions |
| TypeofVariablePortions | Statist. Actualstatisticalkeyfigures |
| Sender | |
|---|---|
| Cost Center | 202## |
| Cost Element | From400000to650000 |
| Receivers | |
| Cost center group | Group ASSE-IT## |
| Fields | Values |
|---|---|
| Statistical key figure | PC## |
| Receivers | Factor per 100 |
|---|---|
| 201## | 300 |
| Segmentnamefield1 | MOTO## |
|---|---|
| SegmentNamefield2 | Assessment203##bykmnumber. |
| Assessment CEle | 6311## |
第 238 页 / 共 543 页
Unit4: Period-EndClosing AC405
Sender Values
Rule Posted amounts
Share in % 100
Actualvalueorigin Select
ReceiverTracingFactor
Receiver rule Variable portions
TypeofVariablePortions Statist. Actualstatisticalkeyfigures
Switch to the Senders/receivers tabpage.
Sender
Cost Center 203##
Cost Element From400000to650000
Receivers
Cost center group B30##
SwitchtotheReceivertracingfactortabpage.
Fields Values
Statistical key figure MI##
Goto → Header Data
Formal check icon
Save your data!
Continued on next page
222
©2009SAPAG.Allrightsreserved. 2009
| Sender Values | |
|---|---|
| Rule | Posted amounts |
| Share in % | 100 |
| Actualvalueorigin | Select |
| ReceiverTracingFactor | |
| Receiver rule | Variable portions |
| TypeofVariablePortions | Statist. Actualstatisticalkeyfigures |
| Sender | |
|---|---|
| Cost Center | 203## |
| Cost Element | From400000to650000 |
| Receivers | |
| Cost center group | B30## |
| Fields | Values |
|---|---|
| Statistical key figure | MI## |
第 239 页 / 共 543 页
AC405 Lesson: Cost Allocations
2. Toenableallofthecyclescreatedinthecoursetoberunatthesametime,
youneedtoassignthecyclestodifferent flowgroups. Createacyclerun
group Gr##, and name it Assessment Group##. (As this is a different
allocation category than intheprevious exercise, thenameGR## can be
used again). Save the cycle.
a) IntheheaderdataoftheASSE##assessmentcycle.
Goto→CycleRunGroup→CreateGroupicon
b)
Fields Values
Run group field 1 GR##
Run group field 2 Assessment Gr##
Confirm your entries.
Save the cycle.
Task 3:
Carry out the following task:
1. Before you can execute the assessment, call the report Cost Centers:
Actual/Plan/Varianceforthecurrentperiodandtheversion0. Executethe
report for the cost center group (B20##).
Whichamountsareallocated from the201##(Organization), 202##(IT
Services), and 203##(MotorPool)costcenters?
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Continued on next page
223
2009 © 2009 SAP AG. All rights reserved.
| Fields | Values |
|---|---|
| Run group field 1 | GR## |
| Run group field 2 | Assessment Gr## |
第 240 页 / 共 543 页
Unit4: Period-EndClosing AC405
203## (Motor
Pool)__________________________________________________
a) Cost Center Accounting: Information System → Reports for Cost
Center Accounting → Plan/Actual Comparisons → Cost Centers:
Actual/Plan/Variance
b)
Field name Values
Controlling Area 1000
Fiscal Year Current
From Period Current
To Period Current
Plan Version 0
Cost center group B20##
Navigatetoeachindividualcostcenterinthevariationmenu.
c) The following will be allocated:
Cost Center 201## 9.000.-
Cost Center 202## 36.000.-
Cost center 92.08kg# 120.000.-
Continued on next page
224
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From Period | Current |
| To Period | Current |
| Plan Version | 0 |
| Cost center group | B20## |
第 241 页 / 共 543 页
AC405 Lesson: Cost Allocations
Task 4:
Run the actual cycle for the assessment.
1. RuntheASSE##cycleforthecurrentperiod,withdetaillists. SelectTest
Run.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations → Assessment
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Select
Detail lists Select
Cycle Name ASSE##
Assessment → Execute.
2. Displaythesegments. WhatdoesthefigurethreesignifyincolumnR?
Answer: Goto → Segments
ColumnRdisplaysthereceiverrulestoredineachsegment. (F1Help)
3signifiesfixedpercentagesasthetracingfactor.
3. Callupthereceiversforeachsegment. Notedowneachreceivercostcenter.
Receiver segment ORGA##:
1. 2. 3.
Receiver segment IT-SERV##
Continued on next page
225
2009 © 2009 SAP AG. All rights reserved.
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Select |
| Detail lists | Select |
| Cycle Name | ASSE## |
| Receiver segment ORGA##: | ||
|---|---|---|
| 1. | 2. | 3. |
| Receiver segment IT-SERV## |
第 242 页 / 共 543 页
Unit4: Period-EndClosing AC405
1. 2. 3.
Receivers segment MOTO##:
1. 2. 3.
a) Place your cursor on thegiven segment.
Goto → Receiver
Repeat for each segment.
ReceiversforsegmentORGA## 202## 301## 302##
ReceiversforsegmentIT-SERV## 201## 301## 302##
ReceiverssegmentMOTO## --- 301## 302##
4. Notedowntheentriesthatthe201##(Organization), 202##(ITServices)
cost centers debited, and vice versa.
201##(Organization)debits202##(ITService)with_______________
202##(ITServices)debits201##(Organization)with_______________
Answer: From the basic list
Goto → Line items
201## debits 202## with 900.-
202## debits 201## with 6,000
5. Thecost center202##(ITServices)allocatesitscostsonthebasisof the
numberofPCs. Althoughthecostcenter201##(Organization)onlyhas2
PCs,atracingfactorof6isdisplayed. Provideanexplanationforthis.
Answer: ReceivertracingfactorsthataredefinedusingtheVariableportions
rulecanbeassignedwithdifferentweightingfactors. Thisweightingfactor,
whenmultiplied withthetracingfactor, enablesyoutotakeinto account
differencesincostscausedbytheindividualreceivers.
Costcenter 201## has2PCsthatincur maintenanceexpensethatisthree
timeshigher thanfor other costcenters, sincetheyareusedfarmorethan
othercostcenters'PCs. Duetotheweightingfactorof300,thetracingfactor
for assessment is increased from two to six.
Continued on next page
226
©2009SAPAG.Allrightsreserved. 2009
| 1. | 2. | 3. |
|---|---|---|
| Receivers segment MOTO##: | ||
| 1. | 2. | 3. |
| ReceiversforsegmentORGA## | 202## | 301## | 302## |
|---|---|---|---|
| ReceiversforsegmentIT-SERV## | 201## | 301## | 302## |
| ReceiverssegmentMOTO## | --- | 301## | 302## |
第 243 页 / 共 543 页
AC405 Lesson: Cost Allocations
6. Runthecycleinanupdateruntoposttheallocations.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations → Assessment
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Deselect
Detail lists Select
Cycle Name ASSE##
Assessment → Execute.
Task 5:
Check theresult of theassessment in thereport.
1. CallthereportCostCenters: Actual/Plan/Varianceforthecurrentperiod
andtheversion0. Executethereportforthecostcentergroup(B20##).
Althougha100%credit(senderrule)wasdefinedforallthecostcentersin
theassessmentcycle, notallofthecost centersarecredited. Whichwere
not credited?
_________________________________________
_________________________________________
Continued on next page
227
2009 © 2009 SAP AG. All rights reserved.
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Deselect |
| Detail lists | Select |
| Cycle Name | ASSE## |
第 244 页 / 共 543 页
Unit4: Period-EndClosing AC405
_________________________________________
a) Cost Center Accounting: Information System → Reports for Cost
Center Accounting → Plan/Actual Comparisons → Cost Centers:
Actual/Plan/Variance
b)
Field name Values
Controlling Area 1000
Fiscal Year Current
From Period Current
To Period Current
Plan Version 0
Cost center group B20##
Cost center 91.17kg# Balance+ 6,000
Cost center 202## Balance + 900
2. Whywerethesecostcentersnotcompletelycredited?
(See the notes for exercise 4-3)
Answer: Cost centers 201## and 202## make allocations to each other.
Sincetheassessmentcyclewasnotdefinediteratively,onlyoneallocation
runtakesplacetocreditthesendercostcenters. Debitsthatarisefromthe
assessment remain on the receiver cost centers.
Continued on next page
228
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From Period | Current |
| To Period | Current |
| Plan Version | 0 |
| Cost center group | B20## |
第 245 页 / 共 543 页
AC405 Lesson: Cost Allocations
Task 6:
Nowexecutetheassessmentwithiterationofthesegments.
1. ReversetheassessmentresultsoftheASSE##cyclefirstfromtheprevious
exercise. Executethereversal in anupdaterun.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations → Assessment
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Deselect
Detail lists Select
Cycle Name ASSE##
Assessment → Reverse
Enter
2. NowchangetheASSE## cyclebyselectingtheIterativeindicatorinthe
header data. Save the cycle.
a) Extras → Cycle → Change
Cycle ASSE## Enter
SelecttheIterativeindicatorinthecycleheaderdata.
b) Save your data!
Continued on next page
229
2009 © 2009 SAP AG. All rights reserved.
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Deselect |
| Detail lists | Select |
| Cycle Name | ASSE## |
第 246 页 / 共 543 页
Unit4: Period-EndClosing AC405
3. RuntheASSE##assessmentcycleagaininanupdaterun.
a) Gobacktotheinitialscreenoftheassessment(Goto→Back.)
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Deselect
Detail lists Select
Cycle Name ASSE##
Assessment → Execute.
4. Call up thesenderinformationandnotedownthesender amountsfor the
201##(Organization)and202##(ITServices)costcenters.
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Comparethenumberswiththosefromexercise3. Whatdoyounotice?
Answer: Goto → Sender
The following was allocated:
Cost Center 201## 15.254,24
Cost Center 202## 37.525,42
Duetoiteration,thecreditamountsoneachsendercostcenterarehigher.
Goto → Basic list
Continued on next page
230
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Deselect |
| Detail lists | Select |
| Cycle Name | ASSE## |
第 247 页 / 共 543 页
AC405 Lesson: Cost Allocations
5. Callupthelineitems. Notedowntheentriesthatthe201##(Organization),
202##(ITServices)costcentersdebited,andviceversa.
201##(Organization)debits202##(ITService)with_______________
202##(ITServices)debits201##(Organization)with_______________
Comparethenumberswiththosefromexercise4-4.
What causes this difference?
Answer: Goto → Line items
201## debits 202## with 1,525.42
202## debits 201## with 6,254.24
Bothcostcentersarecredited100%. Thisisbecausetheinitialdebitoneach
cost center from the first iteration of the assessment cycle was allocated
again by the iterative cycle flow. During the first run, cost center 201##
(Organization)debitscostcenter202##(ITService)with900.00.
Task 7:
Carry out the following task:
1. Check the result of the assessment in the report Cost Centers:
Actual/Plan/Varianceforthecurrentperiodandtheversion0. Executethe
reportforthecostcentergroup(B20##). Gotoeachindividualcostcenter.
What do you notice?
_____________________________________________
_____________________________________________
Continued on next page
231
2009 © 2009 SAP AG. All rights reserved.
第 248 页 / 共 543 页
Unit4: Period-EndClosing AC405
_____________________________________________
a) Cost Center Accounting: Information System → Reports for Cost
Center Accounting → Plan/Actual Comparisons → Cost Centers:
Actual/Plan/Variance
b)
Field name Values
Controlling Area 1000
Fiscal Year Current
From Period Current
To Period Current
Plan Version 0
Cost Center Group B20##
Program → Execute
All cost centers are completely credited.
Task 8: Optional
Management Accounting employees that were not directly involved in the
definition of the cycles would like to have a brief overview of the allocation
relationships. DemonstratetheoptionsprovidedbythemySAP ERPsystemto
your colleagues.
1. CalluptheCycleoverview. Placethecursorinthecyclefor thestructure
planontheassessmentcycleASSE##,andcallupthecycleinformation.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations→Assessment→Extras→Cycle→DisplayOverview
b) ExpandtheASSE## node. DoubleclickASSE##.
Click ontheCycleinformation tab page.
2. Display previous processing.
You can call up the document list by double-clicking on the cycle in the
Executedorreversedcyclesdialogbox. Youcancallupthelineitemsby
double-clickingonthecorrespondingdocumentnumber.
a) Processed to date tab page
Double-clickontheselectedcycleintheExecutedorreversedcycles
dialog box. Double-click on the selected document to see the line
item view.
232
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From Period | Current |
| To Period | Current |
| Plan Version | 0 |
| Cost Center Group | B20## |
第 249 页 / 共 543 页
AC405 Lesson: Cost Allocations
Exercise 15: Cost Allocations
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create an allocation structure.
Business Example
Youfeel that theassessment of acost center that onlyhasoneassessment cost
element is not detailed enough. As the assessment receiver, you require more
detailedinformationaboutthesourceofthecostelements,suchasassessmentof
personnel and material costs. However, you would like to avoid defining ten
segmentsif,forexample,youwanttousetenassessmentcostelementstocredit
acost center. Youdefine an allocation structureso you can usemore thanone
assessment cost element in a segment.
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
2. In Customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
3. Define the assignment number 01, with the text Motor Material Costs,
and the assignment number 02, with the text Personnel Costs. For each
assignment, specifywhich primary cost elementsareto beallocated with
which assessment cost element.
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
Continued on next page
233
2009 © 2009 SAP AG. All rights reserved.
第 250 页 / 共 543 页
Unit4: Period-EndClosing AC405
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
3. RuntheA##assessmentcycleagaininanupdaterun.
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Task 3:
Carry out the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthereport
CostCenters: Actual/Plan/Varianceforthecurrentperiodandtheversion
0. Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
______________________________________________
234
©2009SAPAG.Allrightsreserved. 2009
第 251 页 / 共 543 页
AC405 Lesson: Cost Allocations
Solution 15: Cost Allocations
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
a) CostCenterAccounting: MasterData→CostElement→Individual
Processing → Create Secondary
b)
FieldNameorDataClass Values
Cost Element 6316##
Valid from 01/01currentfiscalyear
To 31.12.9999
Name Assess. Vehic-mat##
Costelementcategory 42
Save your data!
Usethereferencetocreatecostelement6317##(Assess. Vehic-Pers##).
Change the name and description.
Continued on next page
235
2009 © 2009 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Cost Element | 6316## |
| Valid from | 01/01currentfiscalyear |
| To | 31.12.9999 |
| Name | Assess. Vehic-mat## |
| Costelementcategory | 42 |
第 252 页 / 共 543 页
Unit4: Period-EndClosing AC405
2. In Customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
a) SAP ReferenceIMG →Controlling →Cost CenterAccounting →
Actual Postings→Period-EndClosing →Assessment→Maintain
AllocationStructure→Edit →NewEntries
b)
FieldNameorDataClass Cost Elements
Structure See exercise
Text Materialandpersonnelcosts
Save your data!
3. Define the assignment number01, with the text Motor Material Costs,
and the assignment number 02, with thetext Personnel Costs. For each
assignment, specifywhich primary costelementsaretobeallocatedwith
which assessment cost element.
a) SelectthestructureandswitchtotheDialogStructuretree.
Double-click Assignments.
Edit → New Entries
b)
assignment Text
01 Vehicle material costs
02 Personnel Costs
Save your data!
Continued on next page
236
©2009SAPAG.Allrightsreserved. 2009
| FieldNameorDataClass | Cost Elements |
|---|---|
| Structure | See exercise |
| Text | Materialandpersonnelcosts |
| assignment | Text |
|---|---|
| 01 | Vehicle material costs |
| 02 | Personnel Costs |
第 253 页 / 共 543 页
AC405 Lesson: Cost Allocations
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
a) SelectAssignment01,andswitchtotheDialogStructuretree.
Double-click Source.
b)
FieldNameorDataClass Cost Elements
Cost Element From 475000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New Entries
Assessmentcostelement 6316##
Save your data!
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
a) Return to assignments.
SelectAssignment02,andswitchtotheDialogStructuretree.
Double-click on Source.
FieldNameorDataClass Cost Elements
Cost Element From 420000
Cost Element To 431000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New Entries
Assessmentcostelement 6317##
Save your data!
Continued on next page
237
2009 © 2009 SAP AG. All rights reserved.
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost Element From | 475000 |
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost Element From | 420000 |
| Cost Element To | 431000 |
第 254 页 / 共 543 页
Unit4: Period-EndClosing AC405
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations → Assessment
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Deselect
Detail lists Select
Cycle Name A##
Assessment → Reverse
Enter
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
Continued on next page
238
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Deselect |
| Detail lists | Select |
| Cycle Name | A## |
第 255 页 / 共 543 页
AC405 Lesson: Cost Allocations
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
a) CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations→Assessment→Extras→Cycle→Change
b)
Fields Values
Cycle Name A##
Start Date 01/01currentfiscalyear
Execute icon
Goto → Segments Overview
Select the MOTO## segment.
Copy Segment icon. Enter
Insert Segment icon
Name MOTO##NEW
Select the new segment.
Double-clicktogotothesegmentmaintenance.
Placethecursorinthefieldfortheassessmentcostelement.
AssessmentCostElement Delete
AllocationStructure Enter chosen name
Save your data!
Goto → Segments Overview
Select the MOTO## segment.
Choose icon
SettheLockindicator(totherightofthesegmentnamerow).
Save your data!
Continued on next page
239
2009 © 2009 SAP AG. All rights reserved.
| Fields | Values |
|---|---|
| Cycle Name | A## |
| Start Date | 01/01currentfiscalyear |
| AssessmentCostElement | Delete |
|---|---|
| AllocationStructure | Enter chosen name |
第 256 页 / 共 543 页
Unit4: Period-EndClosing AC405
3. RuntheA##assessmentcycleagaininanupdaterun.
a) Gototheinitialscreenfortheactualassessment.
Goto → Back (twice).
b)
Field name Values
Period Current
Fiscal Year Current
Test Run Deselect
Detail lists Select
Cycle Name A##
Assessment → Execute.
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Answer: Goto → Sender
The sender list differentiates by sender cost element. In the allocation
structure, twoassessmentcostelementsweredefinedtocreditcostcenter
203##. Thesecostelementsarelistedseparatelyinthesenderlist.
Task 3:
Carry out the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthereport
CostCenters: Actual/Plan/Varianceforthecurrentperiodandtheversion
0. Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
Continued on next page
240
©2009SAPAG.Allrightsreserved. 2009
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Deselect |
| Detail lists | Select |
| Cycle Name | A## |
第 257 页 / 共 543 页
AC405 Lesson: Cost Allocations
______________________________________________
a) Cost Center Accounting: Information System → Reports for Cost
Center Accounting → Plan/Actual Comparisons → Cost Centers:
Actual/Plan/Variance
b)
Field name Values
Controlling Area 1000
Fiscal Year Current
From Period Current
To Period Current
Plan Version 0
Cost Center 302##
Program → Execute
c) The report containsinformation on thecontent of the debit for cost
center302##,withvehiclecoststhatareallocatedusingtwoassessment
cost elements, duetotheallocationstructure.
Costcenter 302##isdebitedbythevehiclescostcenter, mainlydue
to material costs.
241
2009 © 2009 SAP AG. All rights reserved.
| Field name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From Period | Current |
| To Period | Current |
| Plan Version | 0 |
| Cost Center | 302## |
第 258 页 / 共 543 页
Unit4: Period-EndClosing AC405
242
©2009SAPAG.Allrightsreserved. 2009
第 259 页 / 共 543 页
AC405 Lesson: Cost Allocations
Exercise 16: Indirect Activity Allocation
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Createa cycle for indirect activity allocation
Business Example
Duringtheperiod,additionalcostsarepostedtotherepaircostcenterforrepairs.
At the end of the period, additional repair costs should be assigned to the
productioncostcenteraccordingtotheiroriginwithintheperiod-endclosing.
Task: Optional
Therepaircoststhatwerepreviouslygroupedtogetherontherepaircostcenter
should be allocated to both production cost centers, chip and PC, by means
of indirect activity allocation. The output of each cost center (the number of
producedunits)shouldbethebasisoftheallocation.
1. Enterthesender activitiesintherepair cost center. Therepair cost center
“113##”provided“360hours”ofrepairserviceinthecurrentmonth.
2. Displaythereportforthecostcentergroup“TechnicalAreaS##”.
3. Defineacyclefortheindirectactivityallocation“ILV##.”Thecycleshould
be valid from the first day of the current fiscal year. Create a segment
“repair ## ” that allocates 100% of the posted actual quantities using
variable portions of the “actual statistical key figure”. The repair cost
center “113##”should be the sender of the allocation. The activity to be
allocated is the activity type repair “REP##”, receiver of the cost center
groupproduction“S20##”,thatcontainsbothcostcenterPCPC(211##)and
CHIP(212##). Usethestatisticalkeyfigure“producedunits(PROD##)”as
the receiver tracing factor.
Assign the cycle to acyclerun group Z##.
4. Executetheactualcyclefortheindirectactivityallocation.
5. Displaytheresultoftheallocationforthecostcentersinthetechnicalarea
(S##) in a suitable report.
243
2009 © 2009 SAP AG. All rights reserved.
第 260 页 / 共 543 页
Unit4: Period-EndClosing AC405
Solution 16: Indirect Activity Allocation
Task: Optional
Therepaircoststhatwerepreviouslygroupedtogetherontherepaircostcenter
should be allocated to both production cost centers, chip and PC, by means
of indirect activity allocation. The output of each cost center (the number of
producedunits)shouldbethebasisof theallocation.
1. Enterthesender activitiesintherepair costcenter. Therepair cost center
“113##”provided“360hours”ofrepairserviceinthecurrentmonth.
a) Enterthesenderactivities:CostCenterAccounting: ActualPostings→
Sender Activities → Enter
Document Date Today’s date
Posting Date Today’s date
Screen variant Cost Center
Sender cost center 113##
SAtyTyp(SenderAct.Type) REP##
Quantity 360
2. Displaythereportforthecostcentergroup“TechnicalAreaS##”.
a) Cost Center Accounting: Information System → Reports for Cost
Center Accounting → Plan/Actual Comparisons → Cost Centers:
Actual/Plan/Variance
Fiscal Year Current
Period From 1
Period To 12
Plan Version 0
Cost center group S##
3. Defineacyclefortheindirectactivityallocation“ILV##.”Thecycleshould
be valid from the first day of the current fiscal year. Create a segment
“repair ## ” that allocates 100% of the posted actual quantities using
variable portions of the “actual statistical key figure”. The repair cost
center “113##”should be thesender of the allocation. The activity to be
allocated is the activity type repair “REP##”, receiver of the cost center
Continued on next page
244
©2009SAPAG.Allrightsreserved. 2009
| Document Date | Today’s date |
|---|---|
| Posting Date | Today’s date |
| Screen variant | Cost Center |
| Sender cost center | 113## |
|---|---|
| SAtyTyp(SenderAct.Type) | REP## |
| Quantity | 360 |
| Fiscal Year | Current |
|---|---|
| Period From | 1 |
| Period To | 12 |
| Plan Version | 0 |
| Cost center group | S## |
第 261 页 / 共 543 页
AC405 Lesson: Cost Allocations
groupproduction“S20##”,thatcontainsbothcostcenterPCPC(211##)and
CHIP(212##). Usethestatisticalkeyfigure“producedunits(PROD##)”as
the receiver tracing factor.
Assign the cycle to acyclerun group Z##.
a) CreateacyclewiththenameILV##andtheshortdescription“repair
costs”.
CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations→Indirect Activity Allocation
Extras → Cycle → Create
Cycle Name ILV##
Start Date 1. Currentfiscalyearday
Confirm your entries with Enter and enter any text, for example “
repair costs ##”
Add a segmentEdit →Attach Segment
Segmentnamefield1 Rep ##
Segmentnamefield2 Repaircostsproduction##
Sender Values
Rule posted quantities
Share in % 100
Actual values Select
Receivertracingfactor
Receiver rule Variable portions
TypeofVariablePortions Stat. Key Figures
Select the Senders/receivers tab.
Sender
Cost Center 113##
Activity Type REP##
Receivers
Cost center group S20##
Select theReceiver Tracing Factor tab.
Continued on next page
245
2009 © 2009 SAP AG. All rights reserved.
| Cycle Name | ILV## |
|---|---|
| Start Date | 1. Currentfiscalyearday |
| Segmentnamefield1 | Rep ## |
|---|---|
| Segmentnamefield2 | Repaircostsproduction## |
| Sender Values | |
| Rule | posted quantities |
| Share in % | 100 |
| Actual values | Select |
| Receivertracingfactor | |
| Receiver rule | Variable portions |
| TypeofVariablePortions | Stat. Key Figures |
| Sender | |
|---|---|
| Cost Center | 113## |
| Activity Type | REP## |
| Receivers | |
| Cost center group | S20## |
第 262 页 / 共 543 页
Unit4: Period-EndClosing AC405
Fields Values
Statistical keyfigure PROD##
SavethecycleandassignittoacyclerungroupCycle→Savecycle→
NoCheckGoto→CycleRunGroup→CreateGroup
Fields Values
Run group field 1 Z##
Run group field 2 Parallelizationgrp ##
4. Executetheactualcyclefortheindirectactivityallocation.
a) Also execute thecycleILV##for theactualperiod, first inthetest
run with detail lists.
CostCenterAccounting: Period-EndClosing→SingleFunctions→
Allocations →Indirect Activity Allocation
Field name Values
Period Current
Fiscal Year Current
Test Run Select
Detail lists Select
Cycle Name ILV##
After you receive a successful result, execute the cycle once again
in the update run.
5. Displaytheresultoftheallocationforthecostcentersinthetechnicalarea
(S##) in a suitable report.
a) CallthereportCostCenters: Actual/Plan/Varianceforthecostcenter
groupS##andthecurrentperiodinthecurrentfiscalyear. CostCenter
Accounting: InformationSystem→ReportsforCostCenterAccounting
→Plan/ActualComparisons→CostCenters: Actual/Plan/Variance.
Fiscal Year Current
Period From Current
Period To Current
Plan Version 0
Cost center group S##
246
©2009SAPAG.Allrightsreserved. 2009
| Fields | Values |
|---|---|
| Statistical keyfigure | PROD## |
| Fields | Values |
|---|---|
| Run group field 1 | Z## |
| Run group field 2 | Parallelizationgrp ## |
| Field name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test Run | Select |
| Detail lists | Select |
| Cycle Name | ILV## |
| Fiscal Year | Current |
|---|---|
| Period From | Current |
| Period To | Current |
| Plan Version | 0 |
| Cost center group | S## |
第 263 页 / 共 543 页
AC405 Lesson: Cost Allocations
Lesson Summary
You should now be able to:
• Demonstrate periodic reposting, distribution, and assessment and the
differences between them
• Defineandexecutedistributionsandassessmentsusingthecyclesegment
method.
• Name other cost allocation functions
247
2009 © 2009 SAP AG. All rights reserved.
第 264 页 / 共 543 页
Unit4: Period-EndClosing AC405
Lesson: Period Lock
Lesson Overview
Usetheperiodlocktolockplanandactualbusinesstransactionsforacombination
of controlling area, fiscal year and version.
Lesson Objectives
After completingthislesson, you will beable to:
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
Business Example
Afterendingtheperiod-endclosing,theperiodforpostingsshouldbelockedso
thattheperiod-endclosingcannolongerbeinfluenced.
Period Lock
Figure 75: Period Lock
Usetheperiodlocktolockplanandactualbusinesstransactionsforacombination
of controlling area, fiscal year, and version.
Youcanselectindividualbusinesstransactionsforlockingfromalistofallthe
actual and plan business transactions.
Itisalsopossibletolockindividualbusinesstransactionsforalltheperiodsofthe
fiscalyear,orallbusinesstransactionsforindividualperiods.
248
©2009SAPAG.Allrightsreserved. 2009
第 265 页 / 共 543 页
AC405 Lesson: Period Lock
Lesson Summary
You should now be able to:
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
249
2009 © 2009 SAP AG. All rights reserved.
第 266 页 / 共 543 页
UnitSummary AC405
Unit Summary
You should now be able to:
• Explain accrual calculation
• Describehow tocreatean overhead structure
• Enter statistical key figures
• Defineandexecutetheperiodicrepostingusingthecyclesegmentmethod.
• Demonstrate periodic reposting, distribution, and assessment and the
differences between them
• Defineandexecutedistributionsandassessmentsusingthecyclesegment
method.
• Name other cost allocation functions
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
250
©2009SAPAG.Allrightsreserved. 2009
第 267 页 / 共 543 页
AC405 Test Your Knowledge
Test Your Knowledge
1. Tocalculate costs,usethepercentagemethod.
Fillintheblankstocompletethesentence.
2. Youneedaprimarycostelementofcostelementcategory toprocessthe
accrual calculation.
Fillintheblankstocompletethesentence.
3. If youcannot finda cost element that you can useto define the overhead
rates,youcanalsousethe methodtocalculate
the accrual
Fillintheblankstocompletethesentence.
4. Statistical key figures
Choosethecorrectanswer(s).
□ A Thosedefinedasfixedvaluesareupdatedfromthecorresponding
postingperiodonwards, inallof thefollowingpostingperiods
of the fiscal year.
□ B Canbeusedasabasisforperiodicalallocations.
□ C Mustbedefinedwithintheframeworkoftheactivityallocation.
□ D Cannotbechangedoncetheyhavebeenentered.
5. Theperiodicrepostingcanonlyrepostprimarycosts.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
6. Asecondaryallocationcosr elementisrequired for carryingout periodic
reposting.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
7. Cycles that are assigned to the same cycle run groups can run parallel to
one another.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
251
2009 © 2009 SAP AG. All rights reserved.
第 268 页 / 共 543 页
TestYourKnowledge AC405
8. Whatadvantagesdoesthedistributionhavecomparedtoperiodicreposting?
9. Apportionment
Choosethecorrectanswer(s).
□ A Cantransfer primaryand secondarycosts.
□ B Requiresaprimarycostelementoftype42toclearthecosts.
□ C Requiresasecondarycostelementoftype43forclearing.
□ D Canbereversedandrepeatedasoftenasrequired.
□ E Canonlybeusedinconjunctionwiththeallocationstructure.
10. Youcanselectindividualbusinesstransactionsforlockingfromalistofthe
actual and plan business transactions.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
252
©2009SAPAG.Allrightsreserved. 2009
第 269 页 / 共 543 页
AC405 Test Your Knowledge
Answers
1. Tocalculateaccruedcosts,usethepercentagemethod.
Answer: accrued
2. Youneedaprimarycostelementofcostelementcategory3toprocessthe
accrual calculation.
Answer: 3
3. If youcannot finda cost element that you can useto define the overhead
rates,youcanalsousetheTarget=Actualmethodtocalculatetheaccrual
Answer: Target=Actual
4. Statistical key figures
Answer: A, B
Fixed values are entered once and then updated in the following posting
periods. Statistical key figures can be used as a basis for periodical
allocations. Theyarenotrequiredfortheactivityallocation. Therecorded
data can be changed at any time.
5. Theperiodicrepostingcanonlyrepostprimarycosts.
Answer: True
Primary postings are allocated to the receiver objects with the aid of the
periodicreposting. Secondarycostsarenotallocatedfurther.
6. Asecondaryallocationcosr elementisrequired for carryingout periodic
reposting.
Answer: False
Duringperiodicreposting,theoriginalcostelementremainsthesame.
253
2009 © 2009 SAP AG. All rights reserved.
第 270 页 / 共 543 页
TestYourKnowledge AC405
7. Cycles that areassigned to the same cycle run groups can run parallel to
one another.
Answer: False
Cycles that are assigned to different cycle run groups can run parallel to
one another.
8. Whatadvantagesdoesthedistributionhavecomparedtoperiodicreposting?
Answer: Incomparisontoperiodicrepostinginthetotalsrecord,distribution
representsacompletecreditrecord. Apartfromthat,youcanseeinthetotals
recordto which partner theclearing wasmade.
9. Apportionment
Answer: A, D
Theassessmentcanfurtherallocateprimaryandsecondarycostsbyusing
a secondary cost element of type 42. It can be reversed and repeated as
often as required.
The allocation structure canbe used to receivea more transparent image
of all costs to be assessed.
10. Youcanselectindividualbusinesstransactionsforlockingfromalistofthe
actual and plan business transactions.
Answer: True
Bothindividualtransactionsandcompleteperiodscanbelocked.
254
©2009SAPAG.Allrightsreserved. 2009