第 102 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Thismeansyoucanlimitthevalidityofyoursalesdocumenttypesforonesingle
sales area.
86
©2009SAPAG.Allrightsreserved. 2009
第 103 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents – Sales Document Type
Exercise 4: Controlling Sales Documents
with Sales Document Types
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Control salesdocument typesin Customizing
• Implementyourownsalesprocesseswithnewsalesdocumenttypes.
Business Example
Youwanttocontrolandevaluateyoursalesactivitiesfortradefairsseparately. To
dothis,youuseadifferentsalesdocumenttype,whichyousetupinCustomizing
to meet your requirements. You limit the use of that sales document type for
the defined sales areas.
Task 1:
Yournewtradefairordershouldmeetthefollowingrequirements:
-Description: Fair##-order.
-The number assignment should be internal – you shouldnot be ableto assign
numbers externally.
-Itemnumbering shouldhavean increment of 100.
-OrderentryshouldbeginwiththeItemoverviewscreen.
-Checkingopenquotationsorcontractsisnotnecessary.
-When billing documents are created, the system should re-run pricing
automatically.
Hint: Inthestandardsystem,billingtypeF1isconfiguredsothatpricing
isre-runautomaticallywhenyoucreateanewbillingdocument.
-Yourcompanywantstherequesteddeliverydatetobeproposedautomatically
with a lead time of 10 days.
-Pricing should be based on the current date.
-Thesystemshouldautomaticallyproposethecurrentdateasthepurchaseorder
date.
1. ChangeordertypeZA##,whichhasbeengeneratedasacopyofthestandard
order(ordertypeOR)tomeet theserequirements.
Continued on next page
87
2009 © 2009 SAP AG. All rights reserved.
第 104 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Task 2:
CheckyoursettingsbycreatinganorderwiththenewsalesdocumenttypeZA##
and an item.
1. Your customerT-S62B## orders 10 units of material T-ATB## at a trade
fair. Enter a fair order (sales document type ZA##). The purchase order
number is ##LO605-ZA01.
2. Checkthefieldscontainingthedocumentnumberoftheorder,therequested
deliverydate,thepricingdate,theorderdate,theoverviewscreen,andthe
item numbering for this order.
Task 3:
Optional:
1. ComparethetwosalesdocumenttypesStandardorderandRushorder.
2. Whatarethedifferencesbetweenthesetwotypes?
3. ChangesalesdocumenttypeZA##soitbehaveslikearushorder.
Hint: Checkthesettingsforimmediatedelivery;shippingconditions
and lead time in days.
4. Create an order with order type ZA## in sales area 1000 / 10 / 00 for
customerT-S62A##andyourmaterialT-ATA##. Thepurchaseordernumber
is ##LO605-ZA03.
5. Take a look at the document flow to determine whether the delivery has
been created.
Outbounddeliverynumber:____________________________________
6. UndoyourchangestoordertypeZA##whenyouarefinished.
88
©2009SAPAG.Allrightsreserved. 2009
第 105 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents – Sales Document Type
Solution 4: Controlling Sales Documents
with Sales Document Types
Task 1:
Yournewtradefairordershouldmeetthefollowingrequirements:
-Description: Fair##-order.
-The number assignment should be internal – you shouldnot be ableto assign
numbers externally.
-Itemnumbering shouldhavean increment of 100.
-OrderentryshouldbeginwiththeItemoverviewscreen.
-Checkingopenquotationsorcontractsisnotnecessary.
-When billing documents are created, the system should re-run pricing
automatically.
Hint: Inthestandardsystem,billingtypeF1isconfiguredsothatpricing
isre-runautomaticallywhenyoucreateanewbillingdocument.
-Yourcompanywantstherequesteddeliverydatetobeproposedautomatically
with a lead time of 10 days.
-Pricing should be based on the current date.
-Thesystemshouldautomaticallyproposethecurrentdateasthepurchaseorder
date.
1. ChangeordertypeZA##,whichhasbeengeneratedasacopyofthestandard
order(ordertypeOR)tomeet theserequirements.
a) Change sales document type ZA##.
→Tools→Customizing→IMG→ExecuteProject→SAPReference
IMG.
→ Sales and Distribution → Sales → Sales Documents → Sales
DocumentHeader→DefineSalesDocumentTypes.
Selectdocument typeZA##. ChooseDetails.
Description: Fair##-order
Number range external blank
assignment:
Item no. increment: 100
Continued on next page
89
2009 © 2009 SAP AG. All rights reserved.
第 106 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
FCODEoverviewscreen: UER2
Quotationmessages: blank
Messages about outline blank
agreements
Delivery-rel. billingtype: F1
Order-relatedbillingtype: F1
Leadtimein days: 10
Defaultpricingdate: blank
Proposedeliverydate: activate
Propose PO date: activate
Task 2:
CheckyoursettingsbycreatinganorderwiththenewsalesdocumenttypeZA##
and an item.
1. Your customerT-S62B## orders 10 units of material T-ATB## at a trade
fair. Enter a fair order (sales document type ZA##). The purchase order
number is ##LO605-ZA01.
a) Verify the settings in the sales order.
Create the sales order.
2. Checkthefieldscontainingthedocumentnumberoftheorder,therequested
deliverydate,thepricingdate,theorderdate,theoverviewscreen,andthe
item numbering for this order.
a) ChecktheCustomizingofyoursalesdocumenttypeZA##.
Fair##-order: blank (number is only assigned internally
on saving)
Req. deliv. date: Two days from today
Pricing date: today
Order date: Today
Overviewscreen: Item overview
Item number: 100
Continued on next page
90
©2009SAPAG.Allrightsreserved. 2009
第 107 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents – Sales Document Type
Task 3:
Optional:
1. ComparethetwosalesdocumenttypesStandardorderandRushorder.
a) Comparethedocumenttypesin Customizing.
→ Sales and Distribution → Sales → Sales Documents → Sales
DocumentHeader→DefineSalesDocumentTypes.
2. Whatarethedifferencesbetweenthesetwotypes?
Answer: Thefollowingfieldsintherushorderaredifferentfromthosein
the standard order (Note: these are the critical fields that are different –
there are others):
• Imm. delivery: activated
• Shipping condition: 10 immediately
• Lead time in days: blank
3. ChangesalesdocumenttypeZA##soitbehaveslikearushorder.
Hint: Checkthesettingsforimmediatedelivery;shippingconditions
and lead time in days.
a) Change the document type.
4. Create an order with order type ZA## in sales area 1000 / 10 / 00 for
customerT-S62A##andyourmaterialT-ATA##. Thepurchaseordernumber
is ##LO605-ZA03.
a) Create the order and save it.
5. Take a look at the document flow to determine whether the delivery has
been created.
Outbounddeliverynumber:____________________________________
a) DisplaytheorderandchooseDocument flow.
6. UndoyourchangestoordertypeZA##whenyouarefinished.
a)
Imm. delivery: blank
Shippingcondition: blank
Leadtimeindays: 10
91
2009 © 2009 SAP AG. All rights reserved.
第 108 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Lesson Summary
You should now be able to:
• Identifytheelementsthatcontrolthesalesdocuments
• Nameexamplesofdifferentsalesdocumenttypesusedfordifferentbusiness
processes
• Explain what the sales document type does
• CreateCustomizingsettingsforthesalesdocumenttype
• Restrictthevalidityofsalesdocumenttypestosalesareas
92
©2009SAPAG.Allrightsreserved. 2009
第 109 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Lesson: Controlling Sales Documents - Item Category
Lesson Overview
This lesson describes tasks, control options and automatic determination of
item categories. Theuse of item categories tocontrol bills of material in sales
documents is also described.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Identifyandexplaintheimportantcontrolparametersforitemcategories
• Create a new item category
• Configurethesystemsothatitemcategoriesareautomaticallyassignedtoa
sales document type
• Controlsettingsforbillsofmaterialinthesalesdocument.
Business Example
• Company management has now decided to expand the company's sales
activities.
• Infuture,BOM'saretobeusedtosellcertainproducts.
• To control these processes separately, you want to be able to influence
document control at item level.
Figure 31: Examples of Item Categories
93
2009 © 2009 SAP AG. All rights reserved.
第 110 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Various item categories are delivered with the system to model the different
businessprocesses. Youcan usethemasexamplesor astemplatesfor creating
your own item categories.
The item category is defined with a four-digit key. These keys are copied
automaticallyfromtheoriginalGermankeysandarenottranslated. Thefirsttwo
charactersprovideacluetothesalesdocumenttypethatwasoriginallydesigned
for these item categories. The last two characters indicate the use of the item
category, such as:
• AFTXSalesdocument type: INUsage: TEXT
• TADSalesdocumenttype: ORItemcategorygroup: LEIS
• KMNSalesdocumenttype: AGItemcategorygroup: NORM
Youcandecideifyouwouldliketokeepthestandardkeysordefineyourownso
thattheabbreviationreferstoyour salesdocumenttypesandhowthecategory
is configured.
Figure 32: Item Category Functions
Theitemcategorycontrolswhattheitemdoesinthesalesdocumentandinany
subsequent processing for thebusinesstransaction.
94
©2009SAPAG.Allrightsreserved. 2009
第 111 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Theessentialcharacteristicsofanitemcategorydecide:
• Whetherbusinessdataintheitemcanbedifferenttothatofthedocument
header
• Whether pricing applies to the item
• Whether and how an item is billed
• Whethertheitemreferstoamaterialorwhetheritisjustatextitem
• Whichincompletenessprocedureisusedtochecktheitemdata.
Youcanchangetheitemcategorysettingsdefinedinthestandardsystem. You
canalsodefinenewitemcategories. Todothis,youshouldalwayscopyexisting
item categories that have already beentested, then change these to meet your
requirements.
The delivery relevanceindicator isonlyfor items without schedule lines. You
couldindicatethatatextitemwasrelevanttodelivery, forexample, sothatthe
systemcopiesthisitemfromthesalesorderintothedeliverydocument.
Figure 33: Controlling the Items in the Sales Document
The diagram containsexamples with settings as provided inthe standard SAP
system.
Everyiteminasalesdocumentiscontrolledbymeansofitsitemcategory. This
enables you to
• Usedifferentitemcategoriesindifferentsalesdocumenttypes
• Realizedifferentbusinessprocessesforeachiteminthesalesdocument.
95
2009 © 2009 SAP AG. All rights reserved.
第 112 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
You can configure the functions of the item categories according to your
requirements. For example:
• Youdonotneedpricedeterminationforthetextitemintheinquiry(item
category AFTX), but you want to enter delivery quantities and delivery
dates, and you thereforeallowschedulelines.
• You want schedulelinesfor afree-of-chargeiteminthesalesorder(item
categoryTANN) but youdonotwanttocarry out pricing for thisitemor
transfer it to billing.
Figure 34: Sub-Items
Youcanassignanitemtoahigher-levelitemif,forexample,acustomerreceives
freegoodsfororderingacertainquantityofyourproduct.
Example:
Item 10: M1 100units 1000 Euro
Item 20: M2 10 units free-of-charge
• Forordering100piecesofitem10, thecustomerreceives10unitsfreeof
charge. To display this, you enter item 10 in the higher-level item field
for item 20.
This simple form of supplying free goods is supplemented with automatic
determinationoffreegoods(seetheunitentitled"Freegoods").
96
©2009SAPAG.Allrightsreserved. 2009
| Item 10: | M1 | 100units | 1000 Euro |
|---|---|---|---|
| Item 20: | M2 | 10 units | free-of-charge |
第 113 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Other examplesfor usingsub-itemsincludetheexplosion of BOMs or service
items in sales documents.
Hint: Alternativeitemscanalsoberecordedinquotationsandinquiries
in addition to sub-items. Alternative items are treated differently to
sub-items;forexample,alternativeitemsarenotincludedinthenetvalue
of the document.
Figure35: Assignment: ItemCategorytoSalesDocumentType
Itemcategoriesareassignedtosalesdocumenttypes.
The purpose of this assignment is to:
Configurethesystemtoproposeanitemcategorywhenyoucreateanorder.
Definealternativeitemcategoriestothesystemdefault
which users can choose.
This assignment is influenced by:
Theitemcategorygroupfromthematerialmasterrecord.
The item category group allows you to group together different materials that
behaveinasimilarwayduringsalesanddistributionprocesses,forexample. You
can also definenewitemcategory groupsif needed.
Theusagefortheitem,whichinsomecasesissetinternallyintheprogram.
97
2009 © 2009 SAP AG. All rights reserved.
第 114 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
ThesystemusesTEXTiftheuserentersanitemintheinquiryorquotationby
entering data in the "Description" field without specifying a material number.
FREE isused for controlling free goods items.
Theitemcategoryofahigher-levelitem(inthecaseofasub-item)
Figure 36: Bills of material: Example: Computer
Acomputerconsistsofseveralcomponents. Eachofthesecomponentsisinturn
constructed from several separate parts.
You canstorethisstructurein thesystemasabillof material. All theitemsin
thebill of material (BOM)thatyouwant tocontrolinthesalesdocumentmust
beflaggedasrelevantforsales. (Pleasenote: theitemsinabillofmaterialare
controlleddifferentlythantheitemcategoriesinasalesdocument). Ifyoucreatea
BOMmaterialwithBOMusage5(salesanddistribution),alltheitemsinthebill
ofmaterialwillbeautomaticallyflaggedasrelevanttosales.
By making the appropriate settings in Customizing for the item categories in
the sales document, you can copy the components in the bill of material to a
salesorder. Toprocessthesalesdocument, youonlyneedtoenterthematerial
number of the BOM.
The BOM appears in the sales document as a structure with main items and
sub-items. The system explodes the BOM in the sales order by automatically
generating sub-items for the components.
98
©2009SAPAG.Allrightsreserved. 2009
第 115 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Figure 37: ExplodingBillsofMaterialsin SalesDocuments
The individual itemcategories control what a bill of material cando ina sales
document. InCustomizing,youdefineandassignitemcategoriesforthemainand
sub-items of the BOM in the sales document.
Aspecificitemcategorygroupassignedtothematerialmasterrecordofthemain
itemdefineswhichitemcategoriesareassignedtothemainitem.
TodeterminehowfartheBOMshouldbeexplodedinthesalesdocument, you
needtodefinetheextentofthestructureoftheitemcategoryforthemainitem.
When you determine the sub-items, the system also needs to know the item
category of the higher-level item.
In Customizing for item categories, you control which item(s) are relevant to
pricingandhowyouwanttoimplementrequirementstransfer.
99
2009 © 2009 SAP AG. All rights reserved.
第 116 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
100
©2009SAPAG.Allrightsreserved. 2009
第 117 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Exercise 5: Controlling Sales Documents
- Item Categories and Item Category
Determination
Exercise Objectives
After completingthisexercise, youwillbeableto:
• ConfigureCustomizing of item categories
• Explainandcontrolautomaticdeterminationofitemcategories.
Business Example
Itemsinsalesdocumentsfrequentlyhavetobecontrolleddifferently,suchasfor
pricing or billing. This applies to items
• That pass through several sales documents during the course of the
transaction
• Within an individual sales document
Item categories are determined automatically.
Task 1:
Your customer tellsyou theywouldliketoadd totheir purchaseorder number
##LO605-OR05.
1. Enteranotheritemwith16unitsofmaterialT-ATE##. Thedeliverydateis
in two week’s time.
2. Youhavealsoagreedtogiveyourcustomerafreegoodsitemof1unitof
material T-ATE##. Enteracorrespondingsub-item.
3. Thisitemisincludedinthenetvalueof theorder.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
4. What arethe item categoriesin this order?
Item10: _________________________________
Item20: _________________________________
Item30: _________________________________
Item40: _________________________________
Continued on next page
101
2009 © 2009 SAP AG. All rights reserved.
第 118 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Task 2:
Complete the following table.
1.
Item Descrip- Busi- Sched- Item Pricing Struc-
cate- tion ness ulelines relev. ture
gory item permit- for scope
ted delivery
TAN Standard
item
TANN Free-of-
chargeitem
TAP Extent
delivered
TAQ Extent
delivered
TATX Textitem
TAD Service
TAE Explana-
tion
Task 3:
1. Whyistheitemcategoryintheorderautomaticallyproposedbythesystem?
Find the relevant table in Customizing.
Whatarethekeyfieldsforautomaticallydeterminingtheitemcategories?
Keyfield1: _________________________________
Keyfield2: _________________________________
Keyfield3: _________________________________
Keyfield4: _________________________________
Task 4:
Complete the following table.
1.
Continued on next page
102
©2009SAPAG.Allrightsreserved. 2009
| Item cate- gory | Descrip- tion | Busi- ness item | Sched- ulelines permit- ted | Item relev. for delivery | Pricing | Struc- ture scope |
|---|---|---|---|---|---|---|
| TAN | Standard item | |||||
| TANN | Free-of- chargeitem | |||||
| TAP | Extent delivered | |||||
| TAQ | Extent delivered | |||||
| TATX | Textitem | |||||
| TAD | Service | |||||
| TAE | Explana- tion |
第 119 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Sales Item Item Higher- Default Man- Man-
docu- category usage level item ualitem ual
ment group item category cate- item
type category gory cate-
gory
EN DIEN
QT TEXT
OR NORM
OR NORM TAN
OR NORM TAP
OR NORM TAQ
ZA## ERLA
ZA## ERLA TAQ
ZA## LUMF
ZA## LUMF TAP
Task 5:
Optional
Your customer T-S62A## places a standard order with purchase order number
##LO605-OR06.
1. Enterthestandard order with arequested deliverydateofoneweekfrom
today. Enter the following items:
Material: T-ATA## (5 units)
Material: T-ZSA## (3h)
Whichitemcategorygroupshavebeenassignedtothetwomaterials?
Item10: _________________________________
Item20: _________________________________
2. Whichitemcategoriesareused? InCustomizing,checkwhichoftheitem
categoriesarerelevantfor deliveryand pricing.
Continued on next page
103
2009 © 2009 SAP AG. All rights reserved.
| Sales docu- ment type | Item category group | Item usage | Higher- level item category | Default item category | Man- ualitem cate- gory | Man- ual item cate- gory |
|---|---|---|---|---|---|---|
| EN | DIEN | |||||
| QT | TEXT | |||||
| OR | NORM | |||||
| OR | NORM | TAN | ||||
| OR | NORM | TAP | ||||
| OR | NORM | TAQ | ||||
| ZA## | ERLA | |||||
| ZA## | ERLA | TAQ | ||||
| ZA## | LUMF | |||||
| ZA## | LUMF | TAP |
第 120 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Item Pricing Schedule Item
category lines relevant
permitted for
delivery
Item 10
Item 20
3. Delivertheorderwithpurchaseordernumber##LO605-OR06. Whichorder
items are delivery items generated for?
_________________________________
104
©2009SAPAG.Allrightsreserved. 2009
| Item category | Pricing | Schedule lines permitted | Item relevant for delivery | |
|---|---|---|---|---|
| Item 10 | ||||
| Item 20 |
第 121 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Solution 5: Controlling Sales Documents
- Item Categories and Item Category
Determination
Task 1:
Your customer tellsyou theywouldliketoadd totheir purchaseorder number
##LO605-OR05.
1. Enteranotheritemwith16unitsofmaterialT-ATE##. Thedeliverydateis
in two week’s time.
a)
Material: T-ATE## (16 units)
Deliverydate: Two weeks from today
2. Youhavealsoagreedtogiveyourcustomerafreegoodsitemof1unitof
material T-ATE##. Enteracorrespondingsub-item.
a)
Material: T-ATE## (1 units)
Higher-levelitem: 20
3. Thisitemisincludedinthenetvalueof theorder.
Answer: False
SelectthefreegoodsitemandchooseItemconditions.
No. The net value of the item is zero.
4. What arethe item categoriesin this order?
Item10: _________________________________
Item20: _________________________________
Item30: _________________________________
Continued on next page
105
2009 © 2009 SAP AG. All rights reserved.
第 122 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Item40: _________________________________
a) →Logistics→SalesandDistribution→Sales→Order→Display
Item 10: TAN
Item 20: TAN
Item 30: TAN
Item 40: TANN
Task 2:
Complete the following table.
1.
Item Descrip- Busi- Sched- Item Pricing Struc-
cate- tion ness ulelines relev. ture
gory item permit- for scope
ted delivery
TAN Standard x x - X -
item
TANN Free-of- x x - B -
chargeitem
TAP Extent - x - - A
delivered
TAQ Extent x x - X A
delivered
TATX Textitem - - x - -
TAD Service x x - X -
TAE Explana- - x - - -
tion
a) →IMG→SalesandDistribution→Sales→SalesDocuments
→SalesDocumentItem→DefineItemCategories.
Task 3:
1. Whyistheitemcategoryintheorderautomaticallyproposedbythesystem?
Find the relevant table in Customizing.
Continued on next page
106
©2009SAPAG.Allrightsreserved. 2009
| Item cate- gory | Descrip- tion | Busi- ness item | Sched- ulelines permit- ted | Item relev. for delivery | Pricing | Struc- ture scope |
|---|---|---|---|---|---|---|
| TAN | Standard item | x | x | - | X | - |
| TANN | Free-of- chargeitem | x | x | - | B | - |
| TAP | Extent delivered | - | x | - | - | A |
| TAQ | Extent delivered | x | x | - | X | A |
| TATX | Textitem | - | - | x | - | - |
| TAD | Service | x | x | - | X | - |
| TAE | Explana- tion | - | x | - | - | - |
第 123 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Whatarethekeyfieldsforautomaticallydeterminingtheitemcategories?
Keyfield1: _________________________________
Keyfield2: _________________________________
Keyfield3: _________________________________
Keyfield4: _________________________________
a) Checktheassignmentoftherespectiveitemcategories.
→IMG→SalesandDistribution→Sales→SalesDocuments
→SalesDocumentItem→AssignItemCategories.
Keyfield1: SaTy Salesdocumenttype
Keyfield2: ItCGr Itemcategorygroup
Keyfield3: Usage Item usage
Keyfield4: HlevItCa Itemcategoryofhigher-level
item
Task 4:
Complete the following table.
1.
Sales Item Item Higher- Default Man- Man-
docu- category usage level item ualitem ual
ment group item category cate- item
type category gory cate-
gory
EN DIEN AFX
QT TEXT AGTX
OR NORM TAN TAP TAQ
OR NORM TAN TANN
OR NORM TAP TAN
OR NORM TAQ TAE
ZA## ERLA TAQ
Continued on next page
107
2009 © 2009 SAP AG. All rights reserved.
| Sales docu- ment type | Item category group | Item usage | Higher- level item category | Default item category | Man- ualitem cate- gory | Man- ual item cate- gory |
|---|---|---|---|---|---|---|
| EN | DIEN | AFX | ||||
| QT | TEXT | AGTX | ||||
| OR | NORM | TAN | TAP | TAQ | ||
| OR | NORM | TAN | TANN | |||
| OR | NORM | TAP | TAN | |||
| OR | NORM | TAQ | TAE | |||
| ZA## | ERLA | TAQ |
第 124 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Sales Item Item Higher- Default Man- Man-
docu- category usage level item ualitem ual
ment group item category cate- item
type category gory cate-
gory
ZA## ERLA TAQ TAE
ZA## LUMF TAP
ZA## LUMF TAP TAN
a) see task description
Task 5:
Optional
Your customerT-S62A## places astandard order with purchase order number
##LO605-OR06.
1. Enterthestandardorder witharequesteddeliverydateof oneweekfrom
today. Enter the following items:
Material: T-ATA## (5 units)
Material: T-ZSA## (3h)
Whichitemcategorygroupshavebeenassignedtothetwomaterials?
Item10: _________________________________
Item20: _________________________________
a) Create the sales order.
Gofromthesalesorder tothematerialmaster.
Environment→DisplaymaterialInthematerialmaster,gototheSales
and Distribution tab: SalesOrg2,
Item 10: Itemcategorygroup: NORM
Item 20: Itemcategory group: LEIS
2. Whichitemcategoriesareused? InCustomizing,checkwhichoftheitem
categoriesarerelevant for deliveryandpricing.
Continued on next page
108
©2009SAPAG.Allrightsreserved. 2009
| Sales docu- ment type | Item category group | Item usage | Higher- level item category | Default item category | Man- ualitem cate- gory | Man- ual item cate- gory |
|---|---|---|---|---|---|---|
| ZA## | ERLA | TAQ | TAE | |||
| ZA## | LUMF | TAP | ||||
| ZA## | LUMF | TAP | TAN |
第 125 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Item Pricing Schedule Item
category lines relevant
permitted for
delivery
Item 10 TAN X X -
Item 20 TAD X X -
a) see task description
3. Delivertheorderwithpurchaseordernumber##LO605-OR06. Whichorder
items are delivery items generated for?
_________________________________
a) Adeliveryitemisgeneratedforthestandarditem.
109
2009 © 2009 SAP AG. All rights reserved.
| Item category | Pricing | Schedule lines permitted | Item relevant for delivery | |
|---|---|---|---|---|
| Item 10 | TAN | X | X | - |
| Item 20 | TAD | X | X | - |
第 126 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
110
©2009SAPAG.Allrightsreserved. 2009
第 127 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Exercise 6: Control of Sales Documents -
Item Category - BOMs in Sales Document
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create master records for sales BOMs
• Control BOMs in sales documents.
Business Example
YouoftenhavetoexplodeBOMsinsalesdocuments. Intheprocess,youhave
todetermine,forexample,thelevelatwhichpricedeterminationand/ortransfer
of requirements is performed.
Task:
YouwantyourmaterialT-FUA##inplant: 1200toappearasabillofmaterialin
your sales documents.
Workwiththebillofmaterialanduseitforenteringdata.
1. Forthismaterial,createasalesBOM(usage: 5SalesandDistribution)with
thecomponentsT-ATA##,T-ATF##andT-ATG##(1pieceeach). Configure
the bill of material items as stock items(L).
2. CreateanorderforyourcustomerT-S62A##andyour materialT-FUA##.
Thepurchaseordernumber is##LO605-OR07.
Doesthesystem explodethebill of material?
__________________________________________
Why / why not?
__________________________________________
3. In future, you only want to determine prices for the finished product.
You want to list the individual components of the finished product for
informational purposes. Change the material master for your material
T-FUA##sothatpricingonlytakesplaceatmainitemlevel.
4. Checktheeffectsofyourchangeinthesalesdocument. Createanorderfor
yourcustomerT-S62A##andyourmaterialT-FUA##. Thepurchaseorder
number is ##LO605-TA08.
Doesthesystem explodethebill of material?
__________________________________________
Continued on next page
111
2009 © 2009 SAP AG. All rights reserved.
第 128 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Whichitemsaffect thenet valueof the order?
__________________________________________
5. ChangeyourmaterialT-FUA##sothatpricingonlytakesplaceatsub-item
level.
6. Checktheeffectsofyourchangeinthesalesdocument.
Doesthesystemexplode the bill of material?
__________________________________________
Whichitemsaffect thenet valueof the order?
PO number: ##LO605-OR09
__________________________________________
112
©2009SAPAG.Allrightsreserved. 2009
第 129 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
Solution 6: Control of Sales Documents -
Item Category - BOMs in Sales Document
Task:
YouwantyourmaterialT-FUA##inplant: 1200toappearasabillofmaterialin
your sales documents.
Workwiththebillofmaterialanduseitforenteringdata.
1. Forthismaterial,createasalesBOM(usage: 5SalesandDistribution)with
thecomponentsT-ATA##,T-ATF##andT-ATG##(1pieceeach). Configure
the bill of material items as stock items(L).
a) Enter the bill of material.
→Logistics→SalesandDistribution→MasterData→Products→
BillsofMaterial→BillofMaterial→MaterialBOM→Create
Plant: 1200 Dresden
Usage: 5 Salesand Distribution
BOMitemcategory: L Stock item
2. CreateanorderforyourcustomerT-S62A##andyour materialT-FUA##.
Thepurchaseordernumber is##LO605-OR07.
Doesthesystem explodethebill of material?
__________________________________________
Why / why not?
__________________________________________
a) Enter the bill of material.
The BOM is not exploded.
→IMG→ Sales and Distribution→Sales → SalesDocuments →
SalesDocumentItem→DefineItemCategories
TheitemcategoryofthemainitemintheBOM,TAN,doesnotsupport
theexplosionofBOMsinthesalesdocument(the”Structurescope”
field is blank).
Continued on next page
113
2009 © 2009 SAP AG. All rights reserved.
第 130 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
3. In future, you only want to determine prices for the finished product.
You want to list the individual components of the finished product for
informational purposes. Change the material master for your material
T-FUA##sothatpricingonlytakesplaceatmainitemlevel.
a) →Logistics→SalesandDistribution→MasterData→Products→
Material → Trading Goods→ Change
Choose Sales: Sales Org. Data 2
Salesorganization: 1000
Distr. channel: 10
Itemcategorygroup: ERLA
4. Checktheeffectsofyourchangeinthesalesdocument. Createanorderfor
yourcustomerT-S62A##andyourmaterialT-FUA##. Thepurchaseorder
number is ##LO605-TA08.
Doesthesystemexplode the bill of material?
__________________________________________
Whichitemsaffect thenet valueof the order?
__________________________________________
a) TheBOMisexploded. Pricingisonlyperformedforthemainitem. Asa
result,thenetvalueoftheorderiscalculatedexclusivelyfromthisitem.
5. ChangeyourmaterialT-FUA##sothatpricingonlytakesplaceatsub-item
level.
a) →Logistics→SalesandDistribution→MasterData→Products→
Material → Trading Goods→ Change
Choose Sales: Sales Org. Data 2.
SalesOrganization: 1000
DistributionChannel: 10
Itemcategorygroup: LUMF
6. Checktheeffectsofyourchangeinthesalesdocument.
Doesthesystemexplode the bill of material?
__________________________________________
Whichitemsaffect thenet valueof the order?
PO number: ##LO605-OR09
Continued on next page
114
©2009SAPAG.Allrightsreserved. 2009
第 131 页 / 共 485 页
SCM605 Lesson: Controlling Sales Documents - Item Category
__________________________________________
a) TheBOMisexploded. Pricingisonlyperformedforthesub-item. As
aresult, thenet valueoftheorderiscalculatedexclusivelyfromthe
sub-items.
115
2009 © 2009 SAP AG. All rights reserved.
第 132 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Lesson Summary
You should now be able to:
• Identifyandexplaintheimportantcontrolparametersforitemcategories
• Create a new item category
• Configurethesystemsothatitemcategoriesareautomaticallyassignedtoa
sales document type
• Controlsettingsforbillsofmaterialinthesalesdocument.
116
©2009SAPAG.Allrightsreserved. 2009
第 133 页 / 共 485 页
SCM605 Lesson: ControllingSalesDocuments-Schedule LineCategories
Lesson: Controlling Sales Documents - Schedule Line
Categories
Lesson Overview
This lesson describes tasks, control options and automatic determination of
scheduling line categories.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Identify and explain the most important control parameters for schedule
line categories
• Create a new schedule line category
• Configureyoursettingssothat schedulelinecategoriesareautomatically
assigned to each sales document item
Business Example
• Changes that affect the entire logistics process are taking place at your
company, IDES AG.
• Oneoftheinterfacestotheotherlogisticsmodulesrepresentstheschedule
lines of the sales documents.
• Asaresult,youhavetofindoutaboutthecontrolparametersandautomatic
determination of schedule line categories.
Figure 38: Examples of Schedule Line Categories
117
2009 © 2009 SAP AG. All rights reserved.
第 134 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Variousschedulelinecategoriesaredeliveredwiththesystemtoprovidedifferent
controloptionsfortheitemsthroughoutthesalesprocess. Youcanusethemas
modelexamplesorastemplatesforcreatingyourownschedulelinecategories.
The schedule line category is defined with a two-character key. The standard
system already includes keys that often indicatethe usageof theschedule line
category. The first character indicates the sales process in which the schedule
line category is used.
A = Inquiry B = Quotation
C = Order D = Returns
• The second character in the key indicates what happens to the schedule
line within logistics.
D=Noinventorymanagement X = No inventory management with goods
issue
N = No MRP P=Materialrequirementsplanning
V = Consumption-based
planning
• Youcandecideifyouwouldliketokeepthestandardkeysordefineyour
ownsothattheabbreviationreferstoyoursalesdocumenttypesandhow
the category is configured.
Figure 39: Schedule line category
118
©2009SAPAG.Allrightsreserved. 2009
第 135 页 / 共 485 页
SCM605 Lesson: ControllingSalesDocuments-Schedule LineCategories
Schedulelinescontaindeliverydatesandquantitiesaswellasinformationabout
the requirements transfer and inventory management. They are a prerequisite
for delivering materials.
InCustomizingforitemcategories,youdecideifyouaregoingtoallowschedule
linesfortheitem. Youcanassignschedulelinecategoriestoeachitemcategory.
By defining a schedule line category, you determine which schedule lines are
actually relevant for delivery. You need to activate the relevant to delivery
indicatorifyouwantthegoodstobephysicallydelivered.
In the schedule line category, you set the movement type to control which
changestoquantitiesandvaluesarepostedtoinventoryaccounting. Inventory
managementisresponsibleformaintainingthemovementtypes. Movementtypes
havebeenconfiguredforallprocessesintheSAPstandardsystem. Manyofthe
movementtypesrelevanttosalesarebetween601and699.
Youcandeactivaterequirementstransferandavailabilitychecksatscheduleline
level.
A purchase requisition is a prerequisite for a purchase order and this can be
automatically generated from the sales document. To do this, you need to
configure the purchase order type as well as item and account assignment
categories in the purchase order.
If you activate a delivery block in the schedule line category, the block is
automaticallysetatschedulelinelevelinthesalesdocument.
Figure 40: Controlling ScheduleLinesinSalesDocuments
Examples in the standard SAP system.
Schedule lines in quotations are not relevant for delivery. The requirements
transfer is inactive in the schedule line category. Goods movements are not
necessaryinyourwarehousessonomovementtypeisneeded.
119
2009 © 2009 SAP AG. All rights reserved.
第 136 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
SinceschedulelinesfromcategoryCPgeneratedeliveryitemsinthesalesorder,
the'relevanttodelivery'indicatorisactivated. Therequirementstransferisactive
in theschedulelinecategory. CompleteCustomizingforrequirementstransfer
(for example, for requirementsplanning) requiresyou todefineand assignthe
requirementsclass. Thegoodsmovement iscontrolledbymovementtype601.
With this movement type, when the goods issue for thedelivery is posted, the
quantityshippedistakenfromunrestrictedusestocks.
Ifyouwantareturnsdeliverytofollowareturnorder,youneedascheduleline
categorythatisrelevantfordelivery. Inthiscase,transferringrequirementsisnot
necessary. Movementtype651enablesyoutomakesurethatagoodsreceiptgoes
toblockedstockreturns. Thisreplacestheusualgoodissue.
Figure41: AssigningScheduleLineCategoriestoItemCategories
Schedulelinecategoriesareassignedtoitemcategories.
The purpose of this assignment is to:
• Configurethesystemtoproposeaschedulelinecategoryautomaticallywhen
you create an order
• Determinetheschedulelinecategoriesthattheusercanchooseinsteadof
the system proposal.
Theassignmentisinfluencedbythematerialsrequirementsplanning(MRP)type
in the material master record.
120
©2009SAPAG.Allrightsreserved. 2009
第 137 页 / 共 485 页
SCM605 Lesson: ControllingSalesDocuments-Schedule LineCategories
Thesystemusestwostepstoautomaticallydeterminetheschedulelinecategory:
• First, it tries to determine the schedule line category using the key
combinationof item category and MRP type.
• If no schedule line category is found, the system searches for the key
combinationof item category / no MRP type.
121
2009 © 2009 SAP AG. All rights reserved.
第 138 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
122
©2009SAPAG.Allrightsreserved. 2009
第 139 页 / 共 485 页
SCM605 Lesson: ControllingSalesDocuments-Schedule LineCategories
Exercise 7: Controlling Sales Documents
- Schedule Line Categories
Exercise Objectives
After completingthisexercise, youwillbeableto:
• ConfigureCustomizingof schedulelinecategories
• Explainandcontrolautomaticdeterminationofschedulelinecategories.
Business Example
Theschedulelinescontaindeliveryquantitiesanddatesforasalesdocumentitem.
Later on in the business process, a schedule line can either createan item in a
deliveryoritcantransfer thedatatoasubsequentsalesdocument. Youusethe
schedulelinecategorytodecide,forexample,whetherthesystemshouldcheck
availabilityortransferrequirementsforthatscheduleline.
Task 1:
1. CustomerT-S62A##requestsaquotationfor10unitsofmaterialT-ATA##.
2. Enter the quotation with purchase order number ##LO605-QT02. The
quotation should be valid for one month.
3. Onwhatdatehasthedeliveryoftheschedulelinebeenconfirmed?
Confirmed date:
.
4. Whichitemandschedulelinecategorieshavebeendetermined?
Item category:
Schedule line category:
5. Howdoestheschedulelinecategorycontrolthisscheduleline?
Item relev. for delivery:
Continued on next page
123
2009 © 2009 SAP AG. All rights reserved.
第 140 页 / 共 485 页
Unit5: ControllingSalesDocuments SCM605
Requirements transfer:
Availability check:
6. Try to deliver the quotation (change the delivery selection date to the
schedule line confirmed date).
Can you do it?
____________________________________________
Task 2:
1. Complete the following table:
Schedule Descrip- Avail- Require- Item Move-
linecat. tion ability ments relevant ment
transfer for type
delivery
AT Inquiry
sched. line
BN NoMRP
BP Determin-
isticMate-
rials plan-
ning/MRP
Continued on next page
124
©2009SAPAG.Allrightsreserved. 2009
| Schedule linecat. | Descrip- tion | Avail- ability | Require- ments transfer | Item relevant for delivery | Move- ment type |
|---|---|---|---|---|---|
| AT | Inquiry sched. line | ||||
| BN | NoMRP | ||||
| BP | Determin- isticMate- rials plan- ning/MRP |
第 141 页 / 共 485 页
SCM605 Lesson: ControllingSalesDocuments-Schedule LineCategories
Schedule Descrip- Avail- Require- Item Move-
linecat. tion ability ments relevant ment
transfer for type
delivery
CN No ma-
terial re-
quirements
planning
(MRP)
CP Determin-
isticMate-
rials plan-
ning
DN Returns
Task 3:
After checking your quotationthoroughly, customerT-S62A##placesanorder
with you.
Create the sales order.
1. Enterastandardorderwithreferencetothequotationcreatedintheprevious
exercise (order will use purchase order number ##LO605-OR10). Copy
the quotation into the order in full.
2. Onwhatdateisthedeliveryoftheschedulelineconfirmed?
Confirmeddate:_______________________________________
3. Whichitemandschedulelinecategorieshavebeendetermined?
Item category:
Schedule line category:
4. Howdoestheschedulelinecategorycontrolthisscheduleline?
Item relev. for delivery:
Continued on next page
125
2009 © 2009 SAP AG. All rights reserved.
| Schedule linecat. | Descrip- tion | Avail- ability | Require- ments transfer | Item relevant for delivery | Move- ment type |
|---|---|---|---|---|---|
| CN | No ma- terial re- quirements planning (MRP) | ||||
| CP | Determin- isticMate- rials plan- ning | ||||
| DN | Returns |