第 266 页 / 共 403 页
Unit4: Period-endClosing AC410
3. To check whether any reconciliation postings are still open, call up the
Overview: Cost Flows for company code1000 in the current period.
DeactivatetheLineItemStatementsandReconciliationPosting.
a) Controlling→CostElement Accounting→InformationSystem→
Reports for Cost Element Accounting → Cost Flow → Overview
of Cost Flow
b)
FieldNameorDataClass Values
Company code 1000
Fiscal Year Current
Period Current
Settings
StatementforCOLineItems Deselect
Reconciliationdocument Deselect
Program → Execute
258
©2005SAPAG.Allrightsreserved. 2005/Q2
| FieldNameorDataClass | Values |
|---|---|
| Company code | 1000 |
| Fiscal Year | Current |
| Period | Current |
| Settings | |
| StatementforCOLineItems | Deselect |
| Reconciliationdocument | Deselect |
第 267 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Lesson Summary
You should now be able to:
• Make reconciliation postings in Financial Accounting, using the
reconciliation ledger
259
2005/Q2 © 2005 SAP AG. All rights reserved.
第 268 页 / 共 403 页
Unit4: Period-endClosing AC410
Lesson: The New General Ledger
Lesson Overview
Thefollowingcourseslidesprovideashortoverview,withafewsamples,ofthe
main advantages of thenewG/L inmySAP ERP.
Lesson Objectives
After completingthislesson, you will beable to:
• Describethemainadvantagesofthenew G/L
Business Example
The New General Ledger
Figure 79: The New General Ledger
SAPNote756146canalsogiveyouanoverviewoftheadvantagesinthenewG/L.
IfyouwanttolearnmoreaboutthenewG/L,youneedtoattendtrainingcourse
AC210.
Informationforexistingcustomers: Ifyoufindtheadvantagesdescribedinthe
followingslidesimportant,youcanchangetothenewG/Lduringaprojectafter
upgrading to mySAP ERP.
ThenewG/Lisintegratedwithallsubledgers(⇒FI-AP,FI-ARandFI-AA).
260
©2005SAPAG.Allrightsreserved. 2005/Q2
第 269 页 / 共 403 页
AC410 Lesson: The New General Ledger
Figure 80: Advantages of the New G/L – Overview
Thepurposeofthefollowingslidesistoexplaintheindividualadvantages.
In short, the new G/L contains functions that combine the traditional general
ledgerwiththecomponentsfromtheSpecialPurposeLedger.
Caution: Despite all of the listed improvements, the “screens” for
enteringdataandpostingsarealmostidenticaltothepreviousrelease.
Figure 81: AdvantagesinDetail–ExtendedDataStructure
TheFunctionalAreafieldisnowalsosavedintheG/L.Thismeansyounolonger
havetoactivatethecost of salesledger0Fto createaprofit andlossstatement
following cost-of-sales accounting.
261
2005/Q2 © 2005 SAP AG. All rights reserved.
第 270 页 / 共 403 页
Unit4: Period-endClosing AC410
TheProfitCenterandPartnerProfitCenterfieldsarealsorecordedintheG/L.
ThismeansyoucanusetheG/Ltoconductmanagementanalyses.
You can also use the mySAP ERP Central Component to display simplified
ManagementAccounting(⇒“COlight”)intheG/L.Theavailableobjectsare
cost centers and (primary) cost elements.
TheSegmentfieldisanewentity(characteristic/category). Itallowsyoutocarry
out segment reporting.
The table structure in the new G/L is flexibly expandable, meaning you can
include customized fields and update totals.
Standardreportscanbeusedforalloftheabovepurposes.
Figure82: Advantagesin Detail– Document(Online Split)I
Theinterfaceandthecreationoffinancialdocumentsarethesameasinprevious
releases.
An input tax rate of 16% is assumed.
CurrentlySAPsupportsthederivationofsegmentsfromprofitcenters. Profit
centerscaninturnbederivedfromacostcenter,aCO-internalorderoraproject,
for example.
262
©2005SAPAG.Allrightsreserved. 2005/Q2
第 271 页 / 共 403 页
AC410 Lesson: The New General Ledger
Figure 83: Advantagesin Detail–Document (OnlineSplit)II
Toguaranteeacontinuoussplitofthecharacteristicsegment(oranotherentity),
youneedtoactivatethedocumentsplit! Continuoussegmentationmeansthat
eachdocumentfortheactivatedentityreachesa“balance0position”.
Inadditiontothesplit,thedisplayshowstheinheritanceofthesegmenttothe
vendor and tax lines of the document.
Online split (and inheritance) replaces period-end activities “balance sheet
adjustment”(=>SAPF180)and“profitandlossadjustment”(⇒SAPF181).
Caution: Document splitting also functions with “post processing
processes”,suchasnumbers. Cashdiscountreceivedandcashdiscount
paid are distributed to entitiesaccording to the amount of the original
expenseaccountspostings(inthecaseoforiginalvendorinvoices).
Customer invoices are handled similarly in that revenues are distributed to
different entities.
263
2005/Q2 © 2005 SAP AG. All rights reserved.
第 272 页 / 共 403 页
Unit4: Period-endClosing AC410
Figure84: AdvantagesinDetail–Real-TimeCO→FIIntegration
This slide shows real-time CO → FI integration using functional area
characteristicorcriterionasanexample. Youcanalsodefinereal-timeintegration
for thecriteriacompanycode, businessarea, profit center, segment, fundsand
receivable. Theselectionisnotan“either/ordecision”–youcansimultaneously
activatereal-timeintegrationforallofthesecharacteristics.
WhatstandsoutintheFinancialAccountingdocument(⇒2b.):
• Itispostedinrealtime(perdocument). Reconciliation(⇒[only]summary
reconciliation per expenseaccount/cost element) using the reconciliation
ledger in Cost Element Accounting and transaction KALC is no longer
necessary.
• It is a document, whichdoes not require a clearing account. Clearing
accountsarestillrequiredmySAPERPforcross-companycodetransactions,
for example.
• You can togglebetweenthedocument generatedinreal timein Financial
Accounting fromtheManagement Accounting document (⇒ 2./2a.) and
viceversa: traceabilityof accountingdocuments.
Real-time CO→ FI integrationdocumentscan be logged bytracingandthen
analyzed.
264
©2005SAPAG.Allrightsreserved. 2005/Q2
第 273 页 / 共 403 页
AC410 Lesson: The New General Ledger
Figure85: AdvantagesinDetail–ParallelFinancialReporting
OneledgerinthenewG/Lhastheroleofa“leading”ledger. Thisledgerisusually
used for consolidated financial statements.
ThenewnewG/Lallowsyoutouseotherledgersinadditiontotheleadingledger
for parallel financial reporting.
• ThisfeatureisreferredtotheledgersolutioninthenewG/LinmySAPERP.
•
Caution: “Ledger” in this context does not refer to the special
ledgerasinReleaseR/3Enterprise, however.
You can still display parallel financial reporting using additional accounts
(accountsolution). Ifyouchoosethisoption,theG/Lcontainsonlyoneledger:
the leading ledger.
TheledgersolutioninthenewG/LandtheaccountsolutioninmySAPERPshould
beconsideredasequivalents. Formoreinformation,seeNote779251.
Youcancontinuetousedisplayoptionsfromearlierreleasessuchasthespecial
ledgersolutionandcompanycodesolutioniftheyweresetupbeforeyouupgrade
tomySAP ERP.They cannotbeextended, however.
265
2005/Q2 © 2005 SAP AG. All rights reserved.
第 274 页 / 共 403 页
Unit4: Period-endClosing AC410
Lesson Summary
You should now be able to:
• Describethemainadvantagesofthenew G/L
266
©2005SAPAG.Allrightsreserved. 2005/Q2
第 275 页 / 共 403 页
AC410 Lesson: Period Lock
Lesson: Period Lock
Lesson Overview
Usetheperiodlocktolockplanandactualbusinesstransactionsforacombination
of controlling area, fiscal year, and version.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
Business Example
Afterendingtheperiod-endclosing,theperiodforpostingsshouldbelockedso
thattheperiod-endclosingcannolongerbeinfluenced.
Period Lock
Figure 86: Period Lock
Usetheperiodlocktolockplanandactualbusinesstransactionsforacombination
of controlling area, fiscal year, and version.
Youcanselectindividualbusinesstransactionsforlockingfromalistofallthe
actual and plan business transactions.
Itisalsopossibletolockindividualbusinesstransactionsforalltheperiodsofthe
fiscalyear,orallbusinesstransactionsforindividualperiods.
267
2005/Q2 © 2005 SAP AG. All rights reserved.
第 276 页 / 共 403 页
Unit4: Period-endClosing AC410
Lesson Summary
You should now be able to:
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
268
©2005SAPAG.Allrightsreserved. 2005/Q2
第 277 页 / 共 403 页
AC410 Unit Summary
Unit Summary
You should now be able to:
• Explain accrual calculation
• Describehowtocreatean overhead structure
• Enter statistical key figures
• Defineandexecutetheperiodicrepostingusingthecyclesegmentmethod.
• Demonstrate periodic reposting, distribution, and assessment and the
differences between them
• Defineandexecutedistributionsandassessmentsusingthecyclesegment
method.
• Name other cost allocation functions
• Make reconciliation postings in Financial Accounting, using the
reconciliation ledger
• Describethemain advantagesof the newG/L
• Openandclosewholeperiods,orselectedbusinesstransactionsinperiods
269
2005/Q2 © 2005 SAP AG. All rights reserved.
第 278 页 / 共 403 页
UnitSummary AC410
270
©2005SAPAG.Allrightsreserved. 2005/Q2
第 279 页 / 共 403 页
AC410 Test Your Knowledge
Test Your Knowledge
1. Tocalculate costs,usethepercentagemethod.
Fillintheblankstocompletethesentence.
2. Youneedaprimarycostelementofcostelementcategory toprocessthe
accrual calculation.
Fillintheblankstocompletethesentence.
3. If youcannot finda cost element that you can useto define the overhead
rates,youcanalsousethe methodtocalculate
the accrual
Fillintheblankstocompletethesentence.
4. Statistical Key Figures
Choosethecorrectanswer(s).
□ A Thosedefinedasfixedvaluesareupdatedfromthecorresponding
postingperiodonwards, inallof thefollowingpostingperiods
of the fiscal year.
□ B Canbeusedasabasisforperiodicalallocations.
□ C Mustbedefinedwithintheframeworkoftheactivityallocation.
□ D Cannotbechangedoncetheyhavebeenentered.
5. Theperiodicrepostingcanonlyrepostprimarycosts.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
6. Asecondaryallocationcosr elementisrequired for carryingout periodic
reposting.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
7. Cycles that are assigned to the same cycle run groups can run parallel to
one another.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
271
2005/Q2 © 2005 SAP AG. All rights reserved.
第 280 页 / 共 403 页
TestYourKnowledge AC410
8. Whatadvantagesdoesthedistributionhavecomparedtoperiodicreposting?
9. Apportionment
Choosethecorrectanswer(s).
□ A Cantransfer primaryand secondarycosts.
□ B Requiresaprimarycostelementoftype42toclearthecosts.
□ C Requiresasecondarycostelementoftype43forclearing.
□ D Canbereversedandrepeatedasoftenasrequired.
□ E Canonlybeusedinconjunctionwiththeallocationstructure.
10. For what canyou usethereconciliationledger?
11. Youcanselectindividualbusinesstransactionsforlockingfromalistofthe
actual and plan business transactions.
Determinewhetherthisstatementistrueorfalse.
□ True
□ False
272
©2005SAPAG.Allrightsreserved. 2005/Q2
第 281 页 / 共 403 页
AC410 Test Your Knowledge
Answers
1. Tocalculateaccruedcosts,usethepercentagemethod.
Answer: accrued
2. Youneedaprimarycostelementofcostelementcategory3toprocessthe
accrual calculation.
Answer: 3
3. If youcannot finda cost element that you can useto define the overhead
rates,youcanalsousetheTarget=Actualmethodtocalculatetheaccrual
Answer: Target=Actual
4. Statistical Key Figures
Answer: A, B
Fixed values are entered once and then updated in the following posting
periods. Statistical key figures can be used as a basis for periodical
allocations. Theyarenotrequiredfortheactivityallocation. Therecorded
data can be changed at any time.
5. Theperiodicrepostingcanonlyrepostprimarycosts.
Answer: True
Primary postings are allocated to the receiver objects with the aid of the
periodicreposting. Secondarycostsarenotallocatedfurther.
6. Asecondaryallocationcosr elementisrequired for carryingout periodic
reposting.
Answer: False
Duringperiodicreposting,theoriginalcostelementremainsthesame.
273
2005/Q2 © 2005 SAP AG. All rights reserved.
第 282 页 / 共 403 页
TestYourKnowledge AC410
7. Cycles that areassigned to the same cycle run groups can run parallel to
one another.
Answer: False
Cycles that are assigned to different cycle run groups can run parallel to
one another.
8. Whatadvantagesdoesthedistributionhavecomparedtoperiodicreposting?
Answer: Incomparisontoperiodicrepostinginthetotalsrecord,distribution
representsacompletecreditrecord. Apartfromthat,youcanseeinthetotals
recordto which partner theclearing wasmade.
9. Apportionment
Answer: A, D
Theassessmentcanfurtherallocateprimaryandsecondarycostsbyusing
a secondary cost element of type 42. It can be reversed and repeated as
often as required.
The allocation structure canbe used to receivea more transparent image
of all costs to be assessed.
10. For what canyou usethereconciliationledger?
Answer: IfamountsareallocatedwithinManagementAccountingacross
companycodes, functionalareas, or businessareas, theinformation must
bepassedbacktoFinancialAccounting. Thisisdoneviathereconciliation
ledger.
11. Youcanselectindividualbusinesstransactionsforlockingfromalistofthe
actual and plan business transactions.
Answer: True
Bothindividualtransactionsandcompleteperiodscanbelocked.
274
©2005SAPAG.Allrightsreserved. 2005/Q2
第 283 页 / 共 403 页
Unit 5
Planning
Unit Overview
You learn to describe the purpose of cost center planning and the function of
versions. Weexplaintheuseandcreationofplanlayoutsandplanningprofiles
anddemonstrateanexampleofamanualplanningprocess. Youlearntheoptions
of automatic planning and final planning activities and how to get support in
the SAP system using planning aids.
Unit Objectives
After completing thisunit, you will beableto:
• Describethepurposeofcostcenterplanningandthefunctionofversions
• Explaintheuseofplanninglayoutsandplannerprofiles
• Set upaplanning layout and aplanner profile
• Execute a manual planning process.
• Listtheoptionsavailableunderautomaticplanning
• Describe final planning activities
• ExplaintheplanningaidsprovidedbytheSAPsystem
Unit Contents
Lesson: Planning Configuration...............................................276
Exercise 17: Planning Configuration.....................................283
Lesson: Planning Process.....................................................289
Exercise 18: Planning Process...........................................305
Lesson: Planning Aids .........................................................337
Exercise 19: Planning Aids................................................341
275
2005/Q2 © 2005 SAP AG. All rights reserved.
第 284 页 / 共 403 页
Unit5: Planning AC410
Lesson: Planning Configuration
Lesson Overview
Youuseplanningtodefinetheenterprisegoals. Youwillfamiliarizeyourselfwith
theplanning scopeof thecost center accountingand learnhowtoorganizethe
planning screen.
Lesson Objectives
After completingthislesson, you will beable to:
• Describethepurposeofcostcenterplanningandthefunctionofversions
• Explaintheuseofplanninglayoutsandplannerprofiles
• Set up aplanning layout and aplanner profile
Business Example
After you have configured the SAP system to such an extent that all actual
businesstransactionshaverunaccordingtoplan,dedicateyourselfintheproject
team to theconfigurationof theplanningfunctions.
Cost Center Planning: Goals
Figure 87: Cost Center Planning: Goals
Youuseplanningtodefinetheenterprisegoals. Bycomparingactualandplan
data, youcanfindanyvariancesandmakecorrections.
Costplanningispartoftheoverallbusinessplanningprocess,andisaprerequisite
forstandardcosting. Youusecostandquantityplanningtocalculateallocation
prices.
276
©2005SAPAG.Allrightsreserved. 2005/Q2
第 285 页 / 共 403 页
AC410 Lesson: Planning Configuration
Cost center planning has several aims:
• You plan the structure of your future business transactions for a certain
period of time.
• Youusebenchmarksto control thebusinesstransactionswithin aposting
period.
• Youmonitortheeffectivityoncethepostingperiodisclosed,bycomparing
planwithactual data, andtargetwith actual data.
• Youcreateabaseforvaluatingthebusinesstransactionsinyourenterprise.
The SAP system provides a wide range of options to help you achieve these
objectives.
Line Items in Management Accounting
Figure 88: Versions in Management Accounting
TheversiondefinitionappliesthroughoutManagementAccounting. Thisensures
thatyourdataremainsconsistentifyouusetheversionindifferentapplications,
forexampleinbothOverheadCostManagementAccountingandinProfitability
Analysis (integrated planning).
You define versions for Management Accounting centrally and add
application-specificsettingsforProfitabilityAnalysis,ProfitCenterAccounting,
and Overhead Management.
YoucanplanyourcostcentersinasmanyCOversionsasyouwish. Eachversion
intheSAPsystemistailoredtoparticularplanningrequirements.
277
2005/Q2 © 2005 SAP AG. All rights reserved.
第 286 页 / 共 403 页
Unit5: Planning AC410
Whenyoucreateacontrollingarea,theSAPsystemautomaticallycreatesversion
0, whichisvalidforfivefiscalyears. Youcanalsocreate alternativeversions
for, for example, positive or negative scenarios.
The SAP system always uses version 0 when referencing actual postings.
AlternativeversionsallowonlyforplandatastorageinCostCenterAccounting.
Planning Scope and Techniques
Figure 89: Planning Scope and Techniques
Usethelockingindicatorintheversiontolockalloftheplanningforoneplanning
year.
• Planning statistical key figures
• Planning the activity output and prices
• Planningvalue-basedandquantity-basedprimaryandsecondarycostsand
revenues
Thesubjectofthiscourseisallmanualandautomaticplanningtechniquesthat
canbeusedfortheplanningofcostsindependentofactivity. Youcanselectthe
business transactionsto be locked from alist.
Extended planning techniques that can be used for the planning of activity
quantitiesandtheactivity-dependentcostplanningaredealtwithincourseAC412.
278
©2005SAPAG.Allrightsreserved. 2005/Q2
第 287 页 / 共 403 页
AC410 Lesson: Planning Configuration
Organization of the Planning Screen
Figure 90: Organization of the Planning Screen
You enter planning data in Management Accounting using entry screens, the
layout of which you can define in Customizing. These screens are known as
planning layouts.
TherearethreeplanningareasinCostCenterAccounting:
• Cost elements / Activity Input
• Activity Output / Prices
• Statistical Key Figures
For each planning area, you create at least one planning layout. You can use
planninglayoutstodefinethecharacteristics(costcenter,costelementandsoon)
forwhichyouwanttoenterplanvalues,andsetuptheappropriatevaluecolumns.
SAPprovidesnumerouspredefinedstandard layouts.
You use planner profiles to control the planning process. In a given planner
profile,youcanassignanynumberofplanninglayoutstoanynumberofplanning
areas.
The SAP system contains standard planner profiles and standard planning
layoutsthatcoveralmosteveryconceivableplanningsituation. Youcanusethe
SAPALLplannerprofiletoplanforthethreeplanningareasusinganumberof
SAPstandardlayouts. SAPprovidestheplannerprofileSAPEASYforsituations
whereasimpleplannerprofileisrequired. Youcanalsodefineyourownplanner
profiles.
279
2005/Q2 © 2005 SAP AG. All rights reserved.
第 288 页 / 共 403 页
Unit5: Planning AC410
Youcancarryoutbothcentralized(planningofasinglecostelementforallcost
centersfor example)anddecentralizedplanning(for example,planningofall
costelementsonasinglecostcenter). Thetypeofplanningdependsontheway
your company isorganized. Youcancombinebothmethods, enabling you, for
example,toplanyourpersonnelcostscentrally,andhaveallothercostsplanned
locally by the cost center managers.
Define Planning Layout and Planner Profile
Figure 91: Defining Planning Layouts
Theplanninglayoutisveryflexible,enablingeasyandergonomicplandataentry.
Planning layouts are defined using the Report Painter. The procedure is very
similar to creating reports with Report Painter.
Aplanninglayoutconsistsofaheaderandmultipleleadandvaluecolumns.
Intheheader,entertheselectioncriteriaanddeterminewhichcharacteristicsare
to bedisplayed intheheaderarea. Thecharacteristicsfor thecurrent planning
area are predefined in the SAP System.
In the lead column you define the characteristics you want to plan. For
activity-independent cost planning, you only need one lead column for cost
elements. Foractivity-dependentcostelementplanning,youneedtodefinetwo
leadcolumns,onefortheactivitytypesandtheotherforthecostelements.
280
©2005SAPAG.Allrightsreserved. 2005/Q2
第 289 页 / 共 403 页
AC410 Lesson: Planning Configuration
Youhaveseveraloptionsfor definingvaluecolumns:
• Youcancreatecolumnswitheitherakeyfigurewithcharacteristicsorjust
characteristics. ThekeyfiguresareprovidedbySAP.Someexamplesofkey
figuresarefixedplancostsorvariableplancostsintheCOareacurrency,
consumption, activityprice, andtotalactualcosts.
• Aformula column is a valuecolumn made up of valuesfrom previously
defined columns.
• Inanattributecolumn, youhavetheoptionsfortheunit,distributionkey,
andactionattributes. Theunit and thedistributionkeyshould becreated
as an additional field in a column.
Figure 92: Defining Planner Profiles
In the planner profile, you can assign more than one planning layout to each
planningarea. Youusetheitemnumbertospecifytheorderoftheplanninglayout
in the planning area.
Intheplannerprofileyoucansetthefollowingplanningconditions:
• Youusethedefaultparametersscreentoenterdefaultvaluesintheplanner
profilesforaplanninglayout,andtospecifythattheymaynotbeoverwritten
bytheuser. Itispossibletousethesameplanninglayoutmorethanonceand
assign different default values to it.
• Byassigninganauthorization groupto another plannerprofile, you can
control the planning authorizations. This is particularly important for
decentralized planning. You can ensure that the planning is restricted to
the given area.
281
2005/Q2 © 2005 SAP AG. All rights reserved.
第 290 页 / 共 403 页
Unit5: Planning AC410
For manual planning in different planning areas, you can change the planning
layoutduringyourplanningmeeting. Youcangotothenextassignedplanning
layoutintheinitialscreenorintheoverviewscreen. Youusethefunctions“Next
Layout” and “Previous Layout”.
You can define a planner profile with settings for overhead cost planning,
profitabilityanalysis, andProfit Center Accounting.
282
©2005SAPAG.Allrightsreserved. 2005/Q2
第 291 页 / 共 403 页
AC410 Lesson: Planning Configuration
Exercise 17: Planning Configuration
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create a planning layout.
Business Example
As a member of a project team, you have reviewed all the standard planning
layoutssuppliedbySAPfortheindividualplanningareas. Someoftheselayouts
aretoobasic,sometoodetailed,soyouhavedecidedtoadaptanexistingplanning
layout to your requirements.
Task 1: Optional
ThelayoutsinplannerprofileSAPEASYaredesignedforpriceplanningandnot
for planningofactivityoutput. Usingatemplate, configureanexisting, simple
layouttocreateanewlayoutcorrespondingtothediagrambelow.
Figure 93: Simple layouts
1. Createa planninglayout for the planningarea activity type planningand
callitPL##Prices&Services. Uselayout1-262(centralpriceplanning,
simple layout) as a template.
2. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
withthekeyfigurePlanActivity. Confirmtheelementdefinition.
Continued on next page
283
2005/Q2 © 2005 SAP AG. All rights reserved.
第 292 页 / 共 403 页
Unit5: Planning AC410
3. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
withtheAttributeDistributionKey. Thiscolumndetermineshowplanned
annual activity is distributed among the periods of the fiscal year and is
thereforetheattributeforthePlanactivitycolumn. Confirmyourentries.
4. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
with the Attribute Allocation Cost Element. Branch from the element
definitionscreentothetextmaintenancescreenandenterAllocCElemasa
shorttext. Copytheshorttextandconfirmyourentries.
Save your planning layout.
Task 2:
Solve the following task:
1. AssignyourplanninglayouttoplannerprofileZ-##.
284
©2005SAPAG.Allrightsreserved. 2005/Q2
第 293 页 / 共 403 页
AC410 Lesson: Planning Configuration
Solution 17: Planning Configuration
Task 1: Optional
ThelayoutsinplannerprofileSAPEASYaredesignedforpriceplanningandnot
for planningofactivityoutput. Usingatemplate, configureanexisting, simple
layouttocreateanewlayoutcorrespondingtothediagrambelow.
Figure 94: Simple layouts
1. Createa planninglayout for the planningarea activity type planningand
callitPL##Prices&Services. Uselayout1-262(centralpriceplanning,
simple layout) as a template.
a) IMG→Controlling→CostCenterAccounting→Planning→Manual
Planning→UserdefinedPlanningLayouts→Createplanninglayout
foractivitytypeplanning→Createactivitytypeplanninglayout
b)
FieldNameorDataClass Values
Planninglayoutfield1 PL##
Planninglayoutfield2 Prices &Activities
Template
Planning layout 1-262
Create button
Continued on next page
285
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Planninglayoutfield1 | PL## |
| Planninglayoutfield2 | Prices &Activities |
| Template | |
| Planning layout | 1-262 |
第 294 页 / 共 403 页
Unit5: Planning AC410
2. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
withthekeyfigurePlanActivity. Confirmtheelementdefinition.
a) Placeyourcursor“intheL”(longtext)column.
Edit → Element → Insert element
SelectKey figurewith characteristics.
Enter
Enter the Plan activity key figure.
Confirm the element definition.
3. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
withtheAttributeDistributionKey. Thiscolumndetermineshowplanned
annual activity is distributed among the periods of the fiscal year and is
thereforetheattributeforthePlanactivitycolumn. Confirmyourentries.
a) Place your cursor in the “L” column.
Edit → Element → Insert element
Select Attribute.
Enter
Select Distribution key.
Enter
Confirm the element definition.
4. PlaceyourcursorintheL(longtext)column. Enterthecolumn(element)
with the Attribute Allocation Cost Element. Branch from the element
definitionscreentothetextmaintenancescreenandenterAllocCElemasa
shorttext. Copytheshorttextandconfirmyourentries.
Continued on next page
286
©2005SAPAG.Allrightsreserved. 2005/Q2
第 295 页 / 共 403 页
AC410 Lesson: Planning Configuration
Save your planning layout.
a) Place your cursor in the “L” column.
Edit → Element → Insert element
Select Attribute.
Enter
Select the AllocCElem attribute.
Enter
IconChangeshort, middle, and long texts
Change the short text toAllocCElem.
Icon Copy short text
Confirm the element definition.
Save your data.
Task 2:
Solve the following task:
1. AssignyourplanninglayouttoplannerprofileZ-##.
a) IMG → Controlling → Cost Center Accounting → Planning →
ManualPlanning→DefineUser-DefinedPlannerProfiles
b) Select Z-##.
Inthedialogstructure,gotoGeneralControlling.
SelectCost Centers: Activities/Prices.
Inthedialogstructure,gotoLayoutsforControlling.
Choose New entries.
Add your PL## layout.
Save your data.
287
2005/Q2 © 2005 SAP AG. All rights reserved.
第 296 页 / 共 403 页
Unit5: Planning AC410
Lesson Summary
You should now be able to:
• Describethepurposeofcostcenterplanningandthefunctionofversions
• Explaintheuseofplanninglayoutsandplannerprofiles
• Set up aplanning layout and aplanner profile
288
©2005SAPAG.Allrightsreserved. 2005/Q2
第 297 页 / 共 403 页
AC410 Lesson: Planning Process
Lesson: Planning Process
Lesson Overview
Thisrepresentsatypicalplanningsequencewithitsindividualelements.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Execute a manual planning process.
• Listtheoptionsavailableunderautomaticplanning
• Describe final planning activities
Business Example
Theprojectteamhasdecidedtoplanthecompanydatainthesamewayasinthe
processsuggestedbySAP. For thetimebeing, theprocessshall becompletely
tried in a test.
Typical Sequence of Planning Activities
Figure 95: Typical Sequence of Planning Activities
Cost center planning is used differently in almost every organization. The
industry,organizationstructures,andmanagementareasareallfactorsthataffect
planning.
289
2005/Q2 © 2005 SAP AG. All rights reserved.
第 298 页 / 共 403 页
Unit5: Planning AC410
Thefollowingcouldbea typicalplanningsequence.
• Youplanstatisticalkeyfiguresthatareusedastracingfactorsforperiodic
reposting, distribution, or assessment.
• Thenyouplanactivityoutput,aswellasthepricesfortheseactivitytypes
on each cost center. You plan the statistical key figures and the activity
outputbeforethecostelementplanning,asthesetracingfactorsdetermine
the entire cost volume.
• Nowyoucan plantheprimarycosts. Youcanusea numberof different
proceduresforthis. Youcan,forexample,directlyenterthecostsorcalculate
themfromtheresourcequantitiesmultipliedbytheresourcepriceorderive
thembyusingstatisticalkeyfigures(dependencyplanning).
• Inadditiontomanualplanning,youcanplanprimarycostsautomatically
basedonpredefinedrules(planaccrual calculation, plandistribution, and
periodicrepostingintheplan). Youcanalsoplansecondarycostelements
automatically (plan assessment).
• Aftercompletingplanning,youneedtolocktheversion,sothatunauthorized
users can no longer make any changes.
Plan Statistical Key Figures
Figure 96: Plan Statistical Key Figures
You can plan statistical key figures in order to:
• generateorganizationalkeyfiguresoncostcenters.
• Providereceiverbasesforinternal allocations.
290
©2005SAPAG.Allrightsreserved. 2005/Q2
第 299 页 / 共 403 页
AC410 Lesson: Planning Process
SAPbasicallyprovidestwoentry-optionsforplandata:
• If you use free entry, you have the option of planning all characteristic
valuesspecifiedinthefieldsoftheinitialscreen. Onlycharacteristicvalues,
whichalreadyhaveplanvalues,aredisplayed. Characteristicvalueswhich
werenotplannedonthecostcenterhavetotheenteredintheplanningscreen.
• Ifyouuseaform-basedentry,allcharacteristicvaluesspecifiedinthelines
of theinitial screenaredisplayedinthelinesoftheplanningscreen. You
only have to enter the plan values.
Distribution Keys
Figure 97: Distribution Keys
TheSAPsysteminterpretsthevaluesenteredontheoverviewscreenasthetotal
valuefortheperiodenteredontheinitialscreenforplanning. Itusesadistribution
keyfor period-baseddistribution of thetotalsvalues.
ThestandardSAPsystemcontainsdistributionkeysthatcanbeusedtodistribute
valuesbydifferent criteria. It isnot possibletochange thedefaultdistribution
keys.
Examples: Ifyouselectstandarddistributionkey1,thecorrespondingvalueis
distributedevenlytotheperiods. Distributionkey7meansthattheenteredvalue
isdistributedtotheperiodsusingthenumberofcalendardays.
Inadditiontothestandarddistributionkeys, youcandefineasmanycustomer
distributionkeysasrequired. Forexample,youcancreateadistributionkeyfor
seasonal fluctuations, or onefor shift schedules.
291
2005/Q2 © 2005 SAP AG. All rights reserved.
第 300 页 / 共 403 页
Unit5: Planning AC410
Plan Activity Output and Prices
Figure 98: Plan Activity Output and Prices
Activitytypesareallocatedusinganactivityoutputofacost center, whichis
storedinthemasterdatafortheactivitytypeasadefault. Theycanbeclearedto
cost centers, internal orders, processesandsoonto recordtheir useof internal
services.
Activity types are allocated to asecondary cost element, which isstored asa
default value in the activity type master data.
Theactivitypriceisdeterminedper“costcenter/activitytype”eithermanuallyor
in automatic activity price calculation:
• Youcancreatemanualpricesforyourcombinationof“costcentre/activity
type”,iftheactivityistohaveafixedvaluewithintheenterpriceandisnot
to bedependentonother internalactivities. Manualpricesareoftenused
ifthecostsituationonthecostcenterisnottohaveaninfluenceuponthe
price,butexternalprovidershavedefinitiveprices,orinternalresourcesare
to be specifically controlled.
• Duringtheautomaticpricecalculation,allprimaryandsecondarycosts,
which are plannedfor the respective cost centers as activity-independent
or activity-dependent, areincludedin theprice. If morethanoneactivity
typeisplannedonacostcenter,youinitallyneedtodistribute(split)these
plancosts(activity-independent)thatareonthecostcentertotheseactivity
types. (Content of AC412)
292
©2005SAPAG.Allrightsreserved. 2005/Q2
第 301 页 / 共 403 页
AC410 Lesson: Planning Process
Cost Element Planning
Figure 99: Cost Element Planning
The primary costs that are activity-independent, and are structured by cost
element are planned on cost centers. When you plan primary costs that are
activity-independent, youcanonlyplanthefixedcosts.
Youplansinglecostelementstowhichyoulaterusetocomparetheactualcosts.
Thisenablesyouto makeadifferentiated plan/actual comparison at theend
of the period.
293
2005/Q2 © 2005 SAP AG. All rights reserved.
第 302 页 / 共 403 页
Unit5: Planning AC410
Resource Planning
Figure 100: Resource Planning
GoodsandservicesthatareprocuredexternallyarecalledresourcesintheSAP
system.
Resource planning supports manual cost element planning of primary costs
andrevenuesforcostcenters,internalorders,andWBSelements. Youplanthe
amountsofresourceconsumptionthataretobeevaluatedbytheSAPsystem
during planning. (Layout 1-1R1)
Byassigningseveralresourcestoonecostelement,youcanreduceyourchart
ofaccountswithoutlosingimportantdetailsforcostanalysis.
Example: Planningthecostsof external training.
Definetheresourcemaster datafor SAP coursesand businesscourses. Assign
pricesto theresources. When you dothis, youmust take into account that the
pricesofbusinessadministrationcoursesincreaseintheeleventhperiod. Enter
thenumberofcoursedaysyouwouldliketobookyouremployeesoninresource
planning. The SAP system then automatically calculates thetraining costs for
the planning periods.
You can choosebetweenactivity-dependentandactivity-independentplanning
of resources.
Youcanalsostoredifferentpricesforeachperiodwithinaseparatepricefileand,
ifnecessary,youcanassignthemdifferentdependencies. Ifyoucreateresources
withreferencetoamaterial, the resourcesarecalculatedbased on the material
price stored in the material master.
294
©2005SAPAG.Allrightsreserved. 2005/Q2
第 303 页 / 共 403 页
AC410 Lesson: Planning Process
Ifyouupdateresourceprices,theSAPsystemautomaticallyupdatesyourplanned
costs.
Youcanalsocopyyourresourceplanningtoanotherversionorperiod. Inthis
case,theSAPsystemcopiesonlythequantitiesthathavebeenusedandevaluates
thematthesametime. Ifthepriceforaresourceis2%higherintheperiodinto
whichitwascopied,thenthecostswillalsobe2%higher.
Dependency Planning
Figure 101: Dependency Planning
In dependency planning, you can plan both activity-dependent and
activity-independentprimarycostsbasedonvaluesandquantities. Thesystem
calculatestheprimarycostsusingadependencythatcancontainstatisticalkey
figures or activity types.
Ifyouareusingvalue-baseddependencyplanning,youplancostsperunitofa
statisticalkeyfigureoractivitytype,forexample,EUR100ofofficematerialsor
EUR3,000foreachemployee. Youplanacostelement. Value-baseddependency
planning is normally used in administration.
Inquantity-baseddependencyplanning,youplantheamountsofresourcesper
unitofastatisticalkeyfigureoractivitytype,forexample,theamountofcourse
daysforeachemployeeortheamountofscrewsforeachcar. Thetotalplanned
costsarecalculatedbymultiplyingtheamountperstatisticalkeyfigureoractivity
typebytheamountofthesourceobject,thatis,thenumberofemployeesorcarsby
theresourceprice. Incontrasttovalue-baseddependencyplanning,youcanplan
theamountsofseveralresources, therebyprovidingmoredetailedcostelement
planning. Quantity-baseddependencyplanningisnormallyusedinproduction.
295
2005/Q2 © 2005 SAP AG. All rights reserved.
第 304 页 / 共 403 页
Unit5: Planning AC410
The SAP System calculates the planned costs for each period. If you have
defined different dependency prices, quantities, or resourceprices, the system
willuseameanvalueintheplanningoverviewscreen. Youcanviewtheexact
values in the period planning screen.
Ifthepricesorquantitieschange,thesystemwillrevaluateplanning.
Quantity-baseddependencyplanningdiffersfromresourceplanninginthatit
does not just evaluate the amount of resources based on the resource price; it
also takes into account the dependencyquantity and a statistical key figure or
activity type.
SAP provides the standard planner profile SAP R&R with planning layouts
for dependency planning(value-based: Layout 1-1R2, quantity-based: Layout
1-1R3).
Automatic Planning
Figure 102: Formula Planning
SAPrecommendscreatingcostelementgroupsandcostcentergroupsforusein
theSAPsystem. Formulaplanningletsyouusecalculationdependenciestoplan
yourcostcentercosts. Youcanstorethesedependenciesasformulas(independent
ofthecostcenter)inatemplate. Inthisway,costcenterswithsimilartemplates
can use the same formulas.
Formulaplanningsupportsmanualplanning. Itisparticularlysuitableforplanning
costelementswhosevaluescanbedeterminedusingthesametypeof logicon
many cost centers.
296
©2005SAPAG.Allrightsreserved. 2005/Q2
第 305 页 / 共 403 页
AC410 Lesson: Planning Process
Defineformulasinatemplatetobeabletothenmakeadynamiccalculationof
costs at the evaluation event. Use any planning values such as costs, activity
quantities, statisticalkeyfigures, andsoonasparametersfor yourformulas. If
required,youcanalsoincludeotherSAPsources,orevenexternalsources. You
can define templates for activity-dependent and/or activity-independent cost
planning.
Assign the templatetothemaster datafor each cost center. Useatemplatefor
morethan onecost center toreduceplanning time.
Excuteformulaplanning. Ifrequired,makecorrectionstothemanualplanning.
Theplanningvaluesthatyoucalculatedusingformulaplanningare,however,not
visible in the planning layout of the manual planning. This is because no data
is selected from the database.
Unlike resource and dependency planning, formula planning is an automatic
method in plan value determination. As formula planning can be run
simultaneously for more than one cost center, and depending on the template
definition, for many planning objects (cost elements, statistical key figures,
resourcesandsoon),youcansignificantlyincreasethespeedatwhichyouplan.
Figure 103: Formula Planning - Template Definition
Theplanningtemplatesdonotdependentoncostcenters,whichmeansyoucan
usethesametemplateforseveraldifferentcostcenters. Whencalculatingplan
data,youcanuseaprocedureinthesystemwhichdeterminesautomaticallywhich
planning template to use.
Youcanalsodefineformulaswhichyoucanusetocalculatepricesautomatically
when the data is evaluated.
297
2005/Q2 © 2005 SAP AG. All rights reserved.
第 306 页 / 共 403 页
Unit5: Planning AC410
Youcanalsodefinequantitiesasvariable. YoucandefineformulasthattheSAP
system will use to calculatethequantities acost center usesfor theevaluation
period.
You can set certain lines(items) of the planninglayout toactiveor inactive. If
youonlywanttoplanindividualcostelementsforcertaincostcenters,youcan
usemethodstosetthemtoactiveorinactive. Notethatwhenyouplanformulas,
only active items are taken into account.
Example:Youwouldliketodeterminetheplannedcostsforofficematerialsby
using formula planning.
AssumethateachemployeewilluseofficematerialstothevalueofEUR10per
period. Inyourplanningtemplate,enteralineforcostelement476000anduse
a formula for it, which multiplies the number of employees on the cost center
(statisticalkeyfigure)by10. Becausethiscalculationshouldonlybeappliedto
theadministrationcostcenterandnotallcostcenters,youmustdefineacondition
for it. If youwouldliketoplanEUR5ofofficematerialsper employeeforall
othercostcentersinyourorganization,youcandosointhesametemplate. To
dothis,copythefirstline, changethefactorto5intheformulaandchangethe
"equalto"signintheactivationconditionto“notequalto”. Youcanthenassign
thistemplateto all cost centersinyour organizationandonly the linesthatare
active are executed for each cost center.
Figure104: AccrualCalculation inPlan: PercentageMethod
To calculate accrued costs, use the percentage method. This is based on a
percentageoverhead,whichisrelatedtoacostelementoracostelementgroup.
298
©2005SAPAG.Allrightsreserved. 2005/Q2
第 307 页 / 共 403 页
AC410 Lesson: Planning Process
Thepercentagemethod,forexample,isusefulforaccrualcalculationsforlabor
costsrelevant tosalaries, suchasvacationbonusesorpremiums. Ifyouwould
liketousetheactualpercentagemethodandplaninyouenterprice, youshould
alsousethisproceduretoplantheaccrual. Onlythencanyoumakemeaningful
statementsanddrawmeaningfulconclusionsfromthecostanalysis.
Whenanaccrualiscalculated,thesystemdebitsthecostcenterswiththeaccrual
cost amounts. At the same time, a user-defined accrual object (cost center, or
internalorder)iscredited. Thenon-accruedtotalvaluesareplannedontheaccrual
object.
Youcreateaprimaryaccrualcostelement(costelementcategory=3)toprocess
the accrual calculation.
Figure 105: Periodic Reposting in Plan
Periodic reposting is used as a posting aid.
Primarypostings(suchas,telephonecosts)areplannedonanallocationobject
(costcenter,overheadcostorder,businessprocess,WBSelement,orcostobject),
andduringperiodicrepostingtothecorrespondingcontrollingobjects, wherea
user-defined key is used.
Thereceiversofaperiodicrepostingcanbecostcenters,WBSelements,internal
orders, or cost objects. You can restrict the number of receiver categories in
Customizing. Youcan only repost primary costs.
Youcanonlyrepostprimarycosts. Duringthisprocess,theoriginalcostelement
remains the same.
299
2005/Q2 © 2005 SAP AG. All rights reserved.
第 308 页 / 共 403 页
Unit5: Planning AC410
Line items are posted for the sender as well as for the receiver, enabling the
allocationtoberecordedindetail. TheSAPsystemdoesnotsavetheinformation
fromtheclearingcostcenterintotalsrecordsduringaperiodicreposting. This
enablestheSAPsystemtosavememorywhenstoringthedatarecords.
Periodicrepostingscanbereversedandrepeatedasoftenasrequired.
YouusetheCycle-Segmentmethodtodefinesender-receiverrelationships.
Figure 106: Plan Distribution
Thedistributionwasdesignedtotransferprimarycostsfromasendercostcenter
toreceivingManagementAccountingobjects. Thereforeitisunnecessarytoplan
activityinputsfortheactivitiesproducedbytheendcostcenters.
Primary postings (such as, energy costs) are planned on a cost center, and
allocatedbymeansoftheuser-definedkeyduringplandistribution.
Adistribution receivercanbeacost center, WBS element, internalorder, cost
object,orabusinessprocess. Youcanrestrictthenumberofreceivercategories
in Customizing. Youcanonlyrepost primary costs.
You can only distribute primary costs. During this process, the original cost
element remains the same.
Line items are posted for the sender as well as for the receiver, enabling the
allocation to be recorded in detail.
You canreverse distributionsasoftenasrequired.
YouusetheCycle-Segmentmethodtodefinesender-receiverrelationships.
300
©2005SAPAG.Allrightsreserved. 2005/Q2