2178936 - Change of plan activity price in transaction KP26 is not considered in new confirmation postings

作者:郑德鼎 约 3 分钟阅读 更新日期:2024-02-22 2 年前更新 标签:PP, 生产

2178936 - Change of plan activity price in transaction KP26 is not considered in new confirmation postings

SAP Knowledge Base Article, Version: 7, Released On: 25.06.2018

Show Changes

ComponentCO-PC-ACT

PriorityNormal

CategoryProblem

Release StatusReleased to Customer

Symptom

The plan activity price has been changed in transaction KP26 (Cost Center Accounting). The new plan activity price is not considered during new confirmation postings (e.g. CO11N).

Environment

Financial Accounting (FI)

Controlling (CO)

SAP R/3

SAP R/3 Enterprise 4.7

SAP ERP Central Component

SAP ERP

SAP enhancement package for SAP ERP

SAP enhancement package for SAP ERP, version for SAP HANA

Reproducing the Issue

Enter transaction KP26.

Fill in input parameters.

The new plan activity price is not considered during new confirmation postings.

Cause

The activity update in the plant is '2' means that the activity update is relevant to price determination. Therefore, the plan price that is used for the first confirmation in a period is written to the Material Ledger table CKMLLACR and is used for all other confirmations in that period. This price is “frozen” in table CKMLLACR. The plan activity price needs to be stable during one period. Customizing path: Controlling - Product Cost Controlling - Actual Costing/Material Ledger - Actual Costing - Activate Actual Costing:

Resolution

The plan price still can be changed in the Cost Center Accounting transactions (e.g. KP26) as it might be also used in plants where the Material Ledger is not active. However, the change in KP26 does not have any effect on the activity plan price that is used in the plant where the Material Ledger is active.

This is not an inconsistency but the design of the system with activity update '2'. The price that has been used for the first confirmation can be displayed via the transaction CKMLLA. At the end of the period, the differences between plan activity price and actual activity price are distributed directly to the materials in step “Multilevel price determination” in transaction CKMLCP or CKMLCPAVR.

See Also

KBA 2189173 - How to consider the changed plan activity price in KP26 during new confirmation postings when Material Ledger is active?

Keywords

MLKBA CO11 Leistungsartenfortschreibung Preisermittlung Plantarif Tarifänderung eingefroren CO15N CORK COR6N KB21N CKMLCP CKM3 CKM3N activity type types CKMLLA CKMLLASHOW update KSBT actual price delta KSII  CON2 revaluation multilevel multi-level multi level CKMLQS CO-PC-ACT Actual Costing Material Ledger ML error KBA

Products

References

This document refers to

This document is referenced by

Attributes

Available Languages

日本語 (Machine Translation)

Português (Machine Translation)

Español (Machine Translation)

中文 (Machine Translation)

Français (Machine Translation)

Italiano (Machine Translation)

Русский (Machine Translation)

한국어 (Machine Translation)

Deutsch (Machine Translation)

Rate this document

Was this KBA helpful?

Yes

No

| Products | |

| SAP ERP Central Component all versions | |

| SAP ERP all versions | |

| SAP R/3 Enterprise all versions | |

| SAP R/3 all versions | |

| SAP enhancement package for SAP ERP all versions | |

| SAP enhancement package for SAP ERP, version for SAP HANA all versions | |

| SAP Note/KBA | Component | Title | |

| 2189173 | CO-PC-ACT | How to consider the changed plan activity price in KP26 during new confirmation postings when Material Ledger is active? | |

| SAP Note/KBA | Component | Title | |

| 2985174 | CO-PC-ACT | Activity type cost component split in App Material Price Analysis is not as expected. | |

| 2189173 | CO-PC-ACT | How to consider the changed plan activity price in KP26 during new confirmation postings when Material Ledger is active? | |

| Key | Value | |

| Other Components | CO-OM-ACT (Activity Types) | |

郑德鼎

关于作者:郑德鼎

企业信息化与 SAP 技术顾问,长期专注 SAP ABAP、FI/CO、MM、SD 等模块的技术分享与实战经验总结。查看更多介绍

来源说明:本文内容由「2178936 - Change of plan activity price in transaction KP26 is not considered in new confirmation postings.docx」整理生成,仅用于内部技术分享与学习交流。