Former Member
Mar 17, 2010 at 07:00 AM
Stock Transport Order with Delivery and Billing Document/Invoice
1278 Views
Follow
RSS Feed
Hi Experts,
Up to now we have use STO without billing/ invoice to Orer items from company A to B ,
and we have used only MM side of STO :
Issue using movement type 351 which create delivery and FI document.
We need now to change the process and make it similar to sales peocess with Delivery and Invoicing process.
Please advise how configurate the system for Stock Transport Order with Delivery and Billing Document/Invoice
1. STO - Compny A order item from Company B
2. Delivery from B to A
3. Billing/ issue Invoive from company B to company A
Thanks,
Moshe
Add a Comment
Alert Moderator
Actions
I Have a Similar Question
Assigned Tags
SD (Sales and Distribution)
Similar Questions
Stock tarnsport order
sachin aroraJul 25, 2007
Intercompany Stock Transport order
Former MemberJul 08, 2007
2 Answers
Sort by:
Votes
Newest
Oldest
1
ERHAN YAZICI
Mar 17, 2010 at 08:43 AM
hi Moshe Stein ,
please follow this link,
[http://help.sap.com/bp_bl604/BBLibrary/Documentation/134_BB_ConfigGuide_EN_DE.doc]
best regards,
Add a Comment
Alert Moderator
Share
2 comments
Former Member
Mar 18, 2010 at 03:14 PM
Stock Transfer Orders comes into picture when the stock is moving / Transferring between two different plants with two Different Company Codes or Stock Transfer between two plants with One Company Code the Difference are given below:
Stock Transfer between Two Plants with One Company code.
The Purchase Order Type is Used in this case is "UB".
And the Delivery Type Used here is "NL".
Goods Movement type: 641
Item Category in delivery is NLN
STPO: - Stock Transfer Purchase Order u2013 Inter Company
Stock Transfer Purchase Orders between Two Plants with Two Different Company Codes.
The Purchase Order Type is Used in this case is "NB".
And the Delivery Type Used here is "NLCC".
Goods Movement type: 643
Item Category in delivery is NLC
A. Configure Intercompany Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
Billing (Intercompany pricing conditions should be set).
Hope these steps help you in getting the desired results.
regards
Sai
Like 0
Share
Alert Moderator
Add a Comment
Show all
0
Former Member
Mar 17, 2010 at 07:05 AM
Hi,
See below link
http://help.sap.com/saphelp_47x200/HELPDATA/EN/4d/2b911d43ad11d189410000e829fbbd/frameset.htm
Kapil
Add a Comment
Alert Moderator
Share
2 comments
Former Member
Mar 17, 2010 at 07:17 AM
Hi Kapil ,
I saw this one but this is only overview definition.
We need step by step the configuration in IMG ,
It seems to be a standard SAP process .
Regards,
Moshe
Like 0
Share
Alert Moderator
Former Member
Mar 17, 2010 at 08:25 AM
Check the below configuration Steps :-
1.Define Shipping Data for Plants u2013here which plant we should give receiving plant or supp plant?
In the supplying plants details its own sales area
In the Receiving plants details its own sales area + the internal customer no
This assignment will only decide the shipping tab to appear in PO
2. Assign Delivery Type and Checking Rule-here which plant will give
Supplying plant (because the Availabilty check has to happen in supplying plant only)
Checking rule shoule be B that is SD delivery
3. In availability check wt are the field we should activate?
In OVZ9 you need to activate the settings for the checking group in MMR + for checking rule B
4. Create Customer for Supplying Plant in XD01 with the Same Sales Area as mentioned in the Configuration.
Best Regards,
Ankur
Like 0
Share
Alert Moderator
Add a Comment
Former Member
Jan 29, 2009 at 10:06 AM
STEPS FOR STOCK TRANSPORT ORDER
5380 Views
Follow
RSS Feed
STEPS FOR STOCK TRANSPORT ORDER
Add a Comment
Alert Moderator
Actions
I Have a Similar Question
Assigned Tags
SD (Sales and Distribution)
SAP ERP
Similar Questions
urgently ..
Former MemberMay 30, 2007
STO WITH 351 MOVEMENT TYPE
Former MemberJun 22, 2009
4 Answers
Sort by:
Votes
Newest
Oldest
1
Former Member
Jan 29, 2009 at 10:10 AM
Hello,
Configure Inter company Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
Purchase Order -> Setup stock transport order -> assign the internal customer to the
ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
document.
Billing (Intercompany pricing conditions should be set).
AND
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
NLCC)
4. PO type (which i believe you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
***and by the way for the Invoice to work between Cross-Company Plants, you need
also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
--
STO:
STO CONFIG:
The following steps have to be followed in order to configure stock transport order
between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007
via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the
route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing
procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area.
Similarly select the receiving plant and assign the company code and sales area (The
company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the
receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data
creation.
Stock transfer between two plants in deffernet company codes is known as inter company
stock transfer.
Material shoud be maintained in both supplying and receiving plant MM01
Sotck should maintain only in supplying plant MB1C
Create receving plant as a customer in suplying plants company code and sales area
XD01
Assign this customer number in receving plant detials OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery tupe NB for in combination of supplying/ receving plants.
Create STO ME21N
As it is normal there in the item details wer should get shipping date i.e customer number
Go for Deliveryy VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated....
Add a Comment
Alert Moderator
Share
0
Former Member
Jan 29, 2009 at 10:11 AM
Hi,
STO is Stock Transport order. It is used for inter company transfer of goods. Plant to plant transfer and even transferring raw material to Third party contractors (Job Work).
The Process is you create a STO do delivery against the STO and create a Billing Document against the STO.
Procedure for configuring the Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
Tcode : OMGN
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assaign the supply source ( Delivering Plant).
Create a puchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assaign the purchase order number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
Billing (Intercompany pricing conditions should be set).
Thanks
Add a Comment
Alert Moderator
Share
0
Sushant Krishen
Jan 29, 2009 at 10:15 AM
Hi
you can also search for this OSS note apart form the input povided by our experts.
Note 109254 - Customizing stock transport order Cross Company.
thanks
Sushant
Add a Comment
Alert Moderator
Share
0
Former Member
Jan 29, 2009 at 10:55 AM
Dear Prasad,
Cross Company Stock Transport Orders
--> Configure using transaction OMGN.
--> Depending upon the sending and receiving plants, maintain sales organization and customer data in customizing.
--> Maintain the supplying plant as a vendor and attach the plant to the vendor in the Vendor Master.
--> Material type has to be HALB or HAWA.
--> Ensure that the company with sales Organization has a plant to take care of stocking.
--> The PO used is NB and not Stock Transfer PO.
Configure SD for inter-company billing to enable picking up the pricing procedure for billing.
--> Carry Out delivery through process delivery due list and billing through process billing due list.
Otherwise, You need to configure your Stock Transport Order settings for your Cross-Company:
Business Transaction to work with:
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
4. PO type (which i belive you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Compnay Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
SPRO >Sales and Distribution >InterCompany Billing-->Define Internal Customer No. by Sales Org
Important: For the Invoice to work between Cross-Compnay Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure.
Also, Check with:
[Configuring the Stock Transport Order|http://www.sap-basis-abap.com/mm/configuring-the-stock-transport-order.htm]
[Configure Intercompany Stock Transport Order|http://www.sap-img.com/sap-sd/configure-intercompany-stock-transport-order.htm]
Best Regards,
Amit
Add a Comment
Alert Moderator
Share
Goods in transit using 107 & 109 mvmt types
4196 Views
Follow
RSS Feed
Dear All,
As per our business requirement we are using movement types 107 and 109.
When I post with 107 into valuated GR-blocked stock when the ship is loaded,Inspection lot is created. We do UD with Accepted and Invoice payment down without stock transfer, then we do 109, again Inspection lot is created. now we are doing stock transfer to own stock.
Our client requirement is
1. Dont want stock transfer tab for lot created by 107. but required for 109.
2. Or while doing 109, no inspection lot generate.
3. dont require two inpsection lots from 107 and 109.
Regards
Add a Comment
Alert Moderator
Actions
I Have a Similar Question
Assigned Tags
PLM Quality Management (QM)
SAP ERP
Similar Questions
LSMW
Former MemberAug 10, 2007
diff. b/w 103 and 107 mvt types
Former MemberJul 05, 2012
5 Answers
Sort by:
Votes
Newest
Oldest
0
Former Member
Jul 15, 2013 at 06:46 AM
Attach the screen shot of Material Master Inspection type assignment.
Also, check the configuration IMG - Quality Management - Quality Inspection - Inspection Lot creation - Inspection for goods movements - Deactivate Quality Inspection for a movement type
Try deactivating the Inspection for 107 movement type.
Add a Comment
Alert Moderator
Share
4 comments
Former Member
Jul 15, 2013 at 08:00 AM
Only with 109, stock will be updated in terms of qty. That's the reason, I have mentioned not to deactivate for 109.
I can't simulate your process to give you the complete details. I have asked you to try the process by deactivating for 107.
Also, for what reason, you are not using 101 movement type with Quality Inspection stock??? Why do you want to go for 107 & 109??
Please give the business requirement which made you to choose this process.
Like 1
Share
Alert Moderator
Add a Comment
Show all
0
Arijit Banerjee
Dec 15, 2014 at 12:36 PM
Hi There,
As Maheswaran correctly suggested that MvT 109 is stock-relevant and MvT 107 is not stock relevant, hence you should check to deactivate QM in MvT 107 only. There is no QM config available to stop inspection lot creation for MvT 107.
Hence you can go to Tx - OMJJ for MvT 107, use the node "Deactivate QM Inspection / delivery category", by adding MvT 107 for movement indicator "B" (PurOrd) and tick the check box "QM not active".
After that you can check your business process and you should be able to get only one inspection lot for MvT 109 for your downstream processing.
Pls check and let me know if this helps. Anyone else looking into this thread, please also let me know your feedback as well.
Thanks,
Arijit Banerjee
Add a Comment
Alert Moderator
Share
0
Arijit Banerjee
Dec 15, 2014 at 12:41 PM
Please find the attachment to deactivate QM form MvT 107. This should help you.
Attachments
Deactivating_QM_in_MvT_107_without_impacting_QM_in_MvT_109.xml (415.3 kB)
Add a Comment
Alert Moderator
Share
0
Xavier Covis
Dec 15, 2014 at 12:48 PM
Hello Mr SAP PP,
If your logic of steps are particular check if the following Userexit can help you.
http://wiki.scn.sap.com/wiki/display/PLM/QAAT0001+Do's+and+Don'ts
Regards,
Xavier
Add a Comment
Alert Moderator
Share
0
Former Member
Dec 18, 2014 at 10:33 AM
Hi,
When user checks the confirmation control key during the intercompany PO creation, then an inbound delivery is expected for receiving at the receiving site. So while doing VLPOD the system will put the stock into ‘107’ To Val. GR Blocked stock where QM is not required. After that stock is received by ‘109’ movement type – From GR Block Stock. So basically this is a mistake from user side which leads to the two movement type ‘107 and 109 ‘ instead of single movement type 101.
1) Either user should be trained not to check the confirmation control key during intercompany STO creation.
2) Or to deactivate the ‘107’ movement type for Inspection control.
To Deactivate ‘107’ movement type for Inspection control
SPRO-->img-->Quality Management-->Quality Inspection-->Inspection Lot creation-->Inspection for Goods Movement-->Deactivate Quality Inspection for a Movement Type
check QM not active for 107 mvt type.