2826824 - Credit Check Against Overdue Open Items doesn't work on the day of the due date

作者:郑德鼎 约 2 分钟阅读 更新日期:2024-02-22 2 年前更新 标签:SD, 销售分销

2826824 - Credit Check Against Overdue Open Items doesn't work on the day of the due date

SAP Knowledge Base Article, Version: 1, Released On: 13.09.2019

ComponentFI-AR-CR

PriorityNormal

CategoryProblem

Release StatusReleased to Customer

Rated Helpful

(1 people)

Quality Rating





Symptom

Credit Check Against Overdue Open Items doesn't work on the day of the due date, even if you have maintained the configuration in transaction OVA8.

Environment

Financial Accounting (FI)

SAP R/3

SAP R/3 Enterprise

SAP ERP Central Component

SAP ERP

SAP enhancement package for SAP ERP

Reproducing the Issue

Image/Data is from SAP internal systems, sample data, or demo systems.  Any resemblance to real data is purely coincidental.

The indicate "Open items" is flagged.

The field "Maximum percentage of overdue open items/customer balance (Max. open item %)" and

the field "Number of days for considering open items (NoDays open)" are both set to zero in transaction OVA8.

However, on the day of the due date, the system does not issue any error/warning message nor block the document during the credit check.

Cause

From SAP logic, "Credit Check Against Overdue Open Items" works in conjunction with two values that you enter in the adjacent fields:

• Maximum percentage of overdue items for open items (Max. open item %)

• Number of days for considering open items (NoDays openI)

The ratio of open items that are overdue by more than the specified days to the total open items must not exceed the specified percentage.

If ("Total of Due Items" / "Total of Due Items with More Than the Number of days for considering open items" ) * 100 >  "Max. open item %", the system responses to the respective credit checks (for example, warning) and document will be blocked.

Therefore, as for the reproduce example above, from standard SAP logic, the system will not issue a warning message nor block the document, if the current date does not exceed the due date by zero day.

In other words, the system will consider the amount of items as the “Total of Due Items with More Than 0 Days in Arrears” from the next day of the Due Date.

Resolution

This is standard system behavior.

Keywords

Credit Check Against Overdue Open Items, Maximum percentage of overdue open items/customer balance, Number of days for considering open items, Max. open item %, NoDays openI, OVA8, CUSTOMER_OPEN_ITEMS_STRUCTURE, OPEN_ITEM_CHECK, overdue, open items

郑德鼎

关于作者:郑德鼎

企业信息化与 SAP 技术顾问,长期专注 SAP ABAP、FI/CO、MM、SD 等模块的技术分享与实战经验总结。查看更多介绍

来源说明:本文内容由「2826824 - Credit Check Against Overdue Open Items doesn't work on the day of the due date.docx」整理生成,仅用于内部技术分享与学习交流。