Closing Cockpit
645650,860
The closing cockpit is a very powerful tool in SAP Financial System which provides a structured interface for executing transactions and programs that form part of complex processes such as periodic and annual closing processes. The tree structure supports processes within an organizational structure such as a company code, as well as scenarios impacting multiple organizational structures. The closing cockpit as a tool is very useful in scenarios:
1. The activities are repeated periodically
2. Multiple people are responsible for completion of tasks
3. The activities are performed in a chronological order
4. A collaborative view is required by all people or units involved with a clear overview for dependencies
Two of the basic structural elements of a closing cockpit configuration is:
1. Template – The template contains the list of steps to be executed, the sequence in which they need to be executed
2. Task List – The task list contains the information contained in the template along with the actual date of execution.
The major steps in the configuration for a closing cockpit have been listed in the diagram below:
The path for accessing the closing cockpit configuration is as under:
The transaction for this is CLOCOC
The first prerequisite for configuring the closing cockpit is to register the programs in the table SCMATRANSACT. This can be done using SM30 or the closing cockpit configuration itself as shown below:
The complete list of programs which are already registered is shown. You can add additional programs including custom programs by clicking on “New Entries” as below:
Just like the programs, all the transactions which need to be execute from closing cockpit must also be registered as shown below:
Similar to Programs, you can add the custom Z or Y Transactions as well to the closing cockpit in addition to the standard transaction codes. Once the above prerequisites have been completed, we are now ready to start the configuration steps for the closing cockpit.
Creation of Organizational Hierarchies
The configuration starts with the creation of organizational hierarchy. The creation of organizational hierarchy allows to distribute the closing process in terms of organizational structures. If org elements like profit center are used in SAP system, it essentially means that segregation can be done at this level as well.
Follow the path shown in the screen shot above to start creating the Organizational Hierarchy. If the standard delivered organizational elements are not sufficient for the Business Requirement, you can add more organizational elements for Closing Cockpit as shown below:
Add the field value which needs to be added for creating the organizational hierarchy. When the field has been added, now you can specify the name of your organizational hierarchy as below:
Creation of Template
A template is used to create the individual steps in a process chain. The template is therefore a collection of tasks which need to be executed in a particular sequence keeping in orientation the overall process and organizational units involved.The steps to configure organizational template is as under:
Be mindful of the fact that the Create Template is available only in the change mode for T Code CLOCOC.
A pop up box will appear in which you can define the name of the template and also link the same to the Closing Hierarchy. You can also link it to a Factory Calender and define other time dependent attributes for the template.
When you press enter, the template is saved. Now you create all the subfolders in the order in which the activities need to be executed.This represents a systematic view of completing the closing activities.
You can right clock to modify a folder properties or to create a new sub folder
Once the folders have been created, now we need to add the task to in the form of individual activities that need to be performed as part of the overall process in the task list. This can be an execution of a transaction code or a program. For creating a task in sub folder, right click on the same and click on add task as shown below
The tasks can be created in the following types:
– Program with Variant
– Program without variant
– Transaction
– Notes
– Flow Definition
You can specify the planned run time of the activity. If the same has a deadline for completion, the same can be marked as “Critical Path” and it will display accordingly in the cockpit. You can also specify the usage of the task highlighting the usage of the same, whether the same is used in month end or period end or year end closing.
In the closing cockpit, you can also portray dependencies for a preceding step as well for a task. This allows that the preceding task is completed first successfully before execution of the current task in hand. This is an important step to plan a smooth closing.
Click on any task and on the Dependencies tab, right click to add a dependent task
The task will than show up as a preceding task as shown below
The next step in the configuration is the generation of the task list. Follow the steps as shown below
Here the name of the task list and template is same. This means that we are generating the same out of task list template. The key date is entered along with the type of closing and fiscal year details. By default task list is not in released status.While saving, if the task is ok, save it as released. This will allow the task to be scheduled.
Once all the tasks are in released, these can now be scheduled as part of month end processes.
There are standard templates for closing cockpit delivered which can also be used.
Depending on the requirements, you can create your own task list or use the standard ones.
FollowLikeRSS Feed
Alert Moderator
Assigned Tags
FIN (Finance)
SAP ERP
SD (Sales and Distribution)
Utilities
abap
bug-report
close period
View more...
Similar Blog Posts
SAP LTMC (S/4HANA) replacing LSMW - Migration cockpit - Data Migration
By CA Zunaid HingoraJan 18, 2020
SAP S/4HANA Financial Closing Cockpit At Glance
By Omer YilmazSep 02, 2019
Financial Closing Cockpit- a step by step example ( Part I )
By Erwin LeitnerJun 27, 2013
Related Questions
Migration of Closing Cockpit Templates to FCC
By Roman SemmelMar 05, 2020
SAP Closing Cockpit
By Rahul JhaJun 22, 2016
Closing Cockpit
By Former MemberNov 19, 2012
Join the Conversation
SAP TechEd
Tune in for tech talk. Stay for inspiration. Upskill your future.
SAP BTP Learning Group
SAP Business Technology Platform Learning Journeys.
Coffee Corner
Join the new Coffee Corner Discussion Group.
64 Comments
Ravi Sankar Venna
October 3, 2014 at 10:59 am
Thanks Sanil.
Rated! Liked! Book Marked! Good work. Keep it up.
Best Regards,
Ravi
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 3, 2014 at 11:02 am
Thanks Ravi. Your feedback is indeed encouraging.
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Shihab MS
October 3, 2014 at 11:31 am
HI Sanil,
Appreciated.
Could you explain the relevance of adding customer transaction and program into that table & which program you have updated there.
Shihab
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 3, 2014 at 11:51 am
Hi Shihab
The requirement for adding transactions (both SAP delivered and custom) as well as programs is because they need to be appear in the table SCMATRANSACT and SCMAPROGRAMS respectively. If the transactions and programs do not appear in these tables, you would not be able to create a task for them in the closing cockpit. The program I have added is for illustrative purpose. You may choose the required program based on your business need, be it SAP delivered or your custom program.
Let me know if I have been able to answer your question.
Thanks & regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Shihab MS
October 3, 2014 at 12:09 pm
Thanks Sanil. Now it seems working.
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 3, 2014 at 12:19 pm
It is a pleasure, Shihab
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Marssel Vilaça
October 3, 2014 at 11:58 am
Very relevant blog! Thank you for sharing!
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 3, 2014 at 12:05 pm
Thanks Marssel Vilaça.
It is indeed a pleasure to receive appreciation.
Thanks & Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Erwin Leitner
October 3, 2014 at 10:05 pm
Hello,
Thank you ver much.
Topic I am interested.
LIKE
BOOKMARK
and 5 Stars
all the best Erwin
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 5, 2014 at 6:07 am
Thanks Erwin for the encouragement
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Former Member
October 4, 2014 at 1:08 am
beats spreadsheets any time, but many users are scared to use it as it takes some getting used to.
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 5, 2014 at 6:09 am
You are correct Gregory. It takes times getting used to, but is very very useful and collaborative tool especially for today's organization which have shared service centers serving multiple markets. It helps in a fast close.
Thanks & Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Atif Farooq
October 5, 2014 at 6:48 am
Very useful sharing indeed. Keep posting.
Thanks
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 6, 2014 at 4:00 am
Thanks so much Atif.
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Narasimhulu Konnipati
October 6, 2014 at 9:39 am
New to many and much needed document.
Good Work Sanil.....
NSK
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 6, 2014 at 1:38 pm
Thanks so much Narasimhulu
regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Mariks .
October 6, 2014 at 3:54 pm
Very good document. Thanks for sharing...
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 6, 2014 at 3:57 pm
Thanks so much Mariks.
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
ManiKumar Yandrapu
October 7, 2014 at 4:25 am
Hi Sanil,
Well document Sanil, I must say this document will guide us what is SAP Cockpit & how it is work in real time enviornment / critical periodic processes & also who dealt with several orgnizations under one tree.
Regards
Mani Kumar
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 7, 2014 at 6:15 am
Thanks so much Mani for your encouragement.
Thanks & regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Former Member
October 7, 2014 at 12:58 pm
Hi Sanil,
Great work... A simple illustrative document. Thanks for sharing.
BR, Jaymin R. Bhatt
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 8, 2014 at 3:24 am
Thanks so much Jaymin
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Jose Luis Carbajo
October 13, 2014 at 8:46 am
Hi Sanil,
Keep the good job, thanks for sharing.
Regards,
Jose
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 13, 2014 at 8:54 am
Thanks so much Jose.
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Saikishore Nalbandu
October 24, 2014 at 9:01 am
Complete process. Good work..!!
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 30, 2014 at 4:27 am
Thanks much
Regards
Sanil
Like 0
Reply
Alert Moderator
Share
Former Member
October 30, 2014 at 2:04 am
thanks
good work and presentation.
regards
Vasu
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
October 30, 2014 at 4:27 am
Thanks Vasu
regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Mahmoud Elnady
November 5, 2014 at 10:45 am
Hi
Great Work. thanks for sharing this info.
Regards
Mahmoud El Nady
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
November 5, 2014 at 11:51 am
Thanks so much for the encouraging feedback.
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Vinayak Kulkarni
November 6, 2014 at 4:35 am
Informative Document.
Thanks for Sharing
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
November 6, 2014 at 5:10 am
Thanks Vinayak
regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
CA. Prasad Atmakuri
November 6, 2014 at 9:07 am
Hi Sanil
Thanks for sharing the detailed document on closing cockpit
Regards
Prasad
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
November 6, 2014 at 10:48 am
Thanks much Prasad
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Former Member
November 18, 2014 at 7:45 pm
Thanks for sharing such a nice concept. It is indeed very helpful.
Like 0
Reply
Alert Moderator
Share
Former Member
May 6, 2016 at 5:20 am
Hi,
nice document. thanks for sharing.
Regards
Karthi
Like 0
Reply
Alert Moderator
Share
Former Member
November 10, 2016 at 10:32 am
Hi Sanil ,
Thanks for sharing the detailed document on closing cockpit , its really good..!!
Just a question ,i want to set up 2 factory calendar in a single template for 2 different folders , can you let me know the configuration set up.it will be great help .
Thanks kamal
Like 0
Reply
Alert Moderator
Share
Anant Malvankar
November 17, 2016 at 3:20 pm
Hi,
Can we delete the Folder in the Task list once Task list status is " Released" or " Active"
Regards Anant
Like 0
Reply
Alert Moderator
Share
Former Member
November 28, 2016 at 10:39 am
Hi Sanil,
and thank you for this very helpful introduction to Closing Cockpit.
We are implementing this for one of our customers, but we are experiencing problems with calling some programs from CLOCOC, see below list.
Tcode / PGM CO43 / SAPLKAZB (dynpro pgm) KKAO / SAPMKKAC (dynpro pgm) CO88 / SAPLKO71 (dynpro pgm) KE30 / SAPMKCEE (COPA reports) Do you have any experience regarding how we can include these programs in Closing Cockpit??? Because we are not allowed to create these programs, and it is not possible to operate with selection variants for these programs as well. So, if we need these programs in the cockpit, how do we include these?
I thank you in advance for your reply.
Best regards Frank Jensen
Like 0
Reply
Alert Moderator
Share
Tamas Laszlo Toth
May 31, 2017 at 9:15 am
Hi Frank,
You can go to CLOCOC in menu Goto/Register program, and there you can find many programs - what I did is to find a program ending with the transaction code. For example:
CO88: RKO7CO88
KO8G: RKO7KO8G
VA88: RKO7VA88
etc.
hope it helped. if you have better solution already, please let me know.
Thanks,
Tamas
Like 0
Reply
Alert Moderator
Share
Larry Lawson
May 10, 2017 at 8:56 pm
Excellent job sir
Like 0
Reply
Alert Moderator
Share
Former Member
May 23, 2017 at 1:46 am
Hi Nice blog.
Can any one suggest how to achieve the following requirement, if already had performed.
We have a addon Financial Closing cockpit, and now the requirement is to to consolidate all the emails that workflow sends out as individual emails to the users to one email per day. Tried to implement Custom notifications, Custom Notification Scenarios BADIs. But not getting the result.
any help or suggestions would be appreciated.
Thanks
Hima Akkineni
Like 0
Reply
Alert Moderator
Share
Former Member
June 9, 2017 at 4:50 am
Dear Sanil,
Please, help me please to understand. How can i see creator of Cloco Template ? In all tcodes (cloco, clocot, clocos, clococ) when i try to view changes log, it says there is no changes at all. I could not find any table related to this. Maybe, should i switch on logging for Cloco tables or something. I just want to know which user created a templates in prod system. Thanks in advance.
Like 0
Reply
Alert Moderator
Share
Former Member
July 26, 2017 at 3:37 pm
Viktor,
in FCC 2.0 there is a change log activation option in General Customizing (SPRO-Cross Application Comp - Financial Closing Addon - General Customizing - Define General) in the Change Document section. When checked logging will be turned on
Thanks
James
Like 0
Reply
Alert Moderator
Share
Julius Baumgart
March 6, 2019 at 9:29 am
Hello everyone,
could you tell me, in which SAP or FCC table the logging of the programs, job and transactions is stored?
Thank you very much in advance.
Best,
Julius
Like 0
Reply
Alert Moderator
Share
Kazim Rizvi
June 22, 2017 at 11:38 pm
Hi friends,
Can anyone advice on how to access the below listed closing cockpit reports? I couldn't able to find any SAP standard reports on FCC on S4HANA 1610 (on prem)
1. Closing Status Overview
2. Closing Schedule Overview
3. Closing Schedule Monitor
4. Closing Schedule Analysis
5. Closing Status by Unit
Like 0
Reply
Alert Moderator
Share
Former Member
July 26, 2017 at 3:34 pm
Kazim,
I believe they may be available in BW, else FIORI
James
Like 0
Reply
Alert Moderator
Share
Kazim Rizvi
July 27, 2017 at 7:25 am
Yes we have managed to find in BW. Thanks James
Like 0
Reply
Alert Moderator
Share
Arthur MIESEN
June 30, 2017 at 3:09 pm
Hello,
Does anyone have a solution for the planning does not take into account the closed days (Saturday / Sunday, etc...) on ECC6.
Thank you.
Regards, Arthur
Like 0
Reply
Alert Moderator
Share
Former Member
July 26, 2017 at 3:33 pm
Arthur,
take a look at using the Factory Calendar option on the template header. Different Factory Calendars can be assigned based on the folder level (eg. if for a UK co code you can use "GB", or leave blank if you want to use days of the month).
James
Like 0
Reply
Alert Moderator
Share
Former Member
July 27, 2017 at 1:09 pm
Dear Sanil,
Many thanks for this post, it is helpful.
I just have some more questions concerning the roles I need to set up in CLOCOC. I am trying to implement the closing cockpit for a company with several desks in different countries. Each desk should have its own list of tasks within the same hierarchy. I chose the Controlling Area/Company code hierarchy, and copy paste the task list for each desk/company. I would like to know following :
is it possible to "filter" the list for each company code, so that they don't see the other one? The follow-up would be this way easier and clearer.
is it possible to block the user from a company code to work on a task list adressed to another company code ? I thought on working with the "Role" area for each task. Like for example I have my company codes X001 and X002, I thought of trying to lock the task by assigning the task from X001 only to X001 users. Is it possible ? If yes, can I also add a standard role (https://help.sap.com/erp2005_ehp_04/helpdata/en/44/8daa539a83d444e10000000a44538d/frameset.htm) for each task ?
Many thanks in advance for your help.
Like 0
Reply
Alert Moderator
Share
Madhu kandikuppa
January 9, 2018 at 9:40 pm
Hello Sanil,
Very nice article!!. Do you know by any chance know the table where status of a task is stored? TFC_INST_ITEM has a list of all tasks but don't see the status of it. Any help is greatly appreciated.
Like 1
Reply
Alert Moderator
Share
Eirikur G. Eyvindsson
April 13, 2018 at 9:43 am
Thanks for being generous on the FCC setup, Sanil
and thanks to all contributors on this link!
Has anyone seen this issue; For some tasks (type; Job) The Actual end Date and Time is shown correctly when the Job has been run and the task is complete. Then after some time, the Actual end Date and Time is reset to 00:00:00. (the Change document and the Job logs still show the correct Actual end Date and Time).
ECC6 Ehp, Release of FCC SAPK-20007INFCCO
Root cause: What can it be?
Like 0
Reply
Alert Moderator
Share
Pavan Kumar Arvapally
May 2, 2018 at 9:32 am
Good work Sanil Bhandari
Regards,
Pavan Kumar Arvapally
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
May 2, 2018 at 9:42 am
Thanks Pavan Kumar Arvapally
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
Sandeep Phatak
July 14, 2018 at 7:21 pm
Hi Sanil,
Thanks for your detail information.
I am currently working on S/4HANA 1709 system and when I am trying to customize new template I did not see Organization Hierarchy option on top tool bar. I have created new sub folders with Controlling Area and Company code but I am not able to assign the relevant client codes in it.
Can you please advise.
Thank you.
Sandeep
Like 1
Reply
Alert Moderator
Share
Azael Garduño
November 29, 2018 at 5:28 pm
Can we use the closing cockpit for non FI tasks?, for example, recently a customer ask me for a list of sales order which are not yet billed on a daily basis
Not sure if is a good idea to include this kind of requirements in the closing cockpit, so all involved parties have a common view of the remaining process to be executed after creating a sales order (i.e it must be billed)
Like 0
Reply
Alert Moderator
Share
MalolanTCS R
November 29, 2018 at 7:29 pm
To me this sounds like a report or a collective task list.. I have had people develop production cockpit, logistics cockpit, sales cockpit which are Portal I views or web dynpro screens.. this is the way to go.. In case you are using S4 Hana I would recommend a UI5 launchpad with notifications !!
Like 0
Reply
Alert Moderator
Share
Sanil Bhandari
Blog Post Author
December 3, 2018 at 6:02 am
Hi
Theoretically you can. However, I would not suggest to do that. Rather I would schedule a VA05 or VA06 in a background job with a suitable variant, generate end of day spool in the system and send it to a distribution list daily to billers in my organization, so that they get daily job information and create billing on time. That would be much more efficient and better way to do this
Regards
Sanil Bhandari
Like 0
Reply
Alert Moderator
Share
dhaval GALA
August 2, 2019 at 3:26 pm
Thankyou sir, really very useful.
Like 0
Reply
Alert Moderator
Share
Abubakar Shaik
August 21, 2019 at 7:46 am
Very informative and well articulated
Thanks
Abu Siddiq
Like 0
Reply
Alert Moderator
Share
Venugopal Battepati
April 14, 2020 at 4:13 am
Hello Mr. Sanil,
This is an excellent one like your other ones. thanks for sharing your expertise here.
For our client, I am currently setting up the Financial Closing Cockpit (FCC) in 1809 where I am unable to see a notification after I change the status to complete. I believe this should trigger a notification right in this case too post changing the status to ‘Task Complete’. I am using the task type as ‘Note’. Also, please let me know whether any standard workflow for this to accommodate the approval process
Thanks & Regards,
Venu
Like 0
Reply
Alert Moderator
Share
Vishal Thakur
May 1, 2020 at 2:47 am
Hello Sanil,
Thank you for the excellent exposition on FCC. Is it possible to have notifications that can send out emails? I am looking this for both SAP ECC and S/4HANA solutions.
Regards,
Vishal.
Like 0
Reply
Alert Moderator
Share
Warren Nash
January 25, 2022 at 11:13 am
Other than dependencies, is there a way to define a sequence?
Like 0
Reply
Alert Moderator
Share