第 86 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
IfyoualreadyusetheclassicProfitCenterAccountingliveandplantomigrate
from classicto the new general ledger, you should carefully investigateahead
oftimewhetheritmakesmoresensetocontinueusingtheclassicProfitCenter
Accounting or use the new, integrated profit center accounting instead. The
followingquestionsshouldhelpyoumakeyourdecision:
• IsyourprofitcenteraccountingclosertoFIorCO?Considerthis: Which
department at your company is currently responsible for profit center
accounting - Controlling or Financial Accounting? If your Financial
Accountingdepartmentisalreadyresponsibleforprofitcenteraccounting,
thenintegrating profit center accountingwiththenewgeneral ledger will
probably be very advantageous.
• What areyour company'sreport requirementsfor profit centers? Do you
reportmainlyoncostsandrevenuesinprofitandlossstatements,ordoyou
also report on balance sheet accounts - perhaps even using selected key
figures for each profit center? If you also report key figures at theprofit
centerlevel,youshouldcheckwhetherthedocumentsplittingfunctionsin
the newgeneral ledger would be beneficial - for example, improving the
qualityofyourdatabyenablingsplittingtoprofitcentersbasedonorigin.
Whenyoureportonreceivablesandpayables,anotheradvantageofthenew
general ledger with documentsplittingisthat splittingto profit centersis
availableimmediately,eliminatingtheneedforperiod-endtransfers. Inturn,
this simplifies the period-end closing.
• Do you need segment reporting in future? If so, do you want to use the
new segment entity for this?
• Inwhichform do you use secondary cost elementsin Controlling? Does
yourcompanyneedflexiblereportingofsecondarycostelementsforprofit
centers or profit center groups?
• DoyourunregularreconciliationsbetweenclassicProfitCenterAccounting
andthenewgeneralledger? Ifso,howmucheffortisrequired? Integration
ofprofitcenteraccountingwiththenewgeneralledgereliminatestheneed
for reconciliation.
For more information, see SAP Note826357.
74
©2009SAPAG.Allrightsreserved. 2009
第 87 页 / 共 243 页
AC612 Lesson: Profit Center Update: Overview
Lesson Summary
You should now be able to:
• Describethebasicconceptoftheprofitcenterupdate.
75
2009 © 2009 SAP AG. All rights reserved.
第 88 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Lesson: Integration with Asset Accounting
Lesson Overview
Youlearnhowassetmovementsaremodeledinprofitcenteraccounting
Lesson Objectives
After completingthislesson, you will beable to:
• Transferandanalyzeassetmovementstoprofitcenteraccounting
Business Example
Youwanttomodelassetbalancesandtheirchangesintheprofitcenterfinancial
statements,aswellasdepreciationintheprofitcenterP&Lstatement.
Figure 46: Asset Accounting and Profit Centers
Business integration: Your objective is to model the profit center financial
statements, includingassetmovements. Area01: Postsbalancestothegeneral
ledgerinrealtime. Area20: Postsonlythedepreciation. Thesegmentandprofit
centercannotbedefineddirectlyintheassetmasterrecord. Thesystemnormally
derivesthesetwoobjectsfromacostcenteroranorder–informationthatissaved
intheassetmasterdata. TheaccountassignmenttypesaredefinedinCustomizing
for Asset Accounting: Financial Accounting (New) → Asset Accounting →
IntegrationwiththeGeneralLedger→AdditionalAccountAssignmentObjects→
SpecifyAccountAssignmentTypesforAccountAssignmentObjects. Youcanonly
maintaintheaccountassignmenttypesforactivatedaccountassignmentobjects.
76
©2009SAPAG.Allrightsreserved. 2009
第 89 页 / 共 243 页
AC612 Lesson: Integration with Asset Accounting
Figure 47: Asset Movements and Profit Centers
Documentsplittingalsoworksforacquisitionpostingswithmultipleassets(and
different account assignments). The asset reconciliation accounts (=> stock
adjustmentandvalueadjustmentaccounts)arealreadyclassifiedinternallyasasset
itemcategories. ThenewFIdrilldownreportsletyoucreatefinancialstatements
forasegmentorprofitcenterimmediately(=>transactioncodeFGI0). Therefore,
younolongerhavetotransferassetstoProfitCenterAccounting(transactioncode
1KEI) to generate the profit center financial statements, in contrast to classic
profit center accounting.
Figure 48: Depreciation and Profit Centers
77
2009 © 2009 SAP AG. All rights reserved.
第 90 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
ProgramRAPOST2000postsdepreciationitemstoAssetAccountinginRelease
R/3Enterpriseandlater. AninterestingquestionishowandwhethertheFIentities
(suchasthesegment)arepassedoninthedepreciationpostingdocuments.
About the account assignment types:
• Depreciationarea20musthaveaccountassignmenttype"DepreciationRun"
if area 20 is the area you want to use to post the cost-accounting values
(depreciation / interest) to Controlling. In this case, the "costing-based
depreciation"accountisdefinedasacostelementandrequiresaCO-relevant
account assignment for the depreciation posting run. But this account
assignment is only selected if the corresponding CO object (such as
cost center, order, or WBS element) has depreciation run as its account
assignment type. Furthermore, the segment is derived (indirectly) from
the CO object in this case.
• Depreciationarea01recordsbookdepreciation. Even if the depreciation
expenseaccountisnotdefined asacost element(that is, thesevaluesare
onlypostedinFI),thesystemstilldemandsdepreciationrunastheaccount
assignmenttypeforarea01. Otherwisethereisnowaytoderivetheasset
master record, the profit center, and (possibly) the segment from theCO
objectinthebookdepreciationdocument. Onlytheamountthatisposted
to an account that is defined as a(primary) cost element is transferred to
Controlling– butbothdepreciationamountsappearintheleadingledger.
Assoonasyouactivatedocumentsplitting,thedepreciationdocumentsalso
havetomeetthedocumentsplittingcriteria,whichmeansthecorresponding
accountsmustbedefinedasitemcategories. However,theFI-AAcomponent
alreadyperformsthesplitatsegmentlevelfordepreciationdocuments.
78
©2009SAPAG.Allrightsreserved. 2009
第 91 页 / 共 243 页
AC612 Lesson: Integration with Asset Accounting
Exercise 4: Integration with Financial
Accounting
Exercise Objectives
After completingthisexercise, youwillbeableto:
• ExplainhowassetmovementsandotherpostingsinFinancialAccounting
are transferred to profit center accounting
Business Example
Youwanttomodelassetbalancesandtheirchangesintheprofitcenterfinancial
statements,aswellasdepreciationintheprofitcenterP&Lstatement.
Task 1:
Youwant to transfer balancesheet account postings for assets to Profit Center
Accounting.
1. Posttheacquisitionoftheassetincompanycode1000inAssetAccounting
under Financial Accounting by executing the acquisition posting with
automatic offsetting entry.
Field Name Values
Existing Asset Assembly Pump ##
Posting Amount 100,000.00
Document Date Current Date
Posting Date Current Date
Save the document.
2. Analyzethetransferreddatainastandardprofitcenter reportinFinancial
AccountingcalledProfitCenterGroup: Plan/Actual/Variance(delivered
withEnhancementPackage3). Startthereportandenterthefollowingdata:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Continued on next page
79
2009 © 2009 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Existing Asset | Assembly Pump ## |
| Posting Amount | 100,000.00 |
| Document Date | Current Date |
| Posting Date | Current Date |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
第 92 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Fiscal Year Current fiscal year
Period from 1
Period to 12
Profit Center Group GROUP00
What do you notice?
Task 2:
Theconsumablescostsforassemblyinthegroup'sentirepumpdivisionareposted
toacostcenter. Enterthisinvoiceasadebitforthepumpcostcenter,T611##.
1. EnteranincominginvoiceinFinancialAccounting(transactioncodeFB60)
with the following data:
Vendor T-K500A##
Invoice date Today’s date
Amount 2200
Tax amount 200
Tax Code 1I
G/L Account 403000
D/C Debit
Amount inDoc. Curr. 2000
Cost Center T611##
Save the document.
2. AnalyzethedocumentinthefinancialstatementsandP&Lstatementofprofit
center611##. Todoso,usetheProfitCenterGroup: Plan/Actual/Variance
report with the following parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FISAnnual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
Continued on next page
80
©2009SAPAG.Allrightsreserved. 2009
| Fiscal Year | Current fiscal year |
|---|---|
| Period from | 1 |
| Period to | 12 |
| Profit Center Group | GROUP00 |
| Vendor | T-K500A## |
|---|---|
| Invoice date | Today’s date |
| Amount | 2200 |
| Tax amount | 200 |
| Tax Code | 1I |
| G/L Account | 403000 |
| D/C | Debit |
| Amount inDoc. Curr. | 2000 |
| Cost Center | T611## |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FISAnnual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
第 93 页 / 共 243 页
AC612 Lesson: Integration with Asset Accounting
Period from 1
Period to 12
Profit Center Group GROUP00
81
2009 © 2009 SAP AG. All rights reserved.
| Period from | 1 |
|---|---|
| Period to | 12 |
| Profit Center Group | GROUP00 |
第 94 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Solution 4: Integration with Financial
Accounting
Task 1:
You want totransfer balancesheet account postings for assetsto Profit Center
Accounting.
1. Posttheacquisitionoftheassetincompanycode1000inAssetAccounting
under Financial Accounting by executing the acquisition posting with
automatic offsetting entry.
Field Name Values
Existing Asset Assembly Pump ##
Posting Amount 100,000.00
Document Date Current Date
Posting Date Current Date
Save the document.
a) Accounting→Financial Accounting→FixedAssets→Posting→
Acquisition →External Acquisition→ Acquis. w/Autom. Offsetting
Entry. Enterthedataasspecifiedintheexerciseandsavethedocument.
2. AnalyzethetransferreddatainastandardprofitcenterreportinFinancial
AccountingcalledProfitCenterGroup: Plan/Actual/Variance(delivered
withEnhancementPackage3). Startthereportandenterthefollowingdata:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FISAnnual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
Period from 1
Period to 12
Profit Center Group GROUP00
Continued on next page
82
©2009SAPAG.Allrightsreserved. 2009
| Field Name | Values |
|---|---|
| Existing Asset | Assembly Pump ## |
| Posting Amount | 100,000.00 |
| Document Date | Current Date |
| Posting Date | Current Date |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FISAnnual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| Period from | 1 |
| Period to | 12 |
| Profit Center Group | GROUP00 |
第 95 页 / 共 243 页
AC612 Lesson: Integration with Asset Accounting
What do you notice?
a) Accounting->FinancialAccounting->GeneralLedger->Information
System->GeneralLedgerReports(New)->ReportsforProfitCenter
Accounting->ProfitCenterGroup: Plan/Actual/Variance. Startthe
reportasspecifiedintheexerciseandexaminethefinancialstatements.
Theassetacquisitionappearsinthefinancialstatements.
Task 2:
Theconsumablescostsforassemblyinthegroup'sentirepumpdivisionareposted
toacostcenter. Enterthisinvoiceasadebitforthepumpcostcenter,T611##.
1. EnteranincominginvoiceinFinancialAccounting(transactioncodeFB60)
with the following data:
Vendor T-K500A##
Invoice date Today’s date
Amount 2200
Tax amount 200
Tax Code 1I
G/L Account 403000
D/C Debit
Amount in Doc. Curr. 2000
Cost Center T611##
Save the document.
a) Accounting -> Financial Accounting -> Accounts Payable ->
Document Entry -> Invoice
Enterthedataasspecifiedinthetableandsave.
2. AnalyzethedocumentinthefinancialstatementsandP&Lstatementofprofit
center611##. Todoso,usetheProfitCenterGroup: Plan/Actual/Variance
report with the following parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Continued on next page
83
2009 © 2009 SAP AG. All rights reserved.
| Vendor | T-K500A## |
|---|---|
| Invoice date | Today’s date |
| Amount | 2200 |
| Tax amount | 200 |
| Tax Code | 1I |
| G/L Account | 403000 |
| D/C | Debit |
| Amount in Doc. Curr. | 2000 |
| Cost Center | T611## |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
第 96 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Plan Version 0
Fiscal Year Current fiscal year
Period from 1
Period to 12
Profit Center Group GROUP00
a) Accounting->FinancialAccounting->GeneralLedger->Information
System->GeneralLedgerReports(New)->ReportsforProfitCenter
Accounting->ProfitCenterGroup: Plan/Actual/Variance.
Theexpenseandpayablesarepostedtoprofitcenter611##.
84
©2009SAPAG.Allrightsreserved. 2009
| Plan Version | 0 |
|---|---|
| Fiscal Year | Current fiscal year |
| Period from | 1 |
| Period to | 12 |
| Profit Center Group | GROUP00 |
第 97 页 / 共 243 页
AC612 Lesson: Integration with Asset Accounting
Lesson Summary
You should now be able to:
• Transferandanalyzeassetmovementstoprofitcenteraccounting
85
2009 © 2009 SAP AG. All rights reserved.
第 98 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Lesson: Data Flow from Materials Management
Lesson Overview
YoutransferpostingsfromMaterialsManagementtoProfitCenterAccounting.
Lesson Objectives
After completingthislesson, you will beable to:
• UnderstandandcustomizetheprocessfortransferringdatafromMaterials
Management
Business Example
Outlinewhat effectsMaterialsManagement/logistics-relatedprocesseshavein
Profit Center Accounting
Figure 49: Purchase Order
Theprofitcentertowhichthedatashouldbeposteddependsonwhichmaterials
andwhichCOobjectsareinvolved. Inthecaseofapurchaseordertowarehouse,
theprofitcenteristakenfromthematerialmasterperpurchaseorderitem. The
profitcenterthatisdeterminedisforwardedtothegoodsreceiptforpurchaseorder.
86
©2009SAPAG.Allrightsreserved. 2009
第 99 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Figure 50: Goods Receipt for Purchase Order
Whenyoupostapurchaseorder,thesystempoststhegoodsusageimmediately
upongoodsreceiptifthepurchaseorderhasanaccountassignment. TheGR/IR
account istheclearing account for goodsreceivedandinvoicesreceived. This
givesyouthecostsofthematerialconsumptioninthecorrespondingprofitcenters.
Thesegmentsarederivedfromtheprofitcenterinthematerialmasterforlogistics
processesaswell. Theprofitcentercharacteristicissavedinthematerialmaster
in the Costing 1 and (General) Plant Data / Storage 2 tabs. To achieve a zero
balancesetting,thesystemcreatesvariousclearinglinesasaresultofdocument
splitting. These clearing linesgenerally alsocontain the partner objects of the
accounting characteristics. When an FI document that originated in Materials
Managementissplit,thepartnerinformationisalsoincludedintheexpenseand
material stocks line.
87
2009 © 2009 SAP AG. All rights reserved.
第 100 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Figure 51: Goods Receipt for Purchase Order
When a goods receipt posting is made, the profit center is always determined
indirectly via the preceding document.
Iftheamountontheinvoiceisdifferentfromthestandardpriceofthematerial
purchased,pricedifferencesarisewhenyouposttheinvoicereceipt. Theseprice
differencesareassignedtotheprofitcenterofthematerialpurchased,provided
that it is a nonassigned purchase order.
Ifyourpricedifferenceaccountisdefinedasacostelement,theamountisposted
to theprofitcenter ofthecorrespondingCOobject.
88
©2009SAPAG.Allrightsreserved. 2009
第 101 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Exercise 5: Data Flow from Materials
Management
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Understandhowprofitcentersaredeterminedforpurchaseordersandthe
correspondinggoodsreceiptsandinvoicereceipts
Business Example
Youwanttomodelthepurchasingprocessintheprofitcenterfinancialstatements.
Purchase orders are posted to the respective CO account assignment objects,
provided they are not raw materials orders that increase stock. The head of
FinancialAccountingisinterestedinhowprofitcentersaredeterminedforgoods
receipt postings and invoice receipts for the respective purchase orders, since
payablesshouldalsobedisplayedattheprofitcenterlevel.
Task 1:
Order raw material R-T0## for the pending production of pump R-F1##. The
goodsreceiptistoincreasethestockoftherawmaterial.
Youalsoorderamonitor(materialM-01inplant1000)chargedtotheproduction
costcenter(T611##)asareplacementforanobsoletemodel.
1. WhichprofitcenterisassignedtomaterialM-01inplant1000?
Continued on next page
89
2009 © 2009 SAP AG. All rights reserved.
第 102 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
2. CreateapurchaseorderinlogisticsinpurchasingforMaterialsManagement.
The vendor is known.
Field Name Values
Vendor 1000
Purchasing Org. 1000
Purchasing Group 001
Company Code 1000
Enter thefollowingpurchase order item:
Field Name Values
Acc.Assgmnt Cat. Cost Center
Material M-01
PO Quantity 1
Net Price 200
Plant 1000
Storage Location 0001
GototheAccountAssignmenttabintheitem. EntercostcenterT611##as
the account assignment object. Confirm bypressing Enter and check the
entryintheProfitCenterfield. Whichprofitcenterwasassigned?
3. Enter another PO item. You want to order a slug that is needed to
manufacture the pump. You want the PO to increase the stock of slugs.
Therefore,youdonotneedtoenteranaccountassignmentcategoryinthe
PO item.
Field Name Values
Acc.Assgmnt Cat. No entry
Material R-T0##
PO Quantity 100
Continued on next page
90
©2009SAPAG.Allrightsreserved. 2009
| Field Name | Values |
|---|---|
| Vendor | 1000 |
| Purchasing Org. | 1000 |
| Purchasing Group | 001 |
| Company Code | 1000 |
| Field Name | Values |
|---|---|
| Acc.Assgmnt Cat. | Cost Center |
| Material | M-01 |
| PO Quantity | 1 |
| Net Price | 200 |
| Plant | 1000 |
| Storage Location | 0001 |
| Field Name | Values |
|---|---|
| Acc.Assgmnt Cat. | No entry |
| Material | R-T0## |
| PO Quantity | 100 |
第 103 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Field Name Values
Net Price 52
Plant 1000
Storage Location 0001
Saveyourpurchaseorderandwritedownthedocumentnumber.
Task 2:
Enteragoodsreceiptforthepurchaseorderyoujustentered.
1. Enteragoodsreceiptforthepurchaseorder: EnterthePOnumberandflag
bothPOitemsasOK.UsethePOnumberfromthepreviousstep. Checkthe
AccountAssignmenttab. Whichprofitcenterdidthesystemdetermine?
Postthegoodsreceiptandwritedownthenumberofthematerialdocument.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
From Period 1
To Period 12
ProfitCenterGrouporProfitCenter GROUP## or 1010
Analyze the goods receipt postings in the financial statements and P&L
statement of the involved profit centers.
Continued on next page
91
2009 © 2009 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Net Price | 52 |
| Plant | 1000 |
| Storage Location | 0001 |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| From Period | 1 |
| To Period | 12 |
| ProfitCenterGrouporProfitCenter | GROUP## or 1010 |
第 104 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Task 3:
EnteranMMinvoicereceiptforthepreviouspurchaseorder.
1. EnteranincominginvoiceinLogisticsInvoiceVerification.
Enter the following basic data:
Field Name Values
Invoice Date Current date
Posting Date Current date
Amount 5940
Tax amount 540
Tax Code 1I (Input tax 10%)
Enterthepurchaseordernumberfromtheprevioustaskandconfirm.
Change the tax code to 1I in the item.
Entertheamount fromtheinvoiceitem inthebasic data. Saveand write
down the document number.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FISAnnual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
From Period 1
To Period 12
ProfitCenterGrouporProfitCenter GROUP## or 1010
Analyzetheinvoicereceiptsinthefinancialstatementsoftheinvolvedprofit
centers.
92
©2009SAPAG.Allrightsreserved. 2009
| Field Name | Values |
|---|---|
| Invoice Date | Current date |
| Posting Date | Current date |
| Amount | 5940 |
| Tax amount | 540 |
| Tax Code | 1I (Input tax 10%) |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FISAnnual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| From Period | 1 |
| To Period | 12 |
| ProfitCenterGrouporProfitCenter | GROUP## or 1010 |
第 105 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Solution 5: Data Flow from Materials
Management
Task 1:
Order raw material R-T0## for the pending production of pump R-F1##. The
goodsreceiptistoincreasethestockoftherawmaterial.
Youalsoorderamonitor(materialM-01inplant1000)chargedtotheproduction
costcenter(T611##)asareplacementforanobsoletemodel.
1. WhichprofitcenterisassignedtomaterialM-01inplant1000?
a) Logistics→MaterialsManagement→MaterialMaster→Material
→ Display → Display Current
Material M-01
Choose the Select View(s)pushbutton.
Choose the Costing 1 view.
Enter plant 1000.
M-01 is assigned profit center 9999.
Continued on next page
93
2009 © 2009 SAP AG. All rights reserved.
第 106 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
2. CreateapurchaseorderinlogisticsinpurchasingforMaterialsManagement.
The vendor is known.
Field Name Values
Vendor 1000
Purchasing Org. 1000
Purchasing Group 001
Company Code 1000
Enter thefollowingpurchase order item:
Field Name Values
Acc.Assgmnt Cat. Cost Center
Material M-01
PO Quantity 1
Net Price 200
Plant 1000
Storage Location 0001
GototheAccountAssignmenttabintheitem. EntercostcenterT611##as
the account assignment object. Confirm bypressing Enter and check the
entryintheProfitCenterfield. Whichprofitcenterwasassigned?
Answer: Logistics→MaterialsManagement→Purchasing→Purchase
Order→Create→Vendor/SupplyingPlantKnown
Enter the header data for the purchase order.
Profit center 611## from the master record of cost center T611## was
assigned.
3. Enter another PO item. You want to order a slug that is needed to
manufacture the pump. You want the PO to increase the stock of slugs.
Therefore,youdonotneedtoenteranaccountassignmentcategoryinthe
PO item.
Field Name Values
Acc.Assgmnt Cat. No entry
Material R-T0##
PO Quantity 100
Continued on next page
94
©2009SAPAG.Allrightsreserved. 2009
| Field Name | Values |
|---|---|
| Vendor | 1000 |
| Purchasing Org. | 1000 |
| Purchasing Group | 001 |
| Company Code | 1000 |
| Field Name | Values |
|---|---|
| Acc.Assgmnt Cat. | Cost Center |
| Material | M-01 |
| PO Quantity | 1 |
| Net Price | 200 |
| Plant | 1000 |
| Storage Location | 0001 |
| Field Name | Values |
|---|---|
| Acc.Assgmnt Cat. | No entry |
| Material | R-T0## |
| PO Quantity | 100 |
第 107 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Field Name Values
Net Price 52
Plant 1000
Storage Location 0001
Saveyourpurchaseorderandwritedownthedocumentnumber.
a) –
Task 2:
Enteragoodsreceiptforthepurchaseorderyoujustentered.
1. Enteragoodsreceiptforthepurchaseorder: EnterthePOnumberandflag
bothPOitemsasOK.UsethePOnumberfromthepreviousstep. Checkthe
AccountAssignmenttab. Whichprofitcenterdidthesystemdetermine?
Postthegoodsreceiptandwritedownthenumberofthematerialdocument.
Answer: Logistics→MaterialsManagement→Inventory Management
→ Goods Movement → Goods Receipt → For Purchase Order → PO
Number Known
Enterthepurchaseordernumberfromtheprevioustaskandconfirm.
ClicktheAccountAssignmenttabinthepurchaseorderitem. Costcenter
T611## and profit center 611## are transferred from the purchase order.
Profitcenter1010isderivedfromthematerialmasterforR-T0##.
Set the indicator for both items toOK.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
Continued on next page
95
2009 © 2009 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Net Price | 52 |
| Plant | 1000 |
| Storage Location | 0001 |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
第 108 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
From Period 1
To Period 12
ProfitCenterGrouporProfitCenter GROUP## or 1010
Analyze the goods receipt postings in the financial statements and P&L
statement of the involved profit centers.
a) Accounting→FinancialAccounting→GeneralLedger→Information
System→GeneralLedgerReports(New)→ReportsforProfitCenter
Accounting→ProfitCenterGroup: Plan/Actual/Variance.
TheP&Lstatementforprofitcenter611#showsthematerialexpense
formonitorM-01(EUR200whenyouselectbyPCgroupGROUP##).
Therawmaterialsstockofprofitcenter1010showsthestockofthe
orderedslugs(EUR5200whenyouselectbyprofitcenter1010and
selecttheRawMaterials1account: SelectthenumberandchooseGoto
→CallupreporttostarttheG/LAccountLineItemDisplay,sortedin
descending order by document date.
TheoffsettingpostingforbothitemswasmadetotheGR/IRaccount
(offsetting item in the document).
Task 3:
EnteranMMinvoicereceiptforthepreviouspurchaseorder.
1. EnteranincominginvoiceinLogisticsInvoiceVerification.
Enter the following basic data:
Field Name Values
Invoice Date Current date
Posting Date Current date
Amount 5940
Tax amount 540
Tax Code 1I (Input tax 10%)
Enterthepurchaseordernumberfromtheprevioustaskandconfirm.
Change the tax code to 1I in the item.
Continued on next page
96
©2009SAPAG.Allrightsreserved. 2009
| From Period | 1 |
|---|---|
| To Period | 12 |
| ProfitCenterGrouporProfitCenter | GROUP## or 1010 |
| Field Name | Values |
|---|---|
| Invoice Date | Current date |
| Posting Date | Current date |
| Amount | 5940 |
| Tax amount | 540 |
| Tax Code | 1I (Input tax 10%) |
第 109 页 / 共 243 页
AC612 Lesson: Data Flow from Materials Management
Enter the amountfrom the invoiceitem inthebasicdata. Save andwrite
down the document number.
a) Logistics→MaterialsManagement→LogisticsInvoiceVerification
→ Document Entry → Enter Invoice
Go to the PO Reference tab.
UsethePOnumberfromthepreviousstep. ConfirmwithEnter.
Intheinvoiceitem,scrolltotherighttotheTaxCodescolumn. Change
thetaxcodeto1I.EnterEUR5940astheinvoiceamountandEUR540
asthetaxamount. Post theincominginvoice.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
From Period 1
To Period 12
ProfitCenterGrouporProfitCenter GROUP## or 1010
Analyzetheinvoicereceiptsinthefinancialstatementsoftheinvolvedprofit
centers.
a) Accounting→FinancialAccounting→GeneralLedger→Information
System→GeneralLedgerReports(New)→ReportsforProfitCenter
Accounting→ProfitCenterGroup: Plan/Actual/Variance.
Thepayablesarereportedinprofitcenters611##and1010.
Theinputtaxisreportedinprofitcenters611##and1010.
TheGR/IRaccountisclearedastheoffsettingposting.
97
2009 © 2009 SAP AG. All rights reserved.
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| From Period | 1 |
| To Period | 12 |
| ProfitCenterGrouporProfitCenter | GROUP## or 1010 |
第 110 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Lesson Summary
You should now be able to:
• UnderstandandcustomizetheprocessfortransferringdatafromMaterials
Management
98
©2009SAPAG.Allrightsreserved. 2009
第 111 页 / 共 243 页
AC612 Lesson: Data Flow from Cost Object Controlling
Lesson: Data Flow from Cost Object Controlling
Lesson Overview
YoutransferprimaryandsecondarycostspostingsfromCostObjectControlling
to Profit Center Accounting.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Understandthesecondarycostpostingstotheassignedprofitcenters
Business Example
Explain how postings in internal accounting are updated in Profit Center
Accounting.
Figure 52: Secondary Costs
Sincethiscaseinvolvesgeneralledgeraccounting,andnotaparallelaccounting
system like the classic Profit Center Accounting, each document item must
containageneralledgeraccount intheAccountfield. For thisreason,account
determination takes place when the documents are transferred from CO the
newgeneralledgerwithinthereal-timeintegrationframework. Incontrast,in
classicProfitCenterAccounting,thesecondarycostelementisupdateddirectly
intheAccountfield. Asaresult,youcandisplaybothsecondarycostelements
andP&L/balancesheetaccountsintheAccountfieldinaReportPainterreport
99
2009 © 2009 SAP AG. All rights reserved.
第 112 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
ordrilldownreportinclassicProfitCenterAccounting. Thenewgeneralledger
makesit possibleto createa report exclusively using cost elements, as well as
displaythecostelementasadditionalinformationinareport.
The profit center of the sender account assignment object is credited and the
correspondingprofitcenterofthereceiveraccountassignmentobjectisspecified
as the partner profit center.
Inaddition,thereceiver'sprofitcenterischargedandthesender'sprofitcenteris
recorded as the partner profit center.
AllsecondaryallocationsbetweenCOobjectsaremappedtotheassignedprofit
centers through real-time integration (for example, utilization of cost center
activities for a production order).
Figure 53: Cost Object Controlling – Goods Issue
Theaboveexampleshowsthewithdrawalofamaterialfromthewarehousefora
productionorder. Theprofitcenteroftheproductionorderisdeterminedbasedon
the materials produced.
Inthisexample,thematerialmasterrecordfor therawmaterialsbelongstothe
sameprofitcenterastheproductionorderfromtheperspectiveofProfitCenter
Accounting.
Therawmaterialstoreswithdrawalfortheproductionordermapsthestock
and consumption postings to the same profit center. The profit center and
partner profit center areidentical in thiscase.
100
©2009SAPAG.Allrightsreserved. 2009
第 113 页 / 共 243 页
AC612 Lesson: Data Flow from Cost Object Controlling
Figure54: CostObjectControlling–Confirmation/Settlement
Theaboveexampleshowsthedeliveryofthematerialtomake-to-stockinventory.
Thegoodsreceiptpostingcreditstheproductionorderintheamountof450. This
amountcorrespondstothestandardpriceoftheproducedmaterial. Theinventory
valueinfinishedgoodsinventoryincreasesbythesameamount. Thedifferences
betweendebitandcredit(500-450=50)whichresultontheproductionorderare
postedtoapricedifferenceaccountuponsettlementoftheproductionorder.
Thesettlementprocesswritesofftheremainingorderbalanceof50. Thisamount
correspondstothevariancesintheproductionorderbetweentotalmanufacturing
expenseand thegoodsreceipt value. This valueis postedto apricedifference
account.
101
2009 © 2009 SAP AG. All rights reserved.
第 114 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
102
©2009SAPAG.Allrightsreserved. 2009
第 115 页 / 共 243 页
AC612 Lesson: Data Flow from Cost Object Controlling
Exercise 6: Data Flow from Cost Object
Controlling
Exercise Objectives
After completingthisexercise, youwillbeableto:
• ReportonpostingsresultingfromtheproductionprocessinFI.
Business Example
Your companywants toanalyzethe production costsof thepumpin asuitable
report in FI. To enable this, the secondary costs from production are to be
transferred to FI.
Task 1:
Create a production order in PP.
1. Createaproductionorder(transactionCO01)withthefollowingdata:
Material R-F1##
Production Plant 1000
Order Type PP01
Enter the following data in the order:
Total Quantity 50
Start Current date
Scheduling Type Forwards
Choose Functions → Release.
GototheAssignmenttabandchecktheprofitcenterassignment. Ifprofit
center 612## is assigned, save the order.
Task 2:
PostthegoodsissuefortheproductionofpumpR-F1##.
1. Enterthegoodsissue, chargedtothe productionorder,withthefollowing
data:
Continued on next page
103
2009 © 2009 SAP AG. All rights reserved.
| Material | R-F1## |
|---|---|
| Production Plant | 1000 |
| Order Type | PP01 |
| Total Quantity | 50 |
|---|---|
| Start | Current date |
| Scheduling Type | Forwards |
第 116 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
Movement Type 261
Plant 1000
Storage Location 0001
Refertotheorderandpostthegoodsissue. Thisfunctionislocatedunder
Goods Issue → Create with Reference → To Order. In the dialog box
that appears, enter the order number from theprevious task. You see the
assembliesthat comprisethepump, together with thequantitiesfromthe
production order.
Save the goods issue.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FISAnnual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
From Period 1
Period to 12
Profit Center 612##
Analyzethegoodsissuefromproduction intheP&L statement for profit
center 612##.
Task 3:
Enter theconfirmation of thecomplete order.
1. Fortestpurposes,entertheconfirmationfortheindividualorder,notforthe
individualoperationsfromtherouting(transactionCO15).
Enter aquantity of 50 pieces. No scrap or other quantitiesare generated.
Save the confirmation.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Continued on next page
104
©2009SAPAG.Allrightsreserved. 2009
| Movement Type | 261 |
|---|---|
| Plant | 1000 |
| Storage Location | 0001 |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FISAnnual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| From Period | 1 |
| Period to | 12 |
| Profit Center | 612## |
第 117 页 / 共 243 页
AC612 Lesson: Data Flow from Cost Object Controlling
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
From Period 1
To Period 12
Profit Center 612##
AnalyzethepostingintheP&Lstatementforprofitcenter612##thatresults
fromtheconfirmation. Normally, thisinvolvessecondarycostsfromCO.
Whycanweseethesecostsinthenewgeneralledger?
Task 4:
To perform the period-end closing for the order, determine any variances and
settle the order.
1. Duringtheperiod-endclosinginCostObjectControlling,youdeterminethe
variancesintheorderthatcorrespondtothecurrentbalanceoftheproduction
order. Inthesettlement,youpostthebalanceasproductiondifferencesinFI,
and therefore at the profit center level.
Executethevariancecalculationasanupdaterun.
Execute settlement as an update run.
2. Go to the information system for the new general ledger and call the
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Currency Type 10
Company Code 1000
Ledger 0L
Controlling Area 1000
FIS Annual Rep.Struc INT
Plan Version 0
Fiscal Year Current fiscal year
Continued on next page
105
2009 © 2009 SAP AG. All rights reserved.
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
| From Period | 1 |
| To Period | 12 |
| Profit Center | 612## |
| Currency Type | 10 |
|---|---|
| Company Code | 1000 |
| Ledger | 0L |
| Controlling Area | 1000 |
| FIS Annual Rep.Struc | INT |
| Plan Version | 0 |
| Fiscal Year | Current fiscal year |
第 118 页 / 共 243 页
Unit3: ActualPostingsforProfitCenterAccountinginNewGeneralLedger
Accounting AC612
From Period 1
To Period 12
Profit Center 612##
Analyzethepostinginthesettlement(productionvariances)forprofitcenter
612## that results from the confirmation.
106
©2009SAPAG.Allrightsreserved. 2009
| From Period | 1 |
|---|---|
| To Period | 12 |
| Profit Center | 612## |
第 119 页 / 共 243 页
AC612 Lesson: Data Flow from Cost Object Controlling
Solution 6: Data Flow from Cost Object
Controlling
Task 1:
Create a production order in PP.
1. Createaproductionorder(transactionCO01)withthefollowingdata:
Material R-F1##
Production Plant 1000
Order Type PP01
Enter the following data in the order:
Total Quantity 50
Start Current date
Scheduling Type Forwards
Choose Functions → Release.
GototheAssignmenttabandchecktheprofitcenterassignment. Ifprofit
center 612## is assigned, save the order.
a) Logistics→Production→ShopFloorControl→Order→Create→
With Material
Enterthedataasshowninthetable,releasetheorder,andsave.
Write down the order number.
Task 2:
PostthegoodsissuefortheproductionofpumpR-F1##.
1. Enterthegoodsissue, chargedtothe productionorder,withthefollowing
data:
Movement Type 261
Plant 1000
Storage Location 0001
Continued on next page
107
2009 © 2009 SAP AG. All rights reserved.
| Material | R-F1## |
|---|---|
| Production Plant | 1000 |
| Order Type | PP01 |
| Total Quantity | 50 |
|---|---|
| Start | Current date |
| Scheduling Type | Forwards |
| Movement Type | 261 |
|---|---|
| Plant | 1000 |
| Storage Location | 0001 |