第 80 页 / 共 339 页
Unit3: ActualData AC610
The balance sheet itemsare transferred to Profit Center Accounting at the end
of the period in conjunction with other period closing activities or, except for
payables/receivables,inrealtime(atthetimeofposting).
Figure35: BalanceSheetItems inProfitCenterAccounting
Thefollowingbalancesheetitemscanbetransferredonlineinrealtime:
• Materialstocks(rawmaterials,semi-finishedandfinishedproducts)
• Assets
• Work in process
You first need to enter the accounts you want to transfer to Profit Center
AccountingintheCustomizingtransactionforbalancesheetandprofitandloss
accounts. In addition you also have to transfer the opening balances from the
sourceapplicationonce. Aftertheopeningbalancehasbeencreated,thechanges
can be posted online to Profit Center Accounting. At the end of the year, you
needtocarryforwardthebalancesforthebalancesheetitemsthatwerepostedin
realtime to Profit Center Accounting.
Ifyourunaperiodictransfer,thesystemoverwritesanycorrespondingdatathat
was already transferred to Profit Center Accounting. For example, if certain
materialstockshavealreadybeentransferredinrealtimeandyouwanttoruna
periodictransfer for thesameperiod, thesystem first deletesthedata that was
alreadytransferred. Whenthishappens,youlosetheinformationontheinventory
postingdocumentsfor eachtransaction. Thetransferprogramsonlycreateone
postingpertransferobjectthatcontainsthedifferencetothepreviousbalance.
72
©2006SAPAG.Allrightsreserved. 2005/Q2
第 81 页 / 共 339 页
AC610 Lesson: A Systematic View of Profit Center Determination
Figure 36: Value Flows of Actual Values
Before you can analyze your profits by profit center, the system needs to
summarizealltheprofit-relatedpostingsinprofitcenters.
Theprofit-relatedcomponentsoftheperiodaccountingmethod(revenues,sales
deductions,changeinstockoffinishedandsemi-finishedgoods,changeinwork
inprocess,capitalizedinternalactivities,primarycostsandsecondarycosts)are
transferreddirectlyfromthemySAPERPCentralComponentFI,SD,MM,CO,
IM and FI-AA to Profit Center Accounting.
The actual data transferred from the applicationslisted above canbe analyzed
using the standard reports in the information system directly after it has been
classified for period accounting.
Tocalculateprofitsaccordingtothecostofsalesapproach, youneedtousethe
derivedfunctionalareacharacteristic. IfthisderivationisactiveinFIorCO,the
functionalareaisupdatedforeachposting,makingitpossibletocalculateprofits
accordingtothecostofsalesapproachinProfitCenterAccounting.
WhenProfitCenterAccountingisactive,thesystemonlyallowsthosepostings
which can be transferred to a profit center without errors. This automatically
ensuresthatyourdataiscompleteandreconciledwiththeothercomponents.
73
2005/Q2 © 2006 SAP AG. All rights reserved.
第 82 页 / 共 339 页
Unit3: ActualData AC610
Lesson Summary
You should now be able to:
• understand and configure the characteristic-orientated profit center
determination
• understandthedocument-orientatedprofitcenterdeterminationindifferent
business processes
74
©2006SAPAG.Allrightsreserved. 2005/Q2
第 83 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Lesson: Data Flow in Financial Accounting
Lesson Overview
YoutransferbalancesheetandP&LaccountstoProfitCenterAccounting.
Lesson Objectives
After completingthislesson, youwillbeable to:
• understandandcustomizetheprocessfortransferringdatafromFinancial
Accounting
Business Example
Describe the integration between Financial Accounting and Profit Center
Accountingwithregardtothetransferofbalancesheetitems
Figure37: BalanceSheetAccounts/P&LStatementAccountswithoutCost
Element
You can analyze selected balance sheet items by profit center. The persons in
chargeof the profit center are therefore responsible not only for theprofitable
successbutalsothefixedcapitaloftheprofitcenter. Itisalsopossibletocalculate
keyfigureswhichcomparethesuccessoftheprofitcenterwithitsfixedcapital
(Return On Investment).
Balancesheetitemscanbetransferredperiodicallyoronlineinrealtime.
75
2005/Q2 © 2006 SAP AG. All rights reserved.
第 84 页 / 共 339 页
Unit3: ActualData AC610
The system posts balance postings directly to Profit Center Accounting from
onlinepostingswhichdirectlyaffectthebalancesofassets, materialsandwork
in process. If you manage line items in Profit Center Accounting, the system
updatesaprofitcenterdocumentforeachreferencedocument(forexample, an
FI document).
Entertheaccountsthat you want totransfer toProfit Center Accountingin the
Customizingtransactionforadditionalbalancesheetandprofitandlossaccounts.
Figure 38: P&L Account with Primary Cost Element
WhenyoupostdatadirectlyinFinancialAccounting,allprimarycostelements
require an additional assignment to aCO object.
TheassignmentofthisCOobject(costcenter,order,andsoon)toaprofitcenter
ensuresthatthedataispassedontoProfitCenterAccounting. However,youcan
alsodirectlyentertheprofit centerintheFI posting
Itisrecommendedthatyoudefineyourcostelementssothattheprofitcenterfield
appearsontheaccountassignmentscreeninFinancialAccounting. Thismakesit
possible for you to verify the assignment.
Usingthedocumentdisplayfunction inFinancial Accounting, youcan display
the documents that are created in Profit Center Accounting as a result of the
postingbychoosingthemenuoptionEnvironment→DocumentEnvironment→
Accounting Documents.
76
©2006SAPAG.Allrightsreserved. 2005/Q2
第 85 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Figure 39: Revenue Account Assignment in FI
IfyouarenotusingtheSDModule,youcanpostrevenuesdirectlyinFinancial
Accounting. To do so, youneed to create the account asa revenueelement or
a sales deduction.
IfyouareusingaccountbasedProfitabilityAnalysis,youalsoneedtomakean
assignment toaprofitabilitysegment. Inthiscase, youmust specifytheprofit
center of the profitability segment.
WithoutaccountbasedProfitabilityAnalysis,thesystemupdatesthefield”Profit
center”directlytoasocalled”reconciliationobject”inControlling.
In the latter case, the posting to the reconciliation object is treated as the real
posting. Consequently,theprofitcenterassignmentisstatisticalhereaswell.
Thereconciliationobjectisacombination of companycode, businessareaand
profit center.
77
2005/Q2 © 2006 SAP AG. All rights reserved.
第 86 页 / 共 339 页
Unit3: ActualData AC610
Figure 40: Value Flow from Asset Accounting
Periodic Transfer:Assets are assigned to profit centers indirectly via their
assignment to an internal order or cost center. The program transfers the
acquisitionandmanufacturecostsaswellasaccumulateddepreciation.
Thetransfertakesplaceinconnectionwithyourperiod-endclosingactivitiesin
AssetAccounting. Sinceonlyposteddepreciationistransferred,thetransferisnot
starteduntilthepostingruniscompletedinAssetAccounting.
Assetsareassignedtoprofitcentersindirectlyviatheirassignmenttoaninternal
order or cost center.
You can transfer asset balances as often as you wish, since the system deletes
previouslytransferreddatabeforeeachtransfer. However,notethatifyouhave
transferredstocksinrealtimeinthesamemonth,youwilllosethestockposting
documentsthatwerecreatedduringthosetransfers.
Toset up therealtimetransfer, proceedasfollows:
• EntertheaccountsthatyouwanttotransfertoProfitCenterAccountinginthe
Customizingtableforadditionalbalancesheetandprofitandlossaccounts.
• Createtheopeningbalanceforassetsbyexecutingthetransferprogram.
78
©2006SAPAG.Allrightsreserved. 2005/Q2
第 87 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Exercise 4: Data Flow from Financial
Accounting
Exercise Objectives
After completingthisexercise, youwillbeableto:
• understand howprofit centers are determinedwhen postings are made in
FinancialAccountingtobalancesheetaccountsandP&Laccounts.
Business Example
Theprojectteamneedstoclarifytheprerequisitesfortransferringlineitemsof
postingsinFIonlinetoProfitCenterAccounting. UsingaG/Laccountposting,
youwanttotestwhichprofitcenterisdeterminedwhennoprofitcenterissetby
substitution in the line item.
Task 1:
1. Checkwhetherthecustomizingsettingsallowonlinepostingsandlineitems
in Profit Center Accounting.
Task 2:
1. Check whether the following accounts were created as a balance sheet
account or as a P&L account with cost element in the master data for
Financial Accounting in company code 1000. Then check whether cost
elementsexistfortheseaccountsinthemasterdatamenuforCostElement
Accounting in CO.Completethefollowingtable.
Account Balance Sheet Cost Element Cost Element
Account or Created? Category?
P&LStatement
Account?
156000
479100
430000
415000
800000
Continued on next page
79
2005/Q2 © 2006 SAP AG. All rights reserved.
| Account | Balance Sheet Account or P&LStatement Account? | Cost Element Created? | Cost Element Category? |
|---|---|---|---|
| 156000 | |||
| 479100 | |||
| 430000 | |||
| 415000 | |||
| 800000 |
第 88 页 / 共 339 页
Unit3: ActualData AC610
Task 3:
TotestthewaytheFIinterfaceworks,enterG/Laccountpostingsinthegeneral
ledgerforFinancialAccounting. Enterthefollowingdocumentsincompanycode
1000 using the current dateasthedocumentdate.
1. Enter the following posting:
G/LAccount D/C AmountinDoc. ProfitCenter
Curr.
156000 Debit 10,000 91##
156000 Debit 20,000 No entry
479100 Debit 30,000 No entry
113100 Credit 60,000
Postthedocumentandmakeanoteofthedocumentnumber.
___________________________________
2. CallthereportProfitCenter: ActualLineItemsintheinformationsystem
forProfitCenterAccountingandstartthereportwiththeparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-1
in the ReferenceDocument Number field.
3. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Listsystemsettingstosupport
your answer.
4. Whichlineitemswerenottransferred? Listsystemsettingstosupportyour
answer.
5. Enter the following CO-relevant posting:
Continued on next page
80
©2006SAPAG.Allrightsreserved. 2005/Q2
| G/LAccount | D/C | AmountinDoc. Curr. | ProfitCenter |
|---|---|---|---|
| 156000 | Debit | 10,000 | 91## |
| 156000 | Debit | 20,000 | No entry |
| 479100 | Debit | 30,000 | No entry |
| 113100 | Credit | 60,000 |
第 89 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
G/L D/C Tax Amount Document Order
Account Code Currency
Cost
Center
430000 Debit 20,000 T92##
430000 Debit 15,000 T91##
415000 Debit V0 2,500 Order
number
Trade
Show
Civil
Engi-
neering
Group
##
415000 Debit V0 1,000 4298
113100 Credit 38,500
Postthedocumentandmakeanoteofthedocumentnumber.
___________________________________
6. CallthereportProfitCenter: ActualLineItemsintheinformationsystemfor
Profit Center Accountingandstartthereport withtheparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-5
in the Reference Document Number field.
7. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Givereasonstosupportyour
answer.
8. Enter the following manual revenueposting:
Continued on next page
81
2005/Q2 © 2006 SAP AG. All rights reserved.
| G/L Account | D/C | Tax Code | Amount | Document Currency Cost Center | Order |
|---|---|---|---|---|---|
| 430000 | Debit | 20,000 | T92## | ||
| 430000 | Debit | 15,000 | T91## | ||
| 415000 | Debit | V0 | 2,500 | Order number Trade Show Civil Engi- neering Group ## | |
| 415000 | Debit | V0 | 1,000 | 4298 | |
| 113100 | Credit | 38,500 |
第 90 页 / 共 339 页
Unit3: ActualData AC610
G/L D/C Amountin Tax Profit Profitability
Account Document Code Center Segment
Currency
800000 Credit 15,000 0o 91## Sales
org.
1000
Division
01
800000 Credit 10,000 0o No Sales
entry org.
1000
802000 Credit 5,000 0o No Sales
entry org.
1000
113100 Debit 30,000
Postthedocumentandmakeanoteofthedocumentnumber.
___________________________________________
9. CallthereportProfitCenter: ActualLineItemsintheinformationsystemfor
ProfitCenterAccountingandstartthereportwiththeparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-8
in the Reference Document Numberfield.
10. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Givereasonstosupportyour
answer.
Task 4:
1. Youwanttoobtainanoverallviewofthecostsandrevenuesituationatprofit
centerlevel. Todothis,callthelist-orientatedreportProfitCenterGroup:
Plan/Actual/Varianceintheinformationsystemandstarttheselectionwith
the following parameters:
Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1-12
Continued on next page
82
©2006SAPAG.Allrightsreserved. 2005/Q2
| G/L Account | D/C | Amountin Document Currency | Tax Code | Profit Center | Profitability Segment |
|---|---|---|---|---|---|
| 800000 | Credit | 15,000 | 0o | 91## | Sales org. 1000 Division 01 |
| 800000 | Credit | 10,000 | 0o | No entry | Sales org. 1000 |
| 802000 | Credit | 5,000 | 0o | No entry | Sales org. 1000 |
| 113100 | Debit | 30,000 |
| Field Name | Value |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current fiscal year |
| Period | 1-12 |
第 91 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Field Name Value
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Whatcanyousayaboutthecurrentrevenuesituationofyourprofitcenter?
_____________________________________________________
Which posted values with regard to the financial statements can be
determined?
_____________________________________________________
83
2005/Q2 © 2006 SAP AG. All rights reserved.
| Field Name | Value |
|---|---|
| Plan Version | 0 |
| Profit Center | GR## |
| ProfitandLossAccountsGroup | 3000000.INT |
| BalanceSheetAccountGroup | 1000000.INT |
第 92 页 / 共 339 页
Unit3: ActualData AC610
Solution 4: Data Flow from Financial
Accounting
Task 1:
1. Checkwhetherthecustomizingsettingsallowonlinepostingsandlineitems
in Profit Center Accounting.
a) ORK2: Profit Center Accounting → Basic Settings→ Controlling
AreaSettings→ActivateDirectPostings→SetControlParameters
for Actual Data
Incontrollingarea1000,bothonlinetransferandtransferoflineitems
is set.
Task 2:
1. Check whether the following accounts were created as a balance sheet
account or as a P&L account with cost element in the master data for
Financial Accounting in company code 1000. Then check whether cost
elementsexistfortheseaccountsinthemasterdatamenuforCostElement
AccountinginCO.Completethefollowing table.
Account Balance Sheet Cost Element Cost Element
Account or Created? Category?
P&LStatement
Account?
156000 Balance sheet No -
account
479100 P&L statement No -
account
Continued on next page
84
©2006SAPAG.Allrightsreserved. 2005/Q2
| Account | Balance Sheet Account or P&LStatement Account? | Cost Element Created? | Cost Element Category? |
|---|---|---|---|
| 156000 | Balance sheet account | No | - |
| 479100 | P&L statement account | No | - |
第 93 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Account Balance Sheet Cost Element Cost Element
Account or Created? Category?
P&LStatement
Account?
430000 P&L statement Yes 01Primarycosts
account
415000 P&L statement Yes 01Primarycosts
account
800000 P&L statement Yes 11Revenues
account
a) AccountmasterrecordsinFinancialAccounting:
Accounting →Financial Accounting→General Ledger →Master
Records→G/LAccounts→IndividualProcessing→Centrally
OntheType/Descriptiontabpage,youcanseewhethertheaccountisa
balancesheetaccountorP&Lstatementaccount.
Cost element master recordsin Controlling:
Accounting → Controlling → Cost Element Accounting → Master
Data→CostElement→IndividualProcessing→Display
Ifacostelementexists,thesystemdisplaysitandyoucanseethecost
elementcategoryinthemasterrecord. If nocostelement exists, the
system displays the error message The cost element does not exist
in controlling area 1000.
Task 3:
TotestthewaytheFIinterfaceworks,enterG/Laccountpostingsinthegeneral
ledgerforFinancialAccounting. Enterthefollowingdocumentsincompanycode
1000usingthecurrent date asthedocumentdate.
1. Enter the following posting:
G/LAccount D/C AmountinDoc. ProfitCenter
Curr.
156000 Debit 10,000 91##
156000 Debit 20,000 No entry
479100 Debit 30,000 No entry
113100 Credit 60,000
Postthedocumentandmakeanoteofthedocumentnumber.
Continued on next page
85
2005/Q2 © 2006 SAP AG. All rights reserved.
| Account | Balance Sheet Account or P&LStatement Account? | Cost Element Created? | Cost Element Category? |
|---|---|---|---|
| 430000 | P&L statement account | Yes | 01Primarycosts |
| 415000 | P&L statement account | Yes | 01Primarycosts |
| 800000 | P&L statement account | Yes | 11Revenues |
| G/LAccount | D/C | AmountinDoc. Curr. | ProfitCenter |
|---|---|---|---|
| 156000 | Debit | 10,000 | 91## |
| 156000 | Debit | 20,000 | No entry |
| 479100 | Debit | 30,000 | No entry |
| 113100 | Credit | 60,000 |
第 94 页 / 共 339 页
Unit3: ActualData AC610
___________________________________
a) Accounting→FinancialAccounting→General Ledger→Posting
→ Enter G/L Account Document
Document Date: Current date
Enter the posting items listed below.
2. CallthereportProfitCenter: ActualLineItemsintheinformationsystem
forProfitCenterAccountingandstartthereportwiththeparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-1
in the ReferenceDocument Number field.
a) PCA:
InformationSystem→ReportsforProfitCenterAccounting→Line
ItemReports→ProfitCenter: ActualLineItems
Record type: 0
Version: 0
Controlling area: 1000
Company code: 1000
Posting period: Current period
Fiscal year: Current fiscal year
Referencedocumentnumber: from task 3-1
3. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Listsystemsettingstosupport
your answer.
Answer: ORK2:
ProfitCenterAccounting→ActualPostings→ChooseAdditionalBalance
SheetandP&L Accounts →Choose Accounts
Account156000isenteredandassignedtothedefaultprofitcenter1402.
10,000 EUR was posted to profit center 91## because this is what you
entered manually in the original line item.
20,000EURwaspostedtoprofitcenter1402becausethisprofitcenteristhe
defaultprofitcenterforaccount156000andnomanualprofitcenteraccount
assignment wasspecified in the line item.
Continued on next page
86
©2006SAPAG.Allrightsreserved. 2005/Q2
第 95 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
4. Whichlineitemswerenottransferred? Listsystemsettingstosupportyour
answer.
Answer: Accounts479100and113100werenottransferredtoProfitCenter
Accountingsinceyoudidnotmanuallyenteraprofitcenterintheoriginal
posting. In addition, account 479100 is not entered in table Additional
Balance Sheet and Profit + Loss Accounts. As a result, no default profit
center can be determined.
5. Enter the following CO-relevant posting:
G/L D/C Tax Amount Document Order
Account Code Currency
Cost
Center
430000 Debit 20,000 T92##
430000 Debit 15,000 T91##
415000 Debit V0 2,500 Order
number
Trade
Show
Civil
Engi-
neering
Group
##
415000 Debit V0 1,000 4298
113100 Credit 38,500
Postthedocumentandmakeanoteofthedocumentnumber.
___________________________________
a) Accounting→FinancialAccounting→General Ledger→Posting
→ Enter G/L Account Document.
Document Date: Current date
Enter the posting items listed below.
Continued on next page
87
2005/Q2 © 2006 SAP AG. All rights reserved.
| G/L Account | D/C | Tax Code | Amount | Document Currency Cost Center | Order |
|---|---|---|---|---|---|
| 430000 | Debit | 20,000 | T92## | ||
| 430000 | Debit | 15,000 | T91## | ||
| 415000 | Debit | V0 | 2,500 | Order number Trade Show Civil Engi- neering Group ## | |
| 415000 | Debit | V0 | 1,000 | 4298 | |
| 113100 | Credit | 38,500 |
第 96 页 / 共 339 页
Unit3: ActualData AC610
6. CallthereportProfitCenter: ActualLineItemsintheinformationsystemfor
ProfitCenterAccountingandstartthereportwiththeparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-5
in the ReferenceDocument Number field.
a) PCA:
InformationSystem→ReportsforProfitCenterAccounting→Line
ItemReports→ProfitCenter: ActualLineItems
Record type: 0
Version: 0
Controlling area: 1000
Company code: 1000
Posting period: Current period
Fiscal year: Current fiscal year
Referencedocumentnumber: from task 3-5
7. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Givereasonstosupportyour
answer.
Answer: An amount of 20,000 EUR was posted to profit center 92##
in account 430000 since you entered cost center T92## as the account
assignmentobjectinthelineitem. Profitcenter92##isenteredinthiscost
center master record.
An amount of 15,000 EUR was posted to profit center 91## in account
430000sinceyouenteredcostcenterT91##astheaccountassignmentobject
inthelineitem. Profitcenter91##isenteredinthiscostcentermasterrecord.
Inaddition, an amount of 2,500 EUR was postedto profit center 91## in
account415000sinceprofitcenter91##isenteredintheorderTradeShow
Civil Engineering Group ##.
Anamount of 1,500EURwaspostedtothedummyprofitcenter9999 in
account 415000 since no profit center is entered in the master record of
cost center 4298.
8. Enter the following manual revenue posting:
Continued on next page
88
©2006SAPAG.Allrightsreserved. 2005/Q2
第 97 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
G/L D/C Amountin Tax Profit Profitability
Account Document Code Center Segment
Currency
800000 Credit 15,000 0o 91## Sales
org.
1000
Division
01
800000 Credit 10,000 0o No Sales
entry org.
1000
802000 Credit 5,000 0o No Sales
entry org.
1000
113100 Debit 30,000
Postthedocumentandmakeanoteofthedocumentnumber.
___________________________________________
a) Accounting→FinancialAccounting→General Ledger→Posting
→ Enter G/L Account Document.
Document Date: Current date
Enter the posting items listed below.
9. CallthereportProfitCenter: ActualLineItemsintheinformationsystemfor
Profit Center Accountingandstartthereport withtheparametersRecord
Type0,Version0,ControllingArea1000,CompanyCode1000,current
PostingPeriod,currentFiscalYear,andenterthedocumentfromtask3-8
in the Reference Document Number field.
a) PCA:InformationSystem→ReportsforProfitCenterAccounting→
LineItemReports→ProfitCenter: ActualLineItems
Record type: 0
Version: 0
Controlling area: 1000
Company code: 1000
Posting period: Current period
Fiscal year: Current fiscal year
Referencedocumentnumber: from task 3-8
Continued on next page
89
2005/Q2 © 2006 SAP AG. All rights reserved.
| G/L Account | D/C | Amountin Document Currency | Tax Code | Profit Center | Profitability Segment |
|---|---|---|---|---|---|
| 800000 | Credit | 15,000 | 0o | 91## | Sales org. 1000 Division 01 |
| 800000 | Credit | 10,000 | 0o | No entry | Sales org. 1000 |
| 802000 | Credit | 5,000 | 0o | No entry | Sales org. 1000 |
| 113100 | Debit | 30,000 |
第 98 页 / 共 339 页
Unit3: ActualData AC610
10. WhichlineitemsweretransferredtoProfitCenterAccountingandwhich
profitcentersweredeterminedbythesystem? Givereasonstosupportyour
answer.
a) ORK2: Profit Center Accounting → Actual Postings → Maintain
AutomaticAccountAssignmentofRevenueElements.
Profit center 9000 is defined as the profit center default account
assignment for revenue element 800000.
No profit center default account assignment is defined for revenue
element802000. Anamountof15,000EURwaspostedtoprofitcenter
91##inaccount800000becauseyoumanuallyassignedprofitcenter
91## in the line item.
Anamountof10,000EURwaspostedtoprofitcenter9000inaccount
800000becausethesystemdeterminedtheprofitcenterdefaultaccount
assignmentasnoprofitcenterhadbeenassignedmanually.
Anamountof5,000EURwaspostedtothedummyprofitcenter9999
in account 802000 because neither a manual profit center account
assignmentnoranentryintheprofitcenterdefaultaccountassignment
had been made.
Task 4:
1. Youwanttoobtainanoverallviewofthecostsandrevenuesituationatprofit
centerlevel. Todothis,callthelist-orientatedreportProfitCenterGroup:
Plan/Actual/Varianceintheinformationsystemandstarttheselectionwith
the following parameters:
Field Name Value
Controlling Area 1000
Fiscal Year Current fiscal year
Period 1-12
Plan Version 0
Profit Center GR##
ProfitandLossAccountsGroup 3000000.INT
BalanceSheetAccountGroup 1000000.INT
Whatcanyousayaboutthecurrentrevenuesituationofyourprofitcenter?
_____________________________________________________
Continued on next page
90
©2006SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Value |
|---|---|
| Controlling Area | 1000 |
| Fiscal Year | Current fiscal year |
| Period | 1-12 |
| Plan Version | 0 |
| Profit Center | GR## |
| ProfitandLossAccountsGroup | 3000000.INT |
| BalanceSheetAccountGroup | 1000000.INT |
第 99 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Which posted values with regard to the financial statements can be
determined?
_____________________________________________________
a) PCA:InformationSystem→ReportsforProfitCenterAccounting→
List-OrientatedReports→ProfitCenterGroup: Plan/ActualVariance
What can you sayaboutthecurrent revenue situationof your profit
center?
Bothprofitcenter91##and92##arecurrentlyyieldingaloss.
Which posted values with regard to thefinancial statements can be
determined?
Balancesheetitem156000isdisplayedonprofitcenter91##. This
allowsareturnoninvestmenttobecalculated,basedonthereport
definition,bydividingtheprofitcenterprofitorlossbythefixed
capital.
In thisexample, theprofit or lossisdisplayedby accountgroup
3000000.INT(ProfitandLossStatement),whereasthefixedcapital
isrepresentedbyaccountgroup1000000.INT(Assets).
91
2005/Q2 © 2006 SAP AG. All rights reserved.
第 100 页 / 共 339 页
Unit3: ActualData AC610
92
©2006SAPAG.Allrightsreserved. 2005/Q2
第 101 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Exercise 5: Value Flow from Asset
Accounting
Exercise Objectives
After completingthisexercise, youwillbeableto:
• explain how fixed asset accounts are transferred online to Profit Center
Accounting.
Business Example
Theprofitcentermanagerswanttoseeassetpostingsonlinetotheprofitcenter
withtheaimofdisplayingfinancialkeyfigures. Youchecktherelevantsystem
settingsfortheroadshowtruckwhichhasbeencreatedinassetclass3100.
Task:
You want to transfer balancesheet account postings on assets to Profit Center
Accounting.
1. Hasbalancesheetaccount21000beendefinedforonlinetransfer? Which
defaultprofitcenterisgenerated? Inwhatinstanceisthedefaultprofitcenter
transferred to the line item concerned?
2. Posttheacquisitionoftheassetincompanycode1000inAssetAccounting
under Financial Accounting by executing the acquisition posting with
automatic offsetting entry.
Field Name Values
Existing Asset Asset number of road
show truck ##
Amount Posted 80,000
Document Date Current date
Posting Date Current date
Save the document.
Continued on next page
93
2005/Q2 © 2006 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Existing Asset | Asset number of road show truck ## |
| Amount Posted | 80,000 |
| Document Date | Current date |
| Posting Date | Current date |
第 102 页 / 共 339 页
Unit3: ActualData AC610
3. In the information system for Profit Center Accounting, call the
list-orientatedreportProfitCenterGroup: Plan/Actual/Varianceandstart
the selection with the following parameters:
Controllingarea: 1000
Fiscal Year: Current fiscal
year
Period 1 - 12
Plan Version 0
ProfitCenterValue 91##
Profit and Loss 3000000.INT Profit and loss
AccountsGroup statement
BalanceSheetAccount 1000000.INT Assets
Group
Was the asset posting transferred?
_______________________________________________
Double-click the totals row for account 21000 to go to the report Profit
Center: ActualLineItemsanddisplaytheAssetfieldinthecurrentdisplay
variant. Which asset is in the line item?
_______________________________________________
94
©2006SAPAG.Allrightsreserved. 2005/Q2
第 103 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Solution 5: Value Flow from Asset
Accounting
Task:
You want to transfer balancesheet account postings on assets to Profit Center
Accounting.
1. Hasbalancesheetaccount21000beendefinedforonlinetransfer? Which
defaultprofitcenterisgenerated? Inwhatinstanceisthedefaultprofitcenter
transferred to the line item concerned?
Answer: ORK2: ProfitCenterAccounting→ActualPostings→Choose
AdditionalBalanceSheetandP&LAccounts→ChooseAccounts
Account 21000 isenteredand profit center 9990isdefined asthedefault
profit center.
The system determines the default profit center when a cost center that
doesnothaveaprofit center enteredin itsmaster recordisenteredin the
asset master record.
2. Posttheacquisitionoftheassetincompanycode1000inAssetAccounting
under Financial Accounting by executing the acquisition posting with
automatic offsetting entry.
Field Name Values
Existing Asset Asset number of road
show truck ##
Amount Posted 80,000
Document Date Current date
Posting Date Current date
Save the document.
a) Accounting→Financial Accounting→FixedAssets→Posting→
Acquisition →External Acquisition→Acquis. w/Autom. Offsetting
Entry
Continued on next page
95
2005/Q2 © 2006 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Existing Asset | Asset number of road show truck ## |
| Amount Posted | 80,000 |
| Document Date | Current date |
| Posting Date | Current date |
第 104 页 / 共 339 页
Unit3: ActualData AC610
3. In the information system for Profit Center Accounting, call the
list-orientatedreportProfitCenterGroup: Plan/Actual/Varianceandstart
the selection with the following parameters:
Controllingarea: 1000
Fiscal Year: Current fiscal
year
Period 1 - 12
Plan Version 0
ProfitCenterValue 91##
Profit and Loss 3000000.INT Profit and loss
AccountsGroup statement
BalanceSheetAccount 1000000.INT Assets
Group
Was the asset posting transferred?
_______________________________________________
Double-click the totals row for account 21000 to go to the report Profit
Center: ActualLineItemsanddisplaytheAssetfieldinthecurrentdisplay
variant. Which asset is in the line item?
_______________________________________________
Answer: Scrollinthebalancesheetpostingssection. Theamount posted
waspostedtoaccount21000ofprofitcenter91##.
Double-clickthelineforaccount 21000. Choosethereport Profit Center:
ActualLineItems. YoucanthenseethepostedlineitemsintheSAPList
Viewer. ChooseSettings/Layout/Current. ClicktheAssetfieldinthelist
ofhiddencolumns. Movetheselectedfieldtothelistofdisplayedcolumns.
Transfer by pressing enter. Inthelineitemdisplay, you can see the asset
numberoftheroadshowtruckgroup##intheAssetcolumn.
96
©2006SAPAG.Allrightsreserved. 2005/Q2
第 105 页 / 共 339 页
AC610 Lesson: Data Flow in Financial Accounting
Lesson Summary
You should now be able to:
• understandandcustomizetheprocessfortransferringdatafromFinancial
Accounting
97
2005/Q2 © 2006 SAP AG. All rights reserved.
第 106 页 / 共 339 页
Unit3: ActualData AC610
Lesson: Data Flow from Materials Management
Lesson Overview
YoutransferpostingsfromMaterialsManagementtoProfitCenterAccounting.
Lesson Objectives
After completingthislesson, you will beable to:
• understandandcustomizetheprocessfortransferringdatafromMaterials
Management
Business Example
Outline what effects Materials Management/Logistics-related processes have
in Profit Center Accounting
Figure 41: Purchase order
Theprofitcentertowhichthedatashouldbeposteddependsonwhichmaterials
and which CO objects are involved.
Inthecaseofapurchaseordertowarehouse, theprofitcenteristakenfromthe
material master per purchase order item.
The profit center which is determined is forwarded to the goods receipt for
purchase order.
98
©2006SAPAG.Allrightsreserved. 2005/Q2
第 107 页 / 共 339 页
AC610 Lesson: Data Flow from Materials Management
Figure 42: Goods Receipt for Purchase Order
Whenyoupostapurchaseorder,thesystempoststhegoodsusageimmediately
upongoodsreceiptifthepurchaseorderhasanaccountassignment.
The GR/IR account is the clearing account for goods received and invoices
received.
Thisgivesyouthecostsofthematerialconsumptioninthecorrespondingprofit
centers.
Theappendixcontainsan overviewof special casesof MM-goodsmovements
withdynamicorindirectprofit centerdetermination
99
2005/Q2 © 2006 SAP AG. All rights reserved.
第 108 页 / 共 339 页
Unit3: ActualData AC610
Figure 43: Goods Receipt for Purchase Order
When a goods receipt posting is made, the profit center is always determined
indirectly via the preceding document.
Iftheamountontheinvoiceisdifferentfromthestandardpriceofthematerial
purchased,pricedifferencesarisewhenyouposttheinvoicereceipt. Theseprice
differencesareassignedtotheprofitcenterofthematerialpurchased,provided
that it is a nonassigned purchase order. That is, the price difference was not
created as a cost element
Ifyourpricedifferenceaccountisdefinedasacostelement,theamountisposted
to theprofitcenter ofthecorrespondingCOobject.
Payables and receivables can only be transferred to Profit Center Accounting
periodically(seePeriod-End ClosinginEC-PCA).
100
©2006SAPAG.Allrightsreserved. 2005/Q2
第 109 页 / 共 339 页
AC610 Lesson: Data Flow from Materials Management
Figure 44: Repostings
InternalgoodsmovementsinLogistics(stocktransfers,materialconsumption
for production orders, and so on) can lead to an exchange of goods between
profit centers. To be able to show the material flow correctly in Profit Center
Accounting,youneedtolookattheprofitcenterasanindependentcompany. This
meansthatasaleismadebythesendingprofitcenter,whilethereceivingprofit
center posts a goods receipt.
ThiswayoflookingatpostingsinProfitCenterAccountingcannotbeachieved
based solely on theoriginalposting. Youtherefore needto make anadditional
accountassignment. Usingaccountdeterminationruleswhichyoucandefinein
Customizing,thesystemgeneratesandupdatesadditionalpostinglinesinProfit
CenterAccountingbasedontheoriginaldocument. Thesourcedocumentisnot
changed. ThereforethishasnoeffectonFinancialAccounting. However, note
thattheselinesarealsoupdatedinFinancialAccountingifyourorganizationis
using transfer pricesand the profit center valuation method has been stored in
FI (see the example below).
Forsomegoodsmovements,itdoesnotmakesensetomakeanadditionalposting.
These goodsmovements are given aspecial handling. The table that contains
theseexceptionsisfullymaintainedanddeliveredbySAPinthestandardSAP
system. Youonlyneedtodefinespecialhandlingifyourequirethisformovement
types that you defined yourself.
You enter the accounts that you need in order to represent internal goods
movementsinProfitCenterAccountingforeachcontrollingarea. Theseaccounts
must already bedefinedin Financial Accounting.
101
2005/Q2 © 2006 SAP AG. All rights reserved.
第 110 页 / 共 339 页
Unit3: ActualData AC610
102
©2006SAPAG.Allrightsreserved. 2005/Q2
第 111 页 / 共 339 页
AC610 Lesson: Data Flow from Materials Management
Exercise 6: Data Flow from Materials
Management
Exercise Objectives
After completingthisexercise, youwillbeableto:
• understand howprofit centersaredeterminedfor purchaseordersand the
correspondinggoodsreceiptsandinvoicereceipts
Business Example
In purchasing, purchase orders are also posted to the respective CO account
assignmentobjects. Theyareintendedtoinformthepurchasingmanagerabout
theprofitcenterdetermination. Thefinancialaccountingmanagerisinterestedin
theprofitcenterdeterminationinrelationtogoodsreceiptpostingsandinvoice
receipts for the respective purchase orders.
Task 1:
FirstchecktheprofitcenterassignmentofmaterialM-05inplant1000andthen
createapurchaseorderwithaccountassignmenttothecostcenteradministration.
1. WhichprofitcenterisassignedtomaterialM-05inplant1000?
2. Create a purchase order in Logistics in Purchasing for Materials
Management. The vendor is known.
Field Name Values
Vendor 1000
PurchasingOrganization 1000
Purchasing Group 001
Company code 1000
Enter thefollowingpurchase order Item.
Field Name Values
AccountAssignmentCategory K Cost center
Material M-05
Continued on next page
103
2005/Q2 © 2006 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Vendor | 1000 |
| PurchasingOrganization | 1000 |
| Purchasing Group | 001 |
| Company code | 1000 |
| Field Name | Values |
|---|---|
| AccountAssignmentCategory | K Cost center |
| Material | M-05 |
第 112 页 / 共 339 页
Unit3: ActualData AC610
Field Name Values
PO Quantity 1
Plant 1000
Storage Location 0001
GototheAccountAssignmenttabpageintheitem. EntercostcenterT92##
astheaccountassignmentobject. ConfirmbypressingEnterandcheckthe
entryintheProfitCenterfield. Whichprofitcenterwasassigned?
Savethepurchaseorderandmakeanoteofthepurchaseordernumber.
Task 2:
Enter a goods receipt for purchase order.
1. Enteragoodsreceipt forpurchaseorder intheInventoryManagement of
Logistics. Usethepurchaseordernumberfromtask1-2. ChecktheAccount
Assignment tab page. Which profit center has been determined by the
system? Give reasonsto support youranswer.
Post the goods receipt and make a note of the number of the material
document.
2. IntheinformationsystemforProfitCenterAccounting,calltheinteractive
report Profit Center Group: Plan/Actual/Variance with the following
parameters:
Field Name Values
From Period 1
To Period 12
Fiscal Year Current fiscal year
Continued on next page
104
©2006SAPAG.Allrightsreserved. 2005/Q2
| Field Name | Values |
|---|---|
| PO Quantity | 1 |
| Plant | 1000 |
| Storage Location | 0001 |
| Field Name | Values |
|---|---|
| From Period | 1 |
| To Period | 12 |
| Fiscal Year | Current fiscal year |
第 113 页 / 共 339 页
AC610 Lesson: Data Flow from Materials Management
Field Name Values
Plan Version 0
Values 92##
ProfitandLossAccountsGroup 3000000.INT
Hint: InreportingforProfitCenterAccounting,inadditiontothe
classicReportPainterreportstherearealsodrilldownreportswhich
allowyoutonavigateeasilybetweenreportcharacteristicsandthe
hierarchy displaysof therespectivecharacteristics. Furthermore,
you can definea report interface with the option of branching to
otherreports. Detailedinformationondefiningdrilldownreportsis
given in the Information System unit.
Ifnecessary, expandtheaccounthierarchydowntoaccount410000. Find
theoriginobjectforthispostingbymovingtheaccounttotheOriginObject
characteristic.
___________________________________________
Tofindoutwhichcostcenterishiddenbehindthisposting,youmustbranch
tothelineitems. CallthereportProfitCenter: ActualLineItemsandthen
change the current display variant by displaying the Cost Center field.
Whichcost center isvisiblein the line item?
___________________________________________
Double-clickonthelineitemtoreachthesourcedocument. Whatdocument
is this?
___________________________________________
Task 3:
Enter an MM invoice receipt for purchase order.
1. IntheMaterialsManagementmenu,enteranincominginvoiceforLogistics
Invoice Verification.
EnterthefollowingBasicDatafortheInvoicetransaction:
Field Name Values
Invoice Date Current date
Posting Date Current date
Tax Code IO (0% domestic input
tax)
Continued on next page
105
2005/Q2 © 2006 SAP AG. All rights reserved.
| Field Name | Values |
|---|---|
| Plan Version | 0 |
| Values | 92## |
| ProfitandLossAccountsGroup | 3000000.INT |
| Field Name | Values |
|---|---|
| Invoice Date | Current date |
| Posting Date | Current date |
| Tax Code | IO (0% domestic input tax) |
第 114 页 / 共 339 页
Unit3: ActualData AC610
OnthePOReferencetabpage,enterthepurchaseordernumberfromtask
1-2 and confirm.
Change the tax code to I0 in the item.
Entertheamountfromtheinvoiceiteminthebasicdata. Saveandmakea
note of the document number.
___________________________________________
2. Displaytheinvoicedocument intheFurtherProcessingmenu. Gotothe
follow-on documents.
Which FI posting was generated?
___________________________________________
Wasaprofitcenterdocumentcreated? Givereasonstosupportyouranswer.
___________________________________________
___________________________________________
___________________________________________
106
©2006SAPAG.Allrightsreserved. 2005/Q2