AC405 Lesson: Planning Configuration
Task 2:
Carry out the following task:
1. AssignyourplanninglayouttoplannerprofileZ-##.
a) SAP ReferenceIMG → Controlling → Cost CenterAccounting→
Planning→ManualPlanning→DefineUser-DefinedPlannerProfiles
b) Select Z-##.
Inthedialogstructure,gotoGeneralControlling.
SelectCost Centers: Activities/prices.
Inthedialogstructure,gotoLayoutsControlling.
Choose New Entries.
Add your PL## layout.
Save the data.
385
2009 © 2009 SAP AG. All rights reserved.
第 412 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Lesson Summary
You should now be able to:
• Describethepurposeofcostcenterplanningandthefunctionofversions
• Explaintheuseofplanninglayoutsandplannerprofiles
• Set up aplanning layout and aplanner profile
386
©2009SAPAG.Allrightsreserved. 2009
第 413 页 / 共 543 页
AC405 Lesson: Planning Process
Lesson: Planning Process
Lesson Overview
Thislessonpresentsatypicalplanningsequencewithitsindividualelements.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Execute a manual planning process.
• Listtheoptionsavailableunderautomaticplanning
• Describe final planning activities
Business Example
The project team has decided to plan the company data in the same way as in
theprocesssuggestedbySAP.Firstly,youshouldrunthroughtheentireprocess
in a test.
Typical Sequence of Planning Activities
Figure 124: Typical Sequence of Planning Activities
Planning is managed differently in almost every organization. Theindustry,
organizationstructures,andmanagementareasareallfactorsthataffectplanning.
387
2009 © 2009 SAP AG. All rights reserved.
第 414 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Thefollowingcouldbea typicalplanningsequence.
• Youplanstatisticalkeyfiguresthatareusedastracingfactorsforperiodic
reposting, distribution, or assessment.
• Thenyouplanactivityoutput,aswellasthepricesfortheseactivitytypes
on each cost center. You plan the statistical key figures and the activity
outputbeforethecostelementplanning,asthesetracingfactorsdetermine
the entire cost volume.
• Nowyoucan plantheprimarycosts. Youcanusea numberof different
proceduresforthis. Youcan,forexample,directlyenterthecostsorcalculate
themfromtheresourcequantitiesmultipliedbytheresourcepriceorderive
thembyusingstatisticalkeyfigures(dependencyplanning).
• Inadditiontomanualplanning,youcanplanprimarycostsautomatically
basedonpredefinedrules(planaccrual calculation, plandistribution, and
periodicrepostingintheplan). Youcanalsoplansecondarycostelements
automatically (plan assessment).
• Aftercompletingplanning,youneedtolocktheversion,sothatunauthorized
users can no longer make any changes.
Planning Statistical Key Figures
Figure 125: Planning Statistical Key Figures
You can plan statistical key figures in order to:
• Generateorganizationalkeyfiguresoncostcenters.
• Provide receiverbases for internal allocations.
388
©2009SAPAG.Allrightsreserved. 2009
第 415 页 / 共 543 页
AC405 Lesson: Planning Process
SAPbasicallyprovidestwooptionsforenteringplandata:
• If you use free entry, you have the option of planning all characteristic
valuesspecifiedinthefieldsoftheinitialscreen. Onlycharacteristicvalues
thatalreadyhaveplanvaluesaredisplayed. Characteristicvaluesthatwere
notyetplannedonthecostcenterhavetobeenteredintheplanningscreen.
• Ifyouuseaform-basedentry,allcharacteristicvaluesspecifiedinthelines
of theinitial screenaredisplayedinthelinesoftheplanningscreen. You
only have to enter the plan values.
Distribution keys
Figure 126: Distribution Keys
TheSAPsysteminterpretsthevaluesenteredontheoverviewscreenasthetotal
valuefortheperiodenteredontheinitialscreenforplanning. Itusesadistribution
keyfor period-baseddistribution of thetotalsvalues.
ThestandardSAPsystemcontainsdistributionkeysthatcanbeusedtodistribute
valuesbydifferent criteria. It isnot possibletochange thedefaultdistribution
keys.
Examples: Ifyouselectstandarddistributionkey1,thecorrespondingvalueis
distributedevenlytotheperiods. Distributionkey7meansthattheenteredvalue
isdistributedtotheperiodsusingthenumberofcalendardays.
Inadditiontothestandarddistributionkeys, youcandefineasmanycustomer
distributionkeysasrequired. Forexample,youcancreateadistributionkeyfor
seasonal fluctuations, or onefor shift schedules.
389
2009 © 2009 SAP AG. All rights reserved.
第 416 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Plan Activity Output and Prices
Figure 127: Plan Activity Output and Prices
Activitytypesareallocatedusinganactivityoutputofacost center, whichis
storedinthemasterdatafortheactivitytypeasadefault. Theycanbeclearedto
cost centers, internal orders, processesandsoonto recordtheir useof internal
services.
Activity types are allocated to asecondary cost element, which isstored asa
default value in the activity type master data.
Theactivitypriceisdeterminedper“costcenter/activitytype”eithermanuallyor
in automatic activity price calculation:
• Youcancreatemanualpricesforyourcombinationof“costcenter/activity
type”,ifyouwanttheactivitytohaveafixedvaluewithintheenterpriseand
not to be dependent on other internal activities. Manual prices are often
usedifthecostsituationonthecostcenterdoesnotinfluencetheprice,but
rather, thepricesofexternalprovidersinfluencetheprice, oryouwant to
deliberately control internal resources.
• During automatic price calculation, all primary and secondary costs,
which are plannedfor the respective cost centers as activity-independent
or activity-dependent, areincludedin theprice. If morethanoneactivity
type is planned on a cost center, you first need to distribute (split) the
activity-independentcoststhatareonthecostcentertotheseactivitytypes
beforethesystemcandeterminethepricesbydividingthecostcentercosts
bytheplanactivityortheplancapacity. (ContentofAC412)
390
©2009SAPAG.Allrightsreserved. 2009
第 417 页 / 共 543 页
AC405 Lesson: Planning Process
Cost element planning
Figure 128: Cost Element Planning
The activity-independent primary costs, which are divided by cost element,
are planned on cost centers. When you plan primary costs that are
activity-independent, youcanonlyplanthefixedcosts.
You plan single cost elements, which you later compare with the actual costs.
Thisenablesyouto makeadifferentiated plan/actual comparison at theend
of the period.
391
2009 © 2009 SAP AG. All rights reserved.
第 418 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Resource Planning
Figure 129: Resource Planning
GoodsandservicesthatareprocuredexternallyarecalledresourcesintheSAP
system.
Resource planning supports manual cost element planning of primary costs
andrevenuesforcostcenters,internalorders,andWBSelements. Youplanthe
amountsofresourceconsumptionthataretobeevaluatedbytheSAPsystem
during planning. (Layout 1-1R1)
Byassigningseveralresourcestoonecostelement,youcanreduceyourchart
ofaccountswithoutlosingimportantdetailsforcostanalysis.
Example: Planningthecostsof external training.
Definetheresourcemaster datafor SAP coursesand businesscourses. Assign
prices to the resources, taking into account that the prices of the business
administrationcourseswillbehigheraftertheeleventhperiod. Enterthenumber
ofcoursedaysyouwouldliketobookyouremployeesoninresourceplanning.
TheSAPsystemthenautomaticallycalculatesthetrainingcostsfortheplanning
periods.
You can choosebetweenactivity-dependentandactivity-independentplanning
of resources.
Youcanalsostoredifferentpricesforeachperiodwithinaseparatepricefileand,
ifnecessary,youcanassignthemdifferentdependencies. Ifyoucreateresources
withreferencetoamaterial, the resourcesarecalculatedbased on the material
price stored in the material master.
392
©2009SAPAG.Allrightsreserved. 2009
第 419 页 / 共 543 页
AC405 Lesson: Planning Process
Ifyouupdateresourceprices,theSAPsystemautomaticallyupdatesyourplanned
costs.
Youcanalsocopyyourresourceplanningtoanotherversionorperiod. Inthis
case,theSAPsystemcopiesonlythequantitiesthathavebeenusedandevaluates
thematthesametime. Ifthepriceforaresourceis2%higherintheperiodinto
whichitwascopied,thenthecostswillalsobe2%higher.
Dependency Planning
Figure 130: Dependency Planning
In dependency planning, you can plan both activity-dependent and
activity-independentprimarycostsbasedonvaluesandquantities. Thesystem
calculatestheprimarycostsusingadependencythatcancontainstatisticalkey
figures or activity types.
If you are using value-based dependency planning, you plan costs for each
unit of a statistical key figure or activitytype, for example, EUR 100of office
materialsforeachemployeeorEUR3,000oftrainingcostsforeachemployee.
You plan a cost element. Value-based dependency planning is normally used
in administration.
In quantity-based dependency planning, you plan the amounts of resources
foreachunitofastatisticalkeyfigureoractivitytype,forexample,theamount
of course days for each employee or the amount of screws for each car. The
totalplannedcostsarecalculatedbymultiplying the amountper statisticalkey
figureoractivitytypebytheamountofthesourceobject,thatis,thenumberof
employeesorcarsbytheresourceprice. Incontrasttovalue-baseddependency
393
2009 © 2009 SAP AG. All rights reserved.
第 420 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
planning,youcanplantheamountsofseveralresources,therebyprovidingmore
detailedcostelementplanning. Quantity-baseddependencyplanningisnormally
used in production.
TheSAPsystemcalculatestheplannedcostsforeachperiod. Ifyouhavedefined
differentdependencyprices,quantities,orresourceprices,thesystemwillusea
meanvalueintheplanningoverviewscreen. Youcanviewtheexactvaluesinthe
period planning screen.
Ifthepricesorquantitieschange,thesystemwillrevaluateplanning.
Quantity-baseddependencyplanningdiffersfromresourceplanninginthatit
does not just evaluate the amount of resources based on the resource price; it
also takes into account the dependencyquantity and a statistical key figure or
activity type.
SAP provides the standard planner profile SAP R&R with planning layouts
for dependency planning(value-based: Layout 1-1R2, quantity-based: Layout
1-1R3).
Automatic Planning
Figure 131: Formula planning
You can frequently determine cost center plan values using mathematical
dependencies. Formulaplanningallowsyoutousecalculationdependenciesto
planyourcostcentercosts. Youcandefinethesedependenciesasformulasina
template,whichisindependentofthecostcenter. Asaresult,costcenterswitha
similar structure can use the same formulas.
394
©2009SAPAG.Allrightsreserved. 2009
第 421 页 / 共 543 页
AC405 Lesson: Planning Process
Formula planning supports manual planning. It is particularly suitable for
planningcostelementswhosevaluesaredeterminedonmanycostcentersusing
similar logic.
First of all, you define formulas in atemplate. You then use these formulasto
dynamically calculate thecostsat thetime of evaluation. Use any plan values
such as costs, activity quantities, and statistical key figures as parameters for
your formulas. If required, you can also include other SAP sources, or even
external sources. You can also define templates for activity-dependent and/or
activity-independent cost planning.
Assignthetemplatetothemasterdataoftherelevantcostcenters. Toreducethe
timeandeffortrequiredforplanning,useonetemplateforseveralcostcenters.
Executeformulaplanning. Ifnecessary, correcttheresultsinmanualplanning.
Theplanningvaluesthatyoucalculatedusingformulaplanningare,however,not
visible in the planning layout of the manual planning. This is because no data
is selected from the database.
Unlike resource and dependency planning, formula planning is an automatic
method in plan value determination. Since formula planning can be run
simultaneously for more than one cost center, and depending on the template
definition, for many planning objects (cost elements, statistical key figures,
resourcesandsoon),youcansignificantlyincreasethespeedatwhichyouplan.
Figure 132: Formula Planning - Template Definition
Theplanningtemplatesarenotdependentoncostcenters,whichmeansyoucan
usethesametemplateforseveraldifferentcostcenters. Adeterminationstrategy
isusedtodynamicallyspecifywhichplanningtemplateisusedwhenplandata
is identified.
395
2009 © 2009 SAP AG. All rights reserved.
第 422 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
You can define formulas to dynamically calculate the costs at the time of
evaluation.
You canalso define variablequantities. You candefine formulasthat theSAP
system will use to calculatethequantities acost center usesfor theevaluation
period.
Youcanactivateordeactivateindividuallines(items)oftheplanningtemplate. If
youwouldliketoplanindividualcostelementsonlyonspecificcostcenters,you
canusemethodstoactivateordeactivatethem. Onlytheactiveitemsaretaken
intoaccountwhenyou carryout formulaplanning.
Example:Youwouldliketodeterminetheplannedcostsforofficematerialsby
using formula planning.
YouassumethateachemployeewilluseofficematerialstothevalueofEUR10
perperiod. Inyourplanningtemplate,enteralineforcostelement476000and
useaformulaforit,whichmultipliesthenumberofemployeesonthecostcenter
(statisticalkeyfigure)by10. Becausethiscalculationshouldonlybeappliedto
theadministrationcostcenterandnotallcostcenters,youmustdefineacondition
for it. If youwouldliketoplanEUR5ofofficematerialsper employeeforall
othercostcentersinyourorganization,youcandosointhesametemplate. To
dothis,copythefirstline, changethefactorto5intheformulaandchangethe
"equalto"signintheactivationconditionto“notequalto”. Youcanthenassign
thistemplateto all cost centersinyour organizationandonly the linesthatare
active are executed for each cost center.
Figure133: AccrualCalculation inPlan: PercentageMethod
396
©2009SAPAG.Allrightsreserved. 2009
第 423 页 / 共 543 页
AC405 Lesson: Planning Process
Tocalculateaccruedcosts,usethepercentagemethod. Thecalculationisbasedon
apercentageoverhead,whichisrelatedtoacostelementoracostelementgroup.
Thepercentagemethod,forexample,isusefulforaccrualcalculationsforlabor
costsrelevant tosalaries, suchasvacationbonusesorpremiums. Ifyouwould
liketousetheactualpercentagemethodandplaninyouenterprise,youshould
also usethis procedure to plan the accrual. This ensuresthat thecost analysis
providesuseful information and conclusions.
Whenanaccrualiscalculated,thesystemdebitsthecostcenterswiththeaccrual
cost amounts. At the same time, a user-defined accrual object (cost center, or
internalorder)iscredited. Thenon-accruedtotalvaluesareplannedontheaccrual
object.
Youcreateaprimaryaccrualcostelement(costelementcategory=3)toprocess
the accrual calculation.
Figure 134: Periodic Reposting in Plan
Periodic reposting is used as a posting aid.
Primarypostings(suchas,telephonecosts)areplannedonanallocationobject
(costcenter,overheadcostorder,businessprocess,WBSelement,orcostobject),
andduringperiodicrepostingtothecorrespondingcontrollingobjects, wherea
user-defined key is used.
Thereceiversofaperiodicrepostingcanbecostcenters,WBSelements,internal
orders, or cost objects. You can restrict the number of receiver categories in
Customizing. Youcan only repost primary costs.
397
2009 © 2009 SAP AG. All rights reserved.
第 424 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Youcanonlyrepostprimarycosts. Duringthisprocess,theoriginalcostelement
remains the same.
Line items are posted for the sender as well as for the receiver, enabling the
allocationtoberecordedindetail. TheSAPsystemdoesnotsavetheinformation
fromtheclearingcostcenterintotalsrecordsduringaperiodicreposting. This
enablestheSAPsystemtoconservememorywhenstoringthedatarecords.
Periodicrepostingscanbereversedandrepeatedasoftenasrequired.
YouusetheCycle-Segmentmethodtodefinesender-receiverrelationships.
Figure 135: Plan Distribution
ThedistributionwasdesignedtotransferprimarycostsfromaSenderCostCenter
to receiving Management Accounting objects. Only cost centers or business
processescanbeusedasasenderforthedistribution.
Primary postings (such as, energy costs) are planned on a cost center, and
allocatedbymeansoftheuser-definedkeyduringplandistribution.
Adistribution receivercanbeacost center, WBS element, internalorder, cost
object,orabusinessprocess. Youcanrestrictthenumberofreceivercategoriesin
Customizing.
You can only distribute primary costs. During this process, the original cost
element remains the same.
Line items are posted for the sender as well as for the receiver, enabling the
allocation to be recorded in detail.
You canreverse distributionsasoftenasrequired.
398
©2009SAPAG.Allrightsreserved. 2009
第 425 页 / 共 543 页
AC405 Lesson: Planning Process
YouusetheCycle-Segmentmethodtodefinesender-receiverrelationships.
Figure 136: Plan assessment
Assessment wascreatedto transferprimaryandsecondarycostsfrom asender
costcentertoreceivingManagementAccountingobjects. Duringassessment,cost
centersorbusinessprocessescanbeusedas senders.
Anassessmentreceivercanbeacostcenter,WBSelement,internalorder,cost
object,orabusinessprocess. Youcanrestrictthenumberofreceivercategories
inCustomizing. Youcan onlyrepost primary costs.
Primaryandsecondarypostingsareallocatedattheendoftheperiodbymeans
of the user-defined key.
Duringassessment, theoriginal costelementsaresummarizedintoassessment
costelements(secondarycostelementcategory=42). Asthesystemwritesfewer
totalsrecords, the assessment hasabetter performancethanperiodic reposting
and distribution.
Line items are posted for the sender as well as for the receiver, enabling the
allocationtoberecordedindetail. Thesystemdoesnotdisplaytheoriginalcost
elementsonthereceivers. Therefore, assessmentisusefulifthecostdrilldown
for the receiver is not important, for example, as in the case of the allocation
for the "cafeteria" cost center.
Similar to distribution, the partner is updated in the totals record during
distribution.
Youcanreverseassessmentsasoften asrequired.
399
2009 © 2009 SAP AG. All rights reserved.
第 426 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
YouusetheCycle-Segmentmethodtodefinesender-receiverrelationships.
Forecast AC412: Plan Activity Price Calculation
Figure137: ForecastAC412: PlanActivityPriceCalculation
Evenifyouhaveplannedpricesmanually,youmaywanttofindouttowhatextent
theyreflect the pricesthesystem calculates based on thecost center'splanned
activity. Youcanperformapricecalculationforthispurpose. However,toget
reliable results, you do have think to about the procedure carefully and make
certainsettingsbeforehand,whichwewillgointoherebriefly.
Plancostsplittingassignstheactivity-independentplancostsofacostcenterto
theindividualactivitytypes. Theactivity-independent costsneedtobesplitup
amongtheactivitytypesbeforethepriceoftheactivityunitscanbecalculated.
Thesimplestmethodofsplittingplannedcostsistouseanequivalencenumber.
If you want to use other allocation bases, you can define a splitting structure
containing different splitting rules.
In the price calculation, plan prices are determined automatically by the SAP
system. Activity prices for plan activity types can be calculated for each cost
center and activity type. The SAP system calculates the price by dividing the
planned costsbytheplannedactivityforexample.
Activity-related planning and price calculation is discussed in more detail in
CourseAC412CostCenterAccounting: ExtendedFunctions.
400
©2009SAPAG.Allrightsreserved. 2009
第 427 页 / 共 543 页
AC405 Lesson: Planning Process
Exercise 25: Planning Process
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Plan statistical key figures.
• Plan activity types.
• Planprimarycostsusingcostelement planning.
• Create master data for resources.
• Plan primarycostsusing resource planning.
• Planprimarycostsusing dependencyplanning.
Business Example
TheexecutiveboardhasdecidedtoimplementtheSAPsystemplanningfunctions.
Since you previously used a non-SAP system for your planning, you need to
transfertheplanningdataforthecurrentfiscalyeartotheSAPsystem. Youneed
toentertheannualplanvaluessothatyoucanproduceactual/plancomparison
reports for the whole year.
Task 1:
Carry out the following task:
1. Toavoiderrorsandtosimplifydataentry,youshoulddefinethebasicdata
for planning in your user settings. You want to create planvalues for the
entire current fiscal year in version 0.
Hint: Alltheplandataforthisunitwillbeforperiods1to12ofthe
currentfiscalyear. Thismeansyouhavesomeactualdatathathas
alreadybeenpostedwithwhichtocompareyourplandata.
Task 2:
Firstofall,planthestatisticalkeyfigures. Thesefiguresserveasareferencefor
costelementplanning(forexample,doITcostsvaryaccordingtothenumberof
PCs) and are the basis for plan allocations.
1. UsetheSAPEASYplannerprofileforplanningthestatisticalkeyfigures,or,
ifyoudidtheoptionalplanninglayoutexercises,useplannerprofileZ-##.
2. Use planning layout1-362 for central planning. In this layout, you plan
one statistical key figure on several cost centers. Plan the statistical key
figureTELE##tothecostcentersbelongingtocostcentergroupB##. Use
form-based entry.
Continued on next page
401
2009 © 2009 SAP AG. All rights reserved.
第 428 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Enter the following plan values.
Cost center 201## 202## 203## 301## 302##
TELE## 120.000 120.000 --- 420.000 180.000
Save your entriesbut do not exit the layout.
3. Plan the statistical key figure PC## to the cost centers belonging to cost
centergroupB##. Useform-basedentry. Enterthefollowingplanvalues.
Cost Center 201## 202## 203## 301## 302##
PC## 2 5 --- 18 12
Save your entriesbut do not exit the layout.
4. Planthestatisticalkey figureKM## tothecost centersbelonging tocost
center groupB30##. Useform-basedentry. Enter447,387.26miforcost
center 301# (FI/CO consultant) and 223,693.63 mi for cost center 302#
(LO consultant).
Save your entries.
Task 3:
Plantheactivitytypesforcostcenter301##(FI/COconsultant)and302##(LO
consultant). Asyoualreadyenteredthepriceswhenyoumaintainedthemaster
data, you only need to plantheactivityquantity.
Hint: Ifyoudidnotworkthroughtheexerciseonplanninglayouts,orif
foranyreasonyoucannotaccessyourownplanninglayoutforactivity
typeplanning,useplannerprofileSAPALLforthisexercise.
1. PlantheactivityquantitiesofactivitytypeJ##inyourplanninglayoutPL##
in planner profile Z-## (or 1-202 in planner profile SAPALL) for the
consultingcostcenters(cost center groupB30##).
Choose free entry.
2. Plan12,000juniorconsultanthoursforcostcenter301#(FI/COconsultant)
and9,600forcostcenter302#(LOconsultant). Theplanactivityistobe
distributedevenlyacrossallpostingperiods. Checkthesettingontheperiod
screen. Save your plan.
3. Plan activity type S## for the consulting cost centers (cost center group
B30##). Choose free entry.
Continued on next page
402
©2009SAPAG.Allrightsreserved. 2009
| Cost center | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| TELE## | 120.000 | 120.000 | --- | 420.000 | 180.000 |
| Cost Center | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| PC## | 2 | 5 | --- | 18 | 12 |
第 429 页 / 共 543 页
AC405 Lesson: Planning Process
4. Plan12,000seniorconsultanthoursforcostcenter301#(FI/COconsultant)
and9,600 for cost center302#(LOconsultant). Theplan activity isto be
distributed evenly acrossall postingperiods.
Save your plan.
5. CalltheCostCenters: PlanningOverviewforperiods1through12ofthe
currentfiscalyearandcostcenter301##(FI/COConsulting).
Check your entries.
Task 4:
Plan the costs on the cost centers.
Hint: Ifyoudidnotworkthroughtheexerciseonplanninglayouts,orif
foranyreasonyoucannotaccessyourownplanninglayoutforactivity
typeplanning,useplannerprofileSAPEASYforthisexercise.
1. Salarycosts(costelement430000)areplannedcentrallybytheheadofthe
consultingdepartmentforallcostcenters(B##). Themanagerpresentsyou
with a list of the corresponding plan data and asks you to enter it in the
system. Choose planning layout1-162 for this (Cost element planning:
central, simple). Thevaluestobeenteredareannualvalues, whichareto
beevenly distributed acrossthepostingperiods.
Cost center Planned Costs
201## 60.000
202## 252.000
203## 192.000
301## 2.532.000
302## 1.560.000
2. Theothercosts(costelements473120through477000)incurredbythecost
centers(cost center groupB##) are planned by the cost center managers
themselves,eachmanagerbeingresponsibleforthesefigures. Thefollowing
graphicliststheplandataoftheindividualcostcenters. Chooseplanning
layout 1-161 (cost element planning: simple layout) in planner profile
SAPEASY.
Thevaluestobeenteredareannualvalues,whicharetobeevenlydistributed
acrossthepostingperiods. Useform-basedentry.
Continued on next page
403
2009 © 2009 SAP AG. All rights reserved.
| Cost center | Planned Costs |
|---|---|
| 201## | 60.000 |
| 202## | 252.000 |
| 203## | 192.000 |
| 301## | 2.532.000 |
| 302## | 1.560.000 |
第 430 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Cost Center Cost element Planned Costs
101## 473120–Telephonecosts 84.000
201## 476000 –Officesupplies 24.000
202## 476100 – IT supplies 98.400
203## 475000 – Vehicle costs 1.320.000
3. UsereportCostCenters: Actual/Plan/Variancetochecktheresultsofmanual
planningfortheconsultingCostCenters: Actual/Plan/Variance. Callupthe
reportforthecostcentergroupB##forthecurrentperiodonly,sothatyou
cancomparetheplandatawiththeactualdata. Usethevariantfunctionto
review some of your cost center plans.
Task 5: Optional
Inyour plan, create acycle andasegment to allocate the planned costsfor the
“telephone” cost center to other cost centers.
1. CreateaplancyclePRPC##forperiodicrepostingfortheTelephonecost
center. UsetheactualcyclePU##asthesourcetocopyfrom. Startthecycle
on thefirst day of thecurrent fiscal year.
2. In the first segment, change the variable portions type field to Plan
statisticalkeyfigures. Runaformalcheckonthecycleandthesegment.
Save your entries.
Hint: NotethattheSendervalueshaveautomatically beenset to
planned values (Plnd. Vals).
Task 6: Optional
Executetheperiodicrepostingintheplanforthe“Telephone”costcenter.
1. Intheplan,runtheperiodicrepostingforyourPRPC##cycleforperiods1
through12ofthecurrentfiscalyear. ChooseTestRunandDetailLists.
2. Execute the periodic reposting as an Update Run so that the results are
actually posted.
Task 7: Optional
Check the results of the automatic planning.
1. Callthecostcenters: Actual/PlanVariancereportforthecurrentperiod,
planversion0, andconsultingcostcentergroupB##.
Continued on next page
404
©2009SAPAG.Allrightsreserved. 2009
| Cost Center | Cost element | Planned Costs |
|---|---|---|
| 101## | 473120–Telephonecosts | 84.000 |
| 201## | 476000 –Officesupplies | 24.000 |
| 202## | 476100 – IT supplies | 98.400 |
| 203## | 475000 – Vehicle costs | 1.320.000 |
第 431 页 / 共 543 页
AC405 Lesson: Planning Process
2. Usethevariationfunctiontocheckthecostcenterplanningforcostcenter
101##(Telephone)andforoneofthereceivercostcenters.
Task 8: Optional
Createanassessmentcyclewithwhichtoallocatethecostsofthe“Organization”,
“IT Services”, and “Motor Pool”cost centers.
1. CreateaplancyclePA##for theplanassessmentoftheabove-mentioned
costcenters. UsetheactualassessmentcycleASSE## asasourcetocopy
from. Startthecycleonthefirstdayofthecurrentfiscalyear.
2. Displaythesegmentsinthesegmentoverviewscreen.
3. Becausethe“ITServices”and“MotorPool”costcentersusethePortionsof
actualstatisticalkeyfiguresoptionasabasisforallocationincycleA##and
thisfigureisvariable,youneedtochangethesettingsintheplanassessment
cycle. InthesegmentIT-Serv##, changetheVariableportionstypefield
to Plan statistical figures.
4. Change the Variable portion type field to Planned statistical key figures
in the MOTO## segment (if you did the optional exercise to create an
allocationstructure, usesegmentMOTO##new).
Save the data.
Task 9: Optional
Execute your plan assessment.
1. RuntheplanassessmentintheTestrunforyourcycle(PA##)forperiods1
through12ofthecurrentfiscalyear. ChooseDetailList.
2. NowruntheassessmentasanUpdateRunsothattheallocationsareactually
posted.
Task 10: Optional
Check the resultsof the automatic planning.
1. Callthecostcenters: Actual/PlanVariancereportforthecurrentperiod,
planversion0,andconsultingcostcentergroupB##.
2. Checkwhethercostcenters201##(Organization),202##(ITServices),and
203## (Motor Pool) havebeen creditedinfull.
Continued on next page
405
2009 © 2009 SAP AG. All rights reserved.
第 432 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
3. Whataretheactualbalances(over-absorptionor under-absorption) of the
consulting cost centers?
301##(FI/COconsultant)
302## (LOconsultant)
Whatconclusionscanbedrawnfromtheresultswithregardtotheactivity
type price?
4. The actual credits to both consulting cost centers are lower than the plan
credits.
What is the reason for this?
5. Theactualcostsforcostcenter301##(FI/COconsultant)arelowerthanthe
plancosts,whereastheactualcostsforcostcenter302##(LOconsultant)
are greater than the plan costs.
Analyzethereasonsfor thisforbothcostcenters.
301## (FI/CO consultant)
302## (LO consultant)
406
©2009SAPAG.Allrightsreserved. 2009
第 433 页 / 共 543 页
AC405 Lesson: Planning Process
Solution 25: Planning Process
Task 1:
Carry out the following task:
1. Toavoiderrorsandtosimplifydataentry,youshoulddefinethebasicdata
for planning in your user settings. You want to create planvalues for the
entire current fiscal year in version 0.
Hint: Alltheplandataforthisunitwillbeforperiods1to12ofthe
currentfiscalyear. Thismeansyouhavesomeactualdatathathas
alreadybeenpostedwithwhichtocompareyourplandata.
a) CostCenterAccounting:Informationsystem→Usersettings
b) Choose the Planning period tab page.
FieldNameorDataClass Values
Fiscal year Current
Period from 1 to 12
Save your data.
Task 2:
Firstofall,planthestatisticalkeyfigures. Thesefiguresserveasareferencefor
costelementplanning(forexample,doITcostsvaryaccordingtothenumberof
PCs) and are the basis for plan allocations.
1. UsetheSAPEASYplannerprofileforplanningthestatisticalkeyfigures,or,
ifyoudidtheoptionalplanninglayoutexercises,useplannerprofileZ-##.
a) CostCenterAccounting:Planning→SetPlannerProfile
b)
Planner profile SAPEASYor Z-##
Enter
2. Use planning layout1-362 for central planning. In this layout, you plan
one statistical key figure on several cost centers. Plan the statistical key
figureTELE##tothecostcentersbelongingtocostcentergroupB##. Use
form-based entry.
Continued on next page
407
2009 © 2009 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Fiscal year | Current |
| Period | from 1 to 12 |
第 434 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Enter the following plan values.
Cost center 201## 202## 203## 301## 302##
TELE## 120.000 120.000 --- 420.000 180.000
Save your entriesbut do not exit the layout.
a) CostCenterAccounting:Planning→StatisticalKeyFigures→Change
→ Goto → Next Layout (1-362)
b)
FieldNameorDataClass Values
Version: 0
Period from 1
Period to 12
Fiscal year Current
Cost center group B##
Statist. Key Figure TELE##
Input
Form-based Select
Goto → Overview Screen
CostCenter 201## 202## 203## 301## 302##
Currentplan 120.000 120.000 -- 420.000 180.000
value
DK 1 1 1 1 1
Save your data.
3. Plan the statistical key figure PC## to the cost centers belonging to cost
centergroupB##. Useform-basedentry. Enterthefollowingplanvalues.
Cost Center 201## 202## 203## 301## 302##
PC## 2 5 --- 18 12
Continued on next page
408
©2009SAPAG.Allrightsreserved. 2009
| Cost center | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| TELE## | 120.000 | 120.000 | --- | 420.000 | 180.000 |
| FieldNameorDataClass | Values |
|---|---|
| Version: | 0 |
| Period from | 1 |
| Period to | 12 |
| Fiscal year | Current |
| Cost center group | B## |
| Statist. Key Figure | TELE## |
| Input | |
| Form-based | Select |
| CostCenter | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| Currentplan value | 120.000 | 120.000 | -- | 420.000 | 180.000 |
| DK | 1 | 1 | 1 | 1 | 1 |
| Cost Center | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| PC## | 2 | 5 | --- | 18 | 12 |
第 435 页 / 共 543 页
AC405 Lesson: Planning Process
Saveyour entriesbut do not exit the layout.
a) ChangethevalueinthefieldStatisticalkeyfigureintheplanningentry
screen.
Statist. Key Figure PC##
Goto → Overview Screen
CostCenter 201## 202## 203## 301## 302##
Currentplan 2 5 -- 18 12
value
DK 1 1 1 1 1
Save your data.
4. Planthestatisticalkey figureKM##tothecost centersbelongingtocost
center groupB30##. Useform-basedentry. Enter447,387.26mifor cost
center 301# (FI/CO consultant) and 223,693.63 mi for cost center 302#
(LO consultant).
Save your entries.
a) Changethevaluesof the fields cost centergroup andstatistical key
figure in the planning entry screen.
Cost center group B30##
Statist. Key Figure MI##
Goto → Overview Screen
Cost Center 301## 302##
Current planvalue 720.000 360.000
DK 1 1
Save your data.
Continued on next page
409
2009 © 2009 SAP AG. All rights reserved.
| CostCenter | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| Currentplan value | 2 | 5 | -- | 18 | 12 |
| DK | 1 | 1 | 1 | 1 | 1 |
| Cost center group | B30## |
|---|---|
| Statist. Key Figure | MI## |
| Cost Center | 301## | 302## |
|---|---|---|
| Current planvalue | 720.000 | 360.000 |
| DK | 1 | 1 |
第 436 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Task 3:
Plantheactivitytypesforcostcenter301##(FI/COconsultant)and302##(LO
consultant). Asyoualreadyenteredthepriceswhenyoumaintainedthemaster
data, you only need to plantheactivityquantity.
Hint: Ifyoudidnotworkthroughtheexerciseonplanninglayouts,orif
foranyreasonyoucannotaccessyourownplanninglayoutforactivity
typeplanning,useplannerprofileSAPALLforthisexercise.
1. PlantheactivityquantitiesofactivitytypeJ##inyourplanninglayoutPL##
in planner profile Z-## (or 1-202 in planner profile SAPALL) for the
consultingcostcenters(cost center groupB30##).
Choose free entry.
a) CostCenterAccounting:Planning→SetPlannerProfile→Z-##
CostCenterAccounting:Planning→ActivityOutput/Prices→Change
→ Goto → Next Layout (PL##)
b) or
CostCenterAccounting:Planning→SetPlannerProfile→SAPALL
ActivityOutput/Prices→Change(Layout1-201)
FieldNameorDataClass Values
Version 0
From period 1
To period 12
Fiscal year Current
Cost center B30##
Activity Type J##
Entry
Free Select
Goto → Overview Screen
Continued on next page
410
©2009SAPAG.Allrightsreserved. 2009
| FieldNameorDataClass | Values |
|---|---|
| Version | 0 |
| From period | 1 |
| To period | 12 |
| Fiscal year | Current |
| Cost center | B30## |
| Activity Type | J## |
| Entry | |
| Free | Select |
第 437 页 / 共 543 页
AC405 Lesson: Planning Process
2. Plan12,000juniorconsultanthoursforcostcenter301#(FI/COconsultant)
and9,600for costcenter302#(LOconsultant). Theplanactivityistobe
distributedevenlyacrossallpostingperiods. Checkthesettingontheperiod
screen. Save your plan.
a) Inlayout1-201yougoto thenextcost center.
Goto → Next Combination
Cost Center 301## 302##
Plan activity 12.000 9.600
DK 1 1
Placeyourcursorinthe“PlanActivity”columnGoto→Periodscreen.
Save your data.
3. Plan activity type S## for the consulting cost centers (cost center group
B30##). Choose free entry.
a) In the initial screen for planning, change the value in the Activity
type field.
Activity Type S##
Goto → Overview Screen
4. Plan12,000seniorconsultanthoursforcostcenter301#(FI/COconsultant)
and9,600 for cost center302#(LOconsultant). Theplan activity isto be
distributed evenly acrossall postingperiods.
Save your plan.
a)
Cost Center 301## 302##
Plan Activity 12.000 9.600
DK 1 1
Placeyourcursorinthe“PlanActivity”columnGoto→Periodscreen.
Save your data.
5. CalltheCostCenters: PlanningOverviewforperiods1through12ofthe
currentfiscalyearandcostcenter301##(FI/COConsulting).
Continued on next page
411
2009 © 2009 SAP AG. All rights reserved.
| Cost Center | 301## | 302## |
|---|---|---|
| Plan activity | 12.000 | 9.600 |
| DK | 1 | 1 |
| Cost Center | 301## | 302## |
|---|---|---|
| Plan Activity | 12.000 | 9.600 |
| DK | 1 | 1 |
第 438 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
Check your entries.
a) CostCenterAccounting:InformationSystem→ReportsforCostCenter
Accounting→PlanningReports→CostCenters: PlanningOverview
FieldNameorDataClass Values
Cost Center 301##
Fiscal Year current
Period 1 to 12
Version 0
Planning overview → Execute
Task 4:
Plan the costs on the cost centers.
Hint: Ifyoudidnotworkthroughtheexerciseonplanninglayouts,orif
foranyreasonyoucannotaccessyourownplanninglayoutforactivity
typeplanning,useplannerprofileSAPEASYforthisexercise.
1. Salarycosts(costelement430000)areplannedcentrallybytheheadofthe
consultingdepartmentforallcostcenters(B##). Themanagerpresentsyou
with a list of the corresponding plan data and asks you to enter it in the
system. Choose planning layout 1-162 for this (Cost element planning:
central, simple). Thevaluestobeenteredareannual values, whichareto
beevenlydistributedacrossthepostingperiods.
Cost center Planned Costs
201## 60.000
202## 252.000
Continued on next page
412
©2009SAPAG.Allrightsreserved. 2009
| FieldNameorDataClass | Values |
|---|---|
| Cost Center | 301## |
| Fiscal Year | current |
| Period | 1 to 12 |
| Version | 0 |
| Cost center | Planned Costs |
|---|---|
| 201## | 60.000 |
| 202## | 252.000 |
第 439 页 / 共 543 页
AC405 Lesson: Planning Process
Cost center Planned Costs
203## 192.000
301## 2.532.000
302## 1.560.000
a) Solution to task 1:
CostCenterAccounting:Planning→SetPlannerProfile
Planner profile SAPEASYor Z-##
b) Solution to task 1-1:
Cost Center Accounting:Planning → Cost and Activity Inputs →
Change→ Goto→ Next Layout (1-162)
c)
FieldNameorDataClass Values
Version 0
From period 1
To period 12
Fiscal year Current
Cost center B##
Cost element 430000
Entry
Form-based Select
Goto → Overview Screen
CostCenter 201## 202## 203## 301## 302##
Total 60.000 252.000 192.000 2.532.000 1.560.000
plannedcosts
DK 1 1 1 1 1
Save your data.
2. Theothercosts(costelements473120through477000)incurredbythecost
centers(cost center groupB##) are planned by the cost center managers
themselves,eachmanagerbeingresponsibleforthesefigures. Thefollowing
Continued on next page
413
2009 © 2009 SAP AG. All rights reserved.
| Cost center | Planned Costs |
|---|---|
| 203## | 192.000 |
| 301## | 2.532.000 |
| 302## | 1.560.000 |
| FieldNameorDataClass | Values |
|---|---|
| Version | 0 |
| From period | 1 |
| To period | 12 |
| Fiscal year | Current |
| Cost center | B## |
| Cost element | 430000 |
| Entry | |
| Form-based | Select |
| CostCenter | 201## | 202## | 203## | 301## | 302## |
|---|---|---|---|---|---|
| Total plannedcosts | 60.000 | 252.000 | 192.000 | 2.532.000 | 1.560.000 |
| DK | 1 | 1 | 1 | 1 | 1 |
第 440 页 / 共 543 页
Unit9: Planning,BudgetingandAvailabilityControl AC405
graphicliststheplandataoftheindividualcostcenters. Chooseplanning
layout 1-161 (cost element planning: simple layout) in planner profile
SAPEASY.
Thevaluestobeenteredareannualvalues,whicharetobeevenlydistributed
acrossthepostingperiods. Useform-basedentry.
Continued on next page
414
©2009SAPAG.Allrightsreserved. 2009
第 441 页 / 共 543 页
AC405 Lesson: Planning Process
Cost Center Cost element Planned Costs
101## 473120–Telephonecosts 84.000
201## 476000 –Officesupplies 24.000
202## 476100 – IT supplies 98.400
203## 475000 – Vehicle costs 1.320.000
a) Goto → Previous layout (1-161).
b)
FieldNameorDataClass Values
Version 0
From period 1
To period 12
Fiscal year Current
Cost center B##
Cost element 473120
to 477000
Entry
Form-based Select
Goto → Overview Screen
To go to the next cost center, choose
Goto → Next combination
Cost Cost element PlannedCosts DK
center
101## 473120 – Telephone costs 84.000 1
201## 476000 – Office supplies 24.000 1
202## 476100 – IT supplies 98.400 1
203## 475000 – Vehicle costs 1.320.000 1
Save your data.
Continued on next page
415
2009 © 2009 SAP AG. All rights reserved.
| Cost Center | Cost element | Planned Costs |
|---|---|---|
| 101## | 473120–Telephonecosts | 84.000 |
| 201## | 476000 –Officesupplies | 24.000 |
| 202## | 476100 – IT supplies | 98.400 |
| 203## | 475000 – Vehicle costs | 1.320.000 |
| FieldNameorDataClass | Values |
|---|---|
| Version | 0 |
| From period | 1 |
| To period | 12 |
| Fiscal year | Current |
| Cost center | B## |
| Cost element | 473120 |
| to | 477000 |
| Entry | |
| Form-based | Select |
| Cost center | Cost element | PlannedCosts | DK |
|---|---|---|---|
| 101## | 473120 – Telephone costs | 84.000 | 1 |
| 201## | 476000 – Office supplies | 24.000 | 1 |
| 202## | 476100 – IT supplies | 98.400 | 1 |
| 203## | 475000 – Vehicle costs | 1.320.000 | 1 |