第 233 页 / 共 403 页
AC410 Lesson: Cost Allocations
203## (Motor
Pool)__________________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparisons→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Navigatetoeachindividualcostcenterinthevariationmenu.
c) The following will be allocated:
Cost Center 201## 9,000
Cost Center 202## 36,000
Cost Center 203## 120,000
Continued on next page
225
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 234 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 4:
Run the actual cycle for the assessment.
1. RuntheA##cycleforthecurrentperiod,withdetaillists. SelectTestRun.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Select
Detail lists Select
Cycle ASSE##
Assessment → Execute
2. Displaythesegments. WhatdoesthefigurethreesignifyincolumnE?
Answer: Goto → Segments
ColumnRdisplaysthereceiverrulestoredineachsegment. (F1Help)
3 signifiesfixedpercentagesasthetracingfactor.
3. Callupthereceiversforeachsegment. Notedowneachreceivercostcenter.
Receiver segment ORGA##:
1. 2. 3.
Receiver segment IT-SERV##
Continued on next page
226
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Select |
| Detail lists | Select |
| Cycle | ASSE## |
| Receiver segment ORGA##: | ||
|---|---|---|
| 1. | 2. | 3. |
| Receiver segment IT-SERV## |
第 235 页 / 共 403 页
AC410 Lesson: Cost Allocations
1. 2. 3.
Receiver segment MOTO##:
1. 2. 3.
a) Place your cursor on thegiven segment.
Goto → Recipient
Repeat for each segment.
ReceiversforsegmentORGA## 202## 301## 302##
ReceiversforsegmentIT-SERV## 201## 301## 302##
ReceiversforsegmentVEHIC## --- 301## 302##
4. Notedowntheentriesthatthe201##(Organization), 202##(ITServices)
cost centers debited, and vice versa.
201##(Organization)debits202##(ITServices)with_______________
202##(ITServices)debits201##(Organization)with_______________
Answer: From the basic list
Goto → Line items
202## debits 201## with 900,
202## debits 201## with 6,000
5. Thecost center202##(ITServices)allocatesitscostsonthebasisof the
numberofPCs. Althoughthecostcenter201##(Organization)onlyhas2
PCs,atracingfactorof6isdisplayed. Provideanexplanationforthis.
Answer: ReceivertracingfactorsthataredefinedusingtheVariableportions
rulecanbeassignedwithdifferentweightingfactors. Thisweightingfactor,
whenmultipliedwiththetracing factor, enablesyoutotakein toaccount
differencesincostscausedbytheindividualreceivers.
Costcenter 201##has2PCsthat incurmaintenanceexpensethat isthree
timeshigherthanforothercostcenters, sincetheyareusedfar morethan
othercostcenters'PCs. Duetotheweightingfactorof300,thetracingfactor
for assessment is increasedfrom two to six.
Continued on next page
227
2005/Q2 © 2005 SAP AG. All rights reserved.
| 1. | 2. | 3. |
|---|---|---|
| Receiver segment MOTO##: | ||
| 1. | 2. | 3. |
| ReceiversforsegmentORGA## | 202## | 301## | 302## |
|---|---|---|---|
| ReceiversforsegmentIT-SERV## | 201## | 301## | 302## |
| ReceiversforsegmentVEHIC## | --- | 301## | 302## |
第 236 页 / 共 403 页
Unit4: Period-endClosing AC410
6. Runthecycleinanupdateruntoposttheallocations.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
Task 5:
Check theresult of theassessment in the report.
1. Callthecostcenters: actual/plan/variancereportforthecurrentperiodand
version0. Executethereportforthecostcentergroup(B20##).
Althougha100%credit(senderrule)wasdefinedforallthecostcentersin
theassessmentcycle, notallofthecost centersarecredited. Which were
not credited?
_________________________________________
_________________________________________
Continued on next page
228
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 237 页 / 共 403 页
AC410 Lesson: Cost Allocations
_________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparison→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Cost center 201## Balance + 6,000
Cost center 202## Balance + 900
2. Whywerethesecostcentersnotcompletelycredited?
(See the notes for exercise 4-3)
Answer: Cost centers 201## and 202## make allocations to each other.
Sincetheassessmentcyclewasnotdefinediteratively,onlyoneallocation
runtakesplacetocreditthesendercostcenters. Debitsthatarisefromthe
assessment remainonthereceiver cost centers.
Continued on next page
229
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 238 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 6:
Nowexecutetheassessmentwithiterationofthesegments.
1. Reverse the assessment results of the A## cycle first from the previous
exercise. Executethereversalinanupdaterun.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Reverse
Enter
2. NowchangetheA##cyclebyselectingtheIterativeindicatorintheheader
data. Save the cycle.
a) Extras → Cycle → Change
A## Enter cycle
SelecttheIterativeindicatorinthecycleheaderdata.
b) Save your data!
Continued on next page
230
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 239 页 / 共 403 页
AC410 Lesson: Cost Allocations
3. RuntheA##assessmentcycleagaininanupdaterun.
a) Switchtotheinitialscreenforassessment(Goto? Back.)
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
4. Call upthesenderinformation andnotedownthesender amountsfor the
201##(Organization)and202##(ITServices)costcenters.
201## (Organiza-
tion)________________________________________________
202## (IT
Services)__________________________________________________
Comparethenumberswiththosefromexercise3. Whatdoyounotice?
Answer: Goto → Sender
The following was allocated:
Cost Center 201## 15,254,24
Cost Center 202## 37,525,42
Duetoiteration,thecreditamountsoneachsendercostcenterarehigher.
Goto → Basic list
Continued on next page
231
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 240 页 / 共 403 页
Unit4: Period-endClosing AC410
5. Callupthelineitems. Notedowntheentriesthatthe201##(Organization),
202##(ITServices)costcentersdebited,andviceversa.
201##(Organization)debits202##(ITService)with_______________
202##(ITServices)debits201##(Organization)with_______________
Comparethenumberswiththosefromexercise4-4.
What causes this difference?
Answer: Goto → Line items
202## debits 201## with 1,525,42
202## debits 201## with 6,254,24
Bothcostcentersarecredited100%. Thisisbecausetheinitialdebitoneach
cost center from the first iteration of the assessment cycle was allocated
again by the iterative cycle flow. During the first run, cost center 201##
(Organization)debitscostcenter202##(ITService)with900.00.
Task 7: Optional
1. Optional
Usethefollowinggraphicandtablestotrack the iteration manually. The
graphic already containsthe receiver tracing factors for allocation of the
201##(Organization),and202##(ITServices)costcenters.
Complete the tables.
Hint: Theamountscanbedeterminedwithoutusingacalculator.
Any small variances that may arise in the result calculated by
the mySAP ERP system are not important for understanding the
exercise.
201##(Organization) 60%to301##(ConsultantFI/CO)
30%to302##(ConsultantLO)
10% to202## (IT service)
Continued on next page
232
©2005SAPAG.Allrightsreserved. 2005/Q2
第 241 页 / 共 403 页
AC410 Lesson: Cost Allocations
Actual Cost debit Tracing Allocation to
costs from 202## (IT factor 202##(ITService)
from the Service)
sender
1stRun 9,000 --- 10%
2ndRun --- 10%
3rdRun --- 10%
4thRun --- 10%
S 10%
202##(IT Service) 18→301##(ConsultantFI/CO)
tracing factor
12→302##(ConsultantLO)
6 →201##(Organization)
Actual Cost debit Tracing Allocation
costs from 201## factor to 201##
from the (Organization) (Organization)
sender
1stRun 36,000 --- 1/6
2ndRun --- 1/6
3rdRun --- 1/6
4thRun --- 1/6
S 1/6
a) Of this amount, 6,150.00 is redebited to cost center 201##
(Organization). During the second run, cost center 201##
(Organization)allocates6150,ofwhich610isdebitedtocostcenter
202##(IT Service). Cost center 202##(IT Service)inturn, redebits
costcenter201##(Organization)with1/6ofthatamount.
b)
201##(Organization) 60%to301##(ConsultantFI/CO)
30%to302##(ConsultantLO)
10%to202##(ITServices)
Continued on next page
233
2005/Q2 © 2005 SAP AG. All rights reserved.
| Actual costs from the sender | Cost debit from 202## (IT Service) | Tracing factor | Allocation to 202##(ITService) | |
|---|---|---|---|---|
| 1stRun | 9,000 | --- | 10% | |
| 2ndRun | --- | 10% | ||
| 3rdRun | --- | 10% | ||
| 4thRun | --- | 10% | ||
| S | 10% |
| Actual costs from the sender | Cost debit from 201## (Organization) | Tracing factor | Allocation to 201## (Organization) | |
|---|---|---|---|---|
| 1stRun | 36,000 | --- | 1/6 | |
| 2ndRun | --- | 1/6 | ||
| 3rdRun | --- | 1/6 | ||
| 4thRun | --- | 1/6 | ||
| S | 1/6 |
第 242 页 / 共 403 页
Unit4: Period-endClosing AC410
Actual Cost debit Trac- Allocation
costs from 202## ingfac- to 202## (IT
fromthe (IT Service) tor Service)
sender
1stRun 9,000 --- 10% 900,
2nd --- 6,150 10% 615,
Run
3rd --- 102,50 10% 10,25
Run
4thRun --- 1,71 10% 0,17
--- 0,03 --- ---
S 6,254,24 10% 1,525,42
c)
202##(IT Service) 18→301##(ConsultantFI/CO)
tracing factor
12→302##(ConsultantLO)
6→201##(Organization)
Actual Cost debit Trac- Allocation
costs from 201## ingfac- to 201##
fromthe (Organization) tor (Organization)
sender
1stRun 36,000 900, 1/6 6,150
2nd --- 615, 1/6 102,50
Run
3rd --- 10,25 1/6 1,71
Run
4thRun --- 0,17 1/6 0,03
S 1,525,42 1/6 6,254,24
Task 8:
Solve the following task:
1. ChecktheresultoftheassessmentintheCostCenters: actual/plan/variance
reportforthecurrentperiodandversion0. Executethereportforthecost
centergroup(B20##). Gotoeachindividualcostcenter.
Continued on next page
234
©2005SAPAG.Allrightsreserved. 2005/Q2
| Actual costs fromthe sender | Cost debit from 202## (IT Service) | Trac- ingfac- tor | Allocation to 202## (IT Service) | |
|---|---|---|---|---|
| 1stRun | 9,000 | --- | 10% | 900, |
| 2nd Run | --- | 6,150 | 10% | 615, |
| 3rd Run | --- | 102,50 | 10% | 10,25 |
| 4thRun | --- | 1,71 | 10% | 0,17 |
| --- | 0,03 | --- | --- | |
| S | 6,254,24 | 10% | 1,525,42 |
| Actual costs fromthe sender | Cost debit from 201## (Organization) | Trac- ingfac- tor | Allocation to 201## (Organization) | |
|---|---|---|---|---|
| 1stRun | 36,000 | 900, | 1/6 | 6,150 |
| 2nd Run | --- | 615, | 1/6 | 102,50 |
| 3rd Run | --- | 10,25 | 1/6 | 1,71 |
| 4thRun | --- | 0,17 | 1/6 | 0,03 |
| S | 1,525,42 | 1/6 | 6,254,24 |
第 243 页 / 共 403 页
AC410 Lesson: Cost Allocations
What do you notice?
_____________________________________________
_____________________________________________
_____________________________________________
a) CCA:InformationSystem→ReportsforCostCenterAccounting→
Plan/ActualComparison→CostcenterActual/Plan/Variance
b)
Field Name Values
Controlling Area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center Group B20##
Program → Execute
All cost centersare completely credited.
Task 9: Optional
Management Accounting employees that were not directly involved in the
definition of the cycles would like to have a brief overview of the allocation
relationships. DemonstratetheoptionsprovidedbythemySAP ERPsystemto
your colleagues.
1. Call uptheCycleoverview. Placethecursorinthecycleforthestructure
planontheassessmentcycleA##,andcallupthecycleinformation.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment→Extras→Cycle→DisplayOverview
b) ExpandtheASSE##node. DoubleclickASSE##.
Click on the Cycleinformation tabpage.
2. Display previous processing.
Continued on next page
235
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center Group | B20## |
第 244 页 / 共 403 页
Unit4: Period-endClosing AC410
You can call up the document list by double-clicking on the cycle in the
Executedorreversedcyclesdialogbox. Youcancallupthelineitemsby
double-clickingonthecorrespondingdocumentnumber.
a) Processed to date tab page
Double-clickontheselectedcycleintheExecutedorreversedcycles
dialog box. Double-click on the selected document to see the line
item view.
236
©2005SAPAG.Allrightsreserved. 2005/Q2
第 245 页 / 共 403 页
AC410 Lesson: Cost Allocations
Exercise 15: Cost Allocations
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Create an allocation structure.
Business Example
Youfeel that theassessment of acost center that onlyhasoneassessment cost
element is not detailed enough. As the assessment receiver, you require more
detailed informationonthesourceof thecostelements, suchas, assessmentof
personnel and material costs. However, you would like to avoid defining ten
segmentsif,forexample,youwanttousetenassessmentcostelementstocredit
acost center. Youdefine an allocation structureso you can usemore thanone
assessment cost element in a segment.
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
2. In customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
3. Define the assignment number 01, with the text Motor Material Costs,
and the assignment number 02, with the text Personnel Costs. For each
assignment, specifywhich primary cost elementsareto beallocated with
which assessment cost element.
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
Continued on next page
237
2005/Q2 © 2005 SAP AG. All rights reserved.
第 246 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
3. RuntheA##assessmentcycleagaininanupdaterun.
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Task 3:
Solve the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthecost
centers: Actual/Plan/Variancereportforthecurrentperiodandversion0.
Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
______________________________________________
238
©2005SAPAG.Allrightsreserved. 2005/Q2
第 247 页 / 共 403 页
AC410 Lesson: Cost Allocations
Solution 15: Cost Allocations
Task 1:
Infuture,theassessmentofthe“MotorPool”costcenteristobemoredetailed,
withtwoassessmentcostelements. Theseareassessmentofpersonnelcostsand
assessmentofthevehiclecosts. Defineanallocationstructure.
1. Create two assessment cost elements: 6316## (Assessment Motor
Materials##),and6317##(AssessmentMotorPersonnel##),usingcost
element category 42.
a) CCA: Master Data → Cost Element → Individual Processing →
Create secondary
b)
FieldNameorDataClass Values
Cost element 6316##
Valid from 01/01currentfiscalyear
To 12/31/9999
Name Assess. Vehic-mat##
Costelementcategory 42
Save your data!
Usethereferencetocreatecostelement6317##(Assess. Vehic-Pers##).
Change the name and description.
Continued on next page
239
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Cost element | 6316## |
| Valid from | 01/01currentfiscalyear |
| To | 12/31/9999 |
| Name | Assess. Vehic-mat## |
| Costelementcategory | 42 |
第 248 页 / 共 403 页
Unit4: Period-endClosing AC410
2. In customizing, define an allocation structure with the following text:
Materialandpersonnelcosts. Tonamethestructure,choosethefirstletter
ofthealphabet(A)ifyouareingroup01,Bifyouareingroup02, andJ
if you are in group 10, and so on.
a) IMG→Controlling→CostCenterAccounting→ActualPostings→
Period-EndClosing→Assessment→DefineAllocationStructure→
Edit → New entries
b)
FieldNameorDataClass Cost Elements
Structure See exercise
Text Materialandpersonnelcosts
Save your data!
3. Define the assignment number01, with the text Motor Material Costs,
and the assignment number 02, with thetext Personnel Costs. For each
assignment, specifywhich primary costelementsaretobeallocatedwith
which assessment cost element.
a) SelectthestructureandswitchtotheDialogStructuretree.
Double-click Assignments.
Edit → New entries
b)
Assignments Text
01 Vehicle material costs
02 Personnel costs
Save your data!
Continued on next page
240
©2005SAPAG.Allrightsreserved. 2005/Q2
| FieldNameorDataClass | Cost Elements |
|---|---|
| Structure | See exercise |
| Text | Materialandpersonnelcosts |
| Assignments | Text |
|---|---|
| 01 | Vehicle material costs |
| 02 | Personnel costs |
第 249 页 / 共 403 页
AC410 Lesson: Cost Allocations
4. Selectassignment01,andgototheSourcedefinition. Youwanttoallocate
all vehicle costs (from cost element 475000). Cost element 6316##
(Assessment Motor Materials ##) is to be used as the assessment cost
element for allocating the vehicle costs.
a) SelectAssignment01,andswitchtotheDialogStructuretree.
Double-click on Source.
b)
FieldNameorDataClass Cost Elements
Cost element from 475000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New entries
Assessmentcostelement 6316##
Save your data!
5. Selectassignment02,andgototheSourcedefinition. Youwanttoallocate
allpersonnelcosts(fromcostelement420000to431000).
Costelement6317##(AssessmentMotorPersonnel##)istobeusedasthe
assessmentcostelementforallocatingthepersonnelcosts.
a) Return to assignments.
SelectAssignment02,andswitchtotheDialogStructuretree.
Double-click on Source.
FieldNameorDataClass Cost Elements
Cost element from 420000
Cost element to 431000
Go to the Dialog Structure tree.
Double-click onAssessment cost element
Edit → New entries
Assessmentcostelement 6317##
Save your data!
Continued on next page
241
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost element from | 475000 |
| FieldNameorDataClass | Cost Elements |
|---|---|
| Cost element from | 420000 |
| Cost element to | 431000 |
第 250 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 2:
Youwanttofamiliarizeyourselfwiththewaytheallocationstructureworks.
1. Reverse the assessment results of the A## cycle first from the previous
exercise.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Reverse
Enter
2. Now call up your actual A## cycle up in the change mode. Call up the
Segmentoverview. CopytheMOTO##segment,andinsertacopy. Name
thenewsegmentMOTO##NEW.Thisiswhereyouenteryourallocation
structure. AstherearenowtwosegmentsforassessmentoftheMotorPool
costcenter,thesystemcreditedthecostcentermorethan100%. Therefore,
Continued on next page
242
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 251 页 / 共 403 页
AC410 Lesson: Cost Allocations
you need to either delete the old segment MOTO##, or set the locking
indicatorinthesegmentheader. Ifyousetthelockingindicator,thesegment
definitionisretained,butisnotincludedinthecyclerun. Saveyourchanges.
a) CCA: Period-End Closing → Single Functions → Allocations →
Assessment →Extras→Cycle →Change
b)
Fields Values
Cycle ASSE##
Start date 01/01currentfiscalyear
Execute icon
Goto → Overview Segments
Select the VEHIC## segment.
Copy Segment icon. Enter
Insert Segment icon
Name VEHIC##NEW
Select the new segment.
Double-clicktogotothesegmentmaintenance.
Placethecursorinthefieldfortheassessmentcostelement.
AssessmentCostElement Delete
AllocationStructure Enter chosen name
Save your data!
Goto → Segments Overview
Select the VEHIC## segment.
Choose icon
SettheLockindicator(row: Segment name).
Save your data!
Continued on next page
243
2005/Q2 © 2005 SAP AG. All rights reserved.
| Fields | Values |
|---|---|
| Cycle | ASSE## |
| Start date | 01/01currentfiscalyear |
| AssessmentCostElement | Delete |
|---|---|
| AllocationStructure | Enter chosen name |
第 252 页 / 共 403 页
Unit4: Period-endClosing AC410
3. RuntheA##assessmentcycleagaininanupdaterun.
a) Gototheinitialscreenfortheactualassessment.
Goto → Back (2x)
b)
Field Name Values
Period Current
Fiscal Year Current
Test run Deselect
Detail lists Select
Cycle ASSE##
Assessment → Execute
4. Callupthesenderinformation. Althoughonlythreecostcentersareinvolved
in the assessment, four rows are displayed in the sender list. Provide an
explanation for this
Answer: Goto → Sender
The sender list differentiates by sender cost element. In the allocation
structure, twoassessmentcostelementsweredefinedtocreditcostcenter
203##. Thesecostelementsarelistedseparatelyinthesenderlist.
Task 3:
Solve the following task:
1. Checktheresultoftheassessmentinthereportofareceiver. Callthecost
centers: Actual/Plan/Variancereportforthecurrentperiodandversion0.
Executethereportforthecostcenter302##(ConsultantLO)).
Whichadditionalinformationdoyounowhaveonthereceivercostcenter?
______________________________________________
______________________________________________
Continued on next page
244
©2005SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| Period | Current |
| Fiscal Year | Current |
| Test run | Deselect |
| Detail lists | Select |
| Cycle | ASSE## |
第 253 页 / 共 403 页
AC410 Lesson: Cost Allocations
______________________________________________
a) CCA:InformationSystem→Reports forcost center accounting→
Plan/ActualComparison→Costcenters: Actual/Plan/Variance
b)
Field Name Values
Controlling area 1000
Fiscal Year Current
From period Current
To period Current
Plan version 0
Cost Center 302##
Program → Execute
c) The report containsinformation on thecontent of the debit for cost
center302##,withvehiclecoststhatareallocatedusingtwoassessment
cost elements, duetotheallocationstructure.
Costcenter 302##isdebitedbythevehiclescostcenter, mainlydue
to material costs.
245
2005/Q2 © 2005 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Controlling area | 1000 |
| Fiscal Year | Current |
| From period | Current |
| To period | Current |
| Plan version | 0 |
| Cost Center | 302## |
第 254 页 / 共 403 页
Unit4: Period-endClosing AC410
Lesson Summary
You should now be able to:
• Demonstrate periodic reposting, distribution, and assessment and the
differences between them
• Defineandexecutedistributionsandassessmentsusingthecyclesegment
method.
• Name other cost allocation functions
246
©2005SAPAG.Allrightsreserved. 2005/Q2
第 255 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Lesson: Reconciliation Ledger
Lesson Overview
Management Accounting data is totaled and valuated in the reconciliation
ledger. YouwanttoreconciledatafromFinancialAccountingandManagement
Accounting using the reconciliation ledger.
Lesson Objectives
After completingthislesson, youwillbeable to:
• Make reconciliation postings in Financial Accounting, using the
reconciliation ledger
Business Example
Datafrominternalandexternalaccountingistobereconciled. Thereconciliation
ledgergeneratesthenecessaryreconcilitationpostings.
Reconciliation Ledger
Figure 75: Reconciliation Ledger
Management Accounting data is totaled and valuated in the reconciliation
ledger. The reconciliation ledger shows you the data in all Management
Accountingapplicationsforacostelement,aswellastotalsforcompanycodes,
businessareas, objecttypes, object classes, andsoon.
247
2005/Q2 © 2005 SAP AG. All rights reserved.
第 256 页 / 共 403 页
Unit4: Period-endClosing AC410
Althoughitisnotastatutoryrequirement,itoughttobepossibletoreconciledata
fromControllingandFinancialAccounting. Onepurpose of thereconciliation
ledger is to create reconciliation postings.
• ExternalpostingstoFinancialAccountingthataffectCostAccountingare
transferredautomatically(online,realtime)totheappropriateManagement
Accounting application component. Management Accounting totals are
updatedforthereconciliationledgerforthesepostings.
• IfamountsareallocatedwithinManagementAccountingacrosscompany
codes, functionalareas, or businessareas,theinformationmustbepassed
back to Financial Accounting. The system does not send this data to
FinancialAccountingautomatically. ManagementAccountingtotalsinthe
reconciliation ledger are updated however.
• You can use the reconciliation ledger to create a posting for reconciling
FinancialAccountingandManagementAccountingpostings.
InadditiontoCO/FIreconciliation,thereconciliationledgeralsohasthefollowing
informative functions:
• CrossManagement AccountingCostAnalysis
• Navigational aid and access to Management Accounting from the profit
and loss statement
Thereconciliationledgerdifferentiatespostingsandprovidestotalsaccordingto
the following criteria:
• Account (cost element)
• Company code
• Business area
• Origingroup (subdivision ofthecostelement)
• Objecttype(costcenter,order,project,businessprocess,andsoon)
• Object class
• Functional area
TheobjectclassisusedtocategorizetheManagementAccountingobjectsfrom
a businessmanagement perspective. ThefourManagementAccountingobject
classesareoverheadcosts(OCOST),investments(INVST),production(PRODT),
andprofitandloss,andsalesanddistribution(PROFT).
TheSAPsystemalsomakesadifferentiatedupdateofdatarecords,concentrating
onthecorrespondingbusinesstransactionandthecredit/debitindicator. During
each update, three currency amounts (currency for controlling area, company
code,andgroup)areupdated,aswellasthequantityfield.
Duringallocations,partnerrecordfields(sendersorreceivers)arealsoupdated.
Usingthisdata,youcanvaluatethevalueflowacrosscompanycodes,business
areas, and functional areas.
248
©2005SAPAG.Allrightsreserved. 2005/Q2
第 257 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Reconciliation Reports
Figure 76: Reconciliation Reports
The SAP system contains special cost element reports for evaluating the
reconciliationledger. Youcanusethesereportsforthefollowing:
• YoucancompareManagementAccountingandgeneralledgerresults.
• Displaying costs for each object class.
• Viewthecostflowsbetweencompanycodes,businessareas,andfunctional
areas.
• Drilling down to line item level.
Valuate the reconciliation ledger ona cross-application basis (for thewhole of
ManagementAccounting),andcreateanoverviewofcostsincurred. Thisenables
youtomakecomplexcost analysesusingobject types, functionalareas, object
classes, company codes, or business areas.
249
2005/Q2 © 2005 SAP AG. All rights reserved.
第 258 页 / 共 403 页
Unit4: Period-endClosing AC410
Reconciliation Postings: Account Determination
Figure77: ReconciliationPostings: AccountDetermination
The account determination function helps you decide which SAP system
reconciliationaccountspostingsaretobemadeto. Youneedtocreateadjustment
andclearing accounts in Financial Accounting.
Forstandardaccountdetermination,reconciliationaccountsareonlydefinedby
business transaction and object class.
Ifyourequiremorethanoneadjustmentaccountforyourreconciliationpostings,
thenyoucanuseextendedaccount determination. Thisenablesyoutomake
moredetailedassignmentstoreconciliationaccounts. Insubstitutionrules, you
canuseanyfieldinthereconciliationledger(functionalarea,companycode,cost
element, and so on) asa substitution condition.
If, for example, the standard account determination is based on the chart of
accounts, thencompaniesworkingwiththesamechartofaccountsalsousethe
sameadjustmentaccount. You can usetheaccount determinationtoassignthe
adjustmentaccountindependentlyofthecompanycode.
Youneedtomaintainpostingkeysforeachchartofaccounts,butitdoesnotmatter
whetheryouusestandardorextendedaccountdetermination. Ifareconciliation
account was determined using an earlier version of the standard account
determination,youcanreplacethisaccountwithanewoneusingsubstitution.
250
©2005SAPAG.Allrightsreserved. 2005/Q2
第 259 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
The SAP system needstheadjustment account for secondary cost elements
since there is no corresponding G/L account. The system usually creates the
reconciliation posting on the corresponding FI account for primary costs.
However, youcanalsodefineanextendedaccountassignmentforprimarycost
elementsifthereconciliationpostingisnottobemadetotheFIG/Laccount.
Reconciliation Postings
Figure 78: Reconciliation Postings
ReconciliationpostingsareusedfortransferringpostingsfromCOtoFIthatare
cross-company code, cross-business area, and cross-functional area. You can
createreconciliationpostingsforFI automatically.
You have the following options:
• execute all reconciliation postings,
• selectindividualcostflowsfromallrelevantcostflows
• selectcostflowstobereconciledbymeansofuser-definedrules
TheaccountdeterminationfunctionhelpsyouselecttowhichSAPreconciliation
accounts the postings are to be made to.
Youcan make reconciliation postingsatanytime. However, it is important to
ensurethatthereconciliationpostingsaremadeafterthelastrelevantCOposting.
Ifyourepeatthereconciliation,theSAPsystemonlypoststhedifferencebetween
thenewCOvaluesandthelastreconciliationpostingthatwasmade.
251
2005/Q2 © 2005 SAP AG. All rights reserved.
第 260 页 / 共 403 页
Unit4: Period-endClosing AC410
252
©2005SAPAG.Allrightsreserved. 2005/Q2
第 261 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Exercise 16: Reconciliation Ledger
Exercise Objectives
After completingthisexercise, youwillbeableto:
• Make a reconciliation posting
Business Example
Intheproject team, you decided that Management Accounting isto alwaysbe
reconciledwithFinancialAccountingwithregardtobusinessareas. Thismeans
thatinFI,youwanttofollowupcross-businessareapostingsthatyoumadein
Management Accounting during allocations.
Task 1:
Before reconciliation, examine the costflows that apply to all of the business
areas and require reconciliation.
1. In Cost Element Accounting under the cost flow node, call up the Cost
elements: Allocations between business areas for the current period in
controllingarea1000. Executethereportforthebusinessarea8000toIS##.
2. Ifyoureceiveawarningmessageaboutathresholdvalue, de-activatethe
thresholdsetting. Otherwise,continuewiththenextstep.
3. SelectVariation. SetthebusinessareatoIS##InternalServicesGroup##,
andthepartnerbusinessareato8000ExternalServicestodisplaythecost
flowsbetweenthesetwobusinessareas. Whenyouexitthereport,savethe
layoutsettingsifyoumadeachangetothethresholdvalues.
Task 2:
Process the reconciliation postings in Financial Accounting for your business
area only.
1. Execute the reconciliation postings in company code 1000, and for the
current period. You want to choose Select Reconciliation Postings
Interactively. ExecutetheprograminProductionRunandrequestDetailed
Lists.
2. Selectallrowsthatcontainbusinessarea(BusA)8000,andpartnerbusiness
area(PaBA)IS##orviceversaintheircolumns. Executethereconciliation
posting. Becarefulnottoselectanothergroup’spostings!
Continued on next page
253
2005/Q2 © 2005 SAP AG. All rights reserved.
第 262 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 3:
Review the costs that have been reconciled.
1. Underthecost flownode, callupthe Costelements: Allocationsbetween
businessareasforthecurrentperiodincontrollingarea1000. Executethe
report for thebusiness area 8000 to IS##.
2. SelectVariation. SetthebusinessareatoIS##InternalServicesGroup##,
andthepartnerbusinessareato8000ExternalServicestodisplaythecost
flowsbetween these two business areas.
Inwhatwaydoesthedisplayedreportdifferfromthatinexercise1?
3. To check whether any reconciliation postings are still open, call up the
Overview: Cost Flows for company code1000 in the current period.
DeactivatetheLineItemStatementsandReconciliationPosting.
254
©2005SAPAG.Allrightsreserved. 2005/Q2
第 263 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Solution 16: Reconciliation Ledger
Task 1:
Before reconciliation, examine the costflows that apply to all of the business
areas and require reconciliation.
1. In Cost Element Accounting under the cost flow node, call up the Cost
elements: Allocations between business areas for the current period in
controllingarea1000. Executethereportforthebusinessarea8000toIS##.
a) Controlling→Cost Element Accounting →InformationSystem→
ReportsforCostElementAccounting→CostFlow→Costelements:
Allocations between Business Areas
b)
FieldNameorDataClass Values
Controlling Area 1000
Fiscal Year Current
Period Current
Group Selection
Values 8000 to IS##
Program → Execute
2. Ifyoureceiveawarningmessageaboutathresholdvalue, de-activatethe
thresholdsetting. Otherwise,continuewiththenextstep.
a) Edit → Threshold
Deselect Active.
3. SelectVariation. SetthebusinessareatoIS##InternalServicesGroup##,
andthepartnerbusinessareato8000ExternalServicestodisplaythecost
flowsbetweenthesetwobusinessareas. Whenyouexitthereport,savethe
layoutsettingsifyoumadeachangetothethresholdvalues.
a) Ifthevariationmenuisnotshown,activateitwiththeIconnavigation
bar on/off.
ClickontheVariation: Characteristicsfield,onTrdgpart.BA.
ClickontheVariation: Bus. Areafield, onIS##.
Thereportnowdisplaysthecostflowsbetweenbusinessarea8000,
and partner business area IS##.
Continued on next page
255
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| Period | Current |
| Group Selection | |
| Values | 8000 to IS## |
第 264 页 / 共 403 页
Unit4: Period-endClosing AC410
Task 2:
Process the reconciliation postings in Financial Accounting for your business
area only.
1. Execute the reconciliation postings in company code 1000, and for the
current period. You want to choose Select Reconciliation Postings
Interactively. ExecutetheprograminProductionRunandrequestDetailed
Lists.
a) Controlling → Cost Element Accounting → Actual postings →
Reconciliation with FI
b)
FieldNameorDataClass Values
Controlling Area Select (1000)
Period Current
Fiscal Year Current
Processing Select reconciliation postings
interactively
Test run Deselect
Detail lists Select
Reconciliation Posting → Execute
2. Selectallrowsthatcontainbusinessarea(BusA)8000,andpartnerbusiness
area(PaBA)IS##orviceversaintheircolumns. Executethereconciliation
posting. Becarefulnottoselectanothergroup’spostings!
a) Select the document rows.
ReconcileselecteddocumentswithFinancialAccountingicon.
Continued on next page
256
©2005SAPAG.Allrightsreserved. 2005/Q2
| FieldNameorDataClass | Values |
|---|---|
| Controlling Area | Select (1000) |
| Period | Current |
| Fiscal Year | Current |
| Processing | Select reconciliation postings interactively |
| Test run | Deselect |
| Detail lists | Select |
第 265 页 / 共 403 页
AC410 Lesson: Reconciliation Ledger
Task 3:
Review the costs that have been reconciled.
1. Underthecostflownode,calluptheCost elements: Allocationsbetween
businessareasforthecurrentperiodincontrollingarea1000. Executethe
report for the businessarea 8000 to IS##.
a) Controlling→Cost Element Accounting →InformationSystem→
ReportsforCostElementAccounting→CostFlow→Costelements:
Allocations between Business Areas
b)
FieldNameorDataClass Values
Controlling Area 1000
Fiscal Year Current
Period Current
Group Selection
Values 8000 to IS##
Program → Execute
2. SelectVariation. SetthebusinessareatoIS##InternalServicesGroup##,
andthepartnerbusinessareato8000ExternalServicestodisplaythecost
flows between these two business areas.
Inwhatwaydoesthedisplayedreportdifferfromthatinexercise1?
Answer: If the variation menu is not shown, activate it with the Icon
navigation bar on/off.
ClickontheVariation: CharacteristicsonTrdgpart.BA.
ClickontheVariation: Bus. Areafield, onIS##.
The values from the column to be reconciled can be found under
Reconciliation posting This means that the reconciliation posting was
executed in FI.
Continued on next page
257
2005/Q2 © 2005 SAP AG. All rights reserved.
| FieldNameorDataClass | Values |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current |
| Period | Current |
| Group Selection | |
| Values | 8000 to IS## |